p seismic risk model for a designated e highway system e...

19
Seismic Risk Model for a Designated Highway System Anne Kiremidjian, Professor and Director John A. Blume Earthquake Engineering Center Stanford University James Moore, Associate Professor and Director Transportation Engineering Program University of Southern California Graduate Research Assistants: Ayse Hortacsu (CE, lead, Stanford), Mark Audigier, Jeremiah LeGrue, Dimitris Pachakis (CE, Stanford) Yueyue Fan (CE, lead, USC), Junghoon Ki, Soojung Kim, (SPPD, USC) Undergraduate PEER Scholar: Kelly Burnell (CE, Stanford) P P E E E E R R 2001 PEER Annual Meeting January 25, 2001

Upload: buikhanh

Post on 07-May-2019

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: P Seismic Risk Model for a Designated E Highway System E Rapps.peer.berkeley.edu/events/annual_meeting/2001annualmtg/... · Seismic Risk Model for a Designated Highway System Anne

Seismic Risk Model for a DesignatedHighway System

Anne Kiremidjian, Professor and DirectorJohn A. Blume Earthquake Engineering Center

Stanford University

James Moore, Associate Professor and DirectorTransportation Engineering Program

University of Southern California

Graduate Research Assistants:Ayse Hortacsu (CE, lead, Stanford), Mark Audigier, Jeremiah LeGrue,

Dimitris Pachakis (CE, Stanford)Yueyue Fan (CE, lead, USC), Junghoon Ki, Soojung Kim, (SPPD, USC)

Undergraduate PEER Scholar:Kelly Burnell (CE, Stanford)

PPEEEERR

2001 PEER Annual Meeting January 25, 2001

Page 2: P Seismic Risk Model for a Designated E Highway System E Rapps.peer.berkeley.edu/events/annual_meeting/2001annualmtg/... · Seismic Risk Model for a Designated Highway System Anne

Estimated Bay Area Bridge DamageEstimated Bay Area Bridge Damage

Scenario Earthquakes:Scenario Earthquakes:Hayward 7.0 and 7.5Hayward 7.0 and 7.5San Andreas 7.5 and 8.0San Andreas 7.5 and 8.0

Januray 25, 2001 2001 PEER Annual Meeting

Page 3: P Seismic Risk Model for a Designated E Highway System E Rapps.peer.berkeley.edu/events/annual_meeting/2001annualmtg/... · Seismic Risk Model for a Designated Highway System Anne

Damage State DefinitionsDamage State Definitions

� 1. No Damage� 2. Slight Damage- cracking, spalling� 3. Moderate Damage- bond, abutment

backwall collapse� 4. Extensive Damage- pier concrete

failure� 5. Complete Damage- deck unseating,

pier collapse Januray 25, 2001 2001 PEER Annual Meeting

Page 4: P Seismic Risk Model for a Designated E Highway System E Rapps.peer.berkeley.edu/events/annual_meeting/2001annualmtg/... · Seismic Risk Model for a Designated Highway System Anne

