icao pbn workshop workshop for air traffic...  icao pbn workshop beijing june 2017 ......

Download ICAO PBN WORKSHOP Workshop for Air Traffic...  ICAO PBN WORKSHOP Beijing June 2017 ... – Air Law

Post on 27-Aug-2018

218 views

Category:

Documents

1 download

Embed Size (px)

TRANSCRIPT

  • 09/06/2017

    1

    ICAOPBNWORKSHOP

    BeijingJune2017PhilippeNOTRY

    ENAC/ATCTrainingManager

    ATC in Paris Area Control Center(TCL),

    ATC Trainer at ENAC: TWR/APP/ACC(Toulouse/ France),

    ATC Training Manager at ENAC: In charge of

    french/egyptian/georgian/MUACATCos Involved in PBN Training for ATCO

    (France,China, India, Egypt, Africa, Soudan,Mongolia, Indonesia)

    Participation to ICAO PBN EUR TF, Member of French PBN Implementation

    group,

    PERSONAL INFORMATIONS1993

    2001

    2004..

    ATCBACKGROUND

  • 09/06/2017

    2

    ATC in Paris Area Control Center(TCL),

    ATC Trainer at ENAC: TWR/APP/ACC(Toulouse/ France),

    ATC Training Manager at ENAC: In charge of

    french/egyptian/georgian/MUACATCos Involved in PBN Training for ATCO

    (France,China, India, Egypt, Africa, Soudan,Mongolia, Indonesia)

    Participation to ICAO PBN EUR TF, Member of French PBN Implementation

    group,

    PERSONAL INFORMATIONS1993

    2001

    2004..

    ATCBACKGROUND

    Turn RIGHT..

    Turn LEFT..

    Until 2009, Expertise area as ATC Trainer: Air Law rules for ATC/Pilots,

    Doc 4444: PANS ATM, Annex II: Rules of the Air, Annex XI: Air Traffic Services,

    CNS Tools and Concepts for ATCos, A-CDM, CPDLC, TCAS, FUA/ ATFCM AMAN, DMAN, XMAN, SCTA, MSAW, ADS-C/B, SCTA, MTCD,

    PERSONAL INFORMATIONS

  • 09/06/2017

    3

    Aboatdoesntgoforwardifeachoneisrowingtheirownway

    Swahiliproverb

    ICAOPBNWORKSHOP

    THANKYOUTOICAOFORINVITATION

  • 09/06/2017

    4

    7

    1. PBN and ATC1. The Challenge: Airspace Capacity2. Performance Based?3. ATC: The heart of the system

    2. ENAC PBN TRAINING: FRANCE AND ABROAD1. PBN implementation in France2. PBN Training as a necessity

    3. FEEDBACK ABOUT TRAINING ISSUES1. The Training: CHINESE AND INDONESIAN EXAMPLES2. Case study presentation: INDIA 2010 KOCHIN3. French examples: LFPO/ LFPG/ POINT MERGE SYSTEM

    AGENDA

    8

    1. PBN and ATC1. The Challenge: Airspace Capacity2. Performance Based?3. ATC: The heart of the system

    2. ENAC PBN TRAINING: FRANCE AND ABROAD1. PBN implementation in France2. PBN Training as a necessity

    3. FEEDBACK ABOUT TRAINING ISSUES1. The Training: CHINESE AND INDONESIAN EXAMPLES2. Case study presentation: INDIA 2010 KOCHIN3. French examples: LFPO/ LFPG/ POINT MERGE SYSTEM

    AGENDA

  • 09/06/2017

    5

    9

    WHAT IS THE CHALLENGE TODAY?

    10

    THE CHALLENGE

    CAPACITY

    DEMAND

  • 09/06/2017

    6

    11

    CAPACITYSHORTFALLS

    RestrictionsConstrainingAirborneTraffic(STAM)

    OPTIMISEUTILISATIONOFAVAILABLECAPACITY

    SectorManagement Configuration N ofSectors

    Civil/MilitaryCoordination ReduceTrafficComplexity ReviewCapacityValue enrouteHoldingPattern* BalancingArrival/DepartureCapacity

    REGULATETHEDEMAND Rerouteing Flows

    FlightFLManagement

    UTILISEOTHERAVAILABLECAPACITY

    Or:Matchcapacitytodemand

    Or:Matchdemandtocapacity

    Or:Matchdemandtocapacitywithregulationsorrestrictions

    Howtoavoidit?

