sbca weekly newsletter

72
WEEKLY NEWSLETTER May 2, 2012 Volume 18 Issue 18 Santa Barbara Contractors Association Celebrating Over 60 Years of Service to the Community In This Issue The Sword and the Shield Page 1 Calendar Highlights Page 2 Tailgate Safety Topic Page 7 Kalb’s Q & A for Contractors Page 14 SBCA Golf Tournament Page 16 SBCA Online Planroom Report Page 20 SB City Building Permits Page 35 South County Building Permits Page 38 North County Building Permits Page 55 SBCA Ad Rates for 2012 Page 68 We protect the people who build California. Will my supplies be here on time? Am I going to get this bid? We understand those on the job in California have more on their mind than workers’ compensation insurance. So let us put your mind at ease: you can count on the strength and stability of State Fund. We’ve never pulled out of the market due to an economic downturn, and we never will. Visit statefundca.com today to learn about the 6% discount on premiums we offer eligible SBCA members. Your individual business may be eligible for even more discounts. Thanks for reading…we’ll let you get back to work. Together, we’ll help keep California working. www.statefundca.com Ask for SBCA Group #821 The Sword and the Shield By Sam K. Abdulaziz & Kenneth S. Grossbart When you bid on a job you need to understand what work is involved, what materials you will use, and what subcontractors or material sup- pliers you will be using. But do you understand the rest of the contract? In the Greg Opinski Con- struction, Inc. v. City of Oakdale case, it is seen why it is important to have a complete under- standing of what is in your contract. This matter went to trial for various other issues, but the is- sue at hand in the appeal is all that is discussed for purposes of this article. This particular case came about because of sev- en months of job delays, unapproved change orders, construction defects and non-payment. The contract called for the job to be completed within 300 days. It laid out very specific change order procedures for which either the contract time or price could be changed. There were two acceptable avenues to have a change order ac- cepted. The first was execution of the change order by mutual agreement in writing. In other words, the contractor determines that a change order is necessary and submits the written change order to the City, which in turn approves and signs the change order making it an accept- ed change order. The second way was to ask the engineer for a formal decision on the requested change order and to give written notice of the claim to not only the engineer but the other party no later than 30 days after the event of the occurrence. To clarify this, if a change order that the contractor submitted to the City was not ac- cepted (signed), the contractor could petition the engineer for a decision with respect to that same change order, if it is done within 30 days of the need for that change order first being real- ized, and the City was also notified in writing of the petition. The liquidated damages were $250 per day for those days after the 300 in the contract. The proj- ect was 7 months late. The City refused to pay almost $200,000 towards the balance of the con- tract and change orders, which the City refused to approve, and kept the funds in retention. The City also alleged defective conditions. During tri- al, it was determined that the cause for the delay was actually the fault of the City, not the contrac- tor. However, the City still claimed that the liqui- dated damages were due it because Opinski not only did not submit a change order for the time increase to finish the job, but Opinski also did not submit a claim to the engineer for the time increase or the other change orders that the City refused to approve. After careful review of the contract documents, prior case law, and statutes, the court ruled in favor of the City for $54,000 plus interest, and just over $3,000 for the defects. The court fur- ther stated that the City withholding the monies in retention was reasonable because it was al- lowed to withhold up to 150% of the amount in SBCA GOLF TOURNAMENT Monday May 14, 2012 Shot Gun Start 10am Glen Annie Golf Club Sign Up Today! Register online www.sbcontractors.org Continued on page 14

Upload: april-ford

Post on 23-Mar-2016

219 views

Category:

Documents


1 download

DESCRIPTION

SBCA Weekly Newsletter

TRANSCRIPT

Page 1: SBCA Weekly Newsletter

WEEKLY NEWSLETTER May 2, 2012 Volume 18 Issue 18

Santa Barbara Contractors Association Celebrating Over 60 Years of Service to the Community

In This IssueThe Sword and the Shield Page 1Calendar Highlights Page 2Tailgate Safety Topic Page 7Kalb’s Q & A for Contractors Page 14SBCA Golf Tournament Page 16SBCA Online Planroom Report Page 20SB City Building Permits Page 35South County Building Permits Page 38North County Building Permits Page 55SBCA Ad Rates for 2012 Page 68

We protect the people who build California.

Will my supplies be here on time? Am I going to get this bid? We understand those on the job in California have more on their mind than workers’ compensation insurance. So let us put your mind

at ease: you can count on the strength and stability of State Fund. We’ve never pulled out of the market due to an economic downturn, and we never will. Visit statefundca.com today to learn about

the 6% discount on premiums we offer eligible SBCA members. Your individual business may be

eligible for even more discounts. Thanks for reading…we’ll let you get back to work.

Together, we’ll help keep California working.www.statefundca.comAsk for SBCA Group #821

The Sword and the ShieldBy Sam K. Abdulaziz & Kenneth S. Grossbart

When you bid on a job you need to understand what work is involved, what materials you will use, and what subcontractors or material sup-pliers you will be using. But do you understand the rest of the contract? In the Greg Opinski Con-struction, Inc. v. City of Oakdale case, it is seen why it is important to have a complete under-standing of what is in your contract. This matter went to trial for various other issues, but the is-sue at hand in the appeal is all that is discussed for purposes of this article.

This particular case came about because of sev-en months of job delays, unapproved change orders, construction defects and non-payment. The contract called for the job to be completed within 300 days. It laid out very specific change order procedures for which either the contract time or price could be changed. There were two acceptable avenues to have a change order ac-cepted. The first was execution of the change order by mutual agreement in writing. In other words, the contractor determines that a change order is necessary and submits the written change order to the City, which in turn approves and signs the change order making it an accept-ed change order. The second way was to ask the engineer for a formal decision on the requested change order and to give written notice of the claim to not only the engineer but the other party no later than 30 days after the event of the occurrence. To clarify this, if a change order that the contractor submitted to the City was not ac-

cepted (signed), the contractor could petition the engineer for a decision with respect to that same change order, if it is done within 30 days of the need for that change order first being real-ized, and the City was also notified in writing of the petition.

The liquidated damages were $250 per day for those days after the 300 in the contract. The proj-ect was 7 months late. The City refused to pay almost $200,000 towards the balance of the con-tract and change orders, which the City refused to approve, and kept the funds in retention. The City also alleged defective conditions. During tri-al, it was determined that the cause for the delay was actually the fault of the City, not the contrac-tor. However, the City still claimed that the liqui-dated damages were due it because Opinski not only did not submit a change order for the time increase to finish the job, but Opinski also did not submit a claim to the engineer for the time increase or the other change orders that the City refused to approve.

After careful review of the contract documents, prior case law, and statutes, the court ruled in favor of the City for $54,000 plus interest, and just over $3,000 for the defects. The court fur-ther stated that the City withholding the monies in retention was reasonable because it was al-lowed to withhold up to 150% of the amount in

SBCA GOLFTOURNAMENT

Monday May 14, 2012

Shot Gun Start 10am

Glen Annie Golf Club

Sign Up Today!Register online

www.sbcontractors.org

Continued on page 14

Page 2: SBCA Weekly Newsletter

2

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

MAY 2012SBCA Board of Directors MeetingMay 1, 2012 from 5:00pm to 7:00pmLocation: SBCA, 914 A Santa Barbara Street

SBCA Online Planroom TrainingMay 2, 2012 from 10:00am to 11:00amLocation: SBCA, 914 A Santa Barbara Street

Built Green OrientationMay 3, 2012 from 9:00am to 10:00amLocation: Built Green Resource Center,914 A Santa Barbara Street

SBCA Golf TournamentMay 14, 2012 Shot Gun Start 9:00amLocation: Glen Annie Golf Club,405 Glen Annie Rd, Goleta

Builder of the Year Entry Packet DueMay 21, 2012 at 12:00 noonLocation: SBCA, 914 A Santa Barbara Street

Green Building Education SeriesPresented by Paul Poirier, USGBC C4May 21, 2012 from 12:00pm to 1:30pmLocation: Built Green Resource Center,914 A Santa Barbara Street

emPowerSBC Homeowner WorkshopContractors come and meet homeowners!May 21, 2012 from 5:30 tp 7:30pmLocation: SBCA, 914 A Santa Barbara Street

Mechanics Lien SeminarPresented by Mark Coffin, Hardin & Coffin LLPMay 22, 2012 from 9:00am to 11:00amLocation: SBCA, 914 A Santa Barbara Street

SBCA Office Closed Memorial Day HolidayMay 28, 2012

JUNE 2012Green Building Education SeriesPresented by Paul Poirier, USGBC C4June 4, 2012 from 12:00pm to 1:30pmLocation: Built Green Resource Center,914 A Santa Barbara Street

SBCA Board of Directors MeetingJune 5, 2012 from 5:00pm to 7:00pmLocation: SBCA, 914 A Santa Barbara Street

Calendar Highlights

Need to find out what’sgoing on?

Visit us online for a complete listof events, classes, trainings at

www.sbcontractors.org

SBCA Online Planroom TrainingJune 6, 2012 from 10:00am to 11:00amLocation: SBCA, 914 A Santa Barbara Street

Built Green OrientationJune 6, 2012 from 9:00am to 10:00amLocation: Built Green Resource Center,914 A Santa Barbara Street

Emerge Leadership WorkshopJune 9 - 10, 2012 All DayLocation: Built Green Resource Center,914 A Santa Barbara Street

Green Building Education SeriesPresented by Paul Poirier, USGBC C4June 11, 2012 from 12:00pm to 1:30pmLocation: Built Green Resource Center,914 A Santa Barbara Street

1st Aid CPR Training & CertificationInstructor, Justin Haagen, Safety MattersJune 26, 2012 from 8:30am to 1:30pmLocation: SBCA, 914 A Santa Barbara Street

Quickbooks Training for ContractorsInstructor Monica Dittrich-SummersJune 27, 2012 from 10:00am to 11:00amLocation: SBCA, 914 A Santa Barbara Street

JULY 2012SBCA Office Closed Fourth of July HolidayJuly 4, 2012

SBCA Board of Directors MeetingJuly 10, 2012 from 5:00pm to 7:00pmLocation: SBCA, 914 A Santa Barbara Street

SBCA Online Planroom TrainingJuly 11, 2012 from 10:00am to 11:00amLocation: SBCA, 914 A Santa Barbara Street

Built Green OrientationJuly 12 2012 from 9:00am to 10:00amLocation: Built Green Resource Center,914 A Santa Barbara Street

EPA Lead Paint RRP TrainingPresented by Criterion EnvironmentalJuly 17 2012 from 7:30am to 5:00pmLocation: SBCA, 914 A Santa Barbara Street

Construction Contracts SeminarPresented by Chris Haskell of Price, Postel, & ParmaJuly 24 2012 from 9:00am to 11:30amLocation: SBCA, 914 A Santa Barbara Street

SBCA Builder of the Year Awards BanquetJuly 30, 2012 from 6:00pm to 9:00pmLocation: Fess Parkers Doubletree Resort, 633 East Cabrillo Blvd., Santa Barbara

Page 3: SBCA Weekly Newsletter

3

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Thank you To our SponSorS!

Monday May 14, 2012Glen Annie Golf Club

Get ready for the action!Million $ Hole In One

Putting Contest, Closest to Pin, Longest Drive

Register by April 30, 2012 to receive special discount price $175 per golfer.

Go to www.sbcontractors.org and register today, and moreinfo and details on page 18 of this newsletter. Check it out!

SBCA 16th Annual Golf Tournament

Title Sponsor Double Platinum Sponsor

Golden Tee Sponsor:american riviera Bank

Silver Shot Sponsors:Insulate SB, Inc.MarBorg Industries

Photo Sponsor:ServiceMaster Anytime

Golfer Awards Sponsor:Buena Tile + Stone

Hole Contest Sponsors:Criterion EnvironmentalSierra Pacific Windows Breakfast Sponsor:State Compensation Insurance

Tee Sign Sponsors:Action Roofingallstate - olivares InsuranceBedrock Building SuppilesHanson AggregatesHardin & Coffin LLPhuB Internationalkenney ConstructionMckean Construction

Santa Barbara Stone

Raffle Sponsors:

ARC ReprographicHardin & Coffin LLPSanta Barbara StoneState Compensation Insurance

Page 4: SBCA Weekly Newsletter

4

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 5: SBCA Weekly Newsletter

5

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

You are invited to the Emerge Leadership Workshop A two-day intensive "life-altering" workshop for business and community leaders called to create a society where sustainable buildings are the norm.

