sbca weekly newsletter 06/13/12

63
WEEKLY NEWSLETTER June 13, 2012 Volume 18 Issue 24 Santa Barbara Contractors Association Celebrating Over 60 Years of Service to the Community In This Issue New Rules for Preventing Heat Illness Page 1 Calendar Highlights Page 2 Tailgate Safety Topic Page 7 Heat Safety Supervisor’s Checklist Page 13 Kalb’s Q & A for Contractors Page 14 SBCA Online Planroom Report Page 16 SB City Building Permits Page 29 South County Building Permits Page 31 North County Building Permits Page 49 SBCA Ad Rates for 2012 Page 51 We protect the people who build California. Will my supplies be here on time? Am I going to get this bid? We understand those on the job in California have more on their mind than workers’ compensation insurance. So let us put your mind at ease: you can count on the strength and stability of State Fund. We’ve never pulled out of the market due to an economic downturn, and we never will. Visit statefundca.com today to learn about the 6% discount on premiums we offer eligible SBCA members. Your individual business may be eligible for even more discounts. Thanks for reading…we’ll let you get back to work. Together, we’ll help keep California working. www.statefundca.com Ask for SBCA Group #821 New Rules For Preventing Heat Illnesses “As employers we have to train our employees about heat illness, what we’re doing on our worksite to pre- vent it, and how to respond in an emergency. It’s worth it in the end to make sure everyone is well-pre- pared” – construction contractor Cal OSHA adopted a heat illness prevention regulation to prevent heat-related illnesses and deaths. It includes training, temperature moni- toring, rest periods, and access to shade, all important factors you need to know to prevent heat-related illnesses. Employers must evaluate outdoor working loca- tion for air temperature, humidity, and radiant heat from the sun to see if there is a risk for heat illnesses. Employers must also evaluate work- load, the protective clothing employees are re- quired to wear, and the personal protective gear used to see how they add to the risk. Preventing Heat-Related Illnesses When the body heats up faster than it can cool itself, mild to severe illnesses may develop. It’s important to recognize the symptoms of heat- related illnesses and understand how to pre- vent, control and respond to their effects. Air temperature, humidity and clothing can increase the risk of developing heat-related ill- nesses. So can age, sex, weight, physical fitness, nutrition, alcohol or drug use, or pre-existing diseases like diabetes. How can you prevent or control heat-related ill- nesses? Drink water - Drink small amounts of water frequently, about a cup every 15-20 min- utes. (Alcohol increases the loss of body fluids.) Limit exposure time and/or temperature - Try to schedule hot jobs for cooler times of the day or cooler seasons of the year. Take rest breaks in cool areas. Add more workers to reduce workload or reduce the workday. Acclimatization - Gradually adapting to heat will reduce the severity of heat stress. Engineering controls - Mechanize heavy jobs or increase air movement with fans or coolers. Wearing loose, lightweight clothing - Cloth- ing can affect heat buildup. Salt tablets should not be used - Taking salt tablets can raise blood pressure, cause stomach ulcers, and seriously affect work- ers with heart disease. Someone with a mild reaction to heat may have a rash called “prickly heat” or painful muscle spasms, called heat cramps, during or after ac- tivity. A mild reaction may also include fatigue or dizziness. You may notice a change in physi- To avoid heat illness, EMPLOYERS MUST PROVIDE This is required by California’s Heat Illness Prevention Standard (GISO 3395). Plenty of cool, fresh water Shade to rest and cool down– at least 5 minutes at a time as needed A period of time to get used to working in the heat Training on heat illness, how to prevent it and what to do if someone has symptoms A plan for emergencies Continued on page 14

Upload: april-ford

Post on 23-Mar-2016

227 views

Category:

Documents


10 download

DESCRIPTION

SBCA Weekly Newsletter 06/13/12

TRANSCRIPT

WEEKLY NEWSLETTER June 13, 2012 Volume 18 Issue 24

Santa Barbara Contractors Association Celebrating Over 60 Years of Service to the Community

In This IssueNew Rules for Preventing Heat Illness Page 1Calendar Highlights Page 2Tailgate Safety Topic Page 7Heat Safety Supervisor’s Checklist Page 13Kalb’s Q & A for Contractors Page 14SBCA Online Planroom Report Page 16SB City Building Permits Page 29South County Building Permits Page 31North County Building Permits Page 49SBCA Ad Rates for 2012 Page 51

We protect the people who build California.

Will my supplies be here on time? Am I going to get this bid? We understand those on the job in California have more on their mind than workers’ compensation insurance. So let us put your mind

at ease: you can count on the strength and stability of State Fund. We’ve never pulled out of the market due to an economic downturn, and we never will. Visit statefundca.com today to learn about

the 6% discount on premiums we offer eligible SBCA members. Your individual business may be

eligible for even more discounts. Thanks for reading…we’ll let you get back to work.

Together, we’ll help keep California working.www.statefundca.comAsk for SBCA Group #821

New Rules For Preventing Heat Illnesses“As employers we have to train our employees about heat illness, what we’re doing on our worksite to pre-vent it, and how to respond in an emergency. It’s worth it in the end to make sure everyone is well-pre-pared”– construction contractor

Cal OSHA adopted a heat illness prevention regulation to prevent heat-related illnesses and deaths. It includes training, temperature moni-toring, rest periods, and access to shade, all important factors you need to know to prevent heat-related illnesses.

Employers must evaluate outdoor working loca-tion for air temperature, humidity, and radiant heat from the sun to see if there is a risk for heat illnesses. Employers must also evaluate work-load, the protective clothing employees are re-quired to wear, and the personal protective gear used to see how they add to the risk.

Preventing Heat-Related Illnesses

When the body heats up faster than it can cool itself, mild to severe illnesses may develop. It’s important to recognize the symptoms of heat-related illnesses and understand how to pre-vent, control and respond to their effects. Air temperature, humidity and clothing can

increase the risk of developing heat-related ill-nesses. So can age, sex, weight, physical fitness, nutrition, alcohol or drug use, or pre-existing diseases like diabetes.

How can you prevent or control heat-related ill-nesses?

Drink water - Drink small amounts of water •frequently, about a cup every 15-20 min-utes. (Alcohol increases the loss of body fluids.)Limit exposure time and/or temperature - •Try to schedule hot jobs for cooler times of the day or cooler seasons of the year. Take rest breaks in cool areas. Add more workers to reduce workload or reduce the workday.Acclimatization - Gradually adapting to •heat will reduce the severity of heat stress.Engineering controls - Mechanize heavy •jobs or increase air movement with fans or coolers.Wearing loose, lightweight clothing - Cloth-•ing can affect heat buildup.Salt tablets should not be used - Taking •salt tablets can raise blood pressure, cause stomach ulcers, and seriously affect work-ers with heart disease.

Someone with a mild reaction to heat may have a rash called “prickly heat” or painful muscle spasms, called heat cramps, during or after ac-tivity. A mild reaction may also include fatigue or dizziness. You may notice a change in physi-

• suficiente agua fresca

• un área de sombra para descansar – por lo menos 5 minutos, cada vez que lo necesiten para refrescarse

• un plazo de tiempo para acostumbrarse al calor

• capacitación sobre las enfermedades por calor, maneras de prevenirlas y qué hacer si alguien tiene síntomas

• Un plan de emergencia

To avoid heat illness, EMPLOYERS MUST PROVIDE

This is required by California’s Heat Illness Prevention Standard (GISO 3395).

• Plenty of cool, fresh water

• Shade to rest and cool down– at least 5 minutes at a time as needed

• A period of time to get used to working in the heat

• Training on heat illness, how to prevent it and what to do if someone has symptoms

• A plan for emergencies

Estos son los requisitos de la norma de “Prevención de las Enfermedades por Calor” (GISO 3395).

Para prevenir las enfermedades por calor, LOS PATRONES DEBEN PROPORCIONAR

Continued on page 14

2

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

JUNE 2012BPI Training & CertificationJune 4 - 9, 2012 from 8:00am to 5:00pmLocation: Built Green Resource Center,914 A Santa Barbara Street

SBCA Board of Directors MeetingJune 5, 2012 from 5:00pm to 7:00pmLocation: SBCA, 914 A Santa Barbara Street

SBCA Online Planroom Demo & TrainingJune 6, 2012 from 10:00am to 11:00amLocation: SBCA, 914 A Santa Barbara Street

Built Green OrientationJune 6, 2012 from 9:00am to 10:00amLocation: Built Green Resource Center,914 A Santa Barbara Street

Green Building Education SeriesPresented by Paul Poirier, USGBC C4June 11, 2012 from 12:00pm to 1:30pmLocation: Built Green Resource Center,914 A Santa Barbara Street

Green Building Education SeriesPresented by Paul Poirier, USGBC C4June 18, 2012 from 12:00pm to 1:30pmLocation: Built Green Resource Center,914 A Santa Barbara Street

1st Aid CPR Training & CertificationInstructor, Justin Haagen, Safety MattersJune 26, 2012 from 8:30am to 1:30pmLocation: SBCA, 914 A Santa Barbara Street

Quickbooks Training for ContractorsInstructor Monica Dittrich-SummersJune 27, 2012 from 10:00am to 11:00amLocation: SBCA, 914 A Santa Barbara Street

JULY 2012SBCA Office Closed Fourth of July HolidayJuly 4, 2012

SBCA Board of Directors MeetingJuly 10, 2012 from 5:00pm to 7:00pmLocation: SBCA, 914 A Santa Barbara Street

SBCA Online Planroom Demo & TrainingJuly 11, 2012 from 10:00am to 11:00amLocation: SBCA, 914 A Santa Barbara Street

Calendar Highlights

Need to findout what’sgoing on?

