• Program Update

• $161 million in contracts awarded

• Bay View Wastewater Treatment Plant

• Point Place

• River Road

• LTCP/EPA Update

• Next Meeting

Page 3: CPAC Meeting 5-17-05

BVWWTP – EQ BasinBVWWTP – EQ Basin

• Construction begins in June

• Completed by December 2006

• Low bid was $28 million

• Contract with Rudolph Libbe being finalized

Page 4: CPAC Meeting 5-17-05

BVWWTP – Grit FacilityBVWWTP – Grit Facility

• Construction began in April

• Completed by Fall 2006

• $13.9 million

• Contractor is Rudolph Libbe

Page 5: CPAC Meeting 5-17-05

BVWWTP – Grit FacilityBVWWTP – Grit Facility

Page 6: CPAC Meeting 5-17-05

BVWWTP – Grit FacilityBVWWTP – Grit Facility

Page 7: CPAC Meeting 5-17-05

BVWWTP – Grit FacilityBVWWTP – Grit Facility

Page 8: CPAC Meeting 5-17-05

BVWWTP – BVWWTP – Wet Weather/Wet Weather/Ballasted FlocculationBallasted Flocculation• Construction begins in May

• Completed by Fall 2006

• $40 million

• Contractor is Mosser Construction

Page 9: CPAC Meeting 5-17-05

290290thth Street Pump Station Street Pump Station

• Substantially complete

• Landscaping underway

• Contractor was Gardner Mechanical

Page 10: CPAC Meeting 5-17-05

290290thth Street Pump Station Street Pump Station

Page 11: CPAC Meeting 5-17-05

290290thth Street Pump Station Street Pump Station

Page 12: CPAC Meeting 5-17-05

290290thth Street Pump Station Street Pump Station

Page 13: CPAC Meeting 5-17-05

290290thth Street Pump Station Street Pump Station

Page 14: CPAC Meeting 5-17-05

Edgewater Pump StationEdgewater Pump Station

• Working on startup, plan to start testing in a few weeks

• Completed by early Summer

• $4 million

• Contractor is Walbridge Aldinger

Page 15: CPAC Meeting 5-17-05

Edgewater Pump StationEdgewater Pump Station

Page 16: CPAC Meeting 5-17-05

Edgewater Pump StationEdgewater Pump Station

Page 17: CPAC Meeting 5-17-05

Edgewater ConstructionEdgewater Construction

• Currently testing 24-inch force main, then will test 8-inch force main

• Completed this Summer; resumes Winter 2005

• $2.5 million

• Contractor is Crestline Paving

Page 18: CPAC Meeting 5-17-05

Edgewater ConstructionEdgewater Construction

Page 19: CPAC Meeting 5-17-05

Edgewater ConstructionEdgewater Construction

Page 20: CPAC Meeting 5-17-05

River Road ParkRiver Road Park

• Construction underway

• Completed by Fall 2007

• $3.6 million (pump station and basin)

• Contractor is E.S. Wagner

Page 21: CPAC Meeting 5-17-05

River Road ParkRiver Road Park

Page 22: CPAC Meeting 5-17-05

River Road ParkRiver Road Park

Page 23: CPAC Meeting 5-17-05

River RoadRiver Road

• Water line nearly complete

• Sewer line will be completed by Fall 2005

• $1.8 million

• Contractor is Anderzack Pitzen

Page 24: CPAC Meeting 5-17-05

River RoadRiver Road

Page 25: CPAC Meeting 5-17-05

River RoadRiver Road

Page 26: CPAC Meeting 5-17-05

LTCP/EPA updateLTCP/EPA update

• LTCP

• EPA

Page 27: CPAC Meeting 5-17-05

Next meetingNext meeting