#S

#S

#S#S#S#S#S

#S

#S#S#S#S#S#S#S#S

#S#S

#S

#S

#S#S#S

#S

#S#S#S#S

#S

#S#S#S#S

#S#S#S

#S

#S

#S #S#S#S#S#S#S #S#S #S#S

#S #S#S#S

#S#S#S

#S

#S#S#S

#S#S

#S#S#S

#S

#S#S

#S

#S

#S#S#S

#S

#S

#S#S

#S

#S

#S#S#S#S

#S

#S

#S

#S

#S#S#S#S#S

#S

#S

#S#S

#S

#S#S#S#S#S#S

#S

#S

#S

#S

#S

#S#S

#S

#S

#S

#S#S

#S#S#S

#S

#S#S

#S#S

#S#S

#S

#S

#S

#S#S#S

#S#S

#S

#S#S

#S

#S

#S #S

#S

#S#S#S#S#S

#S#S#S#S#S#S#S#S#S

#S #S#S#S#S#S#S

#S#S

#S

#S

#S

#S #S#S #S#S #S

#S

#S

#S

#S#S#S#S

#S

#S#S

#S

#S

#S

#S#S #S

#S

#S#S

#S

#S

#S#S#S

#S

#S

#S

#S

#S

#S#S#S

#S#S

#S#S

#S#S#S#S

#S#S

#S#S

#S

#S

#S#S#S#S#S

#S#S#S#S#S

#S#S

#S#S #S

#S#S#S

#S#S#S

#S#S#S#S

#S

#S#S

#S

#S

#S #S#S#S#S #S#S#S#S#S#S #S#S

#S#S#S

#S#S#S#S#S#S

#S

#S

#S

#S#S#S

#S#S#S #S#S#S

#S

#S#S#S#S

#S#S #S#S#S#S

#S

#S#S#S

#S

#S#S

#S#S#S#S#S#S

#S#S

#S

#S

#S#S#S#S#S#S#S#S#S#S#S#S#S#S

#S

#S#S#S#S#S#S#S#S#S#S#S #S#S#S#S#S

#S#S#S#S#S#S#S#S

#S#S#S#S

#S#S#S

#S#S#S#S#S#S

#S#S#S#S#S#S#S#S

#S#S

#S#S#S#S

#S#S#S#S#S#S#S

#S#S

#S#S#S#S#S#S#S#S#S#S#S

#S#S#S

#S#S

#S#S#S#S

#S#S#S

#S#S#S#S#S

#S#S

#S#S

#S#S#S#S#S

#S#S

#S

#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S

#S

#S#S#S#S#S#S

#S#S

#S

#S#S

#S#S#S#S

#S

#S#S#S

#S

#S

#S

#S

#S#S

#S

#S #S

#S#S#S#S

#S

#S

#S#S#S

#S

#S#S

#S

#S

#S#S#S#S

#S

#S#S#S#S

#S

#S

#S

#S

#S

#S#S

#S

#S

#S

#S

#S

#S #S#S #S#S#S#S

#S#S

#S#S#S#S#S

#S#S

#S

#S

#S

#S

#S

#S

#S#S#S

#S

#S

#S

#S

#S

#S#S#S#S

#S

#S#S#S

#S#S

#S#S#S#S#S#S#S

#S#S

#S#S

#S#S#S#S#S#S#S#S

#S

#S#S#S

#S #S

#S

#S

#S#S#S#S

#S

#S

#S #S

#S#S

#S#S#S#S#S#S#S#S

#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S

#S#S#S#S#S#S

#S#S#S#S#S#S#S#S#S

#S#S#S

#S#S

#S #S

#S

#S#S#S

#S#S#S#S#S

#S

#S#S #S#S

#S

#S

#S

#S

#S

#S

#S#S#S#S#S

#S#S

#S#S

#S #S#S

#S

#S#S#S#S#S

#S

#S

#S#S

#S

#S

#S#S#S#S#S

#S#S#S#S#S#S#S#S#S#S

#S#S#S#S

#S#S

#S

#S#S#S

#S#S#S

#S#S

#S#S

#S#S#S

#S #S#S#S#S#S#S

#S

#S#S

#S#S#S#S

#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S

#S#S#S#S#S#S#S

#S#S#S#S#S#S#S#S#S#S#S

#S#S#S

#S

#S#S

#S

#S#S

#S

#S#S

#S#S

#S#S

#S#S

#S#S#S#S#S#S#S

#S #S

#S#S

#S#S#S

#S#S#S#S

#S

#S#S#S

#S

#S

#S

#S

#S

#S#S

#S

#S#S #S

#S

#S#S

#S #S

#S

#S

#S#S

#S

#S

#S

#S

#S#S#S

#S #S

#S

#S

#S

#S#S#S

#S

#S

#S

#S#S#S

#S#S

#S

#S#S#S#S

#S

#S

#S

#S

#S#S

#S

#S

#S

#S

#S#S

#S#S#S

#S

#S

#S

#S

#S#S

#S#S#S#S#S#S

#S

#S#S

Gr

Br

y

January 25, 2001 2001 PEER Annual Meeting

Page 5: P Seismic Risk Model for a Designated E Highway System E Rapps.peer.berkeley.edu/events/annual_meeting/2001annualmtg/... · Seismic Risk Model for a Designated Highway System Anne