Dates: June 9-10, 2012 Location: Built Green Resource Center 914A Santa Barbara Street Santa Barbara, CA 93101 Register: http://emergeleadership.net/emerge/events/elw

santabarbara/ Register by April 30th to take advantage of

early bird discounts. Additional discount for Built Green members.

Sponsors: SBCA Education Foundation

Built Green California O'Brien & Company

Learn more: www.emergeleadership.net/emerge

Gain Knowledge About the Psychology and Science of Change

Acquire New Leadership Skills & Tools

Be Inspired by Stories of Emergent Leadership

Build a Leadership Community Focused on Principles Over Personality

Page 6: SBCA Weekly Newsletter

6

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

We protect the people who build California.

Will my supplies be here on time? Am I going to get this bid? We understand those on the job in California have more on their mind than workers’ compensation insurance. So let us put your mind

at ease: you can count on the strength and stability of State Fund. We’ve never pulled out of the market due to an economic downturn, and we never will. Visit statefundca.com today to learn about

the 6% discount on premiums we o�er eligible GSBE members. Your individual business may be eligible for even more discounts. Thanks for reading…we’ll let you get back to work.

Together, we’ll help keep California working.statefundca.com

Member of Golden State Builders Exchanges

State Compensation Insurance Fund is not a branch of the State of California.

First ImpressionsAre Priceless!

First ImpressionsAre Priceless!

Hayward Design Center606 Olive Street

Santa Barbara, CA 93101(805) 965-7772

Goleta, CA 93117(805) 964-7711

. Architectural Mouldings

. Bathroom Cabinets

. Door Hardware

. Doors & Windows

. Kitchen Cabinets

. Lumber

. FSC-Certified Trusses

HAYWARDSO YOU CAN BUILD.

www.haywardlumber.com

Page 7: SBCA Weekly Newsletter

7

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

P.O. Box 23409 Santa Barbara, CA 93121 805-884-1100 phone 805-884-1108 fax www.sbcontractors.org [email protected]

LADDERS - MAKE LADDER SAFETY A HIGH PRIORITY

Many work site injuries are caused by accidents involving ladders that are not placed or used safely. Following these safety guidelines can

help prevent ladder accidents.

Before using any ladder, check its condition. Make sure there are no broken, cracked, or missing rails and that rungs are not slippery from

grease or oil. Check for damage or corrosion on metal ladders. If a ladder is in poor condition, don’t use it. Report the problem so it can be

tagged and repaired. A competent person should periodically inspect all ladders and remove damaged ladders from use until they are

repaired.

When choosing and using a ladder, keep the following in mind:

Choose the appropriate type and size ladder for the job, including correct fittings, and safety feet.

Near electrical conductors or equipment, use only ladders with non-conductive side rails.

Set the ladder on solid footing, against a solid support.

Place the base of a straight ladder out away from the wall or edge of the upper level about one foot for every four feet of vertical

height.

Be sure straight ladders are long enough so that the side rails extend above the top support point by at least 36 inches.

Single cleat job-made ladders should be 15 to 20 inches wide with ladder cleats uniformly spaced 12 inches apart.

Never try to increase the height of a ladder by standing it on other objects, such boxes or barrels, or by splicing two ladders

together.

Portable ladders should be tied, blocked or otherwise secured against movement.

Keep ladders away from doorways or walkways, unless they can be protected by barriers.

Keep the area around the top and base of the ladder clear. Don’t run hoses, extension cords, or ropes on a ladder; these may

create obstructions.

To avoid slipping on a ladder, check your shoes for oil, grease, or mud and wipe it off before climbing.

Climb the ladder carefully, facing it and using both hands. Use a tool belt or hand line to carry materials.

Most ladders are designed to hold only one person at a time. Two persons may cause the ladder to fail or be thrown off balance.

Don’t lean out to the side when you’re on a ladder. If something is out of reach, get down and move the ladder.

Ladders should never be used sideways as platforms, runways or scaffolds.

Choosing and using ladders wisely is a step in the right direction.

Courtesy of the State Compensation Insurance Fund

Visit www.statefundca.com today to learn about the 6% discount on premiums we offer eligible SBCA members.

Your individual business may be eligible for even more discounts. Ask for Santa Barbara Contractors Association Group 821. For more tailgate, and other safety topics please visit us online.

The above evaluations and/or recommendations are for general guidance only and should not be relied upon for legal compliance purposes. They are based solely on the information provided to us and relate only to those conditions specifically discussed. We do not make any warranty, expressed or implied, that your workplace is safe or healthful or that it complies with all laws, regulations or standards.

Tailgate Safety Topic

Page 8: SBCA Weekly Newsletter

8

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Law Offices of Barton C. Merrill Trial Attorney and Counselor at Law

_______________________________________________________________

Specializing in Construction Law __________________________________________

Construction Litigation, including Mechanic’s Liens & Stop Notices Administrative Hearings before CalOSHA and the CSLB

Corporation & Partnership Agreements Contract Drafting & Review

_______________________________________________________________

Since 1989 Barton Merrill has represented contractors & design professionals in the Tri-Counties with all phases of construction.

_______________________________________________________________

225 E. Carrillo St., Suite 305 Santa Barbara, CA, 93101

(805) 750-0910 – Tel. (805) 564-8281 – FAX

[email protected]

FREE INITIAL CONSULTATION FOR SBCA MEMBERS

Expanding Our Office On the Central CoastPhilip E. Vega, President of Contractors & Developers Bonding is proud to announce the appointment of Myrna Smith, as Associate Vice President. She will be joining Jadon Smith, Vice President, and Manager of the new office in Pismo Beach.Contractors & Developers Bonding specializes in providing surety bonds to contractors and other surety clients. The largest independently owned, surety only broker in the western states, C&D bonding has over 80 years combined surety experience.

Let us know how we can assist with your surety bond needs

575 Price Street, #207 Pismo Beach, CA 93449 805-343-7434 www.cndbonding.com

Here to Assist with Your Surety Bond Needs

Myrna Smith, Associate Vice PresidentJadon Smith, Vice President

Now in Pismo Beach!

Page 9: SBCA Weekly Newsletter

9

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

P.O. Box 23409 Santa Barbara, CA 93121 805-884-1100 phone 805-884-1108 fax www.sbcontractors.org [email protected]

ESCALERAS - ORTOGUE ALTA PRIORIDAD A LA SEGURIDAD EN EL USO DE ESCALERAS

Muchas lesiones en el sitio de trabajo son causadas por accidentes que involucran escaleras que no están colocadas ni se util izan con seguridad. Siga las pautas de seguridad que se definen a continuación para ayudar a evitar accidentes.

Antes de usar cualquier escalera, verifique el estado de la misma. Asegúrese de que no haya rieles rotos, agrietados ni sueltos y que los peldaños no estén resbaladizos por la presencia de grasa ni aceite. Verifique que no existan daños ni corrosión en las escaleras metálicas. Si una escalera está en malas condiciones, no la use. Reporte el problema para que éste pueda ser etiquetado y reparado. Una persona competente debe inspeccionar sistemáticamente todas las escaleras y poner fuera de uso las escaleras dañadas hasta que éstas sean reparadas.

Al seleccionar y utilizar una escalera, tenga en mente lo siguiente.

Elija el tipo y tamaño de escalera apropiados para el trabajo, incluyendo los accesorios apropiados y las patas de seguridad. Cerca de conductores o equipos eléctricos; utilice únicamente escaleras con rieles laterales no conductores. Coloque la escalera sobre una fundación sólida y apóyela contra un soporte sólido. Entre la base de una escalera recta y la pared o borde de nivel superior debe existir una separación de aproximadamente un pie

horizontal por cada cuatro pies de altura. Asegúrese de que las escaleras rectas sean lo suficientemente largas para que los rieles laterales se extiendan una longitud

mínima de 36 pulgadas por encima del punto superior de apoyo. Las escaleras hechas en el trabajo de un sólo listón de escala deben tener una anchura mínima de 15 a 20 pulgadas con listones

de escala separados vertical y uniformemente por 12 pulgadas. Nunca intente aumentar la altura de una escalera colocándola sobre otros objetos, tales como cajas o barriles, ni empalmando

dos escaleras entre sí. Las escaleras portátiles deben atarse, bloquearse o sujetarse de alguna otra manera para evitar el movimiento. Mantenga las escaleras alejadas de puertas de acceso o pasillos a menos que éstas puedan protegerse con barreras. Mantenga despejada el área alrededor de la parte superior y la base de la escalera. No pase mangueras, extensiones eléctricas

ni sogas a través de la escalera; éstos pueden crear obstrucciones. Para evitar resbalarse en una escalera, compruebe que las suelas de sus zapatos no contengan aceite, grasa ni arcilla y límpielas

antes de subirse a la escalera. Suba cuidadosamente por la escalera, de frente y utilizando ambas manos. Use un cinturón de herramientas o una línea de mano

para llevar el material. La mayoría de las escaleras están diseñadas para soportar una sola persona a la vez. Dos personas pueden causar la falla

estructural o la pérdida de equilibrio de la escalera. No se incline hacia ninguno de los lados mientras se encuentre en una escalera. Si algo se encuentra fuera de su alcance, bájese

y mueva la escalera. Las escaleras nunca deben usarse horizontalmente como plataformas, pasarelas de acceso ni andamios.

La selección y uso inteligentes de las escaleras es un paso en la dirección correcta.

Courtesy of the State Compensation Insurance Fund

Visit www.statefundca.com today to learn about the 6% discount on premiums we offer eligible SBCA members.

Your individual business may be eligible for even more discounts. Ask for Santa Barbara Contractors Association Group 821. For more tailgate, and other safety topics please visit us online.

The above evaluations and/or recommendations are for general guidance only and should not be relied upon for legal compliance purposes. They are based solely on the information provided to us and relate only to those conditions specifically discussed. We do not make any warranty, expressed or implied, that your workplace is safe or healthful or that it complies with all laws, regulations or standards.

Page 10: SBCA Weekly Newsletter

10

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

PRICE, POSTEL & PARMA LLP Counselors at Law

A Tradition of Service and Excellence Since 1852

_____________________________________________________________

Santa Barbara's Full Service Law Firm Specializing in All Aspects of

Construction and Surety Law, Public and Private Work, Contract and Project Planning,

Pre-Litigation Planning and Resolution of Construction Disputes, Mechanic Liens, Stop Notices and Bond Claims, Labor and Employment Law, Incorporations and Partnerships,

Business and Tax Law, Real Estate, Land Use and Environmental, Insurance Disputes

SPECIAL RATES FOR SBCA MEMBERS

_________________________________________

J. Terry Schwartz, Esq. ([email protected]); Christopher E. Haskell, Esq. ([email protected]) 200 East Carrillo Street, Suite 400, Santa Barbara, CA 93101; (805) 962-0011; Fax (805) 965-3978 www.ppplaw.com

purveyors of ef fo r t l ess access to every th ing amaz ing . . .

Home Thea tersMed ia Rooms

Mul t i -Room Music Sys temsAud ioph i l e L i s ten ing RoomsWire less Con t ro l s

w w w . h i f i c l u b . n e t5 1 9 Ga rden S t ree tSan ta Ba rba ra , CA9 3 1 0 1l i c. #790942

Ca l l t oday !962 .2525

Ta k e a p r i v a t e t o u r o f t h e n e w H o m e A u t o m a t i o n S y s t e m sb y H i F i C l u b , a t t h e B u i l t G r e e n R e s o u r c e Ce n t e r . Fo r c o n t r a c t o r s , a r c h i t e c t s , d e s i g n e r s a n d t h e i r c l i e n t s .

