ranchview - campus improvement plan 2011-2012

Upload: cfbisd

Post on 07-Apr-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 Ranchview - Campus Improvement Plan 2011-2012

    1/17

  • 8/3/2019 Ranchview - Campus Improvement Plan 2011-2012

    2/17

    BOARD OF TRUSTEESNancy Cline, President

    James Goode, Vice PresidentRichard Fleming, Secretary

    Lynn Chaffin, Assistant SecretaryFrank Shor, Board Member

    Nancy Watten, Board MemberKarin Webb, Board Member

    CARROLLTON-FARMERS BRANCHSCHOOLS

    SENIOR HIGH SCHOOLSCreekview

    Early CollegeNewman Smith

    R. L. TurnerRanchview

    MIDDLE SCHOOLS

    BlalackBushFieldLongPerryPolk

    SUPPORTING OBJECTIVESSupporting Objective 1:

    Continuously increase student achievement

    Supporting Objective 2:Continuously improve the learning environment for

    students and staff

    Supporting Objective 3:Continuously increase operational effectiveness

    Supporting Objective 4:Continuously increase stakeholder confidence and

    support of our school system

    ELEMENTARY SCHOOLSBlair

    BlantonCarrollton

    CentralCountry Place

    DavisFarmers Branch

    FreemanFurneaux

    GoodKent

    LandryLas Colinas

    La VillitaMcCoy

    McKamyMcLaughlinMcWhorterRainwaterRiverchaseRosemeade

    Sheffield IntermediateSheffield Primary

    StarkStricklandThompson

    CENTERSMary Grimes Education Center

    Salazar Transition SchoolKelly Pre-K Center

    Huie Education CenterCLC Learning Complex

    C-FBISD GOALThe Goal of the Carrollton-FarmersBranch ISD is high achievement forall students.

    2

  • 8/3/2019 Ranchview - Campus Improvement Plan 2011-2012

    3/17

    3

    CAMPUS IMPROVEMENT COUNCIL REPRESENTATIVESBUSINESS/COMMUNITY REPRESENTATIVES

    PARENT REPRESENTATIVES

    ADMINISTRATORS

    David HicksMelanie MageeTimothy IsalyDonna McMurrey

    STAFF REPRESENTATIVES

    Sonia BustamanteChris Cogswell

    Stephanie PerkinsChris WilkinsHeather DavisGalen CookDee BoydMarianne Paredes

    Laura Fisher

    CAMPUS PLAN REVIEW :

    Sept 29, 2011Chair Signature Date Chair Signature Date

    Chair Signature Date Chair Signature Date

  • 8/3/2019 Ranchview - Campus Improvement Plan 2011-2012

    4/17

    4

    C-FBISD VISION

    All students will meet the State of Texas Assessments ofAcademic Readiness (STAAR) at the satisfactory or advancedlevel and graduate college-ready and/or workforce readywithout remediation.

    MISSIONTogether with families and community we commit all districtresources to guide the learning of each student to graduate as:

    A responsible individual A passionate life-long learner A complex thinker An effective communicator

    STATEMENT OF BELIEFSWe believe that:

    The economic, political and societal success of ourcountry depends upon a quality education for all.

    Diversity strengthens the community and enriches thefabric of our society.

    It is the responsibility of the entire community topartner in the educational process.

    Learning occurs best in a safe, orderly and nurturingenvironment.

    Belonging to a family, to a school and to a communityis vital, and this sense of belonging advances learning.

    People learn at different rates, have differentcapacities and that each persons educational pathdeserves to be valued equally.

    Learning empowers people to reach their fullpotential: physically, mentally, socially, andemotionally

    Everyone is a teacher, everyone is a learner.

    GRADUATE PROFILEGraduates of the Carrollton-Farmers Branch ISD are:

    Responsible individuals who: Model productive citizenship Practice successful personal management Demonstrate character values and ethical behavior Appreciate the value of diversity Function effectively as team members

    Competent learners who: Continually pursue and integrate knowledge Achieve academic standards Apply various forms of technology Seek educational and career options Produce quality products

    Complex thinkers who: Solve problems critically Create original ideas and solutions Understand and apply systems thinking

    Effective communicators who: Read with understanding Interpret information Interact through listening and speaking Write clearly

  • 8/3/2019 Ranchview - Campus Improvement Plan 2011-2012

    5/17

    5

    TARGET AREASTitle I Targeted Assisted (TA)Must address the 8 components of a Targeted Assisted Program

