cpac meeting 3-21-05

12
Community Program Community Program Advisory Committee Advisory Committee Monday, March 21, 2005 Monday, March 21, 2005

Upload: harttwi

Post on 22-May-2015

293 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CPAC Meeting 3-21-05

Community Program Community Program Advisory CommitteeAdvisory Committee

Monday, March 21, 2005Monday, March 21, 2005

Page 2: CPAC Meeting 3-21-05

Today’s MeetingToday’s Meeting

• Program Update

• River Road

• Point Place

• Bay View Wastewater Treatment Plant

• LTCP Public Meetings

• Next Meeting

Page 3: CPAC Meeting 3-21-05

Program Update – Program Update – River RoadRiver Road• Contracts have been awarded

• E.S. Wagner

• Anderzack Pitzen

Page 4: CPAC Meeting 3-21-05

Program Update – Program Update – River Road continuedRiver Road continued• Projects will be built concurrently

• Construction contracts being finalized

• River Road sewer and water line

• Start in next two weeks

• Completed by fall

• Basin and pump station and Brookford sewer

• Begin in April

• Completed by Fall 2006

Page 5: CPAC Meeting 3-21-05

Program Update – Program Update – River Road continuedRiver Road continued

Page 6: CPAC Meeting 3-21-05

Program Update – Program Update – Point PlacePoint Place• 290th Street Pump Station

• Nearly complete

• Edgewater Pump Station• About 2 months behind schedule

• Complete early summer

Page 7: CPAC Meeting 3-21-05

Program Update – Program Update – Point PlacePoint Place• Edgewater Drive construction

• Postponed construction on Edgewater Drive between 131st Street and 136th Street until March 24th, the day before Spring Break, because of concern for children and traffic

Page 8: CPAC Meeting 3-21-05

Program Update – Program Update – Point PlacePoint Place• Edgewater Drive construction

• Currently installing force main and gravity sewer on Edgewater Drive from 131st Street to 129th Street

• Starting March 24th, will begin to install gravity sewer south from school to 131st Street

• Next will install force main north from 131st Street to school

• Then will install gravity sewer north from school to 136th Street

Page 9: CPAC Meeting 3-21-05

Program Update – Program Update – Point PlacePoint Place• Edgewater Drive construction

• Starting April 4th, contractor will shift work scheduled to begin at 9 a.m. to minimize the impact on morning commutes to work and school

• A safe walkway with a visible barrier between the roadway and the walk will be created for children walking to school as well as other foot traffic

Page 10: CPAC Meeting 3-21-05

Program Update – Program Update – BVWWTPBVWWTP

• Grit facility has been bid • Rudolph Libbe low bid

• Wet weather grit facility bid• Mosser low bid

• Equalization basin will be bid first week of April

• Could see groundbreaking as early as first week of April

Page 11: CPAC Meeting 3-21-05

LTCP Public MeetingsLTCP Public Meetings

• Potential sites

Page 12: CPAC Meeting 3-21-05

Next meetingNext meeting

• Other issues

• Next meeting date, time