Page 11: SBCA Weekly Newsletter

11

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

P.O. Box 23409 Santa Barbara, CA 93121 805-884-1100 phone 805-884-1108 fax www.sbcontractors.org [email protected]

Original: Job Office, Oficina Del Departamento

REPORT OF SAFETY MEETING INFORME SOBRE LAS REUNION DE ASUNTOS DE SEGURIDAD

Employer/Patron

Job Location/Ubicacion Del Trabajo - Department/Departamento Date/Fecha

Accidents Reviewed/Accidentes Analizados Employee's Name/Signature Nombre Del Empleado/Firma

1.

2.

3.

4.

Subjects Discussed/Temas Discutidos 5.

6.

7.

8.

9.

10.

11.

12.

Suggestions/Sugerencias - Recommendations/Recomendaciones 13.

14.

15.

16.

17.

18.

19.

Action Taken/Supervisor's Comments Medidas Tomadas/Comentarious Del Supervisor

20.

21.

22.

23.

24.

Supervisor's Name/Nombre Del Supervisor - Signature/Firma

SCIF 17653 (Rev. 5-92) STATE COMPENSATION INSURANCE FUND

Page 12: SBCA Weekly Newsletter

12

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

CONSTRUCTIONLAWSPECIALISTS

H&C HARDIN & COFFIN, LLP

Lawsuits, Arbitrations, Mediation Construction Defect Claims Contract, Business, and Nonpayment Disputes Construction Contract Consultation Mechanic’s Liens, Stop Notices, Attachment Payment & Performance Bonds Jobsite Accidents / Personal Injury Claims Insurance Coverage Analysis

For an appointment, please contact us at:

805-963-3301No charge for initial consultation to SBCA members

HARDIN & COFFIN, LLP

ATTORNEYS AT LAW

www.hardincoffin.com FAX: 805-963-7372

EMAIL: [email protected] 1531 Chapala, Suite 1

Santa Barbara, CA 93101 PLEASE CONTACT: Rick Hardin or Mark Coffin

CONSTRUCTIONLAWSPECIALISTS

H&C HARDIN & COFFIN, LLP

Lawsuits, Arbitrations, Mediation Construction Defect Claims Contract, Business, and Nonpayment Disputes Construction Contract Consultation Mechanic’s Liens, Stop Notices, Attachment Payment & Performance Bonds Jobsite Accidents / Personal Injury Claims Insurance Coverage Analysis

For an appointment, please contact us at:

805-963-3301No charge for initial consultation to SBCA members

HARDIN & COFFIN, LLP

ATTORNEYS AT LAW

www.hardincoffin.com FAX: 805-963-7372

EMAIL: [email protected] 1531 Chapala, Suite 1

Santa Barbara, CA 93101 PLEASE CONTACT: Rick Hardin or Mark Coffin

CONSTRUCTIONLAWSPECIALISTS

H&C HARDIN & COFFIN, LLP

Lawsuits, Arbitrations, Mediation Construction Defect Claims Contract, Business, and Nonpayment Disputes Construction Contract Consultation Mechanic’s Liens, Stop Notices, Attachment Payment & Performance Bonds Jobsite Accidents / Personal Injury Claims Insurance Coverage Analysis

For an appointment, please contact us at:

805-963-3301No charge for initial consultation to SBCA members

HARDIN & COFFIN, LLP

ATTORNEYS AT LAW

www.hardincoffin.com FAX: 805-963-7372

EMAIL: [email protected] 1531 Chapala, Suite 1

Santa Barbara, CA 93101 PLEASE CONTACT: Rick Hardin or Mark Coffin

CONSTRUCTION LAW SPECIALISTSCONSTRUCTIONLAWSPECIALISTS

H&C HARDIN & COFFIN, LLP

Lawsuits, Arbitrations, Mediation Construction Defect Claims Contract, Business, and Nonpayment Disputes Construction Contract Consultation Mechanic’s Liens, Stop Notices, Attachment Payment & Performance Bonds Jobsite Accidents / Personal Injury Claims Insurance Coverage Analysis

For an appointment, please contact us at:

805-963-3301No charge for initial consultation to SBCA members

HARDIN & COFFIN, LLP

ATTORNEYS AT LAW

www.hardincoffin.com FAX: 805-963-7372

EMAIL: [email protected] 1531 Chapala, Suite 1

Santa Barbara, CA 93101 PLEASE CONTACT: Rick Hardin or Mark Coffin

AND RAIN GUTTERS

“We think of Quality and Service first.”Owned and Operated for 25 Years by Jack Martin

FREE ESTIMATE AND EVALUATION

Expert in Leak RepairsReroof Specialists

Tile / SlateComposition Shingles

Single Ply (PVC)Full Maintenance Department

Aluminum / Copper Gutters 5“ Ogee Seamless and

6” Half Round Seamless

LIABILITY INSUREDLic. 674-048

Page 13: SBCA Weekly Newsletter

13

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Santa Barbara Contractors AssociationContractors’ Mechanics Liens, Stop Notices & Bonds

Participate in the Collecting Your Money seminar to:

Events Calendar.

Collecting Your Money!May 22, 2012

from 9:00am to 11:00am

Presented by: Mark T. Co�n, Hardin & Co�n, LLP

Location: SBCA O�ce, 914 A Santa Barbara Street

Page 14: SBCA Weekly Newsletter

14

Kalb’s Q & A for ContractorsBy David Kalb, Capitol Services, Inc.

We help a contractor raise the ‘ante’ in Nevada bids. California contractors reading this will dis-cover a quirk in licensing law they might ben-efit from learning, unless they are ‘shocked’ we would reveal it. While you can transfer a sole owner license to a corporation, you can’t share a contractor’s license because you are ‘related’…

Q: I have a bid limit in Nevada of $250,000. I have a customer who wants me to do a proj-ect for them that will be well above $500,000. Is there any way to increase my bid limit? How quickly can this be done?

A: There are two ways to raise your bid limit in Nevada. You can complete a One Time Raise in Limit application, or you can submit a Perma-nent Raise in Limit application. For a single proj-ect such as you are describing, you can submit the application for a single project limit increase at least five working days prior to the bid date. If submitted in that time frame, the application will be approved prior to bidding the project (as-suming you meet the financial requirements of course).

Q: You helped my company get a CA license 18 years ago and I have another question for you. I am an “A” Contractor (General Enginering) and I

heard recently that I could have an electrician on payroll that is not certified by the Division of Ap-prenticeship Standards. Is that correct?

A: That is indeed correct, only a “C-10” (Electri-cal) contractor is required to have their electrical employees certified by the Division of Appren-ticeship Standards (DAS). An “A” is not required to have their employees certified through DAS even if performing the same type of electrical work.

Q: I currently have a Sole Proprietorship contrac-tor’s license and I am in the process of incorpo-rating. Since I will be the only shareholder, will the corporation be assigned my existing license number?

A: That’s your choice to make. When you sub-mit the license application for the corporation, you are required to also submit a “Licensed Sole Owner Applying for Corporate License” form (available on the CSLB’s website or by calling Capitol Services). The CSLB allows a Sole Owner-ship license number to be reissued to a corpora-tion if: 1) The Sole Ownership license is in good standing, 2) The corporation was formed by the individual licensee, and 3) The Sole Owner li-censee has at least 51% ownership of the new

corporation. You should be aware that once the number is transferred, it belongs to the corpora-tion and cannot be reissued to an individual at a later date.

Q: Can you confirm that we can use the license owned by our Parent company or a company of our same Group, such as a sister company?

A: No, you cannot use a license that doesn’t belong to your company, even if the company is “related”. Each entity performing contracting work is required to have it’s own contractors li-cense. As a subsidiary of the Parent company, you may be able to use the same Responsible Managing Employee (RME)/Responsible Manag-ing Officer (RMO) that is currently qualified for your Parent, however you will be issued a sepa-rate license number.

While knowledge is power, knowing where to go for the answers is half the battle. Get expert assistance immedi-ately when you call 866-443-0657, email [email protected], or write us at Capitol Services, Inc., 1225 8th St. Ste. 580, Sacramento, CA 95814. Research past columns at www.cutredtape.com.

dispute. The court went on further to state that Opinski’s claims were rejected because Opinski did not submit its claims in the manner laid out by the contract within the correct time frame laid out by the contract.

The appellate court sent the case back to the trial court to figure out the difference of what was awarded to the City and what was left of the retention in escrow. The difference of which was to go to Opinski.

Because Opinski was not familiar enough with the contract that was signed, Opinski lost out on a large sum of money that was initially due to it. When change orders were denied, Opinski needed to follow the second course of action by petitioning the engineer, who required that particular work to be done and would have ap-proved the change orders. When Opinski was done with the job other contractors were still working on the project, Opinski should have had substantial completion signed off on for its part of the work or submitted a change order so as not to be responsible for the liquidated damages as laid out in the contract.

If Opinski knew its contract, this would have only cost $3,000 for the defects rather than over $65,000! Make sure you know what your con-tract says and that you refer to it frequently on the job so that something like this does not hap-pen to you!

Abdulaziz, Grossbart & Rudman provides this in-formation as a service to its friends & clients and it does not establish an attorney-client relationship with the reader. This document is of a general na-ture and is not a substitute for legal advice. Since laws change frequently, contact an attorney before using this information. Ken Grossbart and Sam Ab-dulaziz can be reached at Abdulaziz, Grossbart & Rudman: (818) 760-2000 or by E-Mail at [email protected], or at www.agrlaw.com

Source: Abdulaziz, Grossbart & Rudman, Law Talk 2012

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

The Sword and the Shield Continued from page 1

New Member BioNew members, or members who have never utilized this service are welcome to send us a 150 word New Member Bio to be published free of charge in an upcoming issue of our Weekly Newsletter! Please contact the SBCA Office for more informa-tion at 805-884-1100.

Have you introduced your company to the SBCA Membership??

Page 15: SBCA Weekly Newsletter

15

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Santa Barbara office:211 Anacapa Street, Santa Barbara, CA 93101

805-966-3233 www.ventanadoor.com

Page 16: SBCA Weekly Newsletter

16

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 17: SBCA Weekly Newsletter

17

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

□ □ □ □

Page 18: SBCA Weekly Newsletter

18

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

□ □ □ □

Page 19: SBCA Weekly Newsletter

19

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 20: SBCA Weekly Newsletter

20

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Weekly Bulletin

5/2/2012

Reasonable care is given in gathering, compiling and furnishing the information contained herein which is obtained from sources believed to be reliable, but the SBCA is not responsible or liable for errors, omissions or inaccuracies.

Santa Barbara Contractors Association Projects Out to Bid 5/2/2012

Wednesday, May 02, 201211-365 Compton DMV Re-Lamp, re-ballast parking lot lights Compton

1:30 PM 5/2/2012

MAND Apr 5 @ 8am

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: The contractor, agrees to provide to the Department of Motor Vehicles (DMV) all labor, tools, materials and equipment necessary to remove and replace the bulbs and ballasts in the parking lot lighting fixtures for the term of this agreement.

Addenda: 0

Department of Motor Vehicles - Anita Count 2415 First Avenue, MS E112, Sacramento, CA 95818 916-657-8728, Fax#: 000-000-0000

Pavement Striping and Markings Paso Robles

2:00 PM 5/2/2012 Project No 11-16

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Furnishing all labor, materials, equipment, and perfomring all work necessary and incidental to the construction of the project known as Pavement Striping and Markings, Project No. 11-16, removing existing striping and markings, preparing surface to receive new striping and marking, traffic control and all incidental work necessary in order to comlete work according to specifications prepared by the City of Paso Robles and according to the Contract Documents. The work shall indclude, but is not limited to all as specified in these documents and as directed by the City.

