egnos service provision status icao pbn tf7 paris, 2 nd july 2012 02/07/20121icao pbn tf7

35
EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/2012 1 ICAO PBN TF7

Upload: lizbeth-wardwell

Post on 31-Mar-2015

219 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

EGNOS Service Provision Status

ICAO PBN TF7Paris, 2nd July 2012

02/07/2012 1ICAO PBN TF7

Page 2: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

TABLE OF CONTENT

• EGNOS System & Services Status

• EGNOS SoL Service issues

• EGNOS Services Roadmap

• EGNOS SoL Service introduction Status

02/07/2012 2ICAO PBN TF7

Page 3: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

TABLE OF CONTENT

• EGNOS System & Services Status

• EGNOS SoL Service issues

• EGNOS Services Roadmap

• EGNOS SoL Service introduction Status

02/07/2012 3ICAO PBN TF7

Page 4: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

EGNOS System & Services Status

02/07/2012 4ICAO PBN TF7

Page 5: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

EGNOS Services

• EGNOS Safety-of-Life (SoL) Service– Service Declaration: 2nd March 2011– http://www.essp-sas.eu/service_definition_documents

• EGNOS Open Service (OS)– Service Declaration: 1st October 2009– http://www.essp-sas.eu/service_definition_documents

• EGNOS Data Access Service (EDAS)– EDAS Service provided by ESSP since 2009– Service evolutions under development by ESSP– Service Declaration planned for July 2012

502/07/2012 ICAO PBN TF7

Page 6: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

EGNOS Performance Reporting

− Real-Time Performance Monitoring:http://egnos-user-support.essp-sas.eu/egnos_ops/public_upcm

– EGNOS User Support Website: http://egnos-user-support.essp-sas.eu/

– Monthly Performance Reports:http://www.essp-sas.eu/monthly_performance_reports

– Yearly Performance Reports:http://www.essp-sas.eu/printed_documents

02/07/2012 6ICAO PBN TF7

Page 7: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

EGNOS Latest Improvements (I/II)

Increased service area and improved service robustness in border areas

02/07/2012 7ICAO PBN TF7

• New EGNOS System Release V2.3.1p was deployed in February-March 2012 with:– GEO Swap (22/3/12): INMARSAT satellite 4F2 (PRN

126) replaced ARTEMIS satellite (PRN 124), thus improving the visibility over the North ECAC area

– New reference stations: La Palma (Spain) and Alexandria (Egypt). Athens (Greece) to be deployed in the short term

– Improvement in EGNOS functions (iono monitoring)– MT9/MT17 coherency guaranteed– More GPS satellites used by EGNOS (GPS block IIF)

Page 8: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

Actual performance obtained on a typical day…

02/07/2012 8ICAO PBN TF7

EGNOS Latest Improvements (II/II)

Page 9: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

GEO Swap (I/II) • The visibility in the North is improved with the inclusion of PRN126:

Visibility circles on the 26/10/2011. Solid line = 0° elevation, dotted line =5° elevation

INMARSAT satellite 4F2 (PRN 126)ARTEMIS satellite (PRN 124)

02/07/2012 9ICAO PBN TF7

Page 10: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

3 EGNOS Geostationary Satellites

PRN120 Inmarsat AOR-E PRN124 ESA Artemis PRN126 Inmarsat IOR-W

•EGNOS OPS: PRN120 and PRN126 broadcast EGNOS messages to provide the SIS that is actually used by the EGNOS aviation user•EGNOS TEST: PRN124 is used by industry for EGNOS System Releases tests and operators training and qualification•GEO SWAP: PRN124 replaced by PRN126 in OPS end of March 2012

02/07/2012 10ICAO PBN TF7

GEO Swap (II/II)

Page 11: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

• ESR V2.3.1i: Summer 2012.– The Industry is working in the development of a new EGNOS system

release more robust to ionospheric disturbances. – It is expected that this new release will be deployed in Summer 2012.

• ESR V2.3.2 and V2.4.x: 2013-2014– Improvement of Ionospheric monitoring– LPV-200 service– Addition of new RIMS (up to 40)– Next generation infrastructure (New GEOs, improved comm network,

etc.)