Visit us online for a complete listof events, classes, trainings at

www.sbcontractors.org

Built Green OrientationJuly 12 2012 from 9:00am to 10:00amLocation: Built Green Resource Center,914 A Santa Barbara Street

EPA Lead Paint RRP TrainingPresented by Criterion EnvironmentalJuly 17 2012 from 7:30am to 5:00pmLocation: SBCA, 914 A Santa Barbara Street

Construction Contracts SeminarPresented by Chris Haskell of Price, Postel, & ParmaJuly 24 2012 from 9:00am to 11:30amLocation: SBCA, 914 A Santa Barbara Street

SBCA Builder of the Year Awards BanquetJuly 30, 2012 from 6:00pm to 9:00pmLocation: Fess Parkers Doubletree Resort,633 East Cabrillo Blvd., Santa Barbara

AUGUST 2012SBCA Online Planroom Demo & TrainingAugust 1, 2012 from 10:00am to 11:00amLocation: SBCA, 914 A Santa Barbara Street

Built Green OrientationAugust 2, 12 2012 from 9:00am to 10:00amLocation: Built Green Resource Center,914 A Santa Barbara Street

SBCA Board of Directors MeetingAugust 7, 2012 from 5:00pm to 7:00pmLocation: SBCA, 914 A Santa Barbara Street

1st Aid CPR Training & CertificationInstructor, Justin Haagen, Safety MattersAugust 21, 2012 from 8:00am to 2:00pmLocation: SBCA, 914 A Santa Barbara Street

3

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

Santa Barbara Contractors AssociationQuickBooks Troubleshooting Class

Popular Troubleshooting TopicsPayroll items set up and use - aligning with estimates & costsWorkers comp set up/use to include in labor burden & easy workers comp insurance reportingUsing purchase orders for tracking subcontracts - workaround for current QuickBooks issuesHandling joint checksEntry of advance deposits received (before work has commenced)Q & A Session

QuickBooks Premier for Contractors Edition - 2012Bring your laptops & questionsWorksheet & additional resources will be supplied

Santa Barbara Contractors AssociationP.O. Box 23409, Santa Barbara, CA 93121805.884.1100 phone 805.884.1108 faxwww.sbcontractors.org [email protected]

To register, please visit www.sbcontractors.org and go to Events Calendar.Pre-registration is required. Limited seating.

SBCA Member - $35 per person - Online registration fee

SBCA Member - $55 per person - Registration fee via email, fax, phone

Non-Member - $75 per person - Registration fee

Attendees MUST pay in advance to reserve their space(s).All registration is on a 1st come 1st serve basis until the seminar is full.

Late cancellation fees will be billed at 50% of the seminar price. No shows will be billed full seminar price.To avoid being billed you must cancel no later than 5 business days prior to training by 5:00PM.

LATE CANCELLATIONS = NO REFUNDS ~ NO CREDITS ~ NO ROLLING FORWARD ~ NO EXCEPTIONS.The SBCA reserves the right to cancel the class due to low enrollment.

Please register by 5pm on June 25, 2012

June 27 , 2012 from 10:00am to 11:00am

Presented by: Monica Dittrich-Summers, QuickBooks for Contractors Consultant

Location: SBCA O�ce, 914 A Santa Barbara Street

4

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

5

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

REGISTRATION Company

Attendee Name(s)

$15 SBCA Member in State Fund Group

$75 SBCA Member

$150 Non-Member

PAYMENT Enclosed is my check for $ (payable to SBCA)

Visa/MasterCard/AmEx $

Name on Card Card Number Exp Date Sec Code Email Phone Card Holders Signature

REMITTANCE OR QUESTIONS - Payment must accompany form -

Santa Barbara Contractors AssociationP.O. Box 23409, Santa Barbara, CA 93121

805.884.1100 phone 805.884.1108 faxwww.sbcontractors.org [email protected]

First Aid CPR Training & CertificationInstructor Justin Haagen, Safety Matters Certified Training

This course will cover adult, child and infant basic CPR and First Aid training for the home, workplace and the general community. 2 year Certification, Digital Student Guide & Free SmartPhone App.

Date:June 26, 2012

Time: 8:00am to 2:00pm30 Min. Lunch Break (Lunch not provided)

Location:SBCA Classroom 914 A Santa Barbara StreetSanta Barbara

Cost:$15 SBCA Member in State Fund Group$75 SBCA Member$150 Non-Member

Minimum 10 attendees per classMaximum 20 attendees per class

Emergency Action Steps• CPR Skills Adult/Child/Infant• AED Training• Sudden Cardiac Arrest• Adult/Child/Infant Choking• Heart Attack• Recovery Positions•

Bleeding Control• Diabetic Emergencies• Stroke• Deformed Limb• Managing Shock• Seizure & More•

6

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

We protect the people who build California.

Will my supplies be here on time? Am I going to get this bid? We understand those on the job in California have more on their mind than workers’ compensation insurance. So let us put your mind

at ease: you can count on the strength and stability of State Fund. We’ve never pulled out of the market due to an economic downturn, and we never will. Visit statefundca.com today to learn about

the 6% discount on premiums we o�er eligible GSBE members. Your individual business may be eligible for even more discounts. Thanks for reading…we’ll let you get back to work.

Together, we’ll help keep California working.statefundca.com

Member of Golden State Builders Exchanges

State Compensation Insurance Fund is not a branch of the State of California.

First ImpressionsAre Priceless!

First ImpressionsAre Priceless!

Hayward Design Center606 Olive Street

Santa Barbara, CA 93101(805) 965-7772

Goleta, CA 93117(805) 964-7711

. Architectural Mouldings

. Bathroom Cabinets

. Door Hardware

. Doors & Windows

. Kitchen Cabinets

. Lumber

. FSC-Certified Trusses

HAYWARDSO YOU CAN BUILD.

www.haywardlumber.com

7

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

P.O. Box 23409 Santa Barbara, CA 93121 805-884-1100 phone 805-884-1108 fax www.sbcontractors.org [email protected]

GIVE JACKS, LIFTS, AND HOISTS THE HIGH SAFETY PRIORITY THEY DESERVE

Each year serious injuries and deaths occur in the workplace as a result of unsafe jack, stands, lifts, and hoist use. Although safety

responsibility for these devices must be shared between employer and employee, the ultimate responsibility for safety lies with the individual

worker. Even where there is close supervision, the worker makes the final decision on how to do the job.

Jacks

Workers must select a jack with the rated lifting capacity that equals or exceeds the load it will support. Jacks must be placed on a firm,

level surface perpendicular to the load in order to work efficientially. If the jack slips out from under a load, workers may not have enough

time to get out of the way, so adjustable stands or other substantial support should also be placed underneath the load so that it will not fall

if the jack slips or fails. It should be clear to workers, that they should never enter beneath or work under a load that is supported only by

jacks. If a jack is bent or defective, it should be tagged and removed from service.

Hoists

Only workers who have been trained in the proper use of hoists should be allowed to operate them. The lifting capacity of the hoist must be

clearly marked and visible to the operator and cage-controlled hoists must be equipped with an effective warning devices. Before operation,

operators should check that the hoist chains or ropes are of sufficient strength and length to safely lift or otherwise handle the load. On a

chain hoist, they should make sure the hook has a safety clip so that if the chain is given slack the hook won’t come loose. The oil level on

hydraulic hoists should also be periodically checked. Operators should understand that they are prohibited from carrying loads over people

and any hoist malfunction should be reported to their supervisor immediately.

Lifts

Lifts should be marked with the name of the manufacturer, the approval number issued by the Division of Industrial Safety or statement of

compliance with ANSI B153.1-1974 (or if manufactured after 8/17/94, compliance with ANSI B153.1-1990), and date of installation. No one

should be inside a vehicle that will be lifted and for their safety, workers should stand to one side as the lift operates, making sure the doors,

hood, and trunk of the vehicle are closed before the lift. The load should rest squarely on the lift and not overload the lift’s capacity. The floor

under the lift should be free of oil or grease to prevent slipping hazards. Oil levels on hydraulic lifts should be checked periodically and lifts

removed from service if there are any indications of malfunctioning.

Many accidents don’t just happen, they’re caused by unsafe work practices or taking chances. Give jacks, stands, lifts, and hoists the high

safety priority they deserve.

Courtesy of the State Compensation Insurance Fund

Visit www.statefundca.com today to learn about the 6% discount on premiums we offer eligible SBCA members.

Your individual business may be eligible for even more discounts. Ask for Santa Barbara Contractors Association Group 821. For more tailgate, and other safety topics please visit us online.

The above evaluations and/or recommendations are for general guidance only and should not be relied upon for legal compliance purposes. They are based solely on the information provided to us and relate only to those conditions specifically discussed. We do not make any warranty, expressed or implied, that your workplace is safe or healthful or that it complies with all laws, regulations or standards.

Tailgate Safety Topic

8

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

Law Offices of Barton C. Merrill Trial Attorney and Counselor at Law

_______________________________________________________________

Specializing in Construction Law __________________________________________

Construction Litigation, including Mechanic’s Liens & Stop Notices Administrative Hearings before CalOSHA and the CSLB

Corporation & Partnership Agreements Contract Drafting & Review

_______________________________________________________________

Since 1989 Barton Merrill has represented contractors & design professionals in the Tri-Counties with all phases of construction.

_______________________________________________________________

225 E. Carrillo St., Suite 305 Santa Barbara, CA, 93101

(805) 750-0910 – Tel. (805) 564-8281 – FAX

[email protected]

FREE INITIAL CONSULTATION FOR SBCA MEMBERS

Expanding Our Office On the Central CoastPhilip E. Vega, President of Contractors & Developers Bonding is proud to announce the appointment of Myrna Smith, as Associate Vice President. She will be joining Jadon Smith, Vice President, and Manager of the new office in Pismo Beach.Contractors & Developers Bonding specializes in providing surety bonds to contractors and other surety clients. The largest independently owned, surety only broker in the western states, C&D bonding has over 80 years combined surety experience.

Let us know how we can assist with your surety bond needs

575 Price Street, #207 Pismo Beach, CA 93449 805-343-7434 www.cndbonding.com

Here to Assist with Your Surety Bond Needs

Myrna Smith, Associate Vice PresidentJadon Smith, Vice President

Now in Pismo Beach!