Addenda: 0

Thursday, May 03, 2012Zaca Creek Bridge Rail Replacement Bridge No. 51C-0087 on Zaca Station Road 0.77 miles Northeast of Hwy 154

Santa Barbara

2:00 PM 5/3/2012Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: General Work Description: work shall include the removal of existing bridge steel and timber railing and construction of new concrete barriers and approach guard railing. Work also includes water pollution control, construction area signs, traffic handling, traffic striping, fence reconstruction and minor hot mix asphalt.

Addenda: 0

County of Santa Barbara, CA 805-568-2663

11-376 Irrigation System Replacement - Arleta DMV Arleta

2:00 PM 5/3/2012

MAND Apr 12 @ 8am

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: the Contractor agrees to provide to the Department of Motor Vehicles (DMV) all labor, tools, materials and equipment necessary to remove the existing irrigation system and replace the system as specified herein.

Addenda: 0

Department of Motor Vehicles - Heidi Turpen, CA 916-657-9807

= New Plans Entered This Week

SBCA OnLInE PLAnROOM REPORT

Page 21: SBCA Weekly Newsletter

21

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

M E M B E R B E N E F I T S• Referrals• Online Planroom• Safety Program• Networking Events• Group Insurance• Weekly Newsletter• Government Affairs• Get Industry Updates• Educational Seminars• Annual Golf Tournament• Online Membership Listing• Annual Membership Directory• Advertise Directly to Construction Industry in Weekly Newsletter• New Member Bio - Introduce Your Business in the Newsletter• Built Green Santa Barbara

[email protected]

REDUCE YOUR WORKERS’ COMP INSURANCE COSTS

The SBCA and 25 Builder’s Exchanges in California have joined to form the Golden State Builders Exchange (GSBE). Participation in this group insurance program may significantly reduce the cost of your workers’ com-pensation premiums over a State Compensation Insur-ance Fund individual policy. Qualifying SBCA members are eligible for a 6% discount. Ask to be placed into the SBCA Group 821. Please call the SBCA office for more information and conversion form. If you are already with State Fund, please call us or your broker to see if you qualify for this group program.

www.statefundca.com

V I S I T

The Built Green Resource Center offers information, programs and classes on green building practices and materials. It showcases energy independence, wa-ter savings, and other sustainable building practices. The Resource Center is open to the public by appointment only. Please call 805-884-1100 to schedule your visit.

www.builtgreensb.org805.884.1100

Page 22: SBCA Weekly Newsletter

22

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Santa Barbara Contractors Association Projects Out to Bid 5/2/2012

Kitchen Cabinet Replacement Project Oxnard

3:00 PM 5/3/2012Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: The City of Oxnard Housing Authority Capital Fund/Asset Management Program is soliciting bids from qualified contractors for the replacement of kitchen cabinets in one hundred (100) apartments located at 1201 through 1363 Felicia Court (CAL 31-2), in Oxnard, California. SPECIAL NOTE: The cabinets are suspected to contain lead base paint (LBP); contractors and/or laborers involved in removal of the cabinets are to be lead-safe certified in accordance with EPA regulations and guidelines.

Estimated Construction Cost: Between $250,000 and $500,000.

Bids shall include all costs for the furnishings of all materials, equipment, machinery, tools, apparatus, incidentals, labor and supervision necessary in accordance with the attached terms, conditions, and instructions to contractors which by this reference are made a part hereof.

Addenda: 0

Friday, May 04, 2012Sam's Club #6627-201 Stanton

11:00 PM 5/4/2012Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Scope of work includes: Interior / Exterior Demolition, Erosion Control, Grading, Underground Utilities, Site Concrete, AC Paving & Sealcoat, Striping and Signage, Landscaping, Interior Slab Concrete Replacement, Masonry, Concrete Polishing, Structural Shoring, EIFS / Stucco, Sheet Metal, Roofing, Interior / Exterior Paint, Caulking & Sealants, Resilient Flooring, Epoxy Flooring, Metal Stud Drywall, Insulation, Ceramic Tile, Structural Steel, FRP, Insulation, DFH, Fixturing, Millwork, Rough Carpentry, Glass and Glazing, Acoustical Ceilings, Toilet Accessories, Dock Equipment, Overhead Doors, Fencing, Fire Sprinklers, HVAC, Plumbing, Electrical, Refrigeration, Tire/Lube Modifications.

5/2/2012Addenda: 4

Shames Construction Company, LTD. 5826 Brisa Street, Livermore, CA 94550 925-606-3000, Fax#: 925-606-6656

Tuesday, May 08, 2012Broida 3400 Laboratory Modifications Bldg. 572 Santa Barbara

2:30 PM 5/8/2012 FM120207S/987779

Apr 26 @ 1:30 pm

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Renovation and reconfiguration of existing lab, including mechanical, plumbing, electrical systems and casework.

Estimated Construction Cost: $426,486.00Addenda: 0

Tri-County Blueprinting & Supply, CA 805-966-1701, Fax#: 805-966-9484UCSB - Roger Monte, Santa Barbara, CA 93106 805-893-2947

Wednesday, May 09, 2012Blending Station #3 Driveway Improvements Oxnard

2:00 PM 5/9/2012 Spec No PW12-06

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Blending Station #3 Driveway Improvement - Project work consists of removal and placement of base material, asphalt pavement and concrete; tree relocation, irrigation modification and signage improvements at the City's Blending Station #3 located in the City of Oxnard Wankel Way and Solar Drive

Addenda: 0

City of Oxnard - Patricia Friend, CA 805-385-7821

= New Plans Entered This Week

Page 23: SBCA Weekly Newsletter

23

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Interested in a career in the building trades? There is a critical shortage of construction workers. Over 1 million new jobs will be created nationally in the next seven years, with 2,500 of them in Santa Barbara and Ventura in the next three years. California construction workers earn an average of $24 an hour and journey-level workers earn $70,000-plus a year!

Spring 2012

CT 111 Beginning Construction M: 6-9 pm (16wks) Wake Center (Beg. 1/23/12)

Beg. Const. Lab Sat: 8:30-1:30pm (16 wks) Wake Center

CT 113 Roof Framing T: 6-9pm (16 wks) Wake Center (Beg. 1/24/12)

CT 115 Intermediate Finish Carpentry Th: 6-9pm (16 wks) Wake Center (Beg. 1/26/12)

CT 118 Measuring and Calculating Th: 6-9pm (16 wks) Wake Center (Beg. 1/26/12)

CT 124 Weatherization Sat: 1-4pm (16 wks) Wake Center (Beg. 1/28/12)

CT 127 Sustainability Audit W: 6-9pm (16 wks) Wake Center (Beg. 1/25/12)

CT 130 Contractors License Prep T: 6-7pm / Online 2 hrs (16 wks) WC (Beg. 1/24/12)

CT 290 Work Experience in Construction Trades T: 4:45-5:45pm WC (Beg. 1/24/12)

CT 153 Electrical Math T: 6-9pm (16 wks) Wake Center (Beg. 1/24/12)

CT 196 Jobsite Management M: 6-9pm (16 wks) Rod Bond Training Center,

Buellton (Beg. 1/23/12)

Page 24: SBCA Weekly Newsletter

24

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Santa Barbara Contractors Association Projects Out to Bid 5/2/2012

Thursday, May 10, 201211-307 Install 7 New Parking Lot Light Poles and Fixtures San Diego

1:30 PM 5/10/2012

MAND Apr 25 @ 10am

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: The Contractor, agrees to provide to the Department of Motor Vehicles (DMV) all labor, tools, materials, and equipment necessary to install (7) new parking lot light poles and fixtures as specified herein.

Addenda: 0

Department of Motor Vehicles - Julie Phang 2415 First Avenue MS E-112, Sacramento, CA 95818 916-651-2556, Fax#: 916-657-2387

Ortega and Santa Catalina Dining Commons Boiler REplacement Bldgs 542 & 860

Santa Barbara

2:30 PM 5/10/2012 FM120316S/137-53/139-52

MAND Apr 24 @ 9:30am

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Ortega Dining Commons, Building 542:

Demolition of boilers, heat exchangers, pumps, feed water system, controls, coils and electrical. Provide two (2) new steam boilers, feed water system, flues, piping and all associated accessories. Provide two (2) new heating hot water boilers, associated pumps, piping, flues, and accessories. Provide new storage tank, heat exchanger, pumps and piping. Provide new hot water heating coils and control valves for air handler in mezzanine and locker room. Provide new DDC Controls for boiler room operation. Provide new Variable Frequency Drives (VFD's). Provide electrical service to all new equipment. Provide for system automation and testing as required.

Santa Catalina Dining Commons, Building 860:

Demolition of boilers, pumps, piping, controls, and electrical. Provide two (2) new base mounted pumps and piping. Provide three (3) new boilers, pumps, piping, flues, valves and accessories. Provide new DDC Controls for boiler room operation. Provide new Variable Frequency Drives (VFD's). Provide electrical service to all new equipment. Provide for system automation and testing as required.

Estimated Construction Cost: $974,000.004/27/2012Addenda: 2

Tri-County Blueprinting & Supply, CA 805-966-1701, Fax#: 805-966-9484UCSB - Croft Yjader University of California, Building 439, Santa Barbara, CA 93106 805-893-2661 x 2206, Fax#: 805-893-4493

Lower Mission Creek Flood Control Project – Reach 2B, Phase 1 Santa Barbara

2:00 PM 5/10/2012Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: The Project (Phase 1, located from approximately STA 24+85 to STA 28+81) generally consists of providing construction stormwater pollution control; traffic control; construction of 800 linear feet of 6’ x 18’ RCB 12”-30” diameter storm drain relocations in Amtrak Station parking lot; shoring of construction backcut; construction of manholes and junction structures; 12” diameter storm drain relocation at upstream side of Montecito Street; water facilities protection and relocation; miscellaneous concrete curb and gutter, AC and PCC pavement removal and replacement; irrigation system removal and replacement. The Contractor is required to coordinate with Caltrans, UPRR, The City of Santa Barbara and various utility agencies for permitting and relocations. The WORK occurs within and adjacent to Santa Barbara Amtrak Station, paved urban streets within the City of Santa Barbara and within State right-of-way (US 101). Dodge Green Sheet Value Code H.

The WORK occurs in the City of Santa Barbara, County of Santa Barbara, within Public Road Right of Way and Flood Control easements.

Contract Drawings (33 sheets) and Specifications for bidding this Project may be obtained at the office of the Santa Barbara County Flood Control and Water Conservation District, at a non-refundable amount of $54 per set. [Pleasenote that the Contract Drawings include Phases 1 and 2 but the bidding project only consists of Phase 1]. A "Geotechnical Engineering Report” is available from the same office for examination or purchase for a nonrefundable amount of $24 per set. The “Geotechnical Report” is available for the Contractor’s information only, as referred to in the instructions to Bidders and the Special Provisions

Addenda: 0

City of Santa Barbara - Tom Fayram 123 East Anapamu Street, Santa Barbara, CA 93101 805-568-3440, Fax#: 805-568-3434

= New Plans Entered This Week

Page 25: SBCA Weekly Newsletter

25

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

[email protected]

(805) 683-1848Fax: 805.964.6653

Lic. #559076

GEOTECHNICAL SERVICESSoils Engineering Reports, Slope Stability

Foundation Forensics, Liquefaction AnalysisENVIRONMENTAL SERVICES

Percolation Testing, Septic FieldsEnvironmental Site Assessment

GEOLOGIC SERVICESEngineering Geology Reports

Fault and Landslide Investigation, Bluff SetbackSPECIAL INSPECTION

Welding, High Strength Bolt, FireproofingEpoxy, Concrete, Masonry, URM Retrofit

CONSTRUCTION INSPECTIONGrading and Testing Observation, CalTrans Certified

Footing and Foundation ObservationLABORATORY AND DRILLING SERVICES

In-House Laboratory Testing, andTract-Mounted CME Drill Rig

Federal and California Certified Small Business

License No. 788005

SBCA Best Hardscape & LandscapeInternational Landscape Designer of the Year - 2009

Phone (805) 687-3569 gracedesignassociates.com

License No. 788005

SBCA Best Hardscape & LandscapeInternational Landscape Designer of the Year - 2009

Phone (805) 687-3569 | gracedesignassociates.com

General Contractor CM-at-Risk

Construction Management

Frank Schipper Construction Co.