• APV I target Service Area in 2014…

EGNOS future improvements

02/07/2012 11ICAO PBN TF7APV-I target service area 2014

Page 12: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

TABLE OF CONTENT

• EGNOS System & Services Status

• EGNOS SoL Service issues

• EGNOS Services Roadmap

• EGNOS SoL Service introduction Status

02/07/2012 12ICAO PBN TF7

Page 13: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

TABLE OF CONTENT

• EGNOS System & Services Status

• EGNOS SoL Service issues

• EGNOS Services Roadmap

• EGNOS SoL Service introduction Status

02/07/2012 13ICAO PBN TF7

Page 14: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

EGNOS SoL Service Issues

02/07/2012 14ICAO PBN TF7

Page 15: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

EGNOS SoL Service (I/III)

• EGNOS SoL Service Definition Document (SDD) describing the characteristics and conditions of access to the service. Published on the 2nd March 2011

New version of SoL SDD planned for summer 2012

http://www.essp-sas.eu/service_definition_documents

• EGNOS Service Notices generated whenever there is any complementary information to be provided to users that could affect the any SDD contents.

http://www.essp-sas.eu/service_notices

02/07/2012 15ICAO PBN TF7

Page 16: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

A new SoL SDD will be published this summer

02/07/2012 16ICAO PBN TF7

EGNOS SoL Service (II/III)

Page 17: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

• Service Notices are available at ESSP website:

www.essp-sas.eu/service_notices

• Service Notices published so far:

• Service Notice #1: MT9-MT17 Status (NOT APPLICABLE after deployment of ESR2.3.1P)

• Service Notice #2: Status of EGNOS performances (updated in April 2012!)

• Service Notice #3: EGNOS upgrades deployed in Q1 of 2012 (updated in April 2012!)

• Service Notice #4: Published in May 2012, related to the potential Service unavailability due to new Leap Second in June (updated on the 30/06/2012!).

02/07/2012 17ICAO PBN TF7

EGNOS SoL Service (III/III)

Page 18: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

• SoL Service degradation since Sept 2011 affecting APV-I availability mainly in SW and N of Service Area but:– Not compromising integrity at any moment

– Not affecting OS users

– Not affecting NPA users

– Limited impact in published LPV procedures

EGNOS SoL Service Degradation (SN#2)

02/07/2012 18ICAO PBN TF7

– Investigations showed that it was related to:• Several NANUs on GPS SVs together with new

generation GPS satellites (GPS-IIF) out of the EGNOS mask lowering the number of satellites available.

• Solar activity increase degrading the ionospheric monitoring capability of the system.

Page 19: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

• Mitigation actions applied

– Issue given highest priority by ESSP, EC, ESA and industry.

– EGNOS mask updated in February 2012 to include GPS-IIF SVs (PRN1&25) plus PRN27

– Operational workaround applied

– ESR231p in February 2012 already correcting some iono related issues and improving robustness thanks to additional RIMS

02/07/2012 19ICAO PBN TF7

EGNOS SoL Service Degradation (SN#2)

Page 20: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

• Service Degradation Current Status:

– Contingency situation not existing anymore– EGNOS performance back to nominal levels since May

mainly due to:• Effectiveness of Operational Work Around• ESR231p improvements (iono robustness, new

RIMS and new GPS satellites Block IIF)• Moderation of solar activity

– Additional robustness against iono activity is expected by August 2012 with ESR231i

02/07/2012 20ICAO PBN TF7

EGNOS SoL Service Degradation (SN#2)

Page 21: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

• International Earth Rotation and Reference Systems Service (IERS) add a leap second to the UTC, when required, in order to align this reference with the Mean Solar Time

• The process to manage the introduction of a new leap second in EGNOS was concluded that could imply an EGNOS service (OS and SoL) unavailability during a period of 72 hours starting from July the 1st at 00:00:00 CET.

• SN #4 was published to inform on this planned service outage.

• EWA specific communications issued and NOTAMs generated to inform final users accordingly

• No service outage was finally caused.

• SN #4 updated on 30/06/12 accordingly.

• All related NOTAMs were cancelled

Leap Second introduction (SN#4)

02/07/2012 21ICAO PBN TF7

Page 22: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

TABLE OF CONTENT

• EGNOS System & Services Status

• EGNOS SoL Service issues

• EGNOS Services Roadmap

• EGNOS SoL Service introduction Status

02/07/2012 22ICAO PBN TF7

Page 23: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

TABLE OF CONTENT

• EGNOS System & Services Status

• EGNOS SoL Service issues

• EGNOS Services Roadmap

• EGNOS SoL Service introduction Status

02/07/2012 23ICAO PBN TF7

Page 24: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

• EGNOS Service Roadmap document will be published by ESSP soon including:

– A high-level overview of EGNOS services’ current status

– EGNOS Services expected evolutions related to:

• Service Area extensions

• Service Level improvements

• Service Robustness improvements

• User Interfaces enhacements

EGNOS Services Roadmap (2012-2014)