9

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

P.O. Box 23409 Santa Barbara, CA 93121 805-884-1100 phone 805-884-1108 fax www.sbcontractors.org [email protected]

DÉ A LOS GATOS HIDRÁULICOS, A LOS ELEVADORES Y A LOS GUINCHES LA ALTA PRIORIDAD DE SEGURIDAD QUE ELLOS SE MERECEN

Cada año, ocurren lesiones graves y muertes en los lugares de trabajo como resultado del uso inseguro de gatos hidráulicos, pedestales, elevadores y guinches. No obstante que la responsabilidad de seguridad por estos dispositivos debe compartirse entre el empleador y el empleado, la responsabilidad final por la seguridad radica en el trabajador individual. Incluso donde exista supervisión estrecha, el trabajador es quien tiene la última palabra sobre cómo ejecutar el trabajo.

Gatos hidráulicos Los trabajadores deben seleccionar un gato hidráulico con una capacidad nominal de elevación que equivalga o exceda la carga que soportará. A fin de funcionar eficientemente, los gatos hidráulicos deben colocarse sobre una superficie firme, a nivel y perpendicular a la carga. Si el gato hidráulico se desliza bajo la acción de una carga, los trabajadores quizá no tengan suficiente tiempo para apartarse, por esa razón es necesario colocar pedestales ajustables u otro tipo de soportes sustanciales debajo de la carga para que ésta no caiga si el gato hidráulico se desliza o falla. Los trabajadores deben entender con claridad que nunca deben colocarse o trabajar debajo de una carga que esté soportada solamente por gatos hidráulicos. Si el gato hidráulico está doblado o defectuoso, deberá etiquetarse y ponerse fuera de servicio.

Guinches Sólo los trabajadores con capacitación en el uso apropiado de guinches deben estar autorizados para operarlos. La capacidad de izado del guinche debe estar claramente marcada y ser visible para el operador y los guinches controlados desde la jaula deben estar equipados con dispositivos eficaces de advertencia. Antes de accionar el guinche, los operadores deben verificar que las cadenas o los cables del guinche tengan la suficiente longitud y resistencia para izar o de otra manera manejar la carga de manera segura. En un guinche de cadena, es necesario asegurarse que el gancho tenga un dispositivo de seguridad de manera que si se le da holgura a la cadena el gancho no se soltará. También debe inspeccionarse periódicamente el nivel de aceite en los guinches hidráulicos. Los operadores deben entender que les está prohibido transportar cargas sobre las personas y que deben informar a su supervisor la presencia de cualquier desperfecto del guinche.

Elevadores Los elevadores deben estar marcados con el nombre del fabricante, el número de aprobación emitido por la División de Seguridad Industrial o la declaración de cumplimiento con las normas ANSI B153.1-1974 (o si hubiera sido fabricado después del 8/17/94, el cumplimiento con la norma ANSI B153.1-1990), y la fecha de instalación. Nadie debe estar en el interior de un vehículo que se elevará y para su propia seguridad, los trabajadores deben pararse a un lado del elevador mientras esté funcionando, y deberán asegurarse que las puertas, el capó y el baúl del vehículo estén cerrados antes de elevarlo. La carga debe estar apoyada uniformemente en el elevador y no deberá sobrecargarse la capacidad del elevador. El piso debajo del elevador debe estar exento de aceite o grasa para prevenir peligros de resbaladuras. Es necesario verificar periódicamente los niveles de aceite en los elevadores hidráulicos y deberá ponerse fuera de servicio a los elevadores si existe alguna indicación de desperfectos.

Muchos accidentes no ocurren porque sí, ellos son el resultado de prácticas inseguras de trabajo o de riesgos innecesarios. Dé a los gatos hidráulicos, a los pedestales, a los elevadores y a los guinches la alta prioridad de seguridad que ellos se merecen.

Courtesy of the State Compensation Insurance Fund

Visit www.statefundca.com today to learn about the 6% discount on premiums we offer eligible SBCA members.

Your individual business may be eligible for even more discounts. Ask for Santa Barbara Contractors Association Group 821. For more tailgate, and other safety topics please visit us online.

The above evaluations and/or recommendations are for general guidance only and should not be relied upon for legal compliance purposes. They are based solely on the information provided to us and relate only to those conditions specifically discussed. We do not make any warranty, expressed or implied, that your workplace is safe or healthful or that it complies with all laws, regulations or standards.

10

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

PRICE, POSTEL & PARMA LLP Counselors at Law

A Tradition of Service and Excellence Since 1852

_____________________________________________________________

Santa Barbara's Full Service Law Firm Specializing in All Aspects of

Construction and Surety Law, Public and Private Work, Contract and Project Planning,

Pre-Litigation Planning and Resolution of Construction Disputes, Mechanic Liens, Stop Notices and Bond Claims, Labor and Employment Law, Incorporations and Partnerships,

Business and Tax Law, Real Estate, Land Use and Environmental, Insurance Disputes

SPECIAL RATES FOR SBCA MEMBERS

_________________________________________

J. Terry Schwartz, Esq. ([email protected]); Christopher E. Haskell, Esq. ([email protected]) 200 East Carrillo Street, Suite 400, Santa Barbara, CA 93101; (805) 962-0011; Fax (805) 965-3978 www.ppplaw.com

purveyors of ef fo r t l ess access to every th ing amaz ing . . .

Home Thea tersMed ia Rooms

Mul t i -Room Music Sys temsAud ioph i l e L i s ten ing RoomsWire less Con t ro l s

w w w . h i f i c l u b . n e t5 1 9 Ga rden S t ree tSan ta Ba rba ra , CA9 3 1 0 1l i c. #790942

Ca l l t oday !962 .2525

Ta k e a p r i v a t e t o u r o f t h e n e w H o m e A u t o m a t i o n S y s t e m sb y H i F i C l u b , a t t h e B u i l t G r e e n R e s o u r c e Ce n t e r . Fo r c o n t r a c t o r s , a r c h i t e c t s , d e s i g n e r s a n d t h e i r c l i e n t s .

11

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

P.O. Box 23409 Santa Barbara, CA 93121 805-884-1100 phone 805-884-1108 fax www.sbcontractors.org [email protected]

Original: Job Office, Oficina Del Departamento

REPORT OF SAFETY MEETING INFORME SOBRE LAS REUNION DE ASUNTOS DE SEGURIDAD

Employer/Patron

Job Location/Ubicacion Del Trabajo - Department/Departamento Date/Fecha

Accidents Reviewed/Accidentes Analizados Employee's Name/Signature Nombre Del Empleado/Firma

1.

2.

3.

4.

Subjects Discussed/Temas Discutidos 5.

6.

7.

8.

9.

10.

11.

12.

Suggestions/Sugerencias - Recommendations/Recomendaciones 13.

14.

15.

16.

17.

18.

19.

Action Taken/Supervisor's Comments Medidas Tomadas/Comentarious Del Supervisor

20.

21.

22.

23.

24.

Supervisor's Name/Nombre Del Supervisor - Signature/Firma

SCIF 17653 (Rev. 5-92) STATE COMPENSATION INSURANCE FUND

12

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

CONSTRUCTIONLAWSPECIALISTS

H&C HARDIN & COFFIN, LLP

Lawsuits, Arbitrations, Mediation Construction Defect Claims Contract, Business, and Nonpayment Disputes Construction Contract Consultation Mechanic’s Liens, Stop Notices, Attachment Payment & Performance Bonds Jobsite Accidents / Personal Injury Claims Insurance Coverage Analysis

For an appointment, please contact us at:

805-963-3301No charge for initial consultation to SBCA members

HARDIN & COFFIN, LLP

ATTORNEYS AT LAW

www.hardincoffin.com FAX: 805-963-7372

EMAIL: [email protected] 1531 Chapala, Suite 1

Santa Barbara, CA 93101 PLEASE CONTACT: Rick Hardin or Mark Coffin

CONSTRUCTIONLAWSPECIALISTS

H&C HARDIN & COFFIN, LLP

Lawsuits, Arbitrations, Mediation Construction Defect Claims Contract, Business, and Nonpayment Disputes Construction Contract Consultation Mechanic’s Liens, Stop Notices, Attachment Payment & Performance Bonds Jobsite Accidents / Personal Injury Claims Insurance Coverage Analysis

For an appointment, please contact us at:

805-963-3301No charge for initial consultation to SBCA members

HARDIN & COFFIN, LLP

ATTORNEYS AT LAW

www.hardincoffin.com FAX: 805-963-7372

EMAIL: [email protected] 1531 Chapala, Suite 1

Santa Barbara, CA 93101 PLEASE CONTACT: Rick Hardin or Mark Coffin

CONSTRUCTIONLAWSPECIALISTS

H&C HARDIN & COFFIN, LLP

Lawsuits, Arbitrations, Mediation Construction Defect Claims Contract, Business, and Nonpayment Disputes Construction Contract Consultation Mechanic’s Liens, Stop Notices, Attachment Payment & Performance Bonds Jobsite Accidents / Personal Injury Claims Insurance Coverage Analysis

For an appointment, please contact us at:

805-963-3301No charge for initial consultation to SBCA members

HARDIN & COFFIN, LLP

ATTORNEYS AT LAW

www.hardincoffin.com FAX: 805-963-7372

EMAIL: [email protected] 1531 Chapala, Suite 1

Santa Barbara, CA 93101 PLEASE CONTACT: Rick Hardin or Mark Coffin

CONSTRUCTION LAW SPECIALISTSCONSTRUCTIONLAWSPECIALISTS

H&C HARDIN & COFFIN, LLP

Lawsuits, Arbitrations, Mediation Construction Defect Claims Contract, Business, and Nonpayment Disputes Construction Contract Consultation Mechanic’s Liens, Stop Notices, Attachment Payment & Performance Bonds Jobsite Accidents / Personal Injury Claims Insurance Coverage Analysis

For an appointment, please contact us at:

805-963-3301No charge for initial consultation to SBCA members

HARDIN & COFFIN, LLP

ATTORNEYS AT LAW

www.hardincoffin.com FAX: 805-963-7372

EMAIL: [email protected] 1531 Chapala, Suite 1

Santa Barbara, CA 93101 PLEASE CONTACT: Rick Hardin or Mark Coffin

AND RAIN GUTTERS

“We think of Quality and Service first.”Owned and Operated for 25 Years by Jack Martin

FREE ESTIMATE AND EVALUATION

Expert in Leak RepairsReroof Specialists

Tile / SlateComposition Shingles

Single Ply (PVC)Full Maintenance Department

Aluminum / Copper Gutters 5“ Ogee Seamless and

6” Half Round Seamless

LIABILITY INSUREDLic. 674-048

13

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

WATER • Is there plenty of fresh, cool drinking water located as close as possible to the workers?

