ebusiness suite 1 jeannie dobney oracle project management for users of project costing...

Upload: happy-deal

Post on 07-Mar-2016

6 views

Category:

Documents


0 download

DESCRIPTION

Ebusiness Suite 1 Jeannie Dobney Oracle Project Management for Users of Project Costing Billing

TRANSCRIPT

  • The most comprehensive Oracle applications & technology content under one roofThe most comprehensive Oracle applications & technology content under one roof

    Oracle Project Management for Users of Project Costing / Billing

    Jeannie Dobney andLoretta Bayliss Prescience Technology

    (updated paper available from jdobney.com)

  • The most comprehensive Oracle applications & technology content under one roof

    Objectives

    This paper asks and attempts to answer:

    If you already use Oracle Project Costing and Billing, what value does Oracle Project Management add?

    Are the HTML pages just another way of looking at the same data?

    With the authors thanks to the Ipswich City Council support team for the questions above.

    Voltaire: Judge of a man by his questions rather than by his answers.

  • The most comprehensive Oracle applications & technology content under one roof

    Agenda

    Brief history of the Oracle Projects Suite

    The value Oracle Project Management proposition

    Implications of the introduction of Oracle Project Management

    Overview of some of the available similar functionality (including gotchas and irritations)

  • The most comprehensive Oracle applications & technology content under one roof

    First, a little history

    Once upon a time Oracle released the Project Accounting application c.1993

    Included the functionality we now know as Project Foundation and Project Costing - with Billing added soon

    Those were the dim, dark ages of character based Apps, -although Projects was converted to GUI Forms fairly quickly so most early Projects adopters recall it as a purely Forms based product

    Projects introduced the HTML interface when the Oracle Projects Suite was introduced (c.2005)

    So just a short digression about user interfaces

  • The most comprehensive Oracle applications & technology content under one roof

    Oracle Projects chronology

    Oracle Projects suite milestones

    1996

    2000

    20022003 2003

    2004

    2005

    1995

    1994

    1996

    1998

    2000

    2002

    2004

    2006

    Project

    Costing

    Project

    Billing

    Project

    Foundation

    Project

    Resource

    Managem

    ent

    Project

    Managem

    ent

    Project

    Collaboration

    Project

    Intelligence

    Project

    Portfolio

    Planning

    Original Release Date

    Slide is reproduced from http://www.cronininc.com

  • The most comprehensive Oracle applications & technology content under one roof

    Character Based Apps

    Note that this screen is from Oracle Cost Management, not Project Accounting

  • The most comprehensive Oracle applications & technology content under one roof

    GUI Forms Interface

    Also known as the Professional User interface

  • The most comprehensive Oracle applications & technology content under one roof

    HTML Interface

    Also known as the Applications Framework Interface

  • The most comprehensive Oracle applications & technology content under one roof

    Oracle Projects Apps Interfaces Some modules are primarily designed for

    HTML others for Forms

    Slide is from Oracle Projects Suite- Security Options by Timothy Cronin

  • The most comprehensive Oracle applications & technology content under one roof

    Projects HTML vs.. Forms Selected functionality by HTML or Forms

    Slide is from Oracle Projects Suite- Security Options by Timothy Cronin

  • The most comprehensive Oracle applications & technology content under one roof

    So.The initial answer to the HTML Pages question is:

    They were created to support the expanded Oracle Projects Suite.

    You must use the HTML pages if you wish to use specialised functionality such as that available through Project Resource Management

    For most of us Oracle Project Management may be the most relevant new Application and coincidentally has led to some of the most obvious parallel and shared functionality

  • The most comprehensive Oracle applications & technology content under one roof

    Oracle Project Management Some of the apparently similar functionality

    was introduced to support Oracle Project Management, for example:

    So lets look at the value proposition for using Oracle Project Management first and then return to specific (shared) HTML functionality

    Forms HTML

    Budgets Financial Plans

    Project Status Inquiry Project Performance Reporting

    Resource Lists Planning Resource Lists & Resource Breakdown Structures

  • The most comprehensive Oracle applications & technology content under one roof

    The Project Managers Tools (prior to Oracle Project Management )

    Information Requirement

    Cost Vs. Budget

    Work schedule (Gantt chart)

    Risk management

    Issue management

    Stakeholder comms

    Deliverables

    Change Requests

    Status Reporting

    Software / Tool (examples)

    Oracle Project Costing

    MS Projects or Primavera

    Document

    Spread sheet

    Email

    Intranet (for storage etc.)