2402/07/2012 ICAO PBN TF7

Page 25: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

TABLE OF CONTENT

• EGNOS System & Services Status

• EGNOS SoL Service issues

• EGNOS Services Roadmap

• EGNOS SoL Service introduction Status

02/07/2012 25ICAO PBN TF7

Page 26: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

TABLE OF CONTENT

• EGNOS System & Services Status

• EGNOS SoL Service issues

• EGNOS Services Roadmap

• EGNOS SoL Service introduction Status

02/07/2012 26ICAO PBN TF7

Page 27: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

EGNOS SoL Service Introduction Status

02/07/2012 27ICAO PBN TF7

Page 28: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

EGNOS SoL Service• Regulated framework under Supervisory Authority oversight required

for a Safety of Life application. Civil Aviation application Single European Sky (SES):

– ESSP SAS certified as ANSP (Service Provision common requirements)– EGNOS System verified (Interoperability regulation)– Safe introduction of the SoL Service (Safety oversight regulation)– Need for EGNOS Working Agreements

• Main SoL objective is to support civil aviation operations down to LPV (Localizer Performance with Vertical guidance) minima.

• Freely offered for all phases of flight to:– Airspace Users (as defined by SES regulation) equipped with EGNOS certified

receivers (TSOS/ETSOs C144,C145 or C146) – Certified Air Navigation Service Providers (ANSPs) having signed an

EGNOS Working Agreement (EWA) with ESSP

2802/07/2012 ICAO PBN TF7

Page 29: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

LPV implementation status (I/IV) • 1st EGNOS Working Agreement signed with DSNA on 02/03/11

• 2nd EGNOS Working Agreement signed with Skyguide on 14/11/11

• 3rd EGNOS Working Agreement signed with Guernsey Airport (ANSP of Guernsey State, Bailiwick of Guernsey in the Channel Islands) on 05/12/11

• 4th EGNOS Working Agreement signed with DFS on 09/12/11

• 5th EGNOS Working Agreement signed with ENAV on 16/05/12

• 6th and 7th EGNOS Working Agreement signed with NATS and Austrocontrol on 14/06/12

• Many other European ANSPs interested in the EWA or in the process to sign it mainly via the FP7 projects (ACCEPTA, SHERPA): AENA and PANSA now under discussion.

02/07/2012 29ICAO PBN TF7

Page 30: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

LPV implementation status (II/IV)

EGNOS-based procedures implementation map and

detailed list included in the ESSP website

www.essp-sas.eu

3002/07/2012 ICAO PBN TF7

Page 31: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

LPV implementation status (III/IV)

• DSNA (France): First LPV procedure in EU operational in Pau on 17/03/11– LPV in Clermont-Ferrand published on the 5th May 2011– LPV in Le Bourget published on the 2nd June 2011 – LPVs in Bordeaux (08/03/12) and Biarritz (09/02/12) published– LPVs in Toulouse, Brest and Carcassonne (03/05/12) published– LPVs in Vannes and Rodez (31/05/12)– LPVs in Limoges, Nantes and Orléans (28/06/12)

• Skyguide (Switzerland):LPVs in Les Eplatures and St. Gallen-Altenrhein published on the 17th November 2011

• Guernsey Airport (Bailiwick of Guernesey): LPVs in Alderney Airport published on the 17th Nov 2011

• DFS (Germany): EGNOS authorised for APV Baro procedures in Germany since 15/12/11

– 81 APV Baro procedures in 38 airports– 6 new LPVs in different airports planned for 2012

• More than 40 new EGNOS based procedures expected in 2012!!!

02/07/2012 31ICAO PBN TF7

Page 32: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

Country Airports LPV Procedures APV baro

Procedures (EGNOS enabled)

France 13 16 0

Switzerland 2 2 0

Guernsey 1 2 0

Germany 38 0 81

Total 54 20 81

LPV implementation status (IV/IV)• As a summary of the current status:

• Plans for the rest of 2012:– Some tens more LPVs in France– 6 new LPVs in different German regional airports– 1st LPV in Spain?– 1st LPV in UK?– 1st LPV in Italy?

• Plans in the short-mid term…

• High expectations based on ANSPs communicated plans for APV implementation…

32

Courtesy of Eurocontrol’s PBN Apporach Map tool

02/07/2012 32ICAO PBN TF7

Page 33: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

How to Contact ESSP?

ESSP Website: www.essp-sas.eu

EGNOS User Support Website: http://egnos-user-support.essp-sas.eu

EGNOS User Helpdesk:[email protected]

Service Development: [email protected]

02/07/2012 33ICAO PBN TF7

Page 34: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

02/07/2012 34

Questions?

02/07/2012 34ICAO PBN TF7

Page 35: EGNOS Service Provision Status ICAO PBN TF7 Paris, 2 nd July 2012 02/07/20121ICAO PBN TF7

EVENT TITLE 3526 Oct 2009

Thanks!