SERVING THE TRI-COUNTY AREA

FOR 30 YEARS 610 E COTA STREET, SANTA BARBARA, CA 93103

T (805) 963-4359 • F (805) 963-1270 Lic# 436175

EMAIL: [email protected] www.schipperconstruction.com

Page 26: SBCA Weekly Newsletter

26

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Santa Barbara Contractors Association Projects Out to Bid 5/2/2012

Sunrise & Zinfandel Pad Building Rancho Cordova

2:00 PM 5/10/2012Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Scope of work includes 5,773 sf semi-warm shell and and 31,114 sf of site improvements. Trades required: Temp. facilities, temp. fencing, surveying, site demolition, SWPPP, erosion control, earthwork & grading, underground utilities, asphalt paving, striping & signage, landscaping, site concrete, masonry, metal fabrications, rough carpentry, woodtrusses, insulation, roofing, sheet metal, caulking & joist sealants, doors, frames & hdwr, aluminum storefront, lath & plaster, gypsum board assemblies, painting, site furnishings, code signage, signage, canvas awings, design build fire sprinklers, plumbing, HVAC, electrical and design build fire alarm.

Reference revised bid documents containing architectural and engineered drawings. Specifications are contained withing the drawings. An updated soils report is posted and identified as specs. All RFI's are to be submitted in written format only - please do not call the office. This is a non-prevailing wage project. Projected timeline for construction July 2012 thru November 2012. Subcontractors to hold bids a minimum of 90 days from bid date. All bids are to be based on plans and specifications. List alternate equal value engineerings as alternate deducts. Bids are due to Wells Construction on Thursday, May 10th by 2:00 pm. Early bids are welcome and will be protected! Click on the title belowfor a "fast track" link to bid docs thru Brownies ftp site (alternate plan accessto SubHub).

Addenda: 0

Wells Construction, Inc. - Bruce Nye, CA 916-788-4480, Fax#: 916-788-4481

Monday, May 14, 2012Wireless Access Support at Adams, Cleveland, Monroe, La Cumbre and La Cuesta School Sites

Santa Barbara

2:00 PM 5/14/2012 SBUSD #21-11/12

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Installation of wireless materials and cabling, etc. Per public Contract Code Section 20103.8, the Santa Barbara Unified School District will use Method (B) in determining lowest responsible bid.

The successful bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the bidding documents and to pay prevailing wage rates at the location of the work.

Addenda: 0

Coast Reprographics 220 West Canon Perdido Street, Santa Barbara, CA 93101 805-962-9155

Tuesday, May 15, 2012Harold Frank Hall, Corridor Lighting Replacement, Bldg 556 Santa Barbara

2:30 PM 5/15/2012 FM120187S/211-35

MAND May 3 @ 1:30pm

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Harold Frank Hall, Corridor Lighting Replacement.

Estimated Construction Cost $113,650.00Addenda: 0

Tri-County Blueprinting & Supply, CA 805-966-1701, Fax#: 805-966-9484UCSB - Jennifer Hernandez, Santa Barbara, CA 805-893-2661 x 2214, Fax#: 805-893-4493

Walmart #2054-111 LRM Jackson

11:00 AM 5/15/2012Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Remodel Existing Open Store

Scope of Work: Erosion Control, Paving, Striping, Tactile Warning Systems, Concrete, Masonry, Fencing, Demolition, Concrete Cutting, EIFS / Stucco Repair, Carpentry, Metal Stud Framing, Drywall, Painting, Millwork, DFH, Glazing, Floor Coverings, Bead Blasting of Concrete, Ceramic / Quarry Tile, Acoustical Ceiling, Structural Steel Fabrication, Sheet Metal, Roof Repair, Insulation, FRP, HVAC, Electrical, Plumbing, Fire Protection, Caulking / Sealants, Toilet Accessories, Refrigeration, Seismic Systems, Tire/Lube Center Modifications.

Addenda: 0

= New Plans Entered This Week

Page 27: SBCA Weekly Newsletter

27

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

PHONE (805) 965-1926 FAX (805) 963-6071

OSWALD J. DA ROS, INC. • MASONRY CONTRACTORS •

Lic# 216916 MARBLE • GRANITE • STONES

976 Carrillo Road PETER A DA ROS Santa Barbara, CA 93103

805-498-8350

www.augustroofing.com

Residential & Commercial

• Workers Comp Insurance• General Liability Insurance• All work done by company experts• Locally owned and operated• Free Estimates

“Waterproofing at it’s best, quality above the rest!”

CA Lic. B & C-39 786740

Repairs, Re-Roofingand New Construction

P.O. Box 517Santa Barbara, CA 93102

Phone 805-618-8648Email [email protected]

www.tradartfoundation.org

Donate used build materials to the Habitat ReStore All proceeds go directly back to Habitat for Humanity

Goleta ReStore 6725 Hollister Avenue, Goleta

(between Los Carneros & Storke)

Appliances │ Doors │ Windows │ Lighting │ Tile │ Cabinets│ Hardware

Tues. - Fri.: 12 pm - 5 pm Saturday: 9 am - 5 pm Phone: (805) 692-2226

www.sbhabitat.org

Serving Southern Santa Barbara County

SBCA Member Since 1995

WaterProof Deck Coating SystemsConcrete Restoration Resurfacing

Restoration of integral colors & exposed aggregrate

Visit us at brooksqc.com966-5020 CSL 496582

SINCE 1975

BROOKsQUALITY COATINGS

Page 28: SBCA Weekly Newsletter

28

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Santa Barbara Contractors Association Projects Out to Bid 5/2/2012

Wednesday, May 16, 2012Wooley Road Arterial Resurfacing Project ***Bid Withdrawn*** Oxnard

2:00 PM 5/16/2012 Spec No PW10-05

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Wolley Road Arterial Resurfacing - Victoria Avenue to Rose Avenue consists of asphalt concrete overlay of Wolley Road from Victoria Avenue to Rose Avenue; construction of median from Pacific Avenue to Rose Avenue; and digout and pave Cal-Gisler Neighborhood.

***Bid Withdrawn***Addenda: 0

Mesa Center Shell Improvements Santa Barbara

3:00 PM 5/16/2012Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Project Description: 2800sf Shell Improvement at Mesa Center

Bid Notes: This is a +- 2800 Shell Improvement located at 1950 Cliff Drive. This project IS NOT Prevailing Wage Remodel of existing front façade, interior and storefront of commercial space. Project includes new landscape, hardscape, storefront, restrooms, interior wall, access ramp and trellis. All finishes to match existing.

The scope of work includes hard and soft demolition, SoG Concrete, Brick Pavers, Landscaping, Exterior Site Concrete, Metal Handrails, Bollards, Rough Carpentry, Finish Carpentry, Insulation, Aluminum Storefronts, Doors, Frames, Hardware, Laminate Flooring, Metal Stud Framing, Drywall, Plastering, Ceramic Tile, Painting, FRP Wall Paneling, Toilet Accessories, Signage, Plumbing & Electrical

Addenda: 0

Fantastic Sam's Tenant Improvement Santa Barbara

2:00 PM 5/16/2012Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Project Description: 1600sf Tenant Improvement

Bid Notes: This is a +- 1600 Tenantl Improvement located at 1950 Cliff Drive. This project IS NOT Prevailing Wage This project consists of an interior remodel of the existing commercial space for a new Fantastic Sam's Haircut Salon

The scope of work includes hard and soft demolition, SoG Concrete, Finish Carpentry, Insulation, Door, Frame, Hardware, Vinyl Flooring, Metal Stud Framing, Drywall, Acoustical Ceilings, Painting, FRP Wall Paneling, Toilet Accessories, Signage, Plumbing & Electrical

Addenda: 0

= New Plans Entered This Week

Page 29: SBCA Weekly Newsletter

29

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

If you are anemployer who wishes to obtain assistance from

Cal/OSHAConsultation, or want to learn more about what

services are available, you can do so by calling the

toll-free assistance number.

1(800) 963-9424 If you want to arrange an

on-site visit or obtaintechnical information, you can contact the Cal/OSHA Consultation area office

nearest your workplace or you can email us at

[email protected].

MAKE SUREYOU ARE

IN COMPLAINCEwwwdir.ca.gov

ruoH-42 ecivreS remotsuC

wolraH .A salguoD renwO ycnegA

YCNEGA ECNARUSNI WOLRAH

ynapmoC ecnarusnI etatsllA A etiuS ,tS aniV aL eD 5121

10139 AC ,arabraB atnaS

0743-053-008 enohP 108 txe 0743-369-508 enohP

moc.etatslla@wolrah 1210860# esneciL ecnarusnI AC

wolrah/moc.seicnegaetatslla.www

J. SCOTT QUITTNEROWNER, LIC# 610873C-54

P H / F X ( 8 0 5 ) 9 6 5 . 5 3 3 1DAYTIME CELL ( 8 0 5 ) 3 3 1 . 2 2 3 7S A N T A B A R B A R A , C A [email protected] � � T2TILETECHNIQUES.COM

TILE TECHNIQUES, INC.

Page 30: SBCA Weekly Newsletter

30

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Santa Barbara Contractors Association Projects Out to Bid 5/2/2012

Thursday, May 17, 2012Cottage Hospital 2 East Santa Barbara

3:00 PM 5/17/2012Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Project Description: 11,000sf OSHPD Tenant Improvement

Bid Notes: This Bid consists of (3) different sets of plans & specifications for (1) Project at Cottage Hospital (Endoscopy, Non-Invasive Cardio & Waiting Area)

The Endoscopy & Non-Invasive Cardio projects consists of significant mechanical, plumbing & electrical systems on the 2nd floor of the Building E space. The Waiting Area Remodel consists of remodels to offices, staff lounge, and locker rooms.

Bid Scope: Engineer's Estimate: $4-5 Million

The scope of work includes hard and soft demolition, concrete, self-leveling underlayment, metal fabrication, architectural woodwork, waterproofing membrane, vapor control barrier, firestopping, joint sealants, acoustical insulation, doors, frames, hardware, access doors, glass & glazing, metal stud framing & drywall, plastering, shaftwall, cement backer board, ceramic tile, acoustical ceilings, resilient flooring, carpet, painting, high performance coatings, interior concrete floor sealer, cubicle curtain tracks, corner guards, signage, lockers, fire extinguishers, toilet accessories, fire sprinklers, HVAC, Plumbing, Electrical, Fire Alarm.

Addenda: 0

Tuesday, May 22, 2012Barlow and Arundell Barrancas Culvert Concrete Lining At Hwy 101 Ventura

2:00 PM 5/22/2012 Spec No. WP12-21

May 8 @ 10am

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Project Description: concrete lining the inverts of the steel structural plate culverts.

Pre Bid Conference Location: LOCATED AT THE DISTRICT’S ACCESS GATE AT 3868 E MAIN ST, VENTURA, CA 93003.

Engineer's Estimated Cost: $400,000-$400,000 Addenda: 0

County of Ventura - Public Works 800 South Victoria Avenue, Ventura, CA 93009 805-654-3805, Fax#: 805-677-8762

Wednesday, May 23, 201211-383 Torrance Roofing - Remove Existing Built-Up and install new PVC roofing system

Torrance

2:30 PM 5/23/2012

MAND May 1 @ 8am

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Removal of the existing built-up roof system and installation of a new single-ply polyvinyl-chloride (PVC) roof system at the Torrence DMV Field Office.

