11
Today’s AgendaToday’s Agenda
• Point Place Improvements• Overview
• Force Main
• 290th Street Pump Station
• Edgewater Pump Station
• Updates• EQ Basin
• Future meetings
22
Point Place OverviewPoint Place Overview
• Project Goals• Increase capacity of system for wet weather flows
• Project Benefits• “Elimination” of sewage discharge to Ottawa River
and Maumee Bay• Improved protection and reduced risk of basement
backup
33
Point Place OverviewPoint Place Overview
• Consent Order Requirements• 11/01/03 – Award first construction contract• 12/01/06 – Eliminate SSO discharges
• Project Plans• Additional system capacity
• 26,000 feet of new sewer/force main• Replace two pump stations• Eliminate one pump station
44
Pump Station LocationsPump Station Locations
290th Street PumpStation Location
Proposed EdgewaterPump Station Location 55
Phase 2A OverviewPhase 2A Overview
• 36 inch sewer running from Bayview Plant up 290th Street to Ottawa River Road
• Construction of new pump station at Ottawa River Road and 290 Street
66
Phase 2A SchedulePhase 2A Schedule
• Detwiler Park and Golf Course crossing – Winter 2003-04
• 290th Street – Spring/Summer 2004
• Detour of Ottawa River Road – Summer 2004
• Paving of 290th Street – Summer/Fall 2004
• Pump Station Construction Completed – Fall 2004
77
Phase 2A UpdatePhase 2A Update
• Bids went out the third week of July for force main• Underground Utilities, Inc. had low bid of $3,186,343
• Currently negotiating contract
• Anticipated start date is Nov. 1, 2003/ To be completed by Nov. 1, 2004
• Bids went out the third week of July for pump station• Have a prospective low bidder
• Anticipated bid is $2,249,000
• Anticipated start date is November/ To be completed by
• Nov. 1, 200488
Sewer Routing BasisSewer Routing Basis
• Preference was to use roadways with pavement in poor conditions
• Preference was to avoid busy streets• Costs impacts of Routes were considered• Number of utilities in roadway were considered
290290thth Street Street117117thth Street StreetEdgewater at 145Edgewater at 145thth Street Street 99
290290thth Street Street RecommendationsRecommendations• Point Place Committee recommended block-by-
block closures versus maintaining one lane of traffic
• City Traffic Department will work with contractor to re-route traffic nearest east/west roads• Anticipate no major traffic issues
1010
Ottawa River Road Ottawa River Road CrossingCrossing• Summer 2004
• Road crossing much be trenched• Connects to existing manholes
• Will require closure of Ottawa River Road
• Simultaneous work at pump station location• Pump station construction will not cause traffic
disruption
1111
Ottawa River Road Ottawa River Road RecommendationsRecommendations• Committee recommended closure for 7 consecutive
days to complete project• Rather than night work schedule or weekend closures
• City Traffic Department recommended detour – Suder Avenue to Manhattan to Summit Street• Avoids residential areas
• Keeps heavy trucks out of neighborhoods
• Alternate detour – 108th Street to Summit Street• Runs through residential area
1212
290290thth Street Pump Station Street Pump Station Design ConceptsDesign Concepts
• Will eliminate raw sewage from Ottawa River
• 1st SSO eliminated under Consent Decree
• Size is 32’7” x 34’1”• This is the smallest
structure that can do the job
• Initial design concept based on station at Manhattan and Summit streets
• Point Place group providing input on design
Point Place Relief Station to be Point Place Relief Station to be used as architectural modelused as architectural model 1313
Phase 2B/2C OverviewPhase 2B/2C Overview
• Installation of 24-inch gravity relief sewer from the 290th Street pump station east on 117th, then south on Summit to 116th
• Installation of a 24-inch force main from the 290th pump station, east on 117th to 304th, north on 304th to 306th and east on 129th to the 129th pump station 1414
Phase 2B/2C Overview Phase 2B/2C Overview ContinuedContinued• Additional sewer pipes will be installed from that
pump station north to 136th street on Edgewater Drive• Construction of a new pump station on the northeast
corner of the Edgewater School property• Pump stations at 145th St. and 129th St. will be removed• Phase 3 includes the installation of a 24-inch gravity
relief sewer from 136th north on Edgewater to 149th
1515
Edgewater Pump StationEdgewater Pump Station
• Size about the same as 290th Street station
• Located near Edgewater School
• Have agreement with school for right of way
• Working with Toledo Public Schools so that station design compliments new school design
1616
EQ BasinEQ Basin
• Met with EPA Sept. 12
• Positive meeting – expressed willingness to consider splitting storage
• Some at plant
• Some on East side
• Potentially means significantly smaller basin on senior golf course
• Will present formal recommendation with engineering data to EPA next month
• Could be months before final decision on size and locations
1717