10 Name : Garabogaz Fertilizer Plant Project Site location : Garabogaz, Turkmenistan Volume : 168,582 CBM Collection from FOB European origins Direct FTL, LTL, rail and Airfreight shipments Transhipment operations River transportation up to Caspian port Discharging to Caspian port & Storage Re-loading on trailers & barges Shuttle barge operations : Turkmenbashi - Garabogaz Road permits, obstacle removals, civil works Transportation up to site River vessels utilized : 37 Heaviest unit 478 mt along with 19 units over 100 mt 9 Shuttle barge transportation between Turkmenbashi - Garabogaz CASE STUDY: TGF PROJECT– 2016 / 2017 TURKMENISTAN

Upload: others

Post on 08-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CASE STUDY: TGF PROJECT– 2016 / 2017 TURKMENISTAN · ground and railway with hl ... Pre-carriage up to FOB load ports, airports Direct FTL, LTL, rail and Airfreight shipments Ocean

10

Name : Garabogaz Fertilizer Plant Project Site location : Garabogaz, Turkmenistan Volume : 168,582 CBM

Collection from FOB European origins Direct FTL, LTL, rail and Airfreight shipments Transhipment operations River transportation up to Caspian port Discharging to Caspian port & Storage Re-loading on trailers & barges Shuttle barge operations : Turkmenbashi - Garabogaz Road permits, obstacle removals, civil works Transportation up to site

River vessels utilized : 37 Heaviest unit 478 mt along with 19 units over 100 mt 9 Shuttle barge transportation between Turkmenbashi - Garabogaz

CASE STUDY: TGF PROJECT– 2016 / 2017 TURKMENISTAN

Page 2: CASE STUDY: TGF PROJECT– 2016 / 2017 TURKMENISTAN · ground and railway with hl ... Pre-carriage up to FOB load ports, airports Direct FTL, LTL, rail and Airfreight shipments Ocean

11

Name : Gas to Gasoline Project Site location : Ovadandepe, Turkmenistan Volume : 154,110 CBM

Collection from FAS worldwide origins Direct FTL, LTL, rail and Airfreight shipments Ocean carriage up to TS ports Transhipment operations River transportation up to Caspian port Discharging to Caspian port & Storage Re-loading on trailers & transit clearance Road permits, obstacle removals, civil works Transportation up to site Lifting & Erection works Import customs clearance at final destination

Axles utilized : 210 hydraulic Axle movements : 1,280 movements River vessels utilized : 36 Overland distance: 645 km’s Heaviest unit 317 mt along with 23 units over 100 mt 77 OOG/HL units Ocean, river, air, truck transportation from 27 different origins Project is the largest gas to gasoline plant ever built in the world!

CASE STUDY: GTG PROJECT– 2016 / 2017 TURKMENISTAN

Page 3: CASE STUDY: TGF PROJECT– 2016 / 2017 TURKMENISTAN · ground and railway with hl ... Pre-carriage up to FOB load ports, airports Direct FTL, LTL, rail and Airfreight shipments Ocean

12

Name : Karbala Refinery Site location : Karbala, Iraq Volume : 200,000 CBM

Transportation from Umm Qasr port up to final destination Storage Civil works & by-pass constructions Bridge and flyover constructions Various engineering works

Axles utilized : 180 hydraulic & 52 SPMT axles 6 x 665 mt, 3 x 720 mt bullets Total 540 km’s overland distance Heaviest ever cargo to be transported in Iraq! Extensive road improvement works: ¾Samawah Tubular Bridge Construction (150 m length) ¾Kofa Cement Factory Ramp (400 m L) & flyover bridge

(12m) construction. ¾ 350 km of road width extension (4 m extension) done ¾ 16 x bypass road construction avoiding the culverts.

CASE STUDY: KARBALA PROJECT– 2016 / 2017 IRAQ

Page 4: CASE STUDY: TGF PROJECT– 2016 / 2017 TURKMENISTAN · ground and railway with hl ... Pre-carriage up to FOB load ports, airports Direct FTL, LTL, rail and Airfreight shipments Ocean

13

Heaviest Unit

12.42 length

5.42 Width

4.84 height

410 tons

Name : Samsung Kirikkale CCPP Site location : Kirikkale, Yahsiyan, Turkey Volume : 300,000 CBM

Discharging to Samsun Port Storage Re-loading on trailers Transportation up to site Equipment installation with gantry crane

Axles utilized : 200 SPMT Axle movements : 820 movements Overland distance : 360 km’s

CASE STUDY: KIRIKKALE CCPP PROJECT – 2016 TURKEY

Page 5: CASE STUDY: TGF PROJECT– 2016 / 2017 TURKMENISTAN · ground and railway with hl ... Pre-carriage up to FOB load ports, airports Direct FTL, LTL, rail and Airfreight shipments Ocean

