Today & Tomorrow Jun 2014

Download Today & Tomorrow Jun 2014

Post on 15-Jul-2015

143 views

Category:

Documents

0 download

TRANSCRIPT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011

    June 2014 / Rev. 0

    Today & Tomorrow

    June 2014

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 2

    IPD EPC FM / O&M Construction Fabrication Instant Access (Dealership)

    QTECH (Trading)

    Service units

    Departments

    Calibration Laboratory

    Sulaibiya Testing Laboratory

    Projects Temporary Furniture Unit (PTFU)

    Temporary Facilities (Office Cabins)

    Fabrication Workshop Scaffolding Warehousing

    Welders Training & Certification

    Accommodation

    Administration

    Office Services

    Business Development

    Health, Safety & Environment

    Proposals Contracts Procurement Engineering

    Project Controls Services

    Insurance

    Quality Assurance/ Control Human Resources

    Information Technology

    Finance & Accounting Communications Equipment Assets

    Equipment Operations

    Operations

    Organization structured to serve and support operations

    Kharafi National General Overview

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 3

    Business lines Infrastructure Project

    Development

    Engineering, Procurement & Construction

    Construction Facilities

    Management Fabrication Services

    Power Power Power Power Process Equipment

    Water Water Desalination Plants

    Refineries & Petrochemical Plants

    Pressure Vessels

    Wastewater Infrastructure Processing Plants Water Distribution Evaporators

    District Cooling District Cooling Refineries Sewage Treatment Plants Separators

    Renewable Energy

    Renewable Energy Gathering Centers

    Pumping & Lifting Stations Modular Skids

    Solid Waste Management

    Building Services (MEP)

    Petrochemical Plants

    Industrial Complexes Pressure Piping

    Enhanced Oil Recovery

    Social Infrastructure

    Pipeline

    Commercial Centers Tanks

    Mixed-use Development Environmental

    Enhanced Oil Recovery

    Residential Complexes Columns

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 4

    INFRASTRUCTURE PROJECT DEVELOPMENT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 5

    Infrastructure Project Development Wastewater Treatment and Reclamation

    District Cooling

    Renewable Energy

    Solid Waste Management

    Enhanced Oil Recovery

    Mixed-use Development

    BOT (Build-Operate-Transfer) Schemes

    BOO (Build-Own-Operate) Schemes

    PPPs (Public-Private-Partnerships)

    Joint Ventures and Consortia

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 6

    Infrastructure Project Development SULAIBIYA WATER AND WASTEWATER TREATMENT AND RECLAMATION PLANT, KUWAIT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 7

    Infrastructure Project Development ABU DHABI SEWAGE TREATMENT PLANT - BOOT PROJECT / ADWEA

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 8

    Infrastructure Project Development ABU DHABI SEWAGE TREATMENT PLANT - BOOT PROJECT / ADWEA

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 9

    EPC - Engineering,

    Procurement & Construction

    Desalination Plants

    Water Treatment

    Pipeline & Pumping Stations

    Water Distribution Networks

    Power Stations

    Gas Power Stations

    Power Transmission & Distribution

    Office & Residential

    Commercial Centers

    Educational Institutions

    Hospitals

    Hotels & Resorts

    Sewage Treatment Plants

    Solid Waste Management

    Pumping & Lifting Stations

    District Cooling

    Industrial Complexes

    Airports

    Transportation

    Engineering, Procurement & Construction

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 10

    EPC Power OPEN CYCLE GAS FIRED PLANTS 2,000 MW, AL SHABAB AND DAMIETTA, EGYPT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 11

    EPC Power OPEN CYCLE GAS FIRED PLANTS 1,000 MW, AL SHABAB, EGYPT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 12

    EPC Power OPEN CYCLE GAS FIRED PLANTS 1,000 MW, AL SHABAB, EGYPT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 13

    EPC Power OPEN CYCLE GAS FIRED PLANT 500 MW, DAMIETTA, EGYPT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 14

    EPC Water

    Ardiya Pumping Station, Kuwait Pumping & Lifting Station, Kuwait

    Saadiyat STP2, Abu Dhabi, UAE

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 15

    EPC Water

    A7 Pumping Station Riggai, Kuwait

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 16

    EPC District Cooling AL SOWAH DISTRICT COOLING PLANT (50,000 TR)

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 17

    EPC Central Utility Plants (CUP) SABAH AL SALEM UNIVERSITY PROJECT CENTRAL UTILITY PLANT (CUP 1 & 2), KUWAIT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 18

    EPC Infrast. & Environ.

