ICAO UPDATE
16 April 2018
)
Proceedings of the 2018 International Flight Inspection Symposium,Monterey, California, April 16-20, 2018
1
Overview• Global Picture and
the challenges aviation is facing
• PBN implementation update
• ICAO Developments
– PBN
– AIM
– Flight Inspection16 April 2018 2
2
GLOBAL PICTURE AND THE CHALLENGES AVIATION IS FACING
Global Overview
16 April 2018
3
‐
50
100
150
200
250
0
1000
2000
3000
4000
5000
6000
7000
8000
1944
1946
1948
1950
1952
1954
1956
1958
1960
1962
1964
1966
1968
1970
1972
1974
1976
1978
1980
1982
1984
1986
1988
1990
1992
1994
1996
1998
2000
2002
2004
2006
2008
2010
2012
2014
2016
Revenu
e Pa
ssen
ger‐Kilometres
(billion)
Oil
cris
is
Gul
f war Asi
an c
risis
Iran-
Iraq
war
SAR
S
9/11
terr
oris
t at
tack
Wor
ld
rece
ssio
n
Freight Tonne‐Kilometres
(billion)
Growth of Air Transport
Scheduled commercial trafficTotal (international and domestic) servicesSource: ICAO Annual Report of the Council
205billion FTK
+3.8%vs. 2015
7.1trillion RPK
+7.4%growth rate vs. 2015
4
TRAFFIC DENSITY
2010202020302040
5
A Global Picture
16 April 2018Source: Aviation Benefits 2017 (https://www.icao.int/sustainability/Pages/IHLG.aspx)
6
Link aviation to socio‐economic benifits• ICAO’s Strategic Objectives are strongly
linked to 15 of the 17 United Nations Sustainable Development Goals (SDGs).
• ICAO is fully committed to work in close cooperation with States and other UN Bodies to support related targets
16 April 2018Source: https://www.icao.int/about‐icao/aviation‐development/Pages/SDG.aspx
7
Our Aspirational Safety Goal
Our Aspirational Safety Goal
8
We are not that far…Regional Accident Statistics: 2015Regional Accident Statistics: 2013
Regional Accident Statistics: 2014 Regional Accident Statistics: 2016
For 2017 (non‐validated results)MID and AFI(APAC 2 – PA 1)
ZERO fatalities
9
Other Challenges
Cyber Safety RPAS Space TransportationGlobal TrackingConflict Zones
16 April 2018
10
GLOBAL PLANS AND THE 13TH AIR NAVIGATION CONFERENCE
Global Overview
16 April 2018
11
16 April 2018
13th AN Conference – October 2018
40th Assembly – October 2019
12
PBN IMPLEMENTATION UPDATEGlobal Overview
16 April 2018
13
PBN Implementation PlanPBN Implementation Plan
Yes
NoNo Data
14
Implementation of PBN Approach Procedures (World total)Implementation of PBN Approach Procedures (World total)
Total instrument runway ends: 3486
PBN runway ends: 233767%
15
Implementation of PBN Approach Procedures –With vertical guidance (World total)
Implementation of PBN Approach Procedures –With vertical guidance (World total)
Total instrument runway ends: 3486
LNAV/VNAV: 165247.4%
LPV: 1000
28.7%
16
PBN SID/STAR Implementation (World)
17
Summary• Still some way to go:
– Not all States have a PBN Implementation plan– Not all runways have PBN approaches– A37‐11 EXPIRED at the end of 2016
New impulse required through GANP and GASP
18
RECENT AND UPCOMING DEVELOPMENTS - PBN
Global Overview
16 April 2018
19
Flight OperationsPBN Ops approval – (Annex 6)
– Ops Approval for PBN– Only AR requires Specific Approval– All PBN requires regulator approval
• Approve the Operations Manual with PBN included
20
RNP AR APCH Approvals– Simplification of the process– Maintain high standard of oversight– Develop guidance on how to conduct approval
• Coordinated with PBN SG
Flight Operations
21
Flight Operations
PBN procedures for pilots and dispatchers• PANS OPS Vol I (Applicable 2018)
– New structure – All new PBN content– PBN requirements in PANS for 1st time
22
RNP Chart Identification• Circ. 353 published
– Advanced Copy• Transition plan
– Change from RNAV to RNP• Regional Plan
– Coordinate with States– Determine timeframe– Develop sequence
• Global Plan– Coordinated with PBN Programme Office
23
Sample Charts for PBN (AIS Manual):– A‐RNP Examples– PBN SID and Star– RNP AR APCH
24
PBN applications
VPT RNAV (RNAV Visual)Two streams of work:– Development of Standardized approach
– Best practice for developing ‘specials’
25
PBN Applications
PBN to xLS– Hybrid procedures maximize flexibility– PBN path to a precision approach– Efficient and predictable path– Better access to airports
26
PBN ApplicationsTransitions
– Currently developed by many States
– No consistency– Need standardized criteria
27
PBN applications
Parallel Approach Operations– Extended to include PBN– RNP AR APCH– RNP APCH with vertical guidance
28
PBN applications
Established on RNP– RNP AR APCH only– Aircraft ‘established’ after IAF– Separation can be reduced accordingly
29
New PBN requirements
• PBN Manual 5th Planned for 2019– New AR Departures specification– Guidance for use of RF Legs– Additional Guidance
• Advisory VNAV explanation• A‐RNP implementation• All RNAV must be PBN
– Includes free route airspace
30
RECENT AND UPCOMING DEVELOPMENTS – AIS TO AIM
Global Overview
16 April 2018
31
Requirements and performance specifications
State provisions (or « what »)
Operational provisions AIM Practitioners’
instructions (or « how to »)
ExplanatoryGuidance text
PANS‐AIMAnnex 15 AIS manual
New AIM Provisions
AIM‐ SG/ First meeting
32
1) AIM Awareness
2) Training
3) QMS Implementation & Oversight
4) Data Origination
5) AIRAC
6) WGS‐84
7) Aeronautical Charting
8) NOTAM
9) Digital Datasets
10 )AIM interoperability
11) AIM for SWIM
12) AIM for drones
16 April 2018
AIM Steering GroupAIM Implementation
33
RECENT AND UPCOMING DEVELOPMENTS – FLIGHT INSPECTION
Global Overview
16 April 2018
34
Flight Inspection – doc 8071 update• Truly flight inspection
– Flight validation in doc 9906
• Emphasis on operational impact of testing Nav Aids• Types of inspection extended ‐ Consistency• Modern systems• Organizational aspects (QA, SMS)• Flight inspection interval
16 April 2018
35
Flight Inspection – doc 8071 update• ILS – extended def of ILS, DME and alternative height checks
• DME – build‐in test, together with PBN as support
• PBN – satisfies reference from PBN Manual
• VOR – material bends, roughness, scallopping errors, alternative errors
• PAR – modern type PARs
• NDB – minor additions on coverage
• En‐route VHF marker – improvement of measurement of coverage distance
36
THANK YOU!