• Is there a plan for refilling water coolers throughout the day?

SHADE AND REST • Is a shade structure available at all times (regardless of the weather) for workers to

rest and cool down?

• Is the shade structure up and ready when the weather forecast is 85ºF or higher?

• Do you have a plan in place for checking the weather forecast?

TRAINING • Have workers been trained to recognize and prevent heat illness BEFORE they start

working outdoors?

• Can workers identify symptoms of heat illness?

• Is there a special plan in place to allow workers to get used to the heat?

EMERGENCY PLAN • Does everyone know who to notify if there is an emergency?

• Can workers explain their location if they need to call an ambulance?

• Does everyone know who will provide first aid?

WORKER REMINDERS Have workers been reminded to:

• Drink water frequently?

• Rest in the shade for at least 5 minutes as needed?

• Look out for one another and immediately report any symptoms?

Heat Safety Supervisor’s Daily Checklist

The work can’t get done without them.

14

Kalb’s Capitol Connection Q & A for ContractorsBy David Kalb & Shauna Krause, Capitol Services, Inc.

A contractor with a California license look-ing over the borderlines for business discovers things aren’t always as simple as rumored but having good tools makes the job easier. Another contractor walks a fine line to stay out of ‘hot water’ in Nevada, but we begin with a contractor who must make some ‘true’ or false choices…

Q: I need your help with a Nevada License to install boilers. I am currently a licensed HVAC (“C-20”) contractor in CA. From doing a little re-search, I have found that the equivalent classifi-cation is a “C-21” in Nevada. However, I’ve been speaking with an inspector in Nevada who tells me that I cannot install boilers with the “C-21” class and that I would need to also obtain a “C-1a” (Boilers) license. Is that true?

A: Thanks for your question. If you’re installing boilers for the purpose of heating, or raising a room’s temperature, then the “C-21” will cover you. The statute reads: “The installation, repair, service and maintenance of equipment, devices, machinery, units and related ductwork which use evaporation, refrigeration, boilers or combustion for the control of air temperatures in structures where people live, work or assemble....”

Q: I work for a large company that has several

sister companies. I am currently the Qualifier on my company’s “B” (General Building) license in AZ. My company has requested that I become the Qualifier on our sister company’s Arizona li-cense which is a “C-30” (Finish carpentry). Can I do that and if so, will I be able to waive the exam since I have a General Building license?

A: First of all, Arizona will only allow you to be on more than one license at the same time if one of the following is true: (a) You (the Qualifier) own at least 25% of each company that you are licens-ing, or (b) One licensee owns at least 25% of the other licensee. The fact that the two companies have the same parent company is not enough to satisfy the requirement. Secondly, you will be re-quired to take the “C-30” exam, even though you currently hold a ‘B’ license.

Q: I’m an electrical contractor and I have a li-cense here in CA. One of my customers has requested that I do some work for them in the Tahoe area. My understanding is that there’s a reciprocal agreement between CA and NV that allows me to work in NV if I have a license in CA. Is there anything else I need to do to start work, such as obtaining a business license?

A: While many contractors believe that the re-

ciprocal agreement between California, Nevada, Arizona, and Utah allows them to use one license in any of those four States, it isn’t quite that sim-ple. When doing work in another State, you’re required to obtain a license specific to that State. The agreement generally allows you to qualify for a trade waiver, if you have been licensed for 5 out of the last 7 years in one of these recipro-cal States. You’re still required to take and pass the Management exam and go through their application process. Unfortunately not all clas-sifications are reciprocal. For instance, Nevada and California do not reciprocate for Electrical, Plumbing, or Fire Protection. So as an Electrical contractor you would be required to take the trade exams and show the necessary experience qualification. Reciprocity is a great opportunity for contractors but like all ‘tools’ does require some effort to make it work.

Because all four referenced States have different requirements, please contact each state directly or contact Capitol Services for an assessment of your specific contractor’s licensing situation.

While knowledge is power, knowing where to go for the answers is half the battle. Get expert assistance immedi-ately when you call 866-443-0657, email [email protected]. Research past columns at www.cutredtape.com.

cal or mental performance and an increase in accidents. A person with a moderate reaction or heat exhaustion, will have some or all of the following symptoms: excessive sweating, cold, moist, pale or flushed skin, thirst, extreme weak-ness or fatigue, headache, nausea, lack of appe-tite, rapid weak pulse, or giddiness and if not properly treated, the victim may collapse. Anyone with mild or moderate symptoms should be moved to a cool, shaded place with circulating air. They should lie down and, if con-scious, be given small sips of cool water at fre-quent intervals. If symptoms continue, a doctor should be called. In severe cases of heat illness, a heat stroke may result. The victim’s face is flushed red and their skin is hot and dry with no sweating. They develop a severe headache with deep, rapid breathing. They have a very high fever and may become delirious. They may become uncon-

scious, have convulsions, or lapse into a coma. This condition is fatal unless emergency medi-cal treatment is obtained. Immediately call for medical help. In the meantime, get them out of the hot environment. Loosen clothing and pour water over the entire body. Get air circulating around the body. Recognizing the warning signs and symptoms of heat-related illnesses and using preventive and control measures can reduce the frequen-cy and severity of heat illness while increasing worker productivity.

Resources for EmployersDownload materials to help you train workers at http://www.dir.ca.gov/DOSH/HeatIllnessInfo.html

Heat Safety Training Kit– comes with a •poster set for construction workers, in Eng-lish and Spanish. Posters to use as visuals while you train: •

English construction | Spanish construc-tionWorker fact sheets – so workers can follow •along: English | SpanishTrainer’s guide that provides short, easy-to-•follow instructions: English | SpanishSupervisor’s daily checklist – reminding •you what you need at the worksite each day: English | Spanish

To order materials, contact: [email protected]

Source: State Fund Safety Resource Center, www.statefundca.com, and Cal OSHA, www.dir.ca.gov.

Check out the Heat Safety Checklist for Supervisor’s on page 13!

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

New Rules For Preventing Heat Illnesses Continued from page 1

15

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

Santa Barbara office:211 Anacapa Street, Santa Barbara, CA 93101

805-966-3233 www.ventanadoor.com

16

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

Weekly Bulletin

6/12/2012

Reasonable care is given in gathering, compiling and furnishing the information contained herein which is obtained from sources believed to be reliable, but the SBCA is not responsible or liable for errors, omissions or inaccuracies.

Santa Barbara Contractors Association Projects Out to Bid 6/12/2012

Tuesday, June 12, 201211-427 San Ysidro Flooring San Diego

1:30 PM 6/12/2012 11-427

MAND May 17 @ 10:00am

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Contractor agrees to provide to the Department of Motor Vehicles (DMV) all labor, tools, materials and equipment necessary to remove the broadloom carpeting (rolled goods type carpeting) throughout the building and replace with carpet squares for the term of this agreement.

Addenda: 0

Wednesday, June 13, 2012The Preserve at Marin Corte Madera

10:00 AM 6/13/2012Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Scope of Work:Complete interior and exterior remodel of existing wood framed structures over parking garages with associated site improvements and landscaping for (7)residential buildings each with 18 units for a total of 126 new units. Scope of work also includes building a new Leasing Office and pool area.

This is NOT a Prevailing Wage project.

All bids to be good for a minimum of 60 days from bid date

Subcontractor bonds may be required – provide your bond rating with your bid submittal.

Value Engineering is requested for all trades 9 base bid must be based on plans and specs. 9 List V.E. only as alternates!

Trades Required: Division 1: temporary fencing, temporary construction office, final cleaning, surveying, SWPP – erosion control Division 2: not used Division 3: rebar, concrete, cast in place concrete, precast concrete, gypcrete Division 4: masonry Division 5: structural steel, metal fabrications, metal railings, guardrails, metal stairs Division 6: rough carpentry, hardi panel siding, finish carpentry, cabinets, casework, stone countertops Division 7: waterproofing, insulation, roofing, sheet metal flashing and trim, flexible flashing, roof specialties, roof accessories, fireproofing, fire stopping, joint sealants / caulking, expansion joints Division 8: doors / frames / hardware, access doors, sliding glass doors, windows,mirrors, louvers, roof screens Division 9: drywall / metal framing, lath & plaster, tiling, resilient flooring, carpet, wood flooring, laminate flooring, painting, concrete sealer Division 10: toilet partitions, toilet accessories, fire protection specialties, mailboxes, awnings / canopies Division 11: laundry equipment, residential appliances, Division 12: architectural woodwork, cabinets/ countertops Divisions 13: swimming pool Division 14: elevators, chutes Division 20: not used Division 21: fire protection Division 22: plumbing Division 23: mechanical Division 26: electrical, generator Division 27: low voltage Division 28: fire alarm Division 31:shoring, site preparation, earthwork, striping & signing Division 32: fences & gates, site furnishing, landscaping & irrigation Division 33: not used

Addenda: 0

= New Plans Entered This Week

SBCA OnLInE PLAnROOM REPORT

17

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

M E M B E R B E N E F I T S•Referrals•OnlinePlanroom•SafetyProgram•NetworkingEvents•GroupInsurance•WeeklyNewsletter•GovernmentAffairs•GetIndustryUpdates•EducationalSeminars•AnnualGolfTournament•OnlineMembershipListing•AnnualMembershipDirectory•AdvertiseDirectlytoConstruction Industry in Weekly Newsletter•NewMemberBio-IntroduceYour Business in the Newsletter•BuiltGreenSantaBarbara

[email protected]

REDUCE YOUR WORKERS’ COMP INSURANCE COSTS

The SBCA and 25 Builder’s Exchanges in California have joined to form the Golden State Builders Exchange (GSBE). Participation in this group insurance program may significantly reduce the cost of your workers’ com-pensation premiums over a State Compensation Insur-ance Fund individual policy. Qualifying SBCA members are eligible for a 6% discount. Ask to be placed into the SBCA Group 821. Please call the SBCA office for more information and conversion form. If you are already with State Fund, please call us or your broker to see if you qualify for this group program.

www.statefundca.com

V I S I T

The Built Green Resource Center offers information, programs and classes on green building practices and materials. It showcases energy independence, wa-ter savings, and other sustainable building practices. The Resource Center is open to the public by appointment only. Please call 805-884-1100 to schedule your visit.

www.builtgreensb.org805.884.1100

18

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

Santa Barbara Contractors Association Projects Out to Bid 6/12/2012

Pavement Resurfacing - Piru Area Phase II

2:00 PM 6/13/2012 RD12-10Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: The work consists of pavement resurfacing of 9 roads in Piru area. Work includes tree removal, drainage inlet and junction box, PCC curb and gutter, sidewalk removal and replacement, driveway approach, cross gutter, and reinforced concrete swale, CM and RC pipe installation, surface preparation and crack sealing, base repair, cold milling, AC taper with key, asphalt rubber hot mix overlay, miscellaneous paving, AC mountable curb and curb rehabilitation, shoulder backing, pavement delineation and striping, metal beam guard rail, and appurtenant work.