    TA 1. Resources used to help children meet state academic achievement standardsTA 2. Planning for identified students incorporated into existing school planningTA 3. Methods and strategies based on scientifically based researchTA 4. TA program is coordinated with and supports regular educational programsTA 5. Highly qualified teachersTA 6. Professional DevelopmentTA 7. Increase parental involvementTA 8. Coordination of federal, state, and local services

    Title I School-wide Components (TS)TS 1. Comprehensive needs assessmentTS 2. School-wide reform strategiesTS 3. Highly qualified teachers

    TS 4. Professional developmentTS 5. Strategies to attract high-quality highly qualified teachers to high-need schoolsTS 6. Parental involvementTS 7. Assisting preschool children in the transition from early childhood programsTS 8. Measures to include teachers in the decisions regarding use of academic assessments.TS 9. Students difficulties identified on a timely basisTS 10. Coordination and integration between federal, state, and local services.

  • 8/3/2019 Ranchview - Campus Improvement Plan 2011-2012

    6/17

    6

    THE GOAL OF THE CARROLLTON-FARMERS BRANCH ISD IS HIGH ACH IEVEMENT FOR ALL STUDENTSSUPPORTING OBJECTIVE 1 SUPPORTING OBJECTIVE 2 SUPPORTING OBJECTIVE 3 SUPPORTING OBJECTIVE 4

    CONTINUOUSLY INCREASE STUDENTACHIEVEMENTCONTINUOUSY IMPROVE THELEARNING ENVIRONMENT FORSTUDENTS AND STAFF

    CONTINUOUSLY INCREASEOPERATIONAL EFFECTIVENESSCONTINUOUSLY INCREASESTAKEHOLDER CONFIDENCE ANDSUPPORT OF OUR SCHOOL SYSTEM

    Performance Targets:

    Academic Performance Index (API)

    STAAR Satisfactory STAAR Advanced Graduation Rate SAT Mean ACT Mean

    Recognized/Exemplary Distinction

    DesignationsAYP

    Performance Targets:

    Employee

    Job Satisfaction Campus Environment Curriculum and Instruction

    Student:

    Attendance Rate Disciplinary Placements

    Performance Targets:

    Staff Productivity Index (SPI)

    Performance Targets:

    Education Productivity Index (EPI)

    API SPI

    Parent Satisfaction

    Employee

    Campus Communications

    HIGH ACHIEVEMENT FOR ALL STUDENTS

  • 8/3/2019 Ranchview - Campus Improvement Plan 2011-2012

    7/17

  • 8/3/2019 Ranchview - Campus Improvement Plan 2011-2012

    8/17

  • 8/3/2019 Ranchview - Campus Improvement Plan 2011-2012

    9/17

    THE GOAL OF THE CARROLLTON-FARMERS BRANCH ISD IS HIGH ACHIEVEMENT FOR ALL STUDENTSSUPPORTING OBJECTIVE 1 SUPPORTING OBJECTIVE 2 SUPPORTING OBJECTIVE 3 SUPPORTING OBJECTIVE 4

    CONTINUOUSLY INCREASE STUDENTACHIEVEMENT CONTINUOUSY IMPROVE THE LEARNINGENVIRONMENT FOR STUDENTS AND STAFF CONTINUOUSLY INCREASE OPERATIONALEFFECTIVENESSCONTINUOUSLY INCREASE STAKEHOLDERCONFIDENCE AND SUPPORT OF OUR SCHOOLSYSTEM

    9

    through the PLATO Lab Souella Music progress each six weeksand at graduation teammeetings

    AcceleratedEducationFunding 100%

    Supporting Objective 1 Continuously increase student achievementPerformance Target: Academic Performance Index (API): SAT/ACT Mean

    ACTION STRATEGYPERSON

    RESPONSIBLE TIMELINEEVALUATION/

    MEASURE RESOURCESTITLE I

    COMPONENTTarget Students for PSAT/SAT/ACT PreparationPrograms; Review Scores with Teachers, Students,Parents

    David HicksMelanie MageeDawn ThompsonTeachers

    August, October,January, May

    Mean PSAT, SAT, ACTScoresParticipation Rates

    CampusBudget,PSAT BootCamp,College Board,Revolution Prep

    Supporting Objective 2 Continuously improve the learning environment for students and staffPerformance Target: Employee: Job Satisfaction I would recommend this campus to a friend as a good place to work.