    Dubai International Airport, UAE

    Marsa Alam International Airport, Egypt

    Addis Ababa International Airport, Ethiopia

    Kuwait International Airport

    Dubai International Airport

    Addis Ababa International Airport

    Marsa Alam International Airport

    Jebel Ali International Airport

    AIRPORTS

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 19

    EPC Infrast. & Environ. AIRPORTS - JEBEL ALI INTERNATIONAL AIRPORT, UAE

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 20

    EPC Infrastructure INFRASTRUCTURE WORKS FOR ADNEC CAPITAL TOWER - UAE

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 21

    EPC Building Services MEP WORKS - AL HAMRA TOWER, KUWAIT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 22

    EPC Building Services MEP WORKS - AL HAMRA TOWER, KUWAIT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 23

    EPC Building Services FOUR SEASONS HOTEL, LEBANON ADIA TOWER - ABU DHABI, UAE

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 24

    EPC Building Services MEP WORKS

    Central Bank of Kuwait HQ, Kuwait Al BabtainTower, Kuwait

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 25

    CONSTRUCTION

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 26

    Construction Plants HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 27

    Construction Plants HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 28

    Construction Plants HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 29

    Construction Plants HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 30

    Construction Plants HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 31

    Construction Plants HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 32

    Construction Plants HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 33

    Construction Plants AROMATIC COMPLEX, TECNIMONT / PIC, KUWAIT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 34

    Construction Plants AROMATIC COMPLEX, TECNIMONT / PIC, KUWAIT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 35

    Construction Plants POLYETHYLENE EXPANSION, OLEFINS II / FLUOR, KUWAIT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 36

    Construction Plants LARGE SCALE STEAM FLOOD PILOT, JO (KGOC / CHEVRON), KUWAIT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 37

    Construction Plants ETHYLENE GLYCOL II, OLEFINS - II, FLUOR, KUWAIT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 38

    Construction Plants FACILITY UPGRADE (AMALGAMATION PROJECT), KUWAIT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 39

    Construction Plants FUEL GAS PIPELINE PROJECT (PART A), KUWAIT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 40

    FACILITIES MANAGEMENT /

    INSTITUTIONAL & COMMERCIAL

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 41

    FM Institutional & Commercial SEIF PALACE, KUWAIT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 42

    FM Institutional & Commercial BAYAN PALACE, KUWAIT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 43

    FM Institutional & Commercial ADMINISTRATION BUILDING AT BAYAN PALACE, KUWAIT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 44

    FM Institutional & Commercial ADMINISTRATION BUILDING AT BAYAN PALACE, KUWAIT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 45

    FM Institutional & Commercial LIBERATION TOWER, KUWAIT ADIA TOWER - ABU DHABI, UAE

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 46

    FM Institutional & Commercial THE AVENUES, KUWAIT MARINA MALL, KUWAIT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 47

    FM Institutional & Commercial ARWA PRINTING PRESS, KUWAIT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 48

    FM Institutional & Commercial LEBANESE UNIVERSITY CAMPUS, BEIRUT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 49

    FACILITIES MANAGEMENT /

    INDUSTRIAL SERVICES

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 50

    Sewage Treatment Plants

    Reclamation Plants

    Pumping & Lifting Stations

    Water Distribution Network

    Storm Water Drain Network

    Oil Fields

    Gathering Centers

    Booster Stations

    Refineries

    Petrochemical Plants

    Pipelines & Well Heads

    FM - Industrial Services

    Operation

    Power Plants

    Diesel Power Plants

    Water Desalination Plants

    FM - Industrial Services Operation

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 51

    FM - Industrial Services Operation Kharafi National-Industrial Services is a leading One Stop Shop for Industrial Maintenance & Value Added Services in the region.

