third idmp cee workshop: idmp cee progress and plans by sabina bokal
DESCRIPTION
Third IDMP CEE workshop: IDMP CEE progress and plans by Sabina BokalTRANSCRIPT
Overview of the progress (Apr – Sep 2014)
& Plans (Oct 2014 – Mar 2015)
Sabina Bokal, Programme Manager
3rd IDMP CEE Workshop Budapest, 2 – 4 October 20148
Increase the capacity of the CEE region to adapt to climatic variability by enhancing resilience to
drought.
Task Deadline
Development of the Questionnaire
Draft report
Collecting comments
Final report
Act. 1.2: Review of the current status of the implementation of DM plans and measures within RBMP according to EU WFD
Guidelines for preparation of the
Drought Management Plans
1st National consultation
dialouges
Review of current status of drought
planning
review of exsisting Guidelines and
legislative framework
2nd National consultation
dialouges
Testing the Guidelines in national conditions
WP2: National planning process
2014
2013
Development of the draft
Guidelines
June October / November April 2015
Discussion: • completing the Guidelines with national experiences • 2nd NCD (time, content, etc.)
Task Deadline
Draft version of Implementation guide
Survey on properties of available data
Workshop
List of available data sources and list of planned products to be included in the platform
O1: Final version of the Implementation Guide May 2014
O2: Implementation Report December 2014
Act. 1.3: Drought information exchange Platform
Main problem: limitation with providing the data (technical)
Act. 7.1: Good Practice Compendium
Task Deadline
Investigate possible outcome of IDMP CEE activities and who will be the users of the GPC
Current status of existing DMPs and others policy and management documents across Europe analyzed
Information, results and good practices from IDMP CEE activities included
December 2014
Main problem: Demonstration projects – final outputs; what to include?
DEMONSTRATION PROJECTS
Act. 5.1: Increasing soil water holding capacity
„Testing several approaches to agricultural practices which can improve
conditions for soil water holding capacity.“
OUTPUT: Analysis and proposals of preventive measures as a tools
for drought management in agricultural practices and
technologies
Act. 5.2: Drought impact on forest ecosystems
„... identification of mitigation and adaptation measures for forest ecosystems.“
OUTPUT: Remedial measures for the forest ecosystems to
mitigate negative effects of the drought
Act. 5.3: Natural small water retention measures
„adaptation measures to mitigate negative impacts of extreme water situations“
OUTPUT: Guidelines on „Natural landscape retention – combining drought mitigation, flood protection and biodiversity conservation“ Act. 5.4: Drought Risk Management Scheme
OUTPUT: Framework for integrated drought risk mapping that can be adjusted to a given drought context.
Act. 5.5: Remote sensing agricultural drought monitoring methods
„... to upgrade data assessment and forecasting tools to support drought management and monitoring“.
OUTPUTS: o Toolbox with the concrete identification of remote sensing
and GIS data tools for agricultural drought monitoring and forecast
o Guidelines for national governments and local stakeholders to integrate the drought monitoring and intervention levels into national flood and drought protection plans
Act. 5.6: Upgrading agricultural drought monitoring and forecasting: the case of Ukraine and Moldova
OUTPUTS: o Upgraded climate-zoning of Ukraine territory and Dniester
River Basin territory & Drought risk maps for agro sector – identification of drought prone areas
o Upgrading of forecasting models for identification of crop yield losses (UA) & proposals for the precipitation harvesting and practices for moisture conservation (MD)
o Policy makers and stakeholders awareness raising on droughts management/planning
o Drought Management Center for Southeastern Europe
o Cooperation with River Basin Organizations (ICPDR, ISRBC):
• observer status • River Basin Management Expert Group (May, 2014 in Zagreb)
o European Drought Observatory (EDO) - platform for exchanging drought information
Act. 1.1: Cooperation with international basin commissions and regional organizations
o 16th session of the WMO Commission of Agricultural Meteorology in Antay, Turkey (10-12 April 2014)
o International Conference on Sustainability in the Water-Energy-Food Nexus in Bonn, Germany (19-20 May 2014)
o Interreg IVC thematic capitalisation event “Policy sharing, policy learning” in Brussels (22 May 2014)
o 39th River Basin Management Expert Group Meeting, ICPDR in Zagreb, Croatia (5-6 May 2014)
o GWP Regional Days and Consulting Partners Meeting in Port of Spain, Trinidad (23-28 June 2014)
... and participation
Act. 1.4: Development of GIS Based Communication Technology Platform for the Sustainable Management of Transboundary Water Resources in Lithuania, Poland and Kaliningrad Region
to develop GIS based communication platform for the sustainable management of transboundary water resources in Lithuania, Poland, Belarus and Kaliningrad Region (Russia)
OUTPUT: compilation of joint transboundary maps on surface water, groundwater, human pressures, including (where possible) drought elements
Workshops Date
1st workshop in Hodrusa Hamre, Slovakia 15 - 16 October 2013
2nd workshop in Ljubljana, Slovenia 8 - 9 April 2014
3rd IDMP CEE workshop & joint DMCSEE/GWP capcity buidling training
2 - 4 October 2014
4th workshop March/April 2015
o Janusz Kindler (Warsaw University of Technology, Poland)
o Sándor Szalai (Szent István University, Hungary)
o Henny A.J. van Lanen (European Drought Centre, Wageningen University, the Netherlands
o Robert Stefanski (World Meteorological Organization, Geneva, Switzerland)
o 1st Report (October 2013 – March 2014)
o 2nd Report (April – September 2014)
Act. 6.3: Peer Review Group
Peer Review Group review process
accepted
accepted with modifications
rejected Milestone progress report + Annexes
PRG review - assessment
Activity Leader – reply to PRG & updating annexes
PRG Final confirmation
payment
Milestone reports
• quick insight into your activity
STRUCTURE:
• 1. Basic information
• 2. Activity Report
o Short summary of the milestone report o What have been done after the previous milestone report o Describe the progress to the objectives of your activity o The expected final output(s) o At what stage you are now in the process of producing the final output(s) o Have you introduced any change in the original plan as outlined in the
Activity List? o Identify links with other IDMP CEE activities
• 3. Annexes - milestones / Outputs from Activity Lists
Timetable
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar1.3. Platforma Output 1 Output 2
1.4 Kaliningrad Output 1 Output 3 Output 4 Output 2
2.1 Guidelines1st draft G
Final
Guidelines
5.1. Milestone 3 Output
5.2. Output 2 Output 3 Output 4
5.3. Milestone 3 Milestone 4 Milestone 5 Output
5.4. Output 2 Output 3
5.5. Output 2 Output 3
5.6. Milestone 3 Milestone 4 Milestone 5
7.1 Good practicesMilestone 1
Draft
Compendium
Final
Compendium
Confusing – outputs, milestones
Main objectives of this workshop:
o to get informed about the progress and plans till the end of the programme
o to identify main problems and challenges and create solutions how to overcome them
o to find connections between activities
o to put activities in the overall context
o to discuss continuation of the programme (which activities, funds, etc.)
Thank you for your attention!
...and let‘s start
http://www.gwp.org/en/GWP-CEE/IDMPCEE/
http://www.gwp.org/en/GWP-CEE/IDMPCEE/for-Partners/