    ACTION STRATEGY PERSONRESPONSIBLE TIMELINE EVALUATION/MEASURE RESOURCES TITLE ICOMPONENTEstablish department norms emphasizing FISH!,Mindset and key instructional initiatives

    Teacher LeadersTeachers

    MonthlyReview the norms anddetermine actions in PD

    Campus Budget

    Build community within the faculty by planningmonthly teambuilding events

    Heather DavisWendy Bartlett

    Liz Mahaffey

    Monthly Monthly Survey Campus Budget

    Establish staff recognition programs forcolleagues to honor each other for their efforts:This Buds For You, Faculty Meeting Raffles, ApawsCards, Super Staff of the Week

    David HicksTeacher LeadersHeather DavisWendy BartlettLiz Mahaffey

    Monthly Monthly SurveyCampus BudgetDonations

    Preserve time for instructional planning as part ofthe Instructional Improvement Process in PD

    David HicksTeacher Leaders

    WeeklyWolfpack Weekly PDCalendar

    Campus Budget

  • 8/3/2019 Ranchview - Campus Improvement Plan 2011-2012

    10/17

    THE GOAL OF THE CARROLLTON-FARMERS BRANCH ISD IS HIGH ACHIEVEMENT FOR ALL STUDENTSSUPPORTING OBJECTIVE 1 SUPPORTING OBJECTIVE 2 SUPPORTING OBJECTIVE 3 SUPPORTING OBJECTIVE 4

    CONTINUOUSLY INCREASE STUDENTACHIEVEMENT CONTINUOUSY IMPROVE THE LEARNINGENVIRONMENT FOR STUDENTS AND STAFF CONTINUOUSLY INCREASE OPERATIONALEFFECTIVENESSCONTINUOUSLY INCREASE STAKEHOLDERCONFIDENCE AND SUPPORT OF OUR SCHOOLSYSTEM

    10

    Supporting Objective 2 Continuously improve the learning environment for students and staffPerformance Target: Employee: Campus Environment I would characterize my campus as having a positive atmosphere.

    ACTION STRATEGY PERSONRESPONSIBLE TIMELINE EVALUATION/MEASURE RESOURCES TITLE ICOMPONENTEstablish a system for prioritization of effort tofocus on actions that produce results (stop doingand start doing reviews)

    David HicksMelanie MageeTimothy Isaly

    Donna McMurrey

    Each 6 WeeksData collected andshared in PDMonthly Survey

    Campus Budget

    Supporting Objective 2 Continuously improve the learning environment for students and staffPerformance Target: Employee: Curriculum and Instruction Teachers work amicably together on common problems.

    ACTION STRATEGY PERSONRESPONSIBLE TIMELINE EVALUATION/MEASURE RESOURCES TITLE ICOMPONENTReinforce the existing culture of PLCs byimplementing Instructional Rounds: Determine aProblem of Practice and a Theory of Change andthen collect data is a systematic mannerthroughout the year.

    David HicksTeacher LeadersTeachers

    Each 6 weeks Data collected andshared in PD

    Campus Budget$3000.00

    Utilize district-level content facilitators andcoordinators to deepen our understanding ofcontent, EOC requirements and effectiveinstructional strategies

    David HicksMelanie MageeContent Specialists

    Monthly PD Discussions Campus Budget

    Supporting Objective 2 Continuously improve the learning environment for students and staffPerformance Target: Student: Attendance Rate

    ACTION STRATEGY PERSONRESPONSIBLE TIMELINE EVALUATION/MEASURE RESOURCES TITLE ICOMPONENTMonitor student attendance rates and targetstudents for interventions ranging from parentconferences-attendance make up-truancy

    referrals

    Donna McMurrey,Jan Young,Tamara Johnson,

    Teachers

    Each 3 Weeks Attendance Reports Campus Budget

  • 8/3/2019 Ranchview - Campus Improvement Plan 2011-2012

    11/17

    THE GOAL OF THE CARROLLTON-FARMERS BRANCH ISD IS HIGH ACHIEVEMENT FOR ALL STUDENTSSUPPORTING OBJECTIVE 1 SUPPORTING OBJECTIVE 2 SUPPORTING OBJECTIVE 3 SUPPORTING OBJECTIVE 4

    CONTINUOUSLY INCREASE STUDENTACHIEVEMENT CONTINUOUSY IMPROVE THE LEARNINGENVIRONMENT FOR STUDENTS AND STAFF CONTINUOUSLY INCREASE OPERATIONALEFFECTIVENESSCONTINUOUSLY INCREASE STAKEHOLDERCONFIDENCE AND SUPPORT OF OUR SCHOOLSYSTEM