#S

#S#S

#S#S#S#S#S

#S

#S

#S#S#S#S#S#S#S#S#S

#S#S

#S

#S

#S#S#S

#S

#S

#S#S#S#S

#S

#S#S#S#S

#S

#S#S#S#S

#S

#S

#S #S#S#S#S#S#S#S#S#S#S#S#S

#S#S #S#S

#S

#S#S

#S #S#S#S#S

#S#S#S#S

#S#S#S#S

#S

#S#S

#S#S#S #S#S#S#S

#S

#S#S

#S#S

#S

#S#S#S#S#S

#S

#S

#S#S

#S#S

#S

#S#S#S#S#S

#S

#S

#S

#S

#S#S#S#S#S

#S#S#S#S

#S

#S#S

#S

#S#S#S#S#S#S#S

#S#S#S

#S

#S

#S

#S

#S

#S

#S#S

#S

#S#S#S

#S

#S

#S

#S#S

#S

#S

#S

#S#S

#S#S

#S

#S

#S#S

#S#S

#S#S

#S

#S

#S

#S

#S#S#S

#S#S#S

#S

#S#S

#S#S

#S

#S

#S

#S

#S

#S

#S

#S

#S#S#S

#S#S#S#S#S

#S#S#S#S#S#S#S#S#S#S #S#S#S#S#S#S#S

#S#S

#S#S

#S

#S

#S

#S#S#S#S#S#S#S #S#S#S

#S

#S#S

#S#S

#S#S#S#S #S #S

#S#S

#S#S

#S

#S

#S

#S

#S

#S

#S

#S#S #S

#S

#S#S

#S#S#S

#S

#S

#S

#S#S#S

#S

#S

#S

#S#S#S#S#S

#S#S#S

#S#S#S

#S

#S

#S#S#S

#S #S

#S

#S#S#S#S

#S

#S#S#S

#S#S

#S

#S

#S

#S#S#S

#S#S#S#S#S#S

#S#S#S#S#S#S

#S#S

#S#S #S

#S#S#S

#S#S#S

#S#S#S#S#S#S#S#S#S#S

#S

#S#S

#S

#S

#S #S#S#S#S

#S#S

#S #S#S#S#S#S#S#S #S#S

#S#S#S

#S#S#S#S#S#S

#S

#S

#S

#S#S#S

#S#S#S#S#S#S#S

#S

#S#S#S#S

#S#S #S#S#S#S

#S

#S

#S#S#S

#S

#S#S

#S#S#S#S#S#S

#S#S

#S

#S#S

#S#S#S#S#S#S#S#S#S#S#S#S#S#S

#S

#S#S#S#S#S#S#S#S#S#S#S#S#S #S#S#S#S#S#S#S

#S#S#S#S#S#S

#S#S#S#S#S#S#S

#S#S#S

#S#S#S#S#S#S

#S#S#S#S#S#S#S#S

#S#S

#S#S#S#S

#S#S#S#S#S#S#S

#S#S

#S#S#S#S#S#S#S#S#S#S#S

#S#S#S

#S#S

#S#S#S

#S

#S

#S#S#S

#S#S#S#S#S

#S#S

#S#S#S

#S

#S#S#S#S#S#S

#S#S

#S

#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S

#S

#S#S#S#S#S#S#S#S#S#S

#S

#S#S

#S#S#S#S

#S

#S#S#S

#S

#S

#S

#S

#S#S

#S#S#S#S#S#S#S#S

#S

#S #S#S

#S#S#S#S#S#S

#S

#S

#S

#S

#S#S#S

#S#S#S#S

#S

#S#S#S #S

#S

#S

#S

#S

#S

#S#S#S

#S

#S

#S#S

#S

#S#S#S#S

#S#S

#S#S

#S

#S#S

#S

#S

#S

#S

#S

#S#S #S

#S

#S

#S#S

#S

#S

#S#S #S#S #S

#S#S#S

#S

#S#S