Addenda: 0

Department of Motor Vehicles - Cindy Huynh 2415 First Avenue MS E-112, Sacramento, CA 95818 916-657-6972, Fax#: 916-657-2387

Blackstock South Neighborhood Resurfacing, Alley Improvement South of Colonia Road & Gloria Court Street Improvement

Oxnard

2:00 PM 5/23/2012 Spec No. PW12-02

May 2 @ 9:30am

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: The project consists of resurfacing Blackstock South Neighborhood streets; installation of 8 inch recycled water line in Justin Way; alley improvement south of Colonia Road; and street improvements of Gloria Court

Addenda: 0

City of Oxnard - Public Works, Oxnard, CA 805-385-7821Cyber Copy, CA 805-642-3292

= New Plans Entered This Week

Page 31: SBCA Weekly Newsletter

31

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Santa Barbara Contractors Association Projects Out to Bid 5/2/2012

Thursday, May 24, 2012Construction of the 2011-2012 County Wide Preventative Maintenance Application of Scrub Seal and Micro-Surfacing

Santa Barbara

2:00 PM 5/24/2012 County Project No.: 820625

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Repair of failed asphalt pavement plus application of scrub seal and micro-surfacing as part of annual surface treatment program.

Addenda: 0

County of Santa Barbara - Transportation Engineering Dept 123 East Anapamu Street, Santa Barbara, CA 93101 805-568-3000

11-398 - Remove Existing Built-Up and install new PVC roofing system Culiver City

2:30 PM 5/24/2012

MAND May 3 @ 8am

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: The Contractor agrees to provide to the Department of Motor Vehicles (DMV) all labor, tools, materials, and equipment necessary to remove the existing asbestos containing foam roof over a built-up roof system and install a new single-ply polyvinyl-chloride (PVC) roof system at the Culiver City DMV field office for the term of this agreement. The Contractor is responsible for field verifying all dimensions and existing site conditions pertinent to this agreement.

Addenda: 0

Department of Motor Vehicles - Cindy Huynh 2415 First Avenue MS E-112, Sacramento, CA 95818 916-657-6972, Fax#: 916-657-2387

FY2011-12 Major Street Rehabilitation Program: Cochran Street from Erringer Road to Sycamore Drive

Simi Valley

3:30 PM 5/24/2012Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: The proposed improvements consist of placing asphalt concrete overlay of approximately 4,066 tons of asphalt rubber hotmix and 263 tons of asphalt base course. The work further includes cold milling 342,100 square feet of existing ashalt concrete paving, removal, and replacement of curb and gutter, sidewalk, traffic signing, and all appurtenant work.

Addenda: 0

Simi Valley Department of Public Works, Simi Valley, CA 805-563-6891

= New Plans Entered This Week

Page 32: SBCA Weekly Newsletter

32

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Santa Barbara Contractors Association Projects Out to Bid 5/2/2012

Tuesday, May 29, 2012West Los Angeles Avenue Widening from Easy Street to the City's Public Services Center (PSC)

Simi Valley

3:30 PM 5/29/2012 Spec No. SV12-18

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Schedule 1 (Roadway Widening)

The proposed improvements consist of widening of West Los Angeles Avenue from Easy Street to the City's Public Services Center (PSC) 10 feet north and south of existing edge of pavement, including 117,328 s.f. of cold milling, grading, earthwork, installation of 305 l.f. of storm drain pipes, four catch basins, 6'x6' box culvert extension, 1,454 c.y. of pavement removal and unclassified excavation and 8,000 tons of asphalt concrete for base reconstruction and paving. The work also includes the construction of 9,500 s.f. of sidewalks, 3,250 l.f. of curb and gutter, tree removals and planting, adjustment of manhole and utility covers, replacement of traffic striping and singing and all appurtenant work.

Schedule II (Fiber Optic Communication Line)

The work will primarily consist of furnishing and installing equipment and materials for a complete and operational fiber optic communication system in a new conduit on West Los Angeles Avenue from Easy Street ot the City Maintenance Yard entrance, located at 500 West Los Angeles Avenue.

Schedule III (Recycled Water Pipeline)

The Recycled Water Pipeline work shall consist of furnishing and installing approximately 1,425 linear feet of pipeline including valves and fittings, trenching, concrete pavement removal, bedding, backfilling, testing and all necessary appurtenances to complete the work in accordance with Standard Plans, Specification, the Plans and Special Provisions.

Addenda: 0

Simi Valley Department of Public Works, Simi Valley, CA 805-563-6891

Thursday, May 31, 2012Construction Of The El Embarcadero Enhancement Project Phase 2 Santa Barbara

2:00 PM 5/31/2012 County Project No.: 310312R

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: General Work Description: Removal and reconstruction of existing curb, gutter spandrel, cross gutter and sidewalks. Removal and reconstruction of roadway structural section, overlay, installation of concrete crosswalks and paint pavement striping and markings. Installation of conduits, pull boxes, and related items necessary for the installation of street lights. Removal and reconstruction of an existing storm drain system. Furnish and install King Palms and plant establishment.

Addenda: 0

County of Santa Barbara - Transportation Engineering Dept 123 East Anapamu Street, Santa Barbara, CA 93101 805-568-3000

Friday, June 01, 2012Howard Residence - Dorie 805-377-0891 Santa Barbara

12:00 PM 6/1/2012Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: New 9000 sq. ft. custom home, new detached garage, and new 1976 SF guest house on 5 acres.

Project Contact: Dorie Pellegrin (805) 377-0891 e-mail [email protected]: 0

Dorie Pellegrin, CA 805-377-0891Coast Reprographics 220 West Canon Perdido Street, Santa Barbara, CA 93101 805-962-9155

= New Plans Entered This Week

Page 33: SBCA Weekly Newsletter

33

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Santa Barbara Contractors Association Projects Out to Bid 5/2/2012

Thursday, June 07, 2012IFB 11-347 Reroofing project for Inglewood DMV Inlewood

2:00 PM 6/7/2012

MAND May 17 @ 8am

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: The Contractor agrees to provide to the Department of Motor Vehicles (DMV) all labor tools, materials, and equipment necessary to remove the existing foam roof system and install a new single-ply polyvinyl-chloride (pvc) roof system at Inglewood DMV field office for the term of this agreement. The Contractor is responsible for field verifying all dimensions and existing site conditions pertinent to this agreement.

Addenda: 0

Department of Motor Vehicles - Heidi Turpen, CA 916-657-9807

Thursday, June 28, 2012Betteravia Administration Building "D" Addition Santa Maria

12:00 PM 6/28/2012 Project 8676 PH2

MAND June 7

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: The Betteravia Administration Building “D” Addition project will construct a single story approximately 2,000 SF addition to the existing County Administration Building on the Betteravia Government Center Campus in Santa Maria, CA. Additionally, existing Board of Supervisors Hearing Room and Administration Building “D” will receive some minor tenant improvement efforts and site improvements. The project has an estimated construction value of $800,000.00 and estimated construction duration of 7 months. The project schedule will be extremely critical as this project utilizes federal RZEDB funding which includes a firm expiration date. The Contractor will be expected to maintain the project schedule and delivery dates as defined within the contract documents.

The new addition and renovation will include the following elements:• New lobby/ reception area, public restrooms, staff office and facilities support space.• The existing Building “D” renovation work consists of wall reconfiguration, entryreconfiguration, ceiling improvements, lighting improvements, and various room finishes including flooring.• Site Improvements including, concrete walkways, landscaped areas, ADA improvements to paved parking lot, utilities re-routing to support the new addition.• Additive Alternates including tenant improvement options and material upgrades.

The County of Santa Barbara has determined that all General Contractors wishing to bid on the Betteravia Administration Building “D” Addition must be prequalified prior to submitting a bid on the project.The County’s competitive selection process will proceed in two steps:Step 1: The construction General Contractor pre-qualification phase.Step 2: Submittal of bids according to the requirements of the bid documents.Only those successfully qualified in step 1 will be allowed to participate in step 2.

Addenda: 0

County of Santa Barbara, CA 805-568-2663County of Santa Barbara - John Green, Santa Barbara, CA 805-934-6229

PrebidDhaliwal Residence - Bid Set Camarillo

Ref # Project Type: Public Est:

Prebid Conference: Project Description: NEW ±18,000 S.F. HABITABLE RESIDENCE WITH TWO 4 CAR

Addenda: 0

Coast Reprographics 220 West Canon Perdido Street, Santa Barbara, CA 93101 805-962-9155

TISH NON VILLAGE COMMUNITY CENTER Loleta

Ref # Project Type: Public Est:

Prebid Conference: Project Description: 31,167 sq. ft., 2 stories on 230,176 sq.ft. site

Addenda: 0

= New Plans Entered This Week

Page 34: SBCA Weekly Newsletter

34

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Santa Barbara Contractors Association Projects Out to Bid 5/2/2012

1020 Placido Santa Barbara

Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Remodel of an (e) single family residence for a (n) detox facility with maximun 12 clients and on site staff. Exterior improvements: (n) accessible ramp and stairs, (n) van H/C parking space, (n) deck w/ associates ramps and stairs. (n) exterior wall finishes, (n) windows and doors.

Interior improvements: remodel ground floor for H/C access, remodel restroom for accessiility, remodel den to create accessible bedroom, remodel kitchen for accessibility. Remodel for exiting and fire rated conditions due to change of occupancy.

Addenda: 0

Housing Authority of the City of Santa Barbara - Hector Torres 808 Laguna Street, Santa Barbara, CA 93101 805-897-1060Coast Reprographics 220 West Canon Perdido Street, Santa Barbara, CA 93101 805-962-9155

Greyhound Santa Barbara

Ref # Project Type: Public Est:

Prebid Conference:

Project Description: FORMER USE: BICYCLE SALES SHOP. PROPOSED USE: SMALL MARKET THAT WILL ALSO SELL GREYHOUND TICKETS.

PROPERTY OWNER: Redevelopment Agency of the City of Santa Barbara

A.P.N.‘s: 033-010-11,-13,-14,-15; 033-041-12,-13; 033-042-1,-2,-3,-4,-12, -14,-15,-16,-17,-19; 033-075-12,-14.

ADDRESS: 224 Chapala St. ZONING: HRC-2/SD-3 BLD: BLD2010-01798 LOT AREA: 2.21 acres GENERAL PLAN NEIGHBORHOOD: Downtown/Waterfront Lower State HIGH FIRE: No FLOOD ZONE: AH Zone AVG. SLOPE: 1% MAX BLDG. HEIGHT ALLOWED: 45’, 3-STORIES MAX BLDG HEIGHT: 20’, 1-STORY YARD REQUIREMENTS: FRONT YARD SETBACK: 10 FT < 15’ Bldg Hght, 20’ all others INTER. YARD SETBACK: 10 FT or 1/2 Bldg Hght (whichever greater) PARKING Parking Required:104 Spaces Parking Provided (existing): 158 (151 Spaces & 7 HC Spaces) Bicycle Parking (existing): 15 City Standard Posts

Addenda: 0

Coast Reprographics 220 West Canon Perdido Street, Santa Barbara, CA 93101 805-962-9155

Harper Residence Thousand Oaks

Ref # Project Type: Public Est:

Prebid Conference: Project Description: New Construction of House & Pool House

Addenda: 0

Coast Reprographics 220 West Canon Perdido Street, Santa Barbara, CA 93101 805-962-9155

= New Plans Entered This Week

Page 35: SBCA Weekly Newsletter

35

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

CONSTRUCTION MONITOR'S REPORT

for permits issued between: 4/16/2012 4/20/2012and

Building & Safety DivisionCity of Santa Barbara

ROLEADDRESS VAL. $ DATE ISSUEDPERMIT #

BLD2011-02164 555 LA MARINA DR R/B-ADDITION PRICE, STEPHEN L OWNER

555 LA MARINA DR SANTA BARBARACA 93109

45,000 4/19/2012

BELOW MAGID CONSTRUCTION CO.

