22 January 2013 Page 1
PBN Implementation (Where we are today)
Presentation to the 12th Air Navigation Conference
Erwin Lassooij ICAO PBN Programme Manager,
22 November 2012
22 January 2013 Page 2 2
PBN Implementation Plans
104 of 191 States (54%) have submitted a plan
22 January 2013 Page 3 3
PBN Approaches (LNAV, LNAV/VNAV, LPV, RNP AR)
30% of Intl Runways have PBN procedures
WWW.ICAO.INT/PBN
22 January 2013 Page 4
Int’l Airport Approach Type – All Regions (Monitoring and Measurement)
Heading in the right direction, but are we on target?
Targets: 30% by 2010 70% by 2014 100% by 2016
22 January 2013 Page 5
ICAO Actions
Training -
Formal courses
and computer-
based learning
packages ICAO
Actions
B
E
C
D
A PBN symposia,
workshops,
guidance material
PBN implementation
project offices
Support for the ASBU
provisions enabled
by PBN
Continuing PBN
standards
development and
amendment
22 January 2013 Page 6
A – Symposia and Workshops
6
FAA/Eurocontrol Introductory Seminars ICAO Regional Seminars Airspace Concept Workshops –CDO/CCO IATA/ICAO GO Team Visits
22 January 2013 Page 7 7
A - Guidance material framework
• RNP AR Procedure Design Manual
(Doc 9905) • PBN Ops Approval Manual (Doc 9997)* • Manual on PBN Use in Airspace Design
(Doc 9992)* • CDO Manual (Doc 9931) • CCO Manual (Doc 9993)* • GNSS Manual (Doc 9849) • Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906)
* New
Annexes and PANS
22 January 2013 Page 8
A - PBN iKIT
Provides the main stakeholders with essential information,
practical documentation and guidance material on PBN in
relation to their area.
http://www.icao.int/safety/pbn/Pages/DB-View.aspx
22 January 2013 Page 9
B – PBN Implementation Project Offices
• 2 offices – Asia/Pacific
– Africa
• To provide additional support
• Help facilitate PBN Implementation
Denotes Office Location Area
22 January 2013 Page 10 10
C - Computer Based Learning Packages
PBN Overview • Module 1 & 2
Operational Approval
• Dec 2012
Airspace Design
• Dec 2012
22 January 2013 Page 11 11
• Operational Approval
• Airspace Concept
C – Formal Training Courses
In development
22 January 2013 Page 12 12
• Improve Block 0
– Better flight procedures
– Closer separation/route spacing
– Improve connections with industry Standards
– Additional guidance
D - Continuing PBN Standards (Development, Amendment and Support)
22 January 2013 Page 13 13
• Block 0 procedures and guidance is
there
• Momentum is there . . .
. . . but we need to speed up.
• Focus on implementation – PBN Task forces
– Direct assistance stakeholders
– Education
– Expansion on FPP concept
D - Continuing PBN Standards (Development, Amendment and Support)
80% 20%
22 January 2013 Page 14 14
• Endorsement of Instrument procedure design organizations
• Consistent with other endorsements (training)
• To assist States with Implementation
Endorsement
Name of Organization
22 January 2013 Page 15
Efficient Flight Path
Through Trajectory-based Operations
Approach with vertical
guidance
Improved Flexibility & Efficiency in Descent/Climb Profiles (CDO/CCOs)
Block 0
Block 2
Optimised Arrivals in
Dense Airspace
Block 3
Full 4D Trajectory
based Operations
Block 1
Further improved
Flexibility & Efficiency in
Descent/climb Profiles
(CDO/CCO’s)
E – Support for ASBU Provisions enabled by PBN
15
22 January 2013 Page 16 16
• PBN highest Air Navigation priority
• Block 0 is ready
• We need to expedite implementation together
Summary
22 January 2013 Page 17
“What we think, or what we know, or what we believe is, in the end, of little consequence.
The only consequence is what we do.”
—John Ruskin
Erwin Lassooij ICAO PBN Programme Manager
[email protected] Tel: +1 514-954-8219 ext 6290