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 52

    FM Industrial Services MAINTENANCE - OIL & GAS PLANTS

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 53

    FM Industrial Services MAINTENANCE - OIL & GAS PLANTS

    Tank Roof Replacement

    Valve Maintenance

    High pressure Piping Works Hydro jet Cleaning

    Cable laying & Instr. Works De- Sludging Works

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 54

    FM - Upstream PRODUCTION FACILITIES MAINTENANCE, KUWAIT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 55

    FM - Upstream PRODUCTION FACILITIES MAINTENANCE, KUWAIT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 56

    FM - Downstream MINA AL AHMADI REFINERY STEAM FLOOD FACILITIES - JOINT OPERATIONS

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 57

    BOROUGE RUWAIS SHUTDOWN - 2012 FOR FACILITIES 1 & 2, UAE

    FM Industrial Services

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 58

    BOROUGE RUWAIS SHUTDOWN - 2012 FOR FACILITIES 1 & 2, UAE

    FM Industrial Services

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 59

    BOROUGE RUWAIS SHUTDOWN - 2012 FOR FACILITIES 1 & 2, UAE

    FM Industrial Services

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 60

    FM Industrial Services SHUTDOWN WORKS - SHUAIBA REFINERY - GRTA, KUWAIT

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 61

    FM Industrial Services O&M - POWER PLANTS

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 62

    FM Industrial Services O&M - POWER PLANTS

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 63

    FM Industrial Services O&M - POWER PLANTS

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 64

    FM Industrial Services O&M - GIS SUBSTATIONS

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 65

    FM Industrial Services OPERATION & MAINTENANCE OF PUMPING & LIFTING STATIONS

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 66

    FM Industrial Services OPERATION & MAINTENANCE OF PUMPING & LIFTING STATIONS

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 67

    FM Industrial Services OPERATION & MAINTENANCE OF SULAIBIYA WWTRP

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 68

    FM Industrial Services OPERATION & MAINTENANCE OF ADWEA WWTP (WATHBA & SAAD), ABU DHABI

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 69

    Service Units & Departments

    Health, Safety & Environment

    Procurement & Material Control

    Human Recourses

    Equipment Operations

    Quality Assurance / Control

    Scaffolding Services

    Project Control Services

    Calibration Laboratory

    Engineering Services

    Camp Facilities

    ABJ Engineering & Contracting Co. Kuwait

    ABJ Industries PJSC UAE

    Gulf National Insulation Systems Kuwait

    Gulf National Insulation Systems UAE

    Group Supporting Companies

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 70

    All employees undergo a Safety Induction Training course before they assume their responsibilities. Safety awareness is further intensified by:

    Safety Tool Box Talks Pre-task safety briefing Job Safety Analysis Risk Assessments Confined Space Entry

    Rigging, Scaffolding and First Aid training are conducted by Third Party & certified.

    With an objective to continual improvement, the safety management system elements are now certified by OHSAS 18001:2007 standard.

    Health, Safety & Environment

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 71

    Health, Safety & Environment

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 72

    Human Resources Multinational Workforce is recruited through our existing agencies network world-wide.

    Interviews and trade tests are conducted and supervised directly by our Project Staff.

    Candidates are sourced ahead of time, based on project manpower projections.

    Systematic re-certification of welders at work place to cope with new welding technology.

    Continuous reassessment of qualification training and skill development programmes for all personnel.