    11

    Supporting Objective 2 Continuously improve the learning environment for students and staffPerformance Target: Student: Disciplinary Placements

    ACTION STRATEGY PERSONRESPONSIBLE TIMELINE EVALUATION/MEASURE RESOURCES TITLE ICOMPONENTImplement a comprehensive advisory program toaddress norms for acceptable behavior including

    anti drug use and teen violence, social supportprograms, goal setting/effort reinforcement

    Karen Wilson,

    Tamara Johnson Each 9 Weeks RAP Notes Campus Budget

    Create a Portrait of a Wolfto emphasize theimportance of effort and high standards

    Timothy IsalyWolf Nation,Student Exec, andStudent Councilorganizations

    August -January

    PortraitDecreased officereferralsIncreased academicperformance

    Campus Budget

    Supporting Objective 3 Continuously increase operational effectivenessPerformance Target: Staff Productivity Index (SPI)

    ACTION STRATEGY PERSONRESPONSIBLE TIMELINE EVALUATION/MEASURE RESOURCES TITLE ICOMPONENTClosely monitor the master schedule to verifyteachers are assigned to teaching fields in whichthey are highly qualified.

    David Hicks April-August Master Schedule Campus Budget

    Recruit and retain the most successful instructors

    for our IB instructional program

    David Hicks,Sharon Kotarski,Instructional

    Facilitators,Department

    April-August Staff Hiring Trends

    IB Budget,CampusBudget, Job

    Fairs, IB andInternational

  • 8/3/2019 Ranchview - Campus Improvement Plan 2011-2012

    12/17

    THE GOAL OF THE CARROLLTON-FARMERS BRANCH ISD IS HIGH ACHIEVEMENT FOR ALL STUDENTSSUPPORTING OBJECTIVE 1 SUPPORTING OBJECTIVE 2 SUPPORTING OBJECTIVE 3 SUPPORTING OBJECTIVE 4

    CONTINUOUSLY INCREASE STUDENTACHIEVEMENT CONTINUOUSY IMPROVE THE LEARNINGENVIRONMENT FOR STUDENTS AND STAFF CONTINUOUSLY INCREASE OPERATIONALEFFECTIVENESSCONTINUOUSLY INCREASE STAKEHOLDERCONFIDENCE AND SUPPORT OF OUR SCHOOLSYSTEM

    12

    Managers Publications,ProfessionalOrganizationWebsites

    Implement a Watt Watchers Energy ConservationProgram and a Recycling Program

    Timothy IsalyJenny Schero /EcoClubAshley Norris

    August-MayEnergy ConsumptionChartsRecycling Weights

    Campus Budget

    Monitor the use of overtime and decrease its use

    David Hicks Monthly August-June Overtime Reports

    TEAMS

    District Budget

    Supporting Objective 4 Continuously increase stakeholder confidence and support of our school systemPerformance Target: Education Productivity Index (EPI); API; SPI

    ACTION STRATEGY PERSONRESPONSIBLE TIMELINE EVALUATION/MEASURE RESOURCES TITLE ICOMPONENTExamine campus staffing efficiency and make

    staffing recommendations David Hicks January-March Staffing Costs District Budget

    Supporting Objective 4 Continuously increase stakeholder confidence and support of our school systemPerformance Target: Parent Satisfaction: Achieving Quality Together

    ACTION STRATEGYPERSON

    RESPONSIBLE TIMELINEEVALUATION/

    MEASURE RESOURCESTITLE I

    COMPONENTDevelop schoolwide system to prepare students forpost graduation success

    Dawn ThompsonKaren WilsonMelanie Magee

    August-June

    Parent ParticipationTotalsStudent Post-GraduationReports

    Campus Budget

    Organize PTSA to focus on initiating newtraditionsand recognition programs, teacherappreciation activities, parent programs, student-led service projects, and Post-Prom

    David Hicks,PTSA Board

    August-June PTSA Meeting Minutes PTSA Budget

    Hold monthly parent meetings for informalconversation and communication David Hicks Monthly - August-June Meeting Sign In Sheets Campus Budget

  • 8/3/2019 Ranchview - Campus Improvement Plan 2011-2012

    13/17

    THE GOAL OF THE CARROLLTON-FARMERS BRANCH ISD IS HIGH ACHIEVEMENT FOR ALL STUDENTSSUPPORTING OBJECTIVE 1 SUPPORTING OBJECTIVE 2 SUPPORTING OBJECTIVE 3 SUPPORTING OBJECTIVE 4