#S#S #S#S

#S#S

#S

#S#S

#S#S #S

#S

#S

#S

#S#S

#S#S

#S

#S

#S#S#S

#S#S

#S

#S

#S

#S

#S#S#S#S#S

#S

#S#S#S

#S#S

#S#S

#S#S#S#S#S#S

#S#S

#S#S

#S#S#S#S

#S

#S

#S#S#S#S

#S#S#S

#S#S#S

#S #S

#S

#S

#S

#S#S#S#S

#S

#S

#S

#S #S#S#S

#S

#S#S

#S

#S#S#S#S#S#S#S#S

#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S

#S#S#S#S#S

#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S

#S#S#S#S#S#S#S#S#S#S

#S#S

#S#S

#S#S

#S #S#S#S

#S

#S

#S

#S#S

#S#S#S

#S#S#S#S

#S#S

#S

#S#S#S#S#S

#S#S#S

#S#S#S#S#S#S

#S

#S

#S#S

#S

#S #S#S

#S #S

#S

#S#S

#S #S

#S#S#S#S#S

#S#S#S

#S#S#S

#S

#S#S #S#S

#S#S

#S#S#S#S#S

#S

#S

#S

#S

#S#S

#S#S

#S#S

#S#S

#S#S

#S

#S

#S

#S#S#S#S#S

#S#S#S#S #S#S#S#S#S#S#S#S#S#S#S#S

#S#S#S#S

#S

#S

#S#S

#S#S

#S

#S#S

#S

#S

#S#S#S#S#S

#S

#S#S

#S#S

#S#S#S#S

#S#S#S

#S

#S

#S #S#S#S#S

#S

#S

#S#S

#S#S #S

#S

#S

#S

#S#S#S

#S#S#S

#S#S#S#S#S

#S #S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S#S

#S#S#S#S#S#S#S#S#S#S#S#S

#S#S#S#S#S#S#S#S#S

#S#S#S

#S

#S

#S#S

#S

#S#S

#S

#S#S

#S

#S#S

#S#S

#S#S

#S#S#S

#S#S#S#S#S#S #S

#S#S

#S

#S #S

#S#S#S#S#S#S#S#S#S#S

#S

#S

#S#S#S#S#S

#S

#S#S

#S

#S#S

#S#S#S

#S#S

#S

#S#S

#S

#S

#S

#S

#S

#S

#S

#S#S

#S#S

#S

#S

#S#S #S#S

#S#S

#S #S#S#S#S

#S

#S #S

#S

#S#S

#S#S

#S

#S

#S#S#S

#S

#S#S#S

#S

#S

#S

#S #S

#S

#S

#S

#S

#S#S#S

#S#S

#S

#S#S

#S

#S#S

#S#S#S#S#S

#S#S

#S#S

#S

#S #S#S#S#S

#S

#S#S

#S

#S

#S

#S#S#S

#S

#S

#S#S

#S

#S

#S

#S

#S

#S

#S

#S#S#S

#S#S#S

#S#S

#S

#S

#S

#S

#S#S#S

#S#S

#S#S#S#S#S#S#S#S#S#S#S#S

#S

#S#S#S#S

Gr

Br

#S

y

January 25, 2001 2001 PEER Annual Meeting

Page 6: P Seismic Risk Model for a Designated E Highway System E Rapps.peer.berkeley.edu/events/annual_meeting/2001annualmtg/... · Seismic Risk Model for a Designated Highway System Anne