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 73

    Human Resources Manpower Summary

    Total Manpower: 29,579

    Directors / Chief Dev. Officer / COO 15

    Operations Managers / Project Director 11

    Department Managers / Unit Managers / Unit Head 106

    Manager of Projects / Snr. Project Managers 37

    Projects Managers / Construction Managers 70

    Services & Support Staff 1,897

    Field Operations (Engineers / Supervisors) 1,189

    Foremen 1,063

    Skilled Craftsman 8,932

    Plant / Equipment / Crane Operators / Drivers 2,031

    Trade Helpers 2,046

    Labourers 2,280

    General Site Services & Warehouse Man 1,185

    ABJ Engineering & Cont. Co. - Kuwait 5,548

    Kharafi National UAE 2,102

    Kharafi National Egypt 715

    Kharafi National Lebanon 352

    Non Manual: 3,325 Subsidiaries: 8,717 Manual: 17,537

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 74

    Note: * We have deployed over 12,000 employees in Habshan-5 Process Plant Project, Abu Dhabi for GASCO, UAE in its peak and the Project has been completed in June, 2013

    Human Resources Workforce Growth (2008-2013)

    2008 2009 2010 2011 2012 2013 2014 Non-Manual 2,631 3,750 3,814 4,216 4,278 4,327 3,852 Manual 20,250 21,610 27,358 28,929 30,058 30,808 25,727 Total 22,881 25,360 31,172 33,145 34,336 35,135 29,579

    0

    5,000

    10,000

    15,000

    20,000

    25,000

    30,000

    35,000

    40,000

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 75

    Quality Management System

    Well established procedures in place for every part of the business and their continuous update with internal auditing to verify the implementation

    Functional support of Quality Control to projects

    Establishment of Welding Services Unit, to train welders and develop their skills in anticipation of shortage of trained welders in the region

    Calibration and Testing Laboratories to ensure that calibration/ testing is done on time and that results of calibration/ testing are accurate

    Six Sigma program implementation

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 76

    Quality Certifications - Organization Quality Management System

    ISO Certification/ Accreditation:

    ISO 9001:2008 Quality Management System

    ISO 17025 General Requirements for the Competence of Testing and Calibration Laboratories.

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 77

    Quality Certifications - Fabrication Quality Management System

    ASME & National Boards Certification Stamps:

    ASME Code : U Manufacture of Pressure Vessels ASME Section VIII Division I

    ASME Code : U2 Manufacture of Pressure Vessels ASME Section VIII Division II

    ASME Code : PP Fabrication and Assembly of Pressure Piping

    ASME Code : S Manufacture of Power Boilers

    National Board : R Repair/ Alteration of Pressure Vessels

    National Board : NB Registered Boilers/ Pressure Vessels

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 78

    Quality Management System Quality Control - Overview

    Quality Control

    Technical Work Instructions for Piping, Pipeline, Tanks, Welding, Painting , Civil, Electrical and Instrumentation, Operation & Maintenance..etc. Project Quality Plan, ITPs, and Method Statements Orientations and Trainings

    QC Module in ERP Oracle Common database for fabrication and field activities

    Welders Training School &

    Certifications

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 79

    Quality Management System Calibration Laboratory (Calibration & Monitoring of Measuring Equipment)

    Investment of over KD 2 million in Master Equipment & Instruments Number of Instruments currently over 6000 Capabilities: Electrical, Mechanical, Linear, Mass, Pressure, Temperature Recent additions Thermal Imaging Cameras GPRS [Ground Penetration Radar System] Moisture & Density Measurement in Soil using Radioactive Gamma rays

    External Customers M/s. Siemens, Equate, Schlumberger, Hempel Paints, Hyundai Engineering & Construction Co., SK Engineering..etc.

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 80

    Quality Management System Sulaibiya Testing Laboratory

    Investment of over KD 300,000/- Equipment

    Testing Water, Waste water & Sludge samples

    Checking ~ 87 chemical & microbiological parameters

    Customer : Sulaibiya Sewage Treatment & Reclamation Plant

    ISO 17025 accreditation by United Kingdom Accreditation Service - UKAS

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 81

    Projects Control Progress Monitoring is Carried out as Follows:

    Actual returns for quantities installed and man-hours spent are collected daily.

