cpac meeting 3-21-05
TRANSCRIPT
Community Program Community Program Advisory CommitteeAdvisory Committee
Monday, March 21, 2005Monday, March 21, 2005
Today’s MeetingToday’s Meeting
• Program Update
• River Road
• Point Place
• Bay View Wastewater Treatment Plant
• LTCP Public Meetings
• Next Meeting
Program Update – Program Update – River RoadRiver Road• Contracts have been awarded
• E.S. Wagner
• Anderzack Pitzen
Program Update – Program Update – River Road continuedRiver Road continued• Projects will be built concurrently
• Construction contracts being finalized
• River Road sewer and water line
• Start in next two weeks
• Completed by fall
• Basin and pump station and Brookford sewer
• Begin in April
• Completed by Fall 2006
Program Update – Program Update – River Road continuedRiver Road continued
Program Update – Program Update – Point PlacePoint Place• 290th Street Pump Station
• Nearly complete
• Edgewater Pump Station• About 2 months behind schedule
• Complete early summer
Program Update – Program Update – Point PlacePoint Place• Edgewater Drive construction
• Postponed construction on Edgewater Drive between 131st Street and 136th Street until March 24th, the day before Spring Break, because of concern for children and traffic
Program Update – Program Update – Point PlacePoint Place• Edgewater Drive construction
• Currently installing force main and gravity sewer on Edgewater Drive from 131st Street to 129th Street
• Starting March 24th, will begin to install gravity sewer south from school to 131st Street
• Next will install force main north from 131st Street to school
• Then will install gravity sewer north from school to 136th Street
Program Update – Program Update – Point PlacePoint Place• Edgewater Drive construction
• Starting April 4th, contractor will shift work scheduled to begin at 9 a.m. to minimize the impact on morning commutes to work and school
• A safe walkway with a visible barrier between the roadway and the walk will be created for children walking to school as well as other foot traffic
Program Update – Program Update – BVWWTPBVWWTP
• Grit facility has been bid • Rudolph Libbe low bid
• Wet weather grit facility bid• Mosser low bid
• Equalization basin will be bid first week of April
• Could see groundbreaking as early as first week of April
LTCP Public MeetingsLTCP Public Meetings
• Potential sites
Next meetingNext meeting
• Other issues
• Next meeting date, time