14

- Historical Structure Relocation -

The ancient town of Hasankeyf is located in southeastern Turkey The Zeynel Bey Tomb which is located in Hasankeyf, commemorates the warrior son of a Turkish ruler, who died in a battle against the Ottomans six centuries ago. The burial chamber has long disappeared but the tomb, made from cut stones, is architecturally unique in Turkey and an example of central Asian influences The discussions of possibility to relocate the structure began three-and-a-half years ago after scientists warned that the structure was at risk of being submerged with the construction of the Ilısu Dam In the conclusion of long studies and discussions, CJ-ICM Engineers and Crew have rolled up their sleeves to take important part of saving the historic Zeynel Bey Tomb The 1,100 tons Zeynel Bey Monument was transported for 2km by using 48 Axles SPMT in May, 2017

CASE STUDY: ZEYNELBEY PROJECT– 2016 TURKEY

Page 6: CASE STUDY: TGF PROJECT– 2016 / 2017 TURKMENISTAN · ground and railway with hl ... Pre-carriage up to FOB load ports, airports Direct FTL, LTL, rail and Airfreight shipments Ocean

15

Name : Formula-1 Grand Prix of Europe Site location : Baku, Azerbaijan Volume : 2,400 MT

Ocean freight Discharging at Poti Port On-carriage to Baku by rail Customs clearance Re-loading on trailers Transportation to site & offloading Post race logistics (sea, road & air freight)

14 Charter flights (B747) Over 1,550 mt of airfreight Over 550 mt of containerized cargo incl. block train from Poti to Baku 160 TEU Over 200 FTL local deliveries Over 300 tons of int’l road freight shipments about 42 FTL

CASE STUDY: FORMULA1 GRAND PRIX– 2016 AZERBAIJAN

Page 7: CASE STUDY: TGF PROJECT– 2016 / 2017 TURKMENISTAN · ground and railway with hl ... Pre-carriage up to FOB load ports, airports Direct FTL, LTL, rail and Airfreight shipments Ocean

Widest Unit

28 length

7.4 width

7.6 height

152 tons

Heaviest Unit

45 length

6.8 width

7.7 height

253 tons

Transhipment Unloading Civil Works Onshore Haulage Loading @ Origin Storing Reloading

16

Name : UGCC Ethylene Plant Project Site location : Akchalak, Uzbekistan Volume : 98,240 CBM

Loading at origins & transshipment to river vessels River vessel transportation & various HL engineering works Discharging to Caspian port & Storage Re-loading on trailers & transit clearance Road permits, obstacle removals, civil works Transportation up to site

Axles utilized : 258 hydraulic Axle movements : 1,082 movements River vessels utilized : 13 Overland distance : 827 km’s 126 OOG/HL units 16 major bypass constructions

CASE STUDY: UGCC PROJECT– 2014 UZBEKISTAN

Page 8: CASE STUDY: TGF PROJECT– 2016 / 2017 TURKMENISTAN · ground and railway with hl ... Pre-carriage up to FOB load ports, airports Direct FTL, LTL, rail and Airfreight shipments Ocean

17

Highest Unit

5.1 length

3.8 width

9.94 height

22 tons

Heaviest Unit

43 length

8.2 width

9,04 height

263 tons

Name : Turkmenbashi Oil Refineries Site location : Turkmenbashi, Turkmenistan Volume : 98,240 CBM

Transshipment to river vessels River vessel transportation Various HL engineering works Discharging to Caspian port Re-loading on trailers & transit clearance Road permits, obstacle removals, civil works Transportation up to site

● CHALLENGE ● Passing the gas-line pipes on ground and railway with hl unit

● SOLUTION ● CJ-ICM designed & built a fly-over bridge to eliminate the challenge.

CASE STUDY: TORE PROJECT– 2013 TURMENISTAN

Page 9: CASE STUDY: TGF PROJECT– 2016 / 2017 TURKMENISTAN · ground and railway with hl ... Pre-carriage up to FOB load ports, airports Direct FTL, LTL, rail and Airfreight shipments Ocean

Heaviest Unit

37 length

5.6 Width

6.44 height

473 tons

18

Name : South Yoloten Gas Development Project Site location : Mary, Yoloten, Turkmenistan Volume : ~700,000 CBM

Collection from FOB & EX-works worldwide origins Pre-carriage up to FOB load ports, airports Direct FTL, LTL, rail and Airfreight shipments Ocean carriage up to TS ports Transhipment operations River transportation up to Caspian port Discharging to Caspian port & Storage Re-loading on trailers & transit clearance Road permits, obstacle removals, civil works Transportation up to site Import customs clearance at final destination

Axles utilized : 270 hydraulic Axle movements : 2,068 movements River vessels utilized : 79 290 OOG/HL units Transported 100 KM (8,614 pieces) of 56” coated pipes from FOB Italy to site with 24 ocean & 44 river vessels in 143 days

CASE STUDY: YOLOTEN PROJECT– 2010/2013 TURKMENISTAN