    Document

    Assembled laboriously from all of the above

  • The most comprehensive Oracle applications & technology content under one roof

    Imagine a Solution. Develop your work schedule in MS Projects

    Import it into Oracle Projects to generate a budget from the work plan based on rates stored in Oracle

    Link changes in complex work plans to integrated (simpler) financial plans (i.e. update once and replicated across systems in background)

    Link the budget variation process into new budget versions

    Publish updates automatically to the teams homepages (no more ignored emails or use of out-dated plan versions)

    Tailor those team home pages to focus on key data and automate the display of current tasks

    Store issue lists in the same place and add the ability to assign and track actions for them

    Workflow supported and semi-automated production and publication of project status reports from this integrated project data

  • The most comprehensive Oracle applications & technology content under one roof

    A Day in the Life of the PM The Project Status Report is due...

    Is the project within budget? What is the progress against schedule? What risks does the project face? What is the status of logged issues? What is the status of change requests? Where can deliverable documents be accessed for review? Where are other project documents stored?

    (Project Management Plan etc.)

    Oracle Projects can provide a repository of all this information and semi-automate the production of status reports if required.

  • The most comprehensive Oracle applications & technology content under one roof

    A Day in the Life of the PM, cont... Time for a project team meeting, need to:

    Review the schedule for upcoming milestones etc. Focus the team on those upcoming tasks Identify any roadblocks, tasks which have not been completed Review progress on issues assigned to the team Gather input about potential risks etc.

    Oracle Projects can provide: A team member home page which pushes specifically relevant

    upcoming tasks (and actions required for issue resolution) to each team member

    Allow decentralised updating of issues assigned to team members

    Allow decentralised percentage complete entry for tasks

  • The most comprehensive Oracle applications & technology content under one roof

    Checklist for an Integrated PM Solution Workplans / progress tracking

    Cost against budget tracking

    Status reporting (multiple audiences?):detail and / or traffic light status

    Sharing / repository of deliverables

    Repository of other project documentation

    Issue tracking

    Risk Register ?

    Change Requests / Orders

    Stakeholder communications (push / pull?)

    Team member home page / communication method

  • The most comprehensive Oracle applications & technology content under one roof

    Oracle Project ManagementAvailable functionality includes: Parallel integrated WBS structures

    i.e. Workplan, Financial (and Deliverables) Integration with Project Management tools such as MS Projects and

    PrimaVera Budget generation from work-plans Configurable HTML pages for reporting and project communication

    (using page layout functionality and Framework personalisations) Includes performance and exception reporting (incl. traffic lights) Attachment functionality for storage of project documents Sophisticated access control by project role Progress reporting: Workflow supported and semi-automated

    production of project status reports Change orders that can be linked to budget changes Issue lists etc.

  • The most comprehensive Oracle applications & technology content under one roof

    A Quick Tour of Oracle Project Management

    Gantt Chart / work plans

    Cost against budget tracking

    Status reporting

    Repository of project documents

    Issue tracking and change orders

    Team member and stakeholder communication

  • The most comprehensive Oracle applications & technology content under one roof

    Workplans Gantt Chart View

  • The most comprehensive Oracle applications & technology content under one roof

    Workplans Dependencies

  • The most comprehensive Oracle applications & technology content under one roof

    Workplans Resource Assignment

  • The most comprehensive Oracle applications & technology content under one roof

    Integration: Oracle Proj Mgmt and Schedule Management