    Progress verification is carried weekly.

    Productivity and performance indicators are reported on a weekly and monthly basis.

    Key Factors to our Cost Control Approach are:

    Forecast of quantities and man-hours.

    Forecast of balance commitments for materials and subcontracts.

    Forecast of staff and indirect costs.

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 82

    Engineering Services

    Thermoflow Aspentech ETap

    Specialist Design

    X Steel Spoolgen Autocad,Civil,MEP Aveva PDMS

    Process Detail

    Design

    RIPAC Candy

    On Screen Take offs Acad Take offs

    Material Take Offs

    Materials Data Base ERP Modules Primavera

    Bills of Quantity

    Tracking Commissioning Support

    Post Award Detail Design & Engineering Support

    Pre Award Tendering Support

    FEED Packages

    Concept Design

    Technology Selection

    ENGINEERING SOFTWARE EMPLOYED ENGINEERING SUPPORT SERVICES

    Pipeflow Ceasar II Staad III Robot

    Elite Hass HVACOMP HAP Etab

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 83

    Kharafi National follows Integrated Procurement & Materials Management system in line with the ISO 9001 : 2008 requirement covering the following: Procurement & Material

    subcontract (Local & Overseas). Logistics, expediting, Factory

    Acceptance Test (FAT) & transportation.

    Vendor Management (Supplier evaluation, Prequalification and performance measurement).

    Multinational staff strength over 100 (including experienced Engineers, Supervisors and Buyers.)

    Procurement

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 84

    Over US$ 750 Million worth of materials procured annually. In excess of 30,000 Material Requisition closed annually. Approved supplier strength of over 3,000 (one-third being overseas suppliers). KN adopts structured criteria for evaluating and re-evaluating suppliers based on their ability to supply products that meet the Organization's requirement and Periodic evaluation is conducted on the performance of the suppliers. KN conducts Due Diligence on supplier premises as part of the supplier evaluation to enlist them as an approved vendor.

    Procurement

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 85

    Extensive Knowledge of Local and International Markets. Purchase Orders / Subcontracts are awarded to Companies who supply quality products, competitive back to back basis and on time delivery. e-Procurement, utilization of B2B e-markets, Strategic Sourcing & Online negotiations with suppliers. Automated Procurement workflows through Oracle E-Business Suite ERP System. Compliance with the Purchase Order/ project schedule requirements are ensured through expediting/ inspection at manufacturers/ suppliers premises in an orderly & systematic way for highlighting deviations, delay or damages if any, prior to shipment.

    Procurement

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 86

    Procurement Trend Inline with the transformation of KN from a Traditional Contractor to an Operational Investor with EPC , Commissioning and FM capabilities, the Value of Procurement Increased Year on Year with increase in Turnover / Growth of KN

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 87

    Serving Warehousing requirements for More than 150 Projects / Cost Centers across diversified business lines in Middle East & Africa. Central Stores in Kuwait with 48,000 Sq Meters of area (Including 17,000 Sq Meters of Closed Stores, 31,000 Sq. Meters of Open Yard) having Heavy duty multi storied racking with State of art modern material handling facilities, Safety and Security systems. In excess of 160,000 items handled across various Projects and we adopt Efficient Codification & Standardization practices.

    Material Control

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 88

    Over US$ 750 Million worth of KN Procured materials handled annually and Over US$ 1 Billion worth of Client Supplied Free Issue Materials handled annually.

    Total Monthly Receiving Transactions over 5500 and Issues/Transfer Transactions over 4500.

    Effective utilization of Oracle ERP Inventory Modules with Experienced resources to handle Computerized Transactions & Inventory Management.

    Utilization of Temperature controlled Stores and importance for material storage & preservation as per manufacturers recommendations.

    Utilization of Selective Inventory Control / Vendor Managed Inventory / Consigned Stock.