    CONTINUOUSLY INCREASE STUDENTACHIEVEMENT CONTINUOUSY IMPROVE THE LEARNINGENVIRONMENT FOR STUDENTS AND STAFF CONTINUOUSLY INCREASE OPERATIONALEFFECTIVENESSCONTINUOUSLY INCREASE STAKEHOLDERCONFIDENCE AND SUPPORT OF OUR SCHOOLSYSTEM

    13

    Host 2 parent conferences to review our schoolgoals/progress, student goals/progress, TAKSscores and transcripts, and to improveopportunities for direct communication withstakeholders.

    David HicksDepartmentManagersTeachers

    August and January Parent Comment Cards Campus Budget

    Increase student participation and successes inacademic contests: UIL, Reflections, RHS Art Show,VASE, Math Contests, Academic Decathlon,

    Speech/Debate

    Melanie Magee,Kelly OSullivan,DepartmentManagers, Academic

    Coaches, Fine ArtsTeachers

    September-May Awards Earned Campus Budget

    Supporting Objective 4 Continuously increase stakeholder confidence and support of our school systemPerformance Target: Employee: Campus Communication School has system of communication thats open, regular and honest

    ACTION STRATEGY PERSONRESPONSIBLE TIMELINE EVALUATION/MEASURE RESOURCES TITLE ICOMPONENTEstablish a system of two way communication thatkeeps team members informed and provides anavenue for norm driven, solution orientedproblem solving.

    David HicksTeacher LeadersTeachers

    Weekly/MonthlyAugust-May

    Wolfpack WeeklyNewsletter, AdvanceMeeting Agendas,Monthly Survey

  • 8/3/2019 Ranchview - Campus Improvement Plan 2011-2012

    14/17

  • 8/3/2019 Ranchview - Campus Improvement Plan 2011-2012

    15/17

    THE GOAL OF THE CARROLLTON-FARMERS BRANCH ISD IS HIGH ACHIEVEMENT FOR ALL STUDENTSSUPPORTING OBJECTIVE 1 SUPPORTING OBJECTIVE 2 SUPPORTING OBJECTIVE 3 SUPPORTING OBJECTIVE 4

    CONTINUOUSLY INCREASE STUDENTACHIEVEMENT CONTINUOUSY IMPROVE THE LEARNINGENVIRONMENT FOR STUDENTS AND STAFF CONTINUOUSLY INCREASE OPERATIONALEFFECTIVENESSCONTINUOUSLY INCREASE STAKEHOLDERCONFIDENCE AND SUPPORT OF OUR SCHOOLSYSTEM