Addenda: 0

County of Ventura - Public Works 800 South Victoria Avenue, Ventura, CA 93009 805-654-3805, Fax#: 805-677-8762

Thursday, June 14, 2012Engineering Reserch Center Restoration Project, Building 997 Santa Barbara

2:30 PM 6/14/2012 FM120313X/211-77

MAND May 17 @ 1:30 PM

Bid Date: Ref # Project Type: Public Est:

Prebid Conference: Project Description: Estimated Construction Cost: $190,000.00

6/8/2012Addenda: 4

Tri-County Blueprinting & Supply, CA 805-966-1701, Fax#: 805-966-9484

El Estero Wastewater Treatment Plant Influent Pumps Replacement Santa Barbara

3:00 PM 6/14/2012

MAND May 31 @ 10am

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Sealed proposals for Bid No. 3607 for the El Estero Wastewater Treatment Plant Influent Pumps Replacement will be received in the Purchasing Office, 310 E. Ortega Street, Santa Barbara, California 93101, until 3:00 P.M., Thursday, June 14, 2012 to be publicly opened and read at that time. Any bidder who wishes its bid proposal to be considered is responsible for making certain that its bid proposal is actually delivered to said Purchasing Office. Bids shall be addressed to the General Services Manager, Purchasing Office, 310 E. Ortega Street, Santa Barbara, California, and shall be labeled, “El Estero Wastewater Treatment Plant Influent Pumps Replacement Bid No. 3607."

The work includes all labor, material, supervision, plant and equipment necessary to complete the following major work items: replace the four existing influent pumps including vertical shafts and motors; replace two of the four existing variable frequency drives to serve the new high flow pumps; provide separate jib cranes to service each pump; remove all indoor ventilation ductwork and replace as shown; test each new pump after it is installed; and subject to Contingency Item 1, provide recycle pumping of partially treated wastewater after all the pumps are installed for testing the new pumping station at high flows. The work is summarized in more detail in Section 01010. The Engineer’s estimate is $3,360,000. Each bidder must have a Class A license to complete this work in accordance with the California Business and Professions Code.

There will be a mandatory Pre-Bid Meeting scheduled for Thursday, May 31, 2012 at 10:00 at 520 E. Yanonali Street. Addenda: 0

City of Santa Barbara - Lisa Arroyo, CA 805-564-5486Cyber Copy, CA 805-642-3292

11-428 Remove and Replace All Exterior Signs - Oceanside DMV Oceanside

2:30 PM 6/14/2012 11-428

MAND May 31 @ 10am

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Contractor agrees to proved to the Department of Motor Vehicles (DMV) all labor, tools, materials and equipment necessary to remove and replace all exterior signs for the term of this Agreement.

Addenda: 0

= New Plans Entered This Week

19

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

Interested in a career in the building trades? There is a critical shortage of construction workers. Over 1 million new jobs will be created nationally in the next seven years, with 2,500 of them in Santa Barbara and Ventura in the next three years. California construction workers earn an average of $24 an hour and journey-level workers earn $70,000-plus a year!

Santa Barbara City College Summer School 2012

CT 113 Roof Framing T/Th 6:00-9:00pm

(8 weeks) Wake Center (Located by Turnpike/101) (Beg. 6/19/12)

CT 153 Electrical Mathematics W: 5:30-9:30pm Rod Bond Training Center, Buellton

(Beg. 5/21/12)

20

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

Santa Barbara Contractors Association Projects Out to Bid 6/12/2012

Friday, June 15, 2012Fairfield Inn & Suites Santa Cruz

2:00 PM 6/15/2012Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: 83,442 SQ FT, New construction, 3 story hotel building with PT deck, 86 Units, Interior corridor, Indoor pool, Porte cochere, Underground parking garage, Wood frame with Truss roof, and Automatic sprinkler.

This is NOT a Prevailing Wage project.

Subcontractor bonds may be required – provide your bond rating with your bid submittal.

Value Engineering is requested for all trades , base bid must be based on plans and specs. , list V.E. only as alternates!

Trades Required: Division 1: temporary utilities, temporary facilities, temporary fencing, temporary construction office, final cleaning, surveying Division 2: landscaping, clear and grubb, grading and earthwork, retaining wall, furniture,striping/signing, asphalt paving, underground utilities, furniture Division 3: rebar, concrete, shotcrete, gypcrete, site concrete, Division 4: masonry, marble and granite, stone Division 5: prefabricated steel, structural steel, handrails, misc. metal Division 6: rough carpentry, finish carpentry, cabinets, casework Division 7: waterproofing, insulation, roofing, metal roofing, sheet metal flashing and trim, roof accessories, fireproofing, joint sealants / caulking, expansion joints Division 8: doors / frames / hardware, sliding glass doors, aluminum storefront & glazing, windows, mirrors, louvers Division 9: drywall / metal framing, lath & plaster, tiling, acoustical ceiling, wall covering, FRP, painting Division 10: signage, toilet accessories, fire protection specialties, lockers, fireplaces Division 11: laundry equipment, residential appliances, corner guards, foodservice equipment Division 12: not used Divisions 13: swimming pool / spa Division 14: elevators, chutes Division 15: plumbing, fire sprinkler, HVAC Division 16: electrical, communications, low voltage, fire alarm

Do not contact the Owner or Architect on this project. All written RFI’s shall be submitted to the General Contractor.

Bid Response: Please confirm by email or fax that your company is participating in the bid by Thursday, June 7th, 2012.

Please contact Bid Coordinator Brooklyn Erickson, for plan info or RFI’s via email at [email protected]

Estimator: James Morefield , [email protected]: 0

Monday, June 18, 2012Savers #1191 San Jose

3:00 PM 6/18/2012Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Trades needed: demolition, concrete cutting, striping / signage, masonry, structural steel fabrication, concrete, arch. sheet metal, rough carpentry, millwork, caulking & sealants, resilient flooring, acoustical ceilings, frp, insulation, service existing store fronts, doors, floor sealing & polishing, metal stud / drywall, toilet accessories, painting, hvac, plumbing, fire sprinklers, electrical, fire alarm, fencing

Addenda: 0

= New Plans Entered This Week

21

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

[email protected]

(805) 683-1848Fax: 805.964.6653

Lic. #559076

GEOTECHNICAL SERVICESSoils Engineering Reports, Slope Stability

Foundation Forensics, Liquefaction AnalysisENVIRONMENTAL SERVICES

Percolation Testing, Septic FieldsEnvironmental Site Assessment

GEOLOGIC SERVICESEngineering Geology Reports

Fault and Landslide Investigation, Bluff SetbackSPECIAL INSPECTION

Welding, High Strength Bolt, FireproofingEpoxy, Concrete, Masonry, URM Retrofit

CONSTRUCTION INSPECTIONGrading and Testing Observation, CalTrans Certified

Footing and Foundation ObservationLABORATORY AND DRILLING SERVICES

In-House Laboratory Testing, andTract-Mounted CME Drill Rig

Federal and California Certified Small Business

License No. 788005

SBCA Best Hardscape & LandscapeInternational Landscape Designer of the Year - 2009

Phone (805) 687-3569 gracedesignassociates.com

License No. 788005

SBCA Best Hardscape & LandscapeInternational Landscape Designer of the Year - 2009

Phone (805) 687-3569 | gracedesignassociates.com

General Contractor CM-at-Risk

Construction Management

Frank Schipper Construction Co.

SERVING THE TRI-COUNTY AREA

FOR 30 YEARS 610 E COTA STREET, SANTA BARBARA, CA 93103

T (805) 963-4359 • F (805) 963-1270 Lic# 436175

EMAIL: [email protected] www.schipperconstruction.com

22

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

Santa Barbara Contractors Association Projects Out to Bid 6/12/2012

Ventura County Todd Rd. Jail - Design-Build Photovoltaic Electrical Generation System (Subcontractors)

Santa Paula

2:00 PM 6/18/2012 CP12-02

May 24 @ 2pm

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Design, construct, and maintain (for one year) for a new 1 MWac photovoltaic (PV) electrical generation system (System).An PFP has been issued to 7 companies listed in the attached PDF file. This advertisement is for the benifit of potential subcontractors.

Design, construct and maintain (for 1 year) a new utility grid-connected, 1 MW-AC photovoltaic electrical generation system. An RFP has been issued to the 7 companies listed in the attached document. This advertisement is for the benifit of potential subcontractors.For questions contact:Ryan GallagherE-Mail: [email protected]: 805-764-4057FAX: 805-388-3577

Addenda: 0

County of Ventura - Public Works 800 South Victoria Avenue, Ventura, CA 93009 805-654-3805, Fax#: 805-677-8762

Tuesday, June 19, 2012Alisal Curve Improvement Project, SV 471 Solvang

2:00 PM 6/19/2012 SV 471

Juen 12 @ 2pm

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: DESCRIPTION OF WORK: The WORK includes, but is not limited to grinding the western edge of Alisal Road and widening the roadway by 3 feet, requiring some grading and compaction of the existing embankment, construction of pile-supported walls and new signing and striping as outlined in the project plans, specification and Appendices A-G.