    Material Control

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 89

    Equipment Operations Kharafi National own, manage and operate Equipment fleet in all countries where KN operates, keeping same policy, standard and discipline. Currently equipment in excess of 6,100 construction equipment/plant.

    Currently more than 2,100 trained, experienced and qualified staff available at the equipment division.

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 90

    Equipment Operations

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 91

    Equipment Operations

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 92

    Equipment Operations

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 93

    Equipment Operations

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 94

    Scaffolding Services

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 95

    Scaffolding Services

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 96

    Scaffolding Services

    Shuaiba Refinery GRTA, KNPC, Kuwait

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 97

    Electrical Laboratory High Voltage Laboratory

    Fluke Laboratory Pressure Laboratory

    Capabilities Calibration Laboratory

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 98

    Balance Laboratory Chemical Laboratory

    Temperature Laboratory Dimension & Vibration Laboratory

    Calibration Laboratory Capabilities

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 99

    IR Thermography Inspection Power Quality Analysis

    Validation of Welding Machines Cable / Pipe Detection

    Calibration Laboratory Specialized Services

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 100

    INFRARED NORMAL

    LV Fuse Carrier Problem

    Problem in Pump Coupling

    Problem in Busbar Termination

    Calibration Laboratory Thermal imaging camera

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 101

    Camp Facilities in Kuwait & UAE

    Shuaiba Capacity-10,000

    Sulaibiya Capacity- 3,500

    Mahboula Capacity- 2,400

    Amghara Capacity- 500

    Abdally Capacity- 1,000

    Kuwait

    Total = 17,400

    Al Wathba Abu Dhabi Capacity- 2,200

    Al Ain, Abu Dhabi Capacity- 525

    Mussafah, Abu Dhabi Capacity- 750

    Dubai Investment Park Capacity- 100

    UAE

    Total = 12,375

    Saadiyat , Abu Dhabi Capacity- 700

    Habshan-Abu Dhabi Capacity- 8,000

    Madinet Zayed, Abu Dhabi

    Capacity- 100

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 102

    Camp Facilities Sulaibiya, Kuwait

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 103

    Camp Facilities Sulaibiya, Kuwait

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 104

    Camp Facilities Sulaibiya, Kuwait

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 105

    Camp Facilities Shuaiba, Kuwait

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 106

    Camp Facilities - Habshan, UAE

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 107

    Camp Facilities - Habshan, UAE

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 108

    Camp Facilities - Habshan, UAE

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 109

    Aerial view of Mina Abdullah Facilities

    ABJ Fabrication Facilities

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 110

    ABJ Fabrication Facilities

    ABJ Engineering & Contracting Company fabricates a wide range of heavy industrial products for the oil and gas, petrochemical, chemical, fertilizer, power, water and related industrial sectors in Kuwait and beyond.

    The Company designs, manufactures and installs pressure vessels, pressure piping, heavy structural steel works, tanks, modular skids, evaporators, separators and HRSG among a host of customized heavy duty products for large-scale projects in Kuwait and UAE.

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 111

    ABJ Fabrication Facilities

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 112

    ABJ Fabrication Facilities Strengths

    Our current manpower is 2,027 skilled labor

    Our current production covers the fabrication of the following:

    Process Equipment

    Vessels & Pressure Vessels

    Evaporators for MSF Desalination Plants

    Skids Mounted Process Modules

    Pressure / Process Piping

    Structural Steel

    High Capacity 24 Hrs radiography vaults for NDT of pipe fabrication.

    A large number of highly experienced staff in engineering design, production of fabrication drawings in accordance with international codes and standards.

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 113

    ABJ Fabrication Facilities

    Electric Furnace Temp 800 C Transportation

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 114

    ABJ Fabrication Facilities DESALINATION UNITS

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 115

    ABJ Fabrication Facilities SEPARATORS / COLUMNS

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 116

    ABJ Fabrication Facilities PRESSURE PIPING

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 117

    ABJ Fabrication Facilities MODULAR SKIDS

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 118

    Jaber Al Ahmed International Stadium, Kuwait

    Nelson Mandela Stadium, South Africa

    ABJ Fabrication Facilities SPORT STADIUMS

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 119

    Gulf National Insulation Systems

    Aromatics Complex Project

    GNIS is a Specialized Insulation Company set up in 2006 between KN & Riva Mariani Group of Italy.