    15

    Supporting Objective 1 Continuously increase student achievementTAKS READING/ELA

    READING/ELA 2011 2012 2011 2012

    Student Group % PASS% SATIS

    % COM% ADV

    Target Result Target Result

    Afr. American 92 95 13 20

    Hispanic 92 95 21 30

    White 96 98 39 50

    Econ. Dis. 91 95 13 20LEP 59 85 0 3

    G/T 100 100 64 75

    Special Ed 85 90 2 5

    All Students 94 95 24 35

    EOC WRITINGWRITING 2011 2012 2011 2012

    Student Group % PASS% SATIS

    % COM% ADV

    Target Result Target Result

    Afr. American 85 25

    Hispanic 85 25White 85 25

    Econ. Dis. 85 25

    LEP 85 25

    G/T 90 75

    Special Ed 85 25

    All Students 85 25

    SOCIAL STUDIESSOCIAL STUDIES 2011 2012 2011 2012

    Student Group % PASS% SATIS

    % COM% ADV

    Target Result Target Result

    Afr. American 96 100 48 60

    Hispanic 97 100 56 60

    White 100 100 69 80

    Econ. Dis. 97 100 47 60

    LEP 100 100 17 20

    G/T 100 100 99 100

    Special Ed 88 95 6 20

    All Students 98 98 61 70

    MATHEMATICSMATHEMATICS 2011 2012 2011 2012

    Student Group % PASS% SATIS

    % COM% ADV

    Target Result Target Result

    Afr. American 70 85 8 15

    Hispanic 84 90 18 25

    White 89 95 36 45

    Econ. Dis. 74 85 11 15LEP 65 85 18 20

    G/T 100 100 77 85

    Special Ed 60 85 4 10

    All Students 83 90 26 40

    SCIENCESCIENCE 2011 2012 2011 2012

    Student Group % PASS% SATIS

    % COM% ADV

    Target Result Target Result

    Afr. American 74 85 6 15

    Hispanic 83 90 17 25White 94 95 51 60

    Econ. Dis. 76 85 8 15

    LEP 67 85 8 10

    G/T 100 100 69 80

    Special Ed 61 85 0 5

    All Students 84 90 25 35

    RESULTS - 2012PROGRESS TOWARD TARGETSSATISFACTORY ADVANCED

    # of Targets Met

    # of Targets Not Met

    Percent at Target

  • 8/3/2019 Ranchview - Campus Improvement Plan 2011-2012

    16/17

    THE GOAL OF THE CARROLLTON-FARMERS BRANCH ISD IS HIGH ACHIEVEMENT FOR ALL STUDENTSSUPPORTING OBJECTIVE 1 SUPPORTING OBJECTIVE 2 SUPPORTING OBJECTIVE 3 SUPPORTING OBJECTIVE 4

    CONTINUOUSLY INCREASE STUDENTACHIEVEMENT CONTINUOUSY IMPROVE THE LEARNINGENVIRONMENT FOR STUDENTS AND STAFF CONTINUOUSLY INCREASE OPERATIONALEFFECTIVENESSCONTINUOUSLY INCREASE STAKEHOLDERCONFIDENCE AND SUPPORT OF OUR SCHOOLSYSTEM

    16

    Supporting Objective 1 Continuously increase student achievement

    C-FBISD COMPLETION RATEClass of 2009 Class of 2010 Class of 2011

    Completion Rate CompRate

    # ofDropouts

    CompRate

    # ofDropouts

    Comp Rate Dropouts

    Student Group Target Results Target Results

    Afr. American 91.9 1 100 0

    Hispanic 86.2 1 100 0

    White 92.3 2 100 0

    Econ. Dis. 84.1 100 0G/T 100 0

    Special Ed 88.2 .3 100 0

    All Students 92.7 4 100 0

    Dropout Rate HIGH SCHOOL GRADUATION RATEC-FBISD 2008-2009 2009-2010 2010-2011

    Student Group Rate Rate Target Results

    Afr. American 1.5 97

    Hispanic 2.1 97

    White .5 97

    Econ. Dis. 1.6 97

    G/T 97

    Special Ed 2.6 97

    All Students 1.3 97

    RESULTS - 2012PROGRESS TOWARD TARGETS

    Completion Dropout

    # of Targets Met

    # of Targets Not Met

    Percent at Target

    ADEQUATE YEARLY PROGRESS (AYP)C-FBISD Met AYP

    2008 Y

    2009 Y

    2010 Y

    2011 Y

    Target 2012 Y

    Results 2012

  • 8/3/2019 Ranchview - Campus Improvement Plan 2011-2012

    17/17

    THE GOAL OF THE CARROLLTON-FARMERS BRANCH ISD IS HIGH ACHIEVEMENT FOR ALL STUDENTSSUPPORTING OBJECTIVE 1 SUPPORTING OBJECTIVE 2 SUPPORTING OBJECTIVE 3 SUPPORTING OBJECTIVE 4

    CONTINUOUSLY INCREASE STUDENTACHIEVEMENT CONTINUOUSY IMPROVE THE LEARNINGENVIRONMENT FOR STUDENTS AND STAFF CONTINUOUSLY INCREASE OPERATIONALEFFECTIVENESSCONTINUOUSLY INCREASE STAKEHOLDERCONFIDENCE AND SUPPORT OF OUR SCHOOLSYSTEM

    17

    Supporting Objective 1 Continuously increase student achievement

    C-FBISD SAT MEAN SCORESSubtests 2009 2010 2011

    2012

    Target Results

    Critical Reading 500 449 475 500

    Mathematics 526 482 492 500

    Writing 488 456 476 500

    Combined Score 1514 1387 1443 1500

    Percent Tested 63 64 77 85

    C-FBISD ACT MEAN SCORESSubtests 2009 2010 2011 2012Target Results

    English 21 20 20 22

    Mathematics 22 22 22 24

    Reading 23 20 21 23

    Science 21 21 21 22

    Composite 22 21 21 23

    Percent Tested 26 39 28 35

    RESULTS - 2012PROGRESS TOWARD TARGETSSAT ACT

    # of Targets Met

    # of Targets Not Met

    Percent at Target