The engineers estimated cost of construction for this project is $193,000.

The City has established a UDBE goal of 2% for this project.Addenda: 0

City of Solvang - Frank Saunders, Solvang, CA 93463 805-688-5575

Thursday, June 21, 2012Lower Mesa Lane Steps Replacement Project Santa Barbara

3:00 PM 6/21/2012

MAND June 12 @ 1:30pm

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: The project involves the removal of an existing timber coastal access stairway, concrete foundation block, concrete steps, and timber piles and replacement with stainless steel stairs, stainless steel piles and concrete steps.

Sealed proposals for Bid No. 5158 for the Lower Mesa Lane Steps Replacement Project will be received in the Purchasing Office, 310 E. Ortega Street, Santa Barbara, California 93101, until 3:00 P.M., Thursday, June 21, 2012 to be publicly opened and read at that time. Any bidder who wishes its bid proposal to be considered is responsible for making certain that its bid proposal is actually delivered to said Purchasing Office. Bids shall be addressed to the General Services Manager, Purchasing Office, 310 E. Ortega Street, Santa Barbara, California, and shall be labeled, “Lower Mesa Lane Steps Replacement Project, Bid No. 5158".

The work includes all labor, material, supervision, plant and equipment necessary to complete the removal of an existing concrete stair and timber staircase and replacement with concrete and stainless steel stairs. Each bidder must have a Class A license to complete this work in accordance with the California Business and Professions Code. In addition, each bidder must have experience with construction of a project of similar size ($100,000 and greater) and scope (drilling and pile installation and concrete placement in marine or wetland environment) within the past 5 years. Evidence of this work as well as the name of the construction foreman and the project owner’s contact must be submitted with the bid.

There will be a mandatory Pre-Bid Meeting scheduled for Tuesday, June 12th at 1:30 pm. The pre-bid meeting will begin at the end of Mesa Lane and will include a review of the project site, access to the project site from Arroyo Burro County Park, and the staging area in the Arroyo Burro County Park.

Addenda: 0

City of Santa Barbara - Brian DAmour 630 Garden Street, Santa Barbara, CA 93101 805-897-2661, Fax#: 805-564-5467Cyber Copy, CA 805-642-3292

= New Plans Entered This Week

23

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

PHONE (805) 965-1926 FAX (805) 963-6071

OSWALD J. DA ROS, INC. • MASONRY CONTRACTORS •

Lic# 216916 MARBLE • GRANITE • STONES

976 Carrillo Road PETER A DA ROS Santa Barbara, CA 93103

805-498-8350

www.augustroofing.com

Residential & Commercial

• Workers Comp Insurance• General Liability Insurance• All work done by company experts• Locally owned and operated• Free Estimates

“Waterproofing at it’s best, quality above the rest!”

CA Lic. B & C-39 786740

Repairs, Re-Roofingand New Construction

P.O. Box 517Santa Barbara, CA 93102

Phone 805-618-8648Email [email protected]

www.tradartfoundation.org

Donate used build materials to the Habitat ReStore All proceeds go directly back to Habitat for Humanity

Goleta ReStore 6725 Hollister Avenue, Goleta

(between Los Carneros & Storke)

Appliances │ Doors │ Windows │ Lighting │ Tile │ Cabinets│ Hardware

Tues. - Fri.: 12 pm - 5 pm Saturday: 9 am - 5 pm Phone: (805) 692-2226

www.sbhabitat.org

Serving Southern Santa Barbara County

SBCA Member Since 1995

WaterProof Deck Coating SystemsConcrete Restoration Resurfacing

Restoration of integral colors & exposed aggregrate

Visit us at brooksqc.com966-5020 CSL 496582

SINCE 1975

BROOKsQUALITY COATINGS

24

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

Santa Barbara Contractors Association Projects Out to Bid 6/12/2012

Friday, June 22, 2012SFR Full Rebuild - Holehouse Construction 805-966-9662 Santa Barbara

12:00 PM 6/22/2012Bid Date: Ref # Project Type: Public Est:

Prebid Conference: Project Description: SFR full rebuild of Tea Fire house and guest house

Addenda: 0

Tuesday, June 26, 2012Oak Street Drainage Improvements Project, PW 019 Solvang

3:00 PM 6/26/2012 PW 019

June 19 @ 3

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: The work includes, but is not limited to the construction of approximatel 236 linear feet of 36" storm drain pipe, catch basin and headwal in Oak Street and Acorn Way, City of Solvang. The engineers estimated cos of construction for this project is $150,000. The work includes:

Sawcutting and removal of existing AC pavement, curb and gutter, and existing catch basin, removal of abandonment of a portion of an existing sotrm drain pipe, construction of catchbasin, 36" storm drain, headwall and energy dissipation, concrete flume, curb and gutter, and AC paving, slope grading, landscaping and repair of existing irigation system, setup of maintenance of traffic control system; and cleanup of the project area.

Location of work: Along North-south portion of Acorn Way at Oak Street in City of Solvang, CaliforniaAddenda: 0

Thursday, June 28, 2012Betteravia Administration Building "D" Addition Santa Maria

12:00 PM 6/28/2012 Project 8676 PH2

MAND June 7

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: The Betteravia Administration Building “D” Addition project will construct a single story approximately 2,000 SF addition to the existing County Administration Building on the Betteravia Government Center Campus in Santa Maria, CA. Additionally, existing Board of Supervisors Hearing Room and Administration Building “D” will receive some minor tenant improvement efforts and site improvements. The project has an estimated construction value of $800,000.00 and estimated construction duration of 7 months. The project schedule will be extremely critical as this project utilizes federal RZEDB funding which includes a firm expiration date. The Contractor will be expected to maintain the project schedule and delivery dates as defined within the contract documents.

The new addition and renovation will include the following elements:• New lobby/ reception area, public restrooms, staff office and facilities support space.• The existing Building “D” renovation work consists of wall reconfiguration, entryreconfiguration, ceiling improvements, lighting improvements, and various room finishes including flooring.• Site Improvements including, concrete walkways, landscaped areas, ADA improvements to paved parking lot, utilities re-routing to support the new addition.• Additive Alternates including tenant improvement options and material upgrades.

The County of Santa Barbara has determined that all General Contractors wishing to bid on the Betteravia Administration Building “D” Addition must be prequalified prior to submitting a bid on the project.The County’s competitive selection process will proceed in two steps:Step 1: The construction General Contractor pre-qualification phase.Step 2: Submittal of bids according to the requirements of the bid documents.Only those successfully qualified in step 1 will be allowed to participate in step 2.

Addenda: 0

County of Santa Barbara, CA 805-568-2663County of Santa Barbara - John Green, Santa Barbara, CA 805-934-6229

= New Plans Entered This Week

25

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

If you are anemployer who wishes to obtain assistance from

Cal/OSHAConsultation, or want to learn more about what

services are available, you can do so by calling the

toll-free assistance number.

1(800) 963-9424 If you want to arrange an

on-site visit or obtaintechnical information, you can contact the Cal/OSHA Consultation area office

nearest your workplace or you can email us at

[email protected].

MAKE SUREYOU ARE

IN COMPLAINCEwwwdir.ca.gov

ruoH-42 ecivreS remotsuC

wolraH .A salguoD renwO ycnegA

YCNEGA ECNARUSNI WOLRAH

ynapmoC ecnarusnI etatsllA A etiuS ,tS aniV aL eD 5121

10139 AC ,arabraB atnaS

0743-053-008 enohP 108 txe 0743-369-508 enohP

moc.etatslla@wolrah 1210860# esneciL ecnarusnI AC

wolrah/moc.seicnegaetatslla.www

J. SCOTT QUITTNEROWNER, LIC# 610873C-54

P H / F X ( 8 0 5 ) 9 6 5 . 5 3 3 1DAYTIME CELL ( 8 0 5 ) 3 3 1 . 2 2 3 7S A N T A B A R B A R A , C A [email protected] � � T2TILETECHNIQUES.COM

TILE TECHNIQUES, INC.

26

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

Santa Barbara Contractors Association Projects Out to Bid 6/12/2012

BRT III on Hammer Lane Stockton

2:00 PM 6/28/2012 Project No. 11-12

MAND Juen 14 @ 1:30pm

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: The project will provide Transit Signal Priority (TSP) and related improvements at all of the existing signals on Hammer Lane and coordinate signal timing to optimize TSP with operation along the corridor. The project will install pole-mounted TSP control devices at each signalized intersection. New closed circuit television cameras (CCTV) would be installed within the corridor.

Addenda: 0

Pacific Avenue Median Improvements Stockton

2:00 PM 6/28/2012 Project No. 09-21

MAND June 14 @ 3pm

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Improvements will install a raised curb median on Pacific Avenue from W. Fulton Street north to the south side of the Calaveras River, replacing an existing striped median and curb with a landscaped curb median. The medianlandscaping will include trees, shrubs, groundcover, an irrigation system and stamped concrete. The project will also install a gateway monument sign and a fence to exclude mid-block pedestrian crossing.

Addenda: 0

El Dorado Street, Phase 2 Improvments Stockton

2:00 PM 6/28/2012 Project No. 05-12

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: The El Dorado Street Phase 2 Improvements project limits are from Mariposa Avenue to the Calaveras Bridge. In general, work includes, but is not limited to: tree plantings, parkway strip improvements, and two major traffic signal intersection modifications. Traffic signal intersection modifications includes signal equipment upgrades, fiber optic interconnect, preemption equipments, cameras, new streetlights, relocate existing streetlights, corner ramp improvements, replace curb-gutter-sidewalks, install new medians, pavers, railings, storm drainage upgrade and/or adjustments, traffic control, temporary signals, pavement striping, pavement markers, and signs. Work also includesall incidentals to complete the project as per the attached plans and special provisions (specification).

Addenda: 0

University Miracle Mile Median Improvements Stockton

2:00 PM 6/28/2012 Project No. 10-07

MAND June 14 @ 3:30

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Improvements will install a raised curb median on Pacific Avenue from Harding Way north to Elm Street, replacing an existing striped median and curb with a landscaped curb median. The median landscaping will include trees, shrubs,groundcover, an irrigation system, and stamped concrete. The project will also add ADA compliant wheelchair ramps, modify existing pedestrian island, and add detectably warning surfaces to comply with ADA regulation, replaceexisting wiring and traffic detectors affected by planned work, install a gateway monument sign, and a fence to exclude mid-block pedestrian crossing.