January 25, 2001 2001 PEER Annual Meeting

Page 7: P Seismic Risk Model for a Designated E Highway System E Rapps.peer.berkeley.edu/events/annual_meeting/2001annualmtg/... · Seismic Risk Model for a Designated Highway System Anne

January 25, 2001 2001 PEER Annual Meeting

Page 8: P Seismic Risk Model for a Designated E Highway System E Rapps.peer.berkeley.edu/events/annual_meeting/2001annualmtg/... · Seismic Risk Model for a Designated Highway System Anne

January 25, 2001 2001 PEER Annual Meeting

Page 9: P Seismic Risk Model for a Designated E Highway System E Rapps.peer.berkeley.edu/events/annual_meeting/2001annualmtg/... · Seismic Risk Model for a Designated Highway System Anne

January 25, 2001 2001 PEER Annual Meeting

Page 10: P Seismic Risk Model for a Designated E Highway System E Rapps.peer.berkeley.edu/events/annual_meeting/2001annualmtg/... · Seismic Risk Model for a Designated Highway System Anne

January 25, 2001 2001 PEER Annual Meeting

Page 11: P Seismic Risk Model for a Designated E Highway System E Rapps.peer.berkeley.edu/events/annual_meeting/2001annualmtg/... · Seismic Risk Model for a Designated Highway System Anne

1990 Base & San Andreas 7.5 Scenario Comparison

LinkType Base SA 7.5 Base SA 7.5 Base SA 7.5 Base SA 7.5

1 178 92 87.09 42.44 140.95 64.84 2,420 1,4902 2013 1495 1327.39 1025.35 3592.97 2771.98 116,589 119,3473 829 709 432.15 391.64 862.36 785.79 11,951 19,8204 6931 6857 4426.28 4385.49 5304.06 5250.76 17,156 59,0945 1852 1489 528.13 415.67 567 442.64 8,632 11,3536 4892 4892 1921.57 1921.57 5764.65 5764.65 5,385 5,3857 9741 9595 4680.06 4613.54 8113.71 7983.87 59,894 147,6718 78 47 29.89 18.24 31.09 19.44 485 4199 8 8 3.99 3.99 11.97 11.97 3,389 9,195

Total 26522 25184 13436.5 12817.9 24388.8 23095.9 225,901 373,774

No. of Links Link Length(mi) Lane Length Vehicle Hours

Januray 25, 2001 2001 PEER Annual Meeting

Page 12: P Seismic Risk Model for a Designated E Highway System E Rapps.peer.berkeley.edu/events/annual_meeting/2001annualmtg/... · Seismic Risk Model for a Designated Highway System Anne

1990 Base & San Andreas 7.5 Scenario Comparison(Continued)

LinkType Base SA 7.5 Base SA 7.5 Base SA 7.5 Base SA 7.5

1 103,774 56,683 43 38 1192 1336 7719 99232 4,740,782 3,043,641 41 26 3572 2968 11266 145423 538,111 722,303 45 36 1245 1844 4555 71924 458,204 1,032,831 27 17 104 236 3438 41735 234,930 201,356 27 18 445 484 4362 61996 537,591 537,163 100 100 280 280 6897 94637 1,779,913 3,229,454 30 22 380 700 4344 65778 11,718 6,758 24 16 392 370 1869 18069 44,576 56,282 13 6 11172 14106 11174 14433

Total 8,449,598 8,886,470 37 24 629 693 11266 14542

Vehicle Miles Average Speed Average Volumes Max Volumes

Januray 25, 2001 2001 PEER Annual Meeting

Page 13: P Seismic Risk Model for a Designated E Highway System E Rapps.peer.berkeley.edu/events/annual_meeting/2001annualmtg/... · Seismic Risk Model for a Designated Highway System Anne