CON 805-966-3646146 POWERS AVE. SANTA BARBARA CA 93103

ERIC SWENUMSON

DES 805-967-55075521 SAN ARDO WAY SANTA BARBARA CA 93111

BLD2012-00336 206 E PADRE ST R/A-ALTERATION BUTNER, STEVEN & LYNDA REVOCABLE TR OWNER

206 E PADRE ST SANTA BARBARACA 93105

30,000 4/18/2012

ROBERTS CUSTOM INTERIORS

CON 684-1649500 MAPLE #3 CARPINTERIA CA 93013

ERIC SWENUMSON ***

DES 805-967-5507654 ANDAMAR WAY GOLETA CA 93117

BLD2012-00367 710 MAS AMIGOS A R/A-ALTERATIONELEANOR PRECODA OWNER

1031 A CALLE SASTRE SANTA BARBARACA 93105

30,000 4/20/2012

BERTO VAN VEEN CONSTRUCTION

CON 937-3928220 E CLARK SUITE C SANTA MARIA CA 93455

BLD2012-00582 1032 CALLE SASTRE A R/A-ALTERATIONRUTH GEORGI OWNER

4102 HIDDEN OAKS RD SANTA BARBARACA 93105

805-687-8098 30,000 4/20/2012

BERTO VAN VEEN CONSTRUCTION

CON 937-3928220 E CLARK SUITE C SANTA MARIA CA 93455

LAND ARCH. INC.

DES 310-228-70001155 PALM ST #6 ATTN: BRIAN ACKERMAN SAN LUIS OBISPO CA 9340

BLD2012-00662 2941 STATE ST C/OTC-PV HOUSING AUTHORITY OF CITY OF SANTA OWNER

808 LAGUNA STATTN: ROBERT G PEARSON

SANTA BARBARACA 93101

26,500 4/18/2012

SCOTT AND SONS ELECTRIC INC

CON 642-8547423 ROBIN COURT FILLMORE CA 93015

Page 36: SBCA Weekly Newsletter

CONSTRUCTION MONITOR'S REPORT

for permits issued between: 4/23/2012 4/26/2012and

Building & Safety DivisionCity of Santa Barbara

ROLEADDRESS VAL. $ DATE ISSUEDPERMIT #

BLD2011-00139 2375 FOOTHILL RD C/A-SITE WORK T C S B LTD OWNER

2375 FOOTHILL RD SANTA BARBARACA 93105

45,000 4/26/2012

MCMAHON GROUP

CON 701-6979231 COURT AVE VENTURA CA 93003

FARREL T MILES

ENG 818-994-62787136 HASKELL AVE. #204 VAN NUYS CA 91406

THOMAS MCMAHON

ARC 896-55675082 ROCOSO WAY SANTA BARBARA CA 93111

BLD2011-01918 1433 STATE ST C/A-ALTERATION VINCENT RICHARD & MARLENE C TRUSTEE OWNER

3944 STATE ST STE 200 SANTA BARBARACA 93105

28,000 4/26/2012

168 CONSTRUCTION AND REMODELING

CON 626-284-6682821 S. 4TH ST. ALHAMBRA CA 91801

BLD2011-02599 1667 LAS CANOAS RD R/D-JF-REBUILD FRANK, JEFFREY HOWARD TRUST 7/17/06 OWNER

3 ROSEMARY LN SANTA BARBARACA 93108

1,000,000 4/26/2012

ALLEN ASSOCIATES***

CON 884-8777201 N. MILPAS STREET SB CA 93101

THOMPSON-NAYLOR

ARC 966-9807 SANTA BARBARA CA

BLD2011-02684 1800 EL ENCANTO RD R/B-ALTERATION FINAMORE, SUZANNE J REVOCABLE LIVIN OWNER

1800 EL ENCANTO RD SANTA BARBARACA 93103

35,000 4/26/2012

ERIC MOSSMAN

ARC 949-675-12522025 W. BALBOA BLVD SUITE B NEWPORT BEACH 92663

SUZANNE FINAMORE

OWN [email protected] MIRA VISTA AVE SANTA BARBARA CA 92633

BLD2012-00158 730 E ALAMAR AVE R/B-ADDITION QUIJANO, RALPH & CATHERINE 1995 REV OWNER

730 E ALAMAR AVE SANTA BARBARACA 93105

98,000 4/23/2012

36

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 37: SBCA Weekly Newsletter

ROLEADDRESS VAL. $ DATE ISSUEDPERMIT #

CUNNINGHAM-PARRIS CONSTRUCTION

CON 688-9947PO BOX 1927 BUELLTON CA 93427

LENVIK & MINOR

ARC 805-963-3357315 W HALEY ST SANTA BARBARA CA 93101

BLD2012-00178 2026 CLIFF DR C/A-ALTERATIONILAN LEVI OWNER

1616 LA VISTA DEL OCEANO SANTA BARBARACA 93109

805-962-8700 30,000 4/24/2012

FRANK SCHIPPER CONSTRUCTION

CON 331-5411610 E. COTA ST SANTA BARBARA CA 93101

PAUL POIRIER

ARC 682-8894156 WEST ALAMAR AVE, STE C SANTA BARBARA CA 93105

BLD2012-00204 319 COLEMAN AVE R/B-ADDITION TORGESON, JOHN ERIC OWNER

319 COLEMAN AVE SANTA BARBARACA 93109

95,000 4/26/2012

MITCH PERKINS

ENG 568-0880226 E CANON PERDIDO STE. A SANTA BARBARA CA 93101

BLD2012-00486 2225 SANTA BARBARA ST R/B-ALTERATION GINDER FAMILY TRUST 10/25/05 OWNER

2225 SANTA BARBARA ST SANTA BARBARACA 93105

40,000 4/24/2012

WADE DAVIS DESIGN

ARC [email protected]. BOX 390 SANTA BARBARA CA 93102

MICHAEL GRAY

ENG 805-641-1324149 ANACAPA ST. VENTURA CA 93001

BLD2012-00520 3701 PORTOFINO WAY R/A-ALTERATION CRAIG, BRUCE/RANDA TRUST 4/15/10 OWNER

12 KINEVAN RD SANTA BARBARACA 93105

30,000 4/25/2012

A A A DEVELOPMENT INC

CON 482-71911592 ANACAPA DR CAMARILLO CA 93010

37

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 38: SBCA Weekly Newsletter

38

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 39: SBCA Weekly Newsletter

39

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 40: SBCA Weekly Newsletter

40

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 41: SBCA Weekly Newsletter

41

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 42: SBCA Weekly Newsletter

42

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 43: SBCA Weekly Newsletter

43

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 44: SBCA Weekly Newsletter

44

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 45: SBCA Weekly Newsletter

45

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 46: SBCA Weekly Newsletter

46

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 47: SBCA Weekly Newsletter

47

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 48: SBCA Weekly Newsletter

48

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 49: SBCA Weekly Newsletter

49

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 50: SBCA Weekly Newsletter

50

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 51: SBCA Weekly Newsletter

51

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 52: SBCA Weekly Newsletter

52

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 53: SBCA Weekly Newsletter

53

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 54: SBCA Weekly Newsletter

54

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 55: SBCA Weekly Newsletter

55

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 56: SBCA Weekly Newsletter

56

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 57: SBCA Weekly Newsletter

57

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 58: SBCA Weekly Newsletter

58

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 59: SBCA Weekly Newsletter

59

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 60: SBCA Weekly Newsletter

60

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 61: SBCA Weekly Newsletter

61

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 62: SBCA Weekly Newsletter

62

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 63: SBCA Weekly Newsletter

63

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 64: SBCA Weekly Newsletter

64

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 65: SBCA Weekly Newsletter

65

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 66: SBCA Weekly Newsletter

66

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Page 67: SBCA Weekly Newsletter

67

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

Unlicensed Operators

Like legitimate contractors, unlicensed operators sometimes use advertising to find new clients. Ads without license numbers or with numbers that are not issued by the CSLB are frequently used by the Board to identify sting targets.

The CSLB and other enforcement agencies use two sections of the law—B&P Sections 7027.1 and 7099.10—to take legal action against unlicensed contractors and, on occasion, against licensed contractors who advertise illegally.

If an unlicensed operator advertises as a contractor in a telephone directory, and if an investigation determines the entity doing the advertising is unlicensed, under B&P Section 7099.10 (a), the Registrar can issue a citation for a fine or other civil penalty assessment. The citation will also include an order of correction that requires:

any phone number in the unlawful ad and to not refer subsequent calls to any new number obtained by that person. If the order of correction isn’t made, the Registrar can have the Public Utilities Commission disconnect the phone service.

If you believe that an unlicensed contractor is actively working on a construction project, contact the CSLB at 1-800-321-CSLB (2752) or fill out a “SWIFT Lead Referral” form, which is available on the CSLB Web site, www.cslb.ca.gov.

CONTRACTORS STATE LICENSE BOARD DEPARTMENT OF CONSUMER AFFAIRS

ADVERTISINGGUIDELINES

ADVERTISING

Include your license number in

anything that might be considered

advertising.

Don’t use false or misleading

advertising, or advertise a price

you don’t intend to honor.

Don’t advertise to do work you’re

not licensed to perform.

Don’t advertise about bonding.

When advertising asbestos

removal services, be sure to include

your asbestos certification and

registration numbers along with

your business name.

Notify CSLB whenever you see

advertising for an unlicensed

contractor.

CONTRACTORS STATE LICENSE BOARD

P.O. Box 26000Sacramento, CA 95826-00261-800-321-CSLB (2752)www.cslb.ca.gov

D E P A R T M E N T O F C O N S U M E R A F F A I R S

07/08

Unlicensed Operators

Like legitimate contractors, unlicensed operators sometimes use advertising to find new clients. Ads without license numbers or with numbers that are not issued by the CSLB are frequently used by the Board to identify sting targets.

The CSLB and other enforcement agencies use two sections of the law—B&P Sections 7027.1 and 7099.10—to take legal action against unlicensed contractors and, on occasion, against licensed contractors who advertise illegally.

If an unlicensed operator advertises as a contractor in a telephone directory, and if an investigation determines the entity doing the advertising is unlicensed, under B&P Section 7099.10 (a), the Registrar can issue a citation for a fine or other civil penalty assessment. The citation will also include an order of correction that requires:

any phone number in the unlawful ad and to not refer subsequent calls to any new number obtained by that person. If the order of correction isn’t made, the Registrar can have the Public Utilities Commission disconnect the phone service.

If you believe that an unlicensed contractor is actively working on a construction project, contact the CSLB at 1-800-321-CSLB (2752) or fill out a “SWIFT Lead Referral” form, which is available on the CSLB Web site, www.cslb.ca.gov.

CONTRACTORS STATE LICENSE BOARD DEPARTMENT OF CONSUMER AFFAIRS

ADVERTISINGGUIDELINES

ADVERTISING

Include your license number in

anything that might be considered

advertising.

Don’t use false or misleading

advertising, or advertise a price

you don’t intend to honor.

Don’t advertise to do work you’re

not licensed to perform.

Don’t advertise about bonding.

When advertising asbestos

removal services, be sure to include

your asbestos certification and

registration numbers along with

your business name.

Notify CSLB whenever you see

advertising for an unlicensed

contractor.

CONTRACTORS STATE LICENSE BOARD

P.O. Box 26000Sacramento, CA 95826-00261-800-321-CSLB (2752)www.cslb.ca.gov

D E P A R T M E N T O F C O N S U M E R A F F A I R S

07/08

Unlicensed Operators

Like legitimate contractors, unlicensed operators sometimes use advertising to find new clients. Ads without license numbers or with numbers that are not issued by the CSLB are frequently used by the Board to identify sting targets.

The CSLB and other enforcement agencies use two sections of the law—B&P Sections 7027.1 and 7099.10—to take legal action against unlicensed contractors and, on occasion, against licensed contractors who advertise illegally.

If an unlicensed operator advertises as a contractor in a telephone directory, and if an investigation determines the entity doing the advertising is unlicensed, under B&P Section 7099.10 (a), the Registrar can issue a citation for a fine or other civil penalty assessment. The citation will also include an order of correction that requires:

any phone number in the unlawful ad and to not refer subsequent calls to any new number obtained by that person. If the order of correction isn’t made, the Registrar can have the Public Utilities Commission disconnect the phone service.