Addenda: 0

Saturday, June 30, 20122nd Story Addition - Nick Calles - 805-448-8234 Santa Barbara

12:00 PM 6/30/2012Bid Date: Ref # Project Type: Public Est:

Prebid Conference: Project Description: 2nd Story Addition

Addenda: 0

= New Plans Entered This Week

27

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

Santa Barbara Contractors Association Projects Out to Bid 6/12/2012

Tuesday, July 03, 2012FY 2012-13 Slurry Seal Project, PW 027 Solvang

2:00 PM 7/3/2012 PW 027

June 26 @ 2pm

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: The work includes, but is not limited to the slurry seal application to public streets at various locations throughout the City of Solvang. The engineers estimated cost of construcion for this project is $300,000. The work includes: Install slurry seal (Type II), traffic control, replacement of traffic striping, markings and markers, and related work.

6/8/2012Addenda: 1

City of Solvang - Frank Saunders, Solvang, CA 93463 805-688-5575

San Antonio Creek Spreading Grounds Rehabilitation Project Ojai

2:00 PM 7/3/2012 Spec. No. WP12-22

MAND June 19 @ 10am

Bid Date: Ref # Project Type: Public Est:

Prebid Conference:

Project Description: The project involves the construction of a new concrete intake structure on San Antonio Creek; a new 24-inch HDPE intake pipeline between the intake structure and the existing upper settling pond; minor rehabilitation of the four existing settling ponds; new concreted riprap transfer channels between the existing ponds; a new 24-inch recharge pipeline from the existing lower pond to the recharge wells; up to four new 36-inch diameter recharge wells; a new overflow channel from the lower pond to San Antonio Creek; and a new facility access road from Thacher Road through the project site including a concrete “at-grade rock ford” low flow crossing of San Antonio Creek.

Project Purpose:The proposed project is intended to increase groundwater storage in the Ojai Valley Groundwater Basin by diverting up to 25 cubic feet per second of surface water from San Antonio Creek (when available) through an intake structure and a 24-inch transfer pipeline to four new passive injection wells to be constructed on the project site.

Addenda: 0

County of Ventura - Public Works 800 South Victoria Avenue, Ventura, CA 93009 805-654-3805, Fax#: 805-677-8762

PrebidDhaliwal Residence - Bid Set Camarillo

Ref # Project Type: Public Est:

Prebid Conference: Project Description: NEW ±18,000 S.F. HABITABLE RESIDENCE WITH TWO 4 CAR

Addenda: 0

Coast Reprographics 220 West Canon Perdido Street, Santa Barbara, CA 93101 805-962-9155

TISH NON VILLAGE COMMUNITY CENTER Loleta

Ref # Project Type: Public Est:

Prebid Conference: Project Description: 31,167 sq. ft., 2 stories on 230,176 sq.ft. site

Addenda: 0

1020 Placido Santa Barbara

Ref # Project Type: Public Est:

Prebid Conference:

Project Description: Remodel of an (e) single family residence for a (n) detox facility with maximun 12 clients and on site staff. Exterior improvements: (n) accessible ramp and stairs, (n) van H/C parking space, (n) deck w/ associates ramps and stairs. (n) exterior wall finishes, (n) windows and doors.

Interior improvements: remodel ground floor for H/C access, remodel restroom for accessiility, remodel den to create accessible bedroom, remodel kitchen for accessibility. Remodel for exiting and fire rated conditions due to change of occupancy.

Addenda: 0

Housing Authority of the City of Santa Barbara - Hector Torres 808 Laguna Street, Santa Barbara, CA 93101 805-897-1060Coast Reprographics 220 West Canon Perdido Street, Santa Barbara, CA 93101 805-962-9155

= New Plans Entered This Week

28

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

Santa Barbara Contractors Association Projects Out to Bid 6/12/2012

Greyhound Santa Barbara

Ref # Project Type: Public Est:

Prebid Conference:

Project Description: FORMER USE: BICYCLE SALES SHOP. PROPOSED USE: SMALL MARKET THAT WILL ALSO SELL GREYHOUND TICKETS.

PROPERTY OWNER: Redevelopment Agency of the City of Santa Barbara

A.P.N.‘s: 033-010-11,-13,-14,-15; 033-041-12,-13; 033-042-1,-2,-3,-4,-12, -14,-15,-16,-17,-19; 033-075-12,-14.

ADDRESS: 224 Chapala St. ZONING: HRC-2/SD-3 BLD: BLD2010-01798 LOT AREA: 2.21 acres GENERAL PLAN NEIGHBORHOOD: Downtown/Waterfront Lower State HIGH FIRE: No FLOOD ZONE: AH Zone AVG. SLOPE: 1% MAX BLDG. HEIGHT ALLOWED: 45’, 3-STORIES MAX BLDG HEIGHT: 20’, 1-STORY YARD REQUIREMENTS: FRONT YARD SETBACK: 10 FT < 15’ Bldg Hght, 20’ all others INTER. YARD SETBACK: 10 FT or 1/2 Bldg Hght (whichever greater) PARKING Parking Required:104 Spaces Parking Provided (existing): 158 (151 Spaces & 7 HC Spaces) Bicycle Parking (existing): 15 City Standard Posts

Addenda: 0

Coast Reprographics 220 West Canon Perdido Street, Santa Barbara, CA 93101 805-962-9155

Harper Residence Thousand Oaks

Ref # Project Type: Public Est:

Prebid Conference: Project Description: New Construction of House & Pool House

Addenda: 0

Coast Reprographics 220 West Canon Perdido Street, Santa Barbara, CA 93101 805-962-9155

= New Plans Entered This Week

29

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

CONSTRUCTION MONITOR'S REPORT

for permits issued between: 5/21/2012 5/25/2012and

Building & Safety DivisionCity of Santa Barbara

ROLEADDRESS VAL. $ DATE ISSUEDPERMIT #

BLD2012-00297 116 SANTA BARBARA ST C/A-ALTERATION STAPELMANN COMMUNITY PROPERTY TRUST OWNER

4161 CRESTA AVE SANTA BARBARACA 93110

35,000 5/21/2012

TRILLIUM ENTERPRISES

CON 965-4753501 CHAPALA STREET #A SANTA BARBARA CA 93101

DENNIS THOMPSON

ARC 805-966-9807900 PHILINDA AVE. SANTA BARBARA CA 93103

BLD2012-00298 120 SANTA BARBARA ST C/A-ALTERATION STAPELMANN COMMUNITY PROPERTY TRUST OWNER

4161 CRESTA AVE SANTA BARBARACA 93110

35,000 5/21/2012

THOMPSON-NAYLOR

ARC 966-9807 SANTA BARBARA CA

TRILLIUM ENTERPRISES

CON 965-4753501 CHAPALA STREET #A SANTA BARBARA CA 93101

DENNIS THOMPSON

APL 805-966-9807900 PHILINDA AVE. SANTA BARBARA CA 93103

BLD2012-00472 1500 STATE ST C/C-ALTERATION TRINITY EPISCOPAL CHURCH OWNER

1500 STATE ST SANTA BARBARACA 93101

187,000 5/24/2012

ARMSTRONG ASSOCIATES

CON 899-83731825 STATE ST SUITE 202 SANTA BARBARA CA 93101

STORK, WOLFE & ASSOCIATES

ENG 805-548-86001124 NIPOMO ST. #B SAN LUIS OBISPO CA 93401

THOMPSON-NAYLOR

ARC 966-9807 SANTA BARBARA CA

BLD2012-00714 1027 SENDA VERDE B R/A-ALTERATIONRUTH GEORGI OWNER

4102 HIDDEN OAKS RD SANTA BARBARACA 93105

805-687-8098 30,000 5/21/2012

BERTO VAN VEEN CONSTRUCTION

CON 937-3928220 E CLARK SUITE C SANTA MARIA CA 93455

30

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

ROLEADDRESS VAL. $ DATE ISSUEDPERMIT #

LAND ARCH. INC.

DES 310-228-70001155 PALM ST #6 ATTN: BRIAN ACKERMAN SAN LUIS OBISPO CA 9340

BLD2012-00747 1711 & 1713 LOMA STREET R/B-ALTERATION HAACK WILLIAM C OWNER

1713 LOMA ST SANTA BARBARACA 93103

100,000 5/23/2012

DEBRA SORENSEN

DES [email protected] HIGHLANDS DRIVE #7 SANTA BARBARA CA 93109

KEVIN L VANDERVORT

ENG 562-8463147 CASTILIAN DR. #3 GOLETA CA 93117

BLD2012-00761 960 GARCIA RD R/B-ADDITION SCHRAM, EDWARD C OWNER

960 GARCIA RD SANTA BARBARACA 93103

100,000 5/24/2012

HOLEHOUSE CONST. & DESIGN

CON 805-966-966233 W. MICHELTORENA SANTA BARBARA CA 93101

VADIM HSU

ARC 805-705-6625PO BOX 3292 SANTA BARBARA CA 93130

BLD2012-00975 1000 STATE ST C/OTC-ALTERATION QUINCY/1000 ASSOCIATES, LP OWNER

21 E VICTORIA STE 200 SANTA BARBARACA 93101

55,000 5/24/2012

TOWBES GROUP, INC.