    THE CHALLENGE

    12

    TimeLine

    CAPACITYvsDEMAND

    AirspaceConceptHandbook:HowtodeveloptheairspaceelementsofanAirspaceConceptinthecontextof

    PBN =BestPractices

    STEP1 STEP2

    THE CHALLENGE

  • 09/06/2017

    7

    13

    PBN IN THE EQUATION

    ATMEQUATION?

    14

    ATM=ATS+ATFCM+ASMFlight Information Service

    Air Traffic ControlFlexible Use of Airspace

    Airspace Design

    PBN IN THE EQUATION

  • 09/06/2017

    8

    15

    ATM=ATS+ATFCM+ASMFlight Information Service

    Air Traffic ControlFlexible Use of Airspace

    Airspace Design

    PBN IN THE EQUATION

    16

    ATM=ATS+ATFCM+ASMFlight Information Service

    Air Traffic ControlFlexible Use of Airspace

    Airspace Design

    CORE

    PBN IN THE EQUATION

  • 09/06/2017

    9

    17

    PBN is the cornerstone in the airspace optimization process

    PBN is part of the solution to solve capacity issues

    PBN IN THE EQUATION

    18

    1. PBN and ATC1. The Challenge: Airspace Capacity2. Performance Based?3. ATC: The heart of the system

    2. ENAC PBN TRAINING: FRANCE AND ABROAD1. PBN implementation in France2. PBN Training as a necessity

    3. FEEDBACK ABOUT TRAINING ISSUES1. The Training: CHINESE AND INDONESIAN EXAMPLES2. Case study presentation: INDIA 2010 KOCHIN3. French examples: LFPO/ LFPG/ POINT MERGE SYSTEM

    AGENDA

  • 09/06/2017

    10

    19

    1. PBN and ATC1. The Challenge: Airspace Capacity2. Performance Based?3. ATC: The heart of the system

    2. ENAC PBN TRAINING: FRANCE AND ABROAD1. PBN implementation in France2. PBN Training as a necessity

    3. FEEDBACK ABOUT TRAINING ISSUES1. The Training: CHINESE AND INDONESIAN EXAMPLES2. Case study presentation: INDIA 2010 KOCHIN3. French examples: LFPO/ LFPG/ POINT MERGE SYSTEM

    AGENDA

    NAV.SPEC. RCP RSP

    PerformanceBased

    PBN PBC PBS

    Area Navigation based on:ATS Communication services

    and capability based on:

    PERFORMANCE REQUIREMENTS

    For aircraft operating along ATS Routes On IAP* Or designated Airspace

    For ATS Provision For aircraft and Flight Operation

    along ATS Routes On IAP* Or designated Airspace

    GOLDDefinition 1-9

    ATS Surveillance services and capability based on:

    For ATS Provision For aircraft and Flight Operation

    along ATS Routes On IAP* Or designated Airspace

    AND SUPPORTED BY:

    SPECIFICATION

    RNAVXorRNPX

  • 09/06/2017

    11

    NAV.SPEC. RCP RSP

    PerformanceBased

    PBN PBC PBS

    SPECIFICATION

    RNAVXorRNPX

    C/N/SARELINKEDTOGETHERWHENDESIGNINGTHEAIRSPACE

    22

    1. PBN and ATC1. The Challenge: Airspace Capacity2. Performance Based?3. ATC: The heart of the system

    2. ENAC PBN TRAINING: FRANCE AND ABROAD1. PBN implementation in France2. PBN Training as a necessity

    3. FEEDBACK ABOUT TRAINING ISSUES1. The Training: CHINESE AND INDONESIAN EXAMPLES2. Case study presentation: INDIA 2010 KOCHIN3. French examples: LFPO/ LFPG/ POINT MERGE SYSTEM