    GNIS has a 5,500 m2 capacity set up with MAB Facility.

    A 1,000 m2 State of the Art, Full Computerized Workshop.

    Capacity up to 20,000 m2 / month of Fabricated Cladding Materials.

    304 + 20 Strong Fully trained and experienced work force.

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 120

    Gulf National Insulation Systems

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 121

    Ethylene Glycol 2, Kuwait Ethylene Glycol 2, Kuwait

    Gulf National Insulation Systems

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 122

    Main Clients References Ministry of Electricity & Water, Kuwait

    Kuwait Petrochemical Industries Company

    Ministry of Public Works, Kuwait Kuwait Gulf Oil Company

    Kuwait National Petroleum Company Saudi Arabian Chevron Inc.

    Kuwait Oil Company Ansaldo Industrial S.p.A.

    Equate Petrochemicals, Kuwait International Bechtel Company, Ltd.

  • AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 123

    Main Clients References Tecnimont S.p.A., Italy Fluor International Ltd., USA

    Saipem S.p.A., Italy Kellogg Brown & Root KBR, USA

    Fisia, Italy Hyundai Engineering & Construction Co., South Korea

    Technip, Italy Samsung Corporation, South Korea

    Foster Wheeler, Italy SK Engineering & Contracting Company, South Korea

    Petrofac International Ltd., UK Daelim Industrial Company Ltd., South Korea

    Costain Oil & Gas - UK ABB Lummus Heat Transfer B.V., Netherlands

    JGC Corporation, Japan Polimex Cekop, Poland

    Mitsui Engineering & Shipbuilding Company, Japan Cegelec, France

    Today & TomorrowSlide Number 2Slide Number 3Slide Number 4Slide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12Slide Number 13Slide Number 14Slide Number 15Slide Number 16Slide Number 17Slide Number 18Slide Number 19Slide Number 20Slide Number 21Slide Number 22Slide Number 23Slide Number 24Slide Number 25Slide Number 26Slide Number 27Slide Number 28Slide Number 29Slide Number 30Slide Number 31Slide Number 32Slide Number 33Slide Number 34Slide Number 35Slide Number 36Slide Number 37Slide Number 38Slide Number 39Slide Number 40Slide Number 41Slide Number 42Slide Number 43Slide Number 44Slide Number 45Slide Number 46Slide Number 47Slide Number 48Slide Number 49Slide Number 50Slide Number 51Slide Number 52Slide Number 53Slide Number 54Slide Number 55Slide Number 56Slide Number 57Slide Number 58Slide Number 59Slide Number 60Slide Number 61Slide Number 62Slide Number 63Slide Number 64Slide Number 65Slide Number 66Slide Number 67Slide Number 68Slide Number 69Slide Number 70Slide Number 71Slide Number 72Slide Number 73Slide Number 74Slide Number 75Slide Number 76Slide Number 77Slide Number 78Slide Number 79Slide Number 80Slide Number 81Slide Number 82Slide Number 83Slide Number 84Slide Number 85Slide Number 86Slide Number 87Slide Number 88Slide Number 89Slide Number 90Slide Number 91Slide Number 92Slide Number 93Slide Number 94Slide Number 95Slide Number 96Slide Number 97Slide Number 98Slide Number 99Slide Number 100Slide Number 101Slide Number 102Slide Number 103Slide Number 104Slide Number 105Slide Number 106Slide Number 107Slide Number 108Slide Number 109Slide Number 110Slide Number 111Slide Number 112Slide Number 113Slide Number 114Slide Number 115Slide Number 116Slide Number 117Slide Number 118Slide Number 119Slide Number 120Slide Number 121Slide Number 122Slide Number 123