Vehicle Hours Comparison

0

50000

100000

150000

200000

250000

300000

350000

400000

Frwy t

o Frw

y Ram

p

Frwy

Exprw

y

Collec

tor

On&Off R

amp

Centro

id Con

necto

r

Majo

r Roa

d

Met

er R

amp

Specia

l

Total

Facility Type

Ho

urs 1990 Base

San Andreas7.5 Scenario

Januray 25, 2001 2001 PEER Annual Meeting

Page 14: P Seismic Risk Model for a Designated E Highway System E Rapps.peer.berkeley.edu/events/annual_meeting/2001annualmtg/... · Seismic Risk Model for a Designated Highway System Anne

161%

225%

39%

44%

51%

Januray 25, 2001 2001 PEER Annual Meeting

San Andreas 7.5 Bridge Damage States

Page 15: P Seismic Risk Model for a Designated E Highway System E Rapps.peer.berkeley.edu/events/annual_meeting/2001annualmtg/... · Seismic Risk Model for a Designated Highway System Anne

Hayward 7.0 Damage Distribution

2

34 5

1

Hayward 7.5 Damage Distribution

1

2

3

4 5

San Andreas 7.5 Damage Distribution

12

34 5

San Andreas 8.0 Damage Distribution

1

2

3

4 5

Proportion of 2,640 Bridges in each Damage State by Scenario

Januray 25, 2001 2001 PEER Annual Meeting

Page 16: P Seismic Risk Model for a Designated E Highway System E Rapps.peer.berkeley.edu/events/annual_meeting/2001annualmtg/... · Seismic Risk Model for a Designated Highway System Anne

Damage SummaryDamage Summary

593550215closed

201110182914closed

4132492802213closed

6346587785852

13341589135017321

San Andreas 8.0# of bridges

San Andreas7.5# of bridges

Hayward 7.5# of bridges

Hayward 7.0# of bridges

Damage State

Januray 25, 2001 2001 PEER Annual Meeting

Page 17: P Seismic Risk Model for a Designated E Highway System E Rapps.peer.berkeley.edu/events/annual_meeting/2001annualmtg/... · Seismic Risk Model for a Designated Highway System Anne

Januray 25, 2001 2001 PEER Annual Meeting

Closed Freeway Segments, BDI Closed Freeway Segments, BDI >> 0.75, Maximum of 0.75, Maximum of200 Simulations200 Simulations

Page 18: P Seismic Risk Model for a Designated E Highway System E Rapps.peer.berkeley.edu/events/annual_meeting/2001annualmtg/... · Seismic Risk Model for a Designated Highway System Anne

Januray 25, 2001 2001 PEER Annual Meeting

NONSTRUCTURAL(DIRECT, INDIRECT, INDUCED)NONSTRUCTURAL(DIRECT, INDIRECT, INDUCED)ECONOMIC LOSSES AND CHANGES IN TRANS-ECONOMIC LOSSES AND CHANGES IN TRANS-

PORTATION COST, BRIDGE CLOSURE CRITERIAPORTATION COST, BRIDGE CLOSURE CRITERIAOF BDI > 0.75, MAXIMUM OF 200 SIMULATIONSOF BDI > 0.75, MAXIMUM OF 200 SIMULATIONS

Thousands of $

129,000 to 345,000 (85 zones)61,000 to 129,000 (195 zones)32,000 to 61,000 (290 zones)14,000 to 32,000 (478 zones)

0 to 14,000 (479 zones)

Page 19: P Seismic Risk Model for a Designated E Highway System E Rapps.peer.berkeley.edu/events/annual_meeting/2001annualmtg/... · Seismic Risk Model for a Designated Highway System Anne

Januray 25, 2001 2001 PEER Annual Meeting

Closed Freeway Segments, BDI Closed Freeway Segments, BDI >> 0.75, Median of 200 0.75, Median of 200SimulationsSimulations