If you believe that an unlicensed contractor is actively working on a construction project, contact the CSLB at 1-800-321-CSLB (2752) or fill out a “SWIFT Lead Referral” form, which is available on the CSLB Web site, www.cslb.ca.gov.

CONTRACTORS STATE LICENSE BOARD DEPARTMENT OF CONSUMER AFFAIRS

ADVERTISINGGUIDELINES

ADVERTISING

Include your license number in

anything that might be considered

advertising.

Don’t use false or misleading

advertising, or advertise a price

you don’t intend to honor.

Don’t advertise to do work you’re

not licensed to perform.

Don’t advertise about bonding.

When advertising asbestos

removal services, be sure to include

your asbestos certification and

registration numbers along with

your business name.

Notify CSLB whenever you see

advertising for an unlicensed

contractor.

CONTRACTORS STATE LICENSE BOARD

P.O. Box 26000Sacramento, CA 95826-00261-800-321-CSLB (2752)www.cslb.ca.gov

D E P A R T M E N T O F C O N S U M E R A F F A I R S

07/08

Page 68: SBCA Weekly Newsletter

68

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

New New New New

Page 69: SBCA Weekly Newsletter

69

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

2012 ADVERTISING RATE SHEET

FORMAT OF ARTWORK - Artwork must be submitted in a digital format. Web Banner Ads can not be larger than 15KB. Artwork must be exact size. We accept PDF, TIFF, JPEG, GIF; InDesign & Illustrator �les save as EPS & have fonts turned to outlines.

SUBMISSION OF ARTWORK - Please deliver your artwork along with your payment to the SBCA. Send emails to [email protected] or mail a CD to P.O. Box 23409, Santa Barbara, CA 93121 or deliver to the SBCA o�ce at 914 A Santa Barbara Street, Santa Barbara, CA 93101.

ARTWORK QUALITY - The SBCA is not responsible for the quality of ads that do not meet the above criteria. Advertisers must be current members of the SBCA. All advertisements are subject to approval by the SBCA Board of Directors.

PAYMENT -

Santa Barbara Contractors AssociationP.O. Box 23409, Santa Barbara, CA 93121805-884-1100 phone 805-884-1108 fax

www.sbcontractors.org [email protected]

SIZE BLACK & WHITE COLORA - Business Card - 3.5” x 2” $250 $280 B - 1/4 Page - 3.5” x 4.75” $375 $420 C - 1/2 Page - 7.375” x 4.75” $625 $700 D - Full Page - 7.375” x 10.25” $1065 $1190 Inside Cover & Tab Full Pages - 7.375” x 10.25” $2800 (Call for availability!)Back Cover - 7.375 x 10.25” $3600 (Call for availability!) Highlighted Member Listing $100

DISTRIBUTION - The Resource Directory is sent to each member of the SBCA and is also stocked at the SBCA o�ce. Resource Directories are also distributed to the AIA SB Chapter, Santa Barbara Board of Realtors, local retail home design showrooms, material suppliers, banks, building departments, public agencies, and +organizations. For the �rst time, the SBCA will also place an online version of the Resource Directory on the webpage to maximize your advertising dollars and reach a larger audience. Additional copies can be picked up at the SBCA o�ce during normal business hours and are available free of charge.

DEADLINE - Artwork and payment must be received no later than March 31, 2012. Resource Directory is printed once a year.

2012 Resource Directory for Contractors & Homeowners Advertising

The SBCA accepts Check Visa Master Card American Express

Company Name Contact Name Signature Date

Credit Card Number Expiration Date Security Code Authorized Charge $

D

C

BA

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

abcdefabcdefabcdefabcdef

HIGHLIGHTED MEMBER LISTING

Page 70: SBCA Weekly Newsletter

70

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

2012 ADVERTISING RATE SHEET

Aging In PlaceAlarm SystemsArchitectsAsbestos Consulting and TestingAsbestos Removal ContractorsAttorneysAuctioneersAudio / Video SuppliersAutomotive Sales and ServiceBathroom SafetyBoiler, Hot Water Heating and Steam Fitting ContractorsBondingBookkeeping, PayrollBuilding Materials and SuppliersBuilding Moving/Demolition ContractorsCabinet, Millwork and Finish Carpentry ContractorCabinetry and Millwork SuppliersCeramic and Mosaic Tile ContractorsCleaning ServicesClosetsConcrete ContractorsConcrete Ready Mix / Rock and Sand SuppliersConstruction ForensicsConstruction Management ServicesConstruction WasteCrawlspacesDecks and Siding ContractorsDesignersDoors and WindowsDoors, Gates and Activating DevicesDrilling, Blasting and Oil Field WorkDrywall ContractorsEarthwork and Paving ContractorsEducational InstitutionsElectrical ContractorsElectrical SuppliersEmployment/Temporary WorkEnergy Audit ConsultingEngineering, Surveying and PlanningEquipment Sales and RentalsFence RentalsFencing ContractorsFinancial ServicesFinish CarpentryFire & Water Cleanup/RestorationFire / Water / Asbestos / Mold RestorationFire Protection ContractorsFloor Covering Suppliers Flooring and Floor Covering ContractorsFoundation Underpinning and RepairFraming ContractorsGeneral ContractorsGeneral Contractors - CommercialGeneral Contractors - ResidentialGeneral Engineering ContractorsGeologistsGeotechnical EngineeringGlazing ContractorsGovernment AgenciesGranite and Marble Countertop SuppliersGreen Building ConsultingHardware Suppliers

Honorary MembersHorizontal Boring/DrillingHotel and Conference FacilitiesHuman Resource ServicesInspectionsInsulation and Acoustical ContractorsInsurance ServicesIntegrationInterior DesignersIrrigation and Drainage Material SuppliersLandscape SuppliersLandscaping ContractorsLathing and Plastering ContractorsLead AbatementLead Paint Consulting and TestingLow Voltage Systems ContractorsManufactured Housing ContractorsMarble & Stone FabricationMarketing/AdvertisingMasonry ContractorsMetal Stud Framing ContractorsMold Mitigation and IAQMold/IAQ Consulting and TestingNon-Chlorine Swimming Pool/Spa SystemsNon-Pro�t OrganizationsNurseriesOrnamental Metal ContractorsPainting and Decorating ContractorsPayroll ServicesPlumbing and Appliance SuppliersPlumbing ContractorsProperty ManagementPublic UtilitiesQuickbooks ConsultingRadiant Floor Heating SupplierReinforcing Steel ContractorsReprographicsResidential Electronic Systems ConsultingRetaining Wall & Shotcrete ContractorsRoo�ng ContractorsSafety Training and ComplianceSanitation System ContractorsSheet Metal ContractorsSolar ContractorsStone Distributors Structural EngineersStructural Steel ContractorsSwimming Pool ContractorsTankless Water Heater SuppliersTech Help / Computer RepairTile and Stone SuppliersTool and Equipment Repair Tool SuppliersTree ServiceUnion Vocational TrainingWarm-Air Heating, Ventilating and Air-ConditioningWater AgencyWaterproo�ng ContractorsWeatherization Material SuppliersWelding ContractorsWindow Coverings

TRADE LISTING(S) CONSTRUCTION SERVICE(S) - with your membership you receive one free trade listing in our printed and online directory. If you would like to be listed under other classi�cations, there is a fee of $25 for each additional category at time of request.

Page 71: SBCA Weekly Newsletter

71

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER May 2, 2012

2012 ADVERTISING RATE SHEET

SIZE BIANNUALLY ANNUALLYSBCA Website - 468 x 60 pixels $850 $1500 SBCA Online Planroom - Level 1 - 234 x 60 pixels $425 $ 750 SBCA Online Planroom - Level 2 - 234 x 60 pixels $425 $ 750 SBCA Online Planroom - Level 3 - 468 x 60 pixels $600 $1000 SBCA Online Planroom - Level 4 - 468 x 60 pixels $600 $1000 SBCA Online Planroom - Level 5 - 221 x 26 pixels $600 $1000 SBCA Online Planroom - Level 6 - 468 x 60 pixels $850 $1500 SBCA Online Planroom - Level 7 - 221 x 125 pixels $850 $1500

RUN TIME - The Santa Barbara Contractors Association web site www.sbcontractors.org, had more than 2.7 million visitors in the year 2011. Ads run for 12 seconds each on every page of the site. All banner ads can link to your company website. The online planroom site runs per click in each zone, and a biannual report of ad views and ad clicks can and provided upon request. Levels are as follows: Level 1 - Planrooms, Bidding Projects, CSI Projects, Keyword Search Results, View & Print Project Docs, Level 2 - Planrooms, Bidding Projects, CSI Projects, Project Info Search, Install Software, Level 3 - Login Page, Level 4 - Login Page, Level 5 - Project Details, Level 6 - My Desk, CSI Code Setup, Keyword Spec Search, Daily Project Email Setup, Support Center, View Activity, Add to Bidders and Search Spec Book, Level 7 - Project Details.

2012 Web Banner Advertising

SIZE 13 ISSUES 52 ISSUESBusiness Card - 3.5” x 2” $125 $ 400 1/4 Page - 3.5” x 4.75” $175 $ 650 1/2 Page - 7.375” x 4.75” $350 $1200 Full Page - 7.375 x 10.25” $500 $1750 Full Page - 7.375 x 10.25” - 1 Issue Special Insert $300 (please provide run date)

DISTRIBUTION - The Santa Barbara Contractors Association Newsletter is distributed 52 times a year to over 600 subscribers. Copies are delivered electronically on Wednesdays. The Newsletter is provided free to association members.

DEADLINES - Artwork must be received by Wednesday at noon for the following Wednesday’s publication.

2012 Newsletter Advertising

FORMAT OF ARTWORK - Artwork must be submitted in a digital format. Web Banner Ads can not be larger than 15KB. Artwork must be exact size. We accept PDF, TIFF, JPEG, GIF; InDesign & Illustrator �les save as EPS & have fonts turned to outlines.

SUBMISSION OF ARTWORK - Please deliver your artwork along with your payment to the SBCA. Send emails to [email protected] or mail a CD to P.O. Box 23409, Santa Barbara, CA 93121 or deliver to the SBCA o�ce at 914 A Santa Barbara Street, Santa Barbara, CA 93101.

ARTWORK QUALITY - The SBCA is not responsible for the quality of ads that do not meet the above criteria. Advertisers must be current members of the SBCA. All advertisements are subject to approval by the SBCA Board of Directors.

PAYMENT -

Santa Barbara Contractors AssociationP.O. Box 23409, Santa Barbara, CA 93121805-884-1100 phone 805-884-1108 fax

www.sbcontractors.org [email protected]

The SBCA accepts Check Visa Master Card American Express

Company Name Contact Name Signature Date

Credit Card Number Expiration Date Security Code Authorized Charge $

Page 72: SBCA Weekly Newsletter

Board of Directors

John HolehousePresident

Jack Martin1st Vice President

Paulo Sitolini2nd Vice President

Dan GeorgeTreasurer

Peter NovakParliamentarian

Patrick Foster

David James

Brian Larkowski

William Mace

Mark Magid

Aaron McKean

Rodney Utt

Executive DirectorKarin [email protected]

Administrative AssistantApril [email protected]

Santa Barbara Contractors Association914 A Santa Barbara StreetP. O. Box 23409Santa Barbara, CA 93121805.884.1100 Phone805.884.1108 Faxinfo@sbcontractors.orgwww.sbcontractors.orgwww.builtgreensb.org

The Santa Barbara Contractors Association Newsletter is published weekly by the Santa Barbara Contractors Association, Inc. Edito-rial and advertising offices are located at 914 A Santa Barbara Street, P.O. Box 23409, Santa Barbara, CA 93121. Office 805-884-1100, Fax 805-884-1108, Email [email protected]. A subscription is included in the annual membership dues. The news-letter is distributed to more than 600 local businesses and agencies. Articles appearing in this newsletter are presented as a public service and may not reflect the opinion of the publisher, its board of directors or its members. Please send comments regarding the newsletter to [email protected].