pbn - what’s new from icao?€¦ · learning packages pbn overview • module 1 & 2...

16
PBN - What’s new from ICAO? Session 1 – PBN from 35,000’ Erwin Lassooij ICAO PBN Programme Manager, 16 October 2012

Upload: others

Post on 18-Oct-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PBN - What’s new from ICAO?€¦ · Learning Packages PBN Overview • Module 1 & 2 Operational Approval Airspace Design . 10 • Operational Approval • Airspace Concept PBN Symposium

PBN - What’s new from ICAO?

Session 1 – PBN from 35,000’

Erwin Lassooij ICAO PBN Programme Manager,

16 October 2012

Page 2: PBN - What’s new from ICAO?€¦ · Learning Packages PBN Overview • Module 1 & 2 Operational Approval Airspace Design . 10 • Operational Approval • Airspace Concept PBN Symposium

Outline

Formal training courses

ICAO Actions

B

E

C

D

A PBN guidance material, workshops,

symposia

PBN computer-based learning packages

Support for the ASBU provisions enabled

by PBN

Continuing PBN standards

development and amendment

Page 3: PBN - What’s new from ICAO?€¦ · Learning Packages PBN Overview • Module 1 & 2 Operational Approval Airspace Design . 10 • Operational Approval • Airspace Concept PBN Symposium

3 PBN Symposium and Workshops, 16-19 October, 2012

Guidance material framework

• RNP AR Procedure Design Manual

(Doc 9905) • PBN Ops Approval Manual (Doc 9997)* • Manual on PBN Use in Airspace Design

(Doc 9992)* • CDO Manual (Doc 9931) • CCO Manual (Doc 9993)* • GNSS Manual (Doc 9849) • Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906)

* New

Annexes and PANS

Page 4: PBN - What’s new from ICAO?€¦ · Learning Packages PBN Overview • Module 1 & 2 Operational Approval Airspace Design . 10 • Operational Approval • Airspace Concept PBN Symposium

4 PBN Symposium and Workshops, 16-19 October 2012

PBN iKIT

Provides the main stakeholders with essential information, practical documentation and guidance material on PBN in relation to their area.

Page 5: PBN - What’s new from ICAO?€¦ · Learning Packages PBN Overview • Module 1 & 2 Operational Approval Airspace Design . 10 • Operational Approval • Airspace Concept PBN Symposium

Int’l Airport Approach Type – All Regions Monitoring and Measurement

Heading in the right direction, but are we on target?

Page 6: PBN - What’s new from ICAO?€¦ · Learning Packages PBN Overview • Module 1 & 2 Operational Approval Airspace Design . 10 • Operational Approval • Airspace Concept PBN Symposium

6

PBN Symposium and Workshops, 16-19 October 2012

Implementation plans

104 out of 191 States submitted plan

Page 7: PBN - What’s new from ICAO?€¦ · Learning Packages PBN Overview • Module 1 & 2 Operational Approval Airspace Design . 10 • Operational Approval • Airspace Concept PBN Symposium

7

PBN Symposium and Workshops, 16-19 October 2012

Actual implementation of PBN approaches (LNAV, LNAV/VNAV, LPV, RNP AR)

30% PBN implementation on intl rwys

WWW.ICAO.INT/PBN

Page 8: PBN - What’s new from ICAO?€¦ · Learning Packages PBN Overview • Module 1 & 2 Operational Approval Airspace Design . 10 • Operational Approval • Airspace Concept PBN Symposium

A – Symposia and Workshops

PBN Symposium and Workshops, 16-19 October 2012 8

FAA/Eurocontrol Introductory Seminars ICAO Regional Seminars Airspace Concept Workshops –CDO/CCO IATA/ICAO GO Team Visits

Page 9: PBN - What’s new from ICAO?€¦ · Learning Packages PBN Overview • Module 1 & 2 Operational Approval Airspace Design . 10 • Operational Approval • Airspace Concept PBN Symposium

9 PBN Symposium and Workshops, 16-19 October 2012

B- Computer Based Learning Packages

PBN Overview

• Module 1 & 2

Operational Approval Airspace Design

Page 10: PBN - What’s new from ICAO?€¦ · Learning Packages PBN Overview • Module 1 & 2 Operational Approval Airspace Design . 10 • Operational Approval • Airspace Concept PBN Symposium

10

• Operational Approval

• Airspace Concept

PBN Symposium and Workshops, 16-19 October, 2012

C – Formal Training Courses

In development

Page 11: PBN - What’s new from ICAO?€¦ · Learning Packages PBN Overview • Module 1 & 2 Operational Approval Airspace Design . 10 • Operational Approval • Airspace Concept PBN Symposium

11

• Improve Block 0

– Better flight procedures

– Better separation/route spacing

– Improve connections with industry Standards

– Improve guidance

PBN Symposium and Workshops, 16-18 October 2012

D- Continuing PBN Standards Development and Amendment

Page 12: PBN - What’s new from ICAO?€¦ · Learning Packages PBN Overview • Module 1 & 2 Operational Approval Airspace Design . 10 • Operational Approval • Airspace Concept PBN Symposium

12

• Block 0 procedures and guidance is there

• Momentum is there……. …….but we need to speed up.

• Focus on implementation

– PBN Task forces – Direct assistance stakeholders – Education – Expansion on FPP concept

PBN Symposium and Workshops, 16-19 October 2012

D - Continuing PBN Standards Development, Amendment and Support

80% 20%

Page 13: PBN - What’s new from ICAO?€¦ · Learning Packages PBN Overview • Module 1 & 2 Operational Approval Airspace Design . 10 • Operational Approval • Airspace Concept PBN Symposium

13

• Endorsement of Instrument procedure design organizations

• To assist States with Implementation

PBN Symposium and Workshops, 16-19 October 2012

Endorsement

Name of Organization

Page 14: PBN - What’s new from ICAO?€¦ · Learning Packages PBN Overview • Module 1 & 2 Operational Approval Airspace Design . 10 • Operational Approval • Airspace Concept PBN Symposium

Efficient Flight Path

Through Trajectory-based Operations

Approach with vertical

guidance

Improved Flexibility & Efficiency in Descent/Climb Profiles (CDO/CCOs)

Block 0

Block 2

Optimised Arrivals in

Dense Airspace

Block 3

Full 4D Trajectory

based Operations

Block 1

Further improved

Flexibility & Efficiency in

Descent/climb Profiles

(CDO/CCO’s)

E – Support for ASBU Provisions enabled by PBN

14

Page 15: PBN - What’s new from ICAO?€¦ · Learning Packages PBN Overview • Module 1 & 2 Operational Approval Airspace Design . 10 • Operational Approval • Airspace Concept PBN Symposium

15

• PBN highest priority

• Block 0 is ready

• We all need to

expedite implementation together

PBN Symposium and Workshops, 16-19 October, 2012

Summary

Page 16: PBN - What’s new from ICAO?€¦ · Learning Packages PBN Overview • Module 1 & 2 Operational Approval Airspace Design . 10 • Operational Approval • Airspace Concept PBN Symposium

What we think, or what we know, or what we believe is, in the end, of little consequence. The only consequence is what we do.

—John Ruskin

Erwin Lassooij ICAO PBN Programme Manager

[email protected] Tel: +1 514-954-8219 ext 6290