CON FAX8055681412P.O. BOX 20130 SANTA BARBARA CA 93120-0130

31

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

32

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

33

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

34

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

35

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

36

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

37

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

38

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

39

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

40

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

41

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

42

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

43

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

44

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

45

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

46

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

47

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

48

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

49

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

50

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

51

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

52

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

53

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

54

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

55

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

56

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

57

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

58

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

59

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

60

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

61

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

2012 ADVERTISING RATE SHEET

SIZE BIANNUALLY ANNUALLYSBCA Website - 468 x 60 pixels $850 $1500 SBCA Online Planroom - Level 1 - 234 x 60 pixels $425 $ 750 SBCA Online Planroom - Level 2 - 234 x 60 pixels $425 $ 750 SBCA Online Planroom - Level 3 - 468 x 60 pixels $600 $1000 SBCA Online Planroom - Level 4 - 468 x 60 pixels $600 $1000 SBCA Online Planroom - Level 5 - 221 x 26 pixels $600 $1000 SBCA Online Planroom - Level 6 - 468 x 60 pixels $850 $1500 SBCA Online Planroom - Level 7 - 221 x 125 pixels $850 $1500

RUN TIME - The Santa Barbara Contractors Association web site www.sbcontractors.org, had more than 2.7 million visitors in the year 2011. Ads run for 12 seconds each on every page of the site. All banner ads can link to your company website. The online planroom site runs per click in each zone, and a biannual report of ad views and ad clicks can and provided upon request. Levels are as follows: Level 1 - Planrooms, Bidding Projects, CSI Projects, Keyword Search Results, View & Print Project Docs, Level 2 - Planrooms, Bidding Projects, CSI Projects, Project Info Search, Install Software, Level 3 - Login Page, Level 4 - Login Page, Level 5 - Project Details, Level 6 - My Desk, CSI Code Setup, Keyword Spec Search, Daily Project Email Setup, Support Center, View Activity, Add to Bidders and Search Spec Book, Level 7 - Project Details.

2012 Web Banner Advertising

SIZE 13 ISSUES 52 ISSUESBusiness Card - 3.5” x 2” $125 $ 400 1/4 Page - 3.5” x 4.75” $175 $ 650 1/2 Page - 7.375” x 4.75” $350 $1200 Full Page - 7.375 x 10.25” $500 $1750 Full Page - 7.375 x 10.25” - 1 Issue Special Insert $300 (please provide run date)

DISTRIBUTION - The Santa Barbara Contractors Association Newsletter is distributed 52 times a year to over 600 subscribers. Copies are delivered electronically on Wednesdays. The Newsletter is provided free to association members.

DEADLINES - Artwork must be received by Wednesday at noon for the following Wednesday’s publication.

2012 Newsletter Advertising

FORMAT OF ARTWORK - Artwork must be submitted in a digital format. Web Banner Ads can not be larger than 15KB. Artwork must be exact size. We accept PDF, TIFF, JPEG, GIF; InDesign & Illustrator �les save as EPS & have fonts turned to outlines.

SUBMISSION OF ARTWORK - Please deliver your artwork along with your payment to the SBCA. Send emails to [email protected] or mail a CD to P.O. Box 23409, Santa Barbara, CA 93121 or deliver to the SBCA o�ce at 914 A Santa Barbara Street, Santa Barbara, CA 93101.

ARTWORK QUALITY - The SBCA is not responsible for the quality of ads that do not meet the above criteria. Advertisers must be current members of the SBCA. All advertisements are subject to approval by the SBCA Board of Directors.

PAYMENT -

Santa Barbara Contractors AssociationP.O. Box 23409, Santa Barbara, CA 93121805-884-1100 phone 805-884-1108 fax

www.sbcontractors.org [email protected]

The SBCA accepts Check Visa Master Card American Express

Company Name Contact Name Signature Date

Credit Card Number Expiration Date Security Code Authorized Charge $

62

SANTA BARBARA CONTRACTORS ASSOCIATIONWEEKLY NEWSLETTER June 13, 2012

Unlicensed Operators

Like legitimate contractors, unlicensed operators sometimes use advertising to find new clients. Ads without license numbers or with numbers that are not issued by the CSLB are frequently used by the Board to identify sting targets.

The CSLB and other enforcement agencies use two sections of the law—B&P Sections 7027.1 and 7099.10—to take legal action against unlicensed contractors and, on occasion, against licensed contractors who advertise illegally.

If an unlicensed operator advertises as a contractor in a telephone directory, and if an investigation determines the entity doing the advertising is unlicensed, under B&P Section 7099.10 (a), the Registrar can issue a citation for a fine or other civil penalty assessment. The citation will also include an order of correction that requires:

any phone number in the unlawful ad and to not refer subsequent calls to any new number obtained by that person. If the order of correction isn’t made, the Registrar can have the Public Utilities Commission disconnect the phone service.

If you believe that an unlicensed contractor is actively working on a construction project, contact the CSLB at 1-800-321-CSLB (2752) or fill out a “SWIFT Lead Referral” form, which is available on the CSLB Web site, www.cslb.ca.gov.

CONTRACTORS STATE LICENSE BOARD DEPARTMENT OF CONSUMER AFFAIRS

ADVERTISINGGUIDELINES

ADVERTISING

Include your license number in

anything that might be considered

advertising.

Don’t use false or misleading

advertising, or advertise a price

you don’t intend to honor.

Don’t advertise to do work you’re

not licensed to perform.

Don’t advertise about bonding.

When advertising asbestos

removal services, be sure to include

your asbestos certification and

registration numbers along with

your business name.

Notify CSLB whenever you see

advertising for an unlicensed

contractor.

CONTRACTORS STATE LICENSE BOARD

P.O. Box 26000Sacramento, CA 95826-00261-800-321-CSLB (2752)www.cslb.ca.gov

D E P A R T M E N T O F C O N S U M E R A F F A I R S

07/08

Unlicensed Operators

Like legitimate contractors, unlicensed operators sometimes use advertising to find new clients. Ads without license numbers or with numbers that are not issued by the CSLB are frequently used by the Board to identify sting targets.

The CSLB and other enforcement agencies use two sections of the law—B&P Sections 7027.1 and 7099.10—to take legal action against unlicensed contractors and, on occasion, against licensed contractors who advertise illegally.

If an unlicensed operator advertises as a contractor in a telephone directory, and if an investigation determines the entity doing the advertising is unlicensed, under B&P Section 7099.10 (a), the Registrar can issue a citation for a fine or other civil penalty assessment. The citation will also include an order of correction that requires:

any phone number in the unlawful ad and to not refer subsequent calls to any new number obtained by that person. If the order of correction isn’t made, the Registrar can have the Public Utilities Commission disconnect the phone service.

If you believe that an unlicensed contractor is actively working on a construction project, contact the CSLB at 1-800-321-CSLB (2752) or fill out a “SWIFT Lead Referral” form, which is available on the CSLB Web site, www.cslb.ca.gov.

CONTRACTORS STATE LICENSE BOARD DEPARTMENT OF CONSUMER AFFAIRS

ADVERTISINGGUIDELINES

ADVERTISING

Include your license number in

anything that might be considered

advertising.

Don’t use false or misleading

advertising, or advertise a price

you don’t intend to honor.

Don’t advertise to do work you’re

not licensed to perform.

Don’t advertise about bonding.

When advertising asbestos

removal services, be sure to include

your asbestos certification and

registration numbers along with

your business name.

Notify CSLB whenever you see

advertising for an unlicensed

contractor.

CONTRACTORS STATE LICENSE BOARD

P.O. Box 26000Sacramento, CA 95826-00261-800-321-CSLB (2752)www.cslb.ca.gov

D E P A R T M E N T O F C O N S U M E R A F F A I R S

07/08

Unlicensed Operators

Like legitimate contractors, unlicensed operators sometimes use advertising to find new clients. Ads without license numbers or with numbers that are not issued by the CSLB are frequently used by the Board to identify sting targets.

The CSLB and other enforcement agencies use two sections of the law—B&P Sections 7027.1 and 7099.10—to take legal action against unlicensed contractors and, on occasion, against licensed contractors who advertise illegally.

If an unlicensed operator advertises as a contractor in a telephone directory, and if an investigation determines the entity doing the advertising is unlicensed, under B&P Section 7099.10 (a), the Registrar can issue a citation for a fine or other civil penalty assessment. The citation will also include an order of correction that requires:

any phone number in the unlawful ad and to not refer subsequent calls to any new number obtained by that person. If the order of correction isn’t made, the Registrar can have the Public Utilities Commission disconnect the phone service.

If you believe that an unlicensed contractor is actively working on a construction project, contact the CSLB at 1-800-321-CSLB (2752) or fill out a “SWIFT Lead Referral” form, which is available on the CSLB Web site, www.cslb.ca.gov.

CONTRACTORS STATE LICENSE BOARD DEPARTMENT OF CONSUMER AFFAIRS

ADVERTISINGGUIDELINES

ADVERTISING

Include your license number in

anything that might be considered

advertising.

Don’t use false or misleading

advertising, or advertise a price

you don’t intend to honor.

Don’t advertise to do work you’re

not licensed to perform.

Don’t advertise about bonding.

When advertising asbestos

removal services, be sure to include

your asbestos certification and

registration numbers along with

your business name.

Notify CSLB whenever you see

advertising for an unlicensed

contractor.

CONTRACTORS STATE LICENSE BOARD

P.O. Box 26000Sacramento, CA 95826-00261-800-321-CSLB (2752)www.cslb.ca.gov

D E P A R T M E N T O F C O N S U M E R A F F A I R S

07/08

Board of Directors

John HolehousePresident

Jack Martin1st Vice President

Paulo Sitolini2nd Vice President

Dan GeorgeTreasurer

Peter NovakParliamentarian

Patrick Foster

David James

Brian Larkowski

William Mace

Mark Magid

Aaron McKean

Rodney Utt

Executive DirectorKarin [email protected]

Administrative AssistantApril [email protected]

Santa Barbara Contractors Association914 A Santa Barbara StreetP. O. Box 23409Santa Barbara, CA 93121805.884.1100 Phone805.884.1108 Faxinfo@sbcontractors.orgwww.sbcontractors.orgwww.builtgreensb.org

The Santa Barbara Contractors Association Newsletter is published weekly by the Santa Barbara Contractors Association, Inc. Edito-rial and advertising offices are located at 914 A Santa Barbara Street, P.O. Box 23409, Santa Barbara, CA 93121. Office 805-884-1100, Fax 805-884-1108, Email [email protected]. A subscription is included in the annual membership dues. The news-letter is distributed to more than 600 local businesses and agencies. Articles appearing in this newsletter are presented as a public service and may not reflect the opinion of the publisher, its board of directors or its members. Please send comments regarding the newsletter to [email protected].