    AGENDA

  • 09/06/2017

    12

    23

    1. PBN and ATC1. The Challenge: Airspace Capacity2. Performance Based?3. ATC: The heart of the system

    2. ENAC PBN TRAINING: FRANCE AND ABROAD1. PBN implementation in France2. PBN Training as a necessity

    3. FEEDBACK ABOUT TRAINING ISSUES1. The Training: CHINESE AND INDONESIAN EXAMPLES2. Case study presentation: INDIA 2010 KOCHIN3. French examples: LFPO/ LFPG/ POINT MERGE SYSTEM

    AGENDA

    24

    PBN AND ATC

    PBN akeyenabler toairspace optimization PBN akeyenabler toATFMimplementation asATFMis thenext

    challenge: Thebestyou designtheairspace thebestyou useit Delays reductions:

    India:6ATFMUnits inbiggest airports linked toCentralUnitinDelhiimplementation phase

    China:ATFMcentralised systemontheway Indonesia:ATFMcentralised systemontheway.Citypairs

    regulations forthetime Asia/Pacifichastocope with huge changescoming aswritten inthe Asia/Pacificseamless ATMPLAN

  • 09/06/2017

    13

    25

    PBN AND ATC

    Routeoptimization Airspace restructuration Sectors capacity increase Delays reduction

    REGIONALVISION

    REGIONALIMPLEMENTATIONSTRATEGY

    GLOBALSTRATEGYGANP

    A/PRANP

    A/PSEAMLESSATMPLAN

    PBNTheoptimaluseofappropriatePBNspecificationisakeyenablertoprogressSeamlessATMintheAsia/Pacificregion.

  • 09/06/2017

    14

    27

    PBN AND ATC

    *RPK:RevenuePassengerKilometers

    =Measuresoftraffficforairlineflightcalculatedbymultiplyingthenumberofrevenuepayingpassengersaboardbythedistancetraveled

    2010 2030

    LargestregionalMarket

    2lastmonths PBNtraining:India,Indonsia,China(ICAO),

    PBN TRAINING FOR ATC

  • 09/06/2017

    15

    Hyderabad04/2017Indian CAA CPDLC ACDM AMANDMAN ASMFUA

    Jakarta05/2017Indonesian CAA PBN ACDM AMANDMAN

    Makassar 05/2017Indonesian CAA CPDLC PBN TBO

    Lom06/2017???TogoCAA PBN

    Beijing06/2017ICAO PBN

    2lastmonths PBNtraining:India,Indonsia,China(ICAO),

    PBN TRAINING FOR ATC

    30

    PBN TRAINING FOR ATC

  • 09/06/2017

    16

    31

    PBN AND ATC

    ATCWorls is moreandmorecomplex

    ATCTraining:ASafety reason

    TraficinEurop TraficinChina

    THETRAINING:NewTechnologies/NewProcedures

    32

    1. As an ATM component,2. In which ATCOs are involved,

    How to explain PBN Concept?

  • 09/06/2017

    17

    33

    ATSASM

    -ATC

    -SAR-Air

    -Traffic

    -Flow

    -Management

    -Air

    -Space

    -Management

    ATFM

    How to explain PBN Concept?

    ATFMATM

    -Air

    -Traffic

    -Services

    34

    C SNTechnological

    world

    Operational world ATM

    I A

    FANS GANP

  • 09/06/2017

    18

    35

    36

    PBN Training as a key to PBN Implementation

  • 09/06/2017

    19

    37

    1. PBN and ATC1. The Challenge: Airspace Capacity2. Performance Based?3. ATC: The heart of the system

    2. ENAC PBN TRAINING: FRANCE AND ABROAD1. PBN implementation in France2. PBN Training as a necessity

    3. FEEDBACK ABOUT TRAINING ISSUES1. The Training: CHINESE AND INDONESIAN EXAMPLES2. Case study presentation: INDIA 2010 KOCHIN3. French examples: LFPO/ LFPG/ POINT MERGE SYSTEM

    AGENDA

    38

    1. PBN and ATC1. The Challenge: Airspace Capacity2. Performance Based?3. ATC: The heart of the system

    2. ENAC PBN TRAINING: FRANCE AND ABROAD1. PBN implementation in France2. PBN Training as a necessity

    3. FEEDBACK ABOUT TRAINING ISSUES1. The Training: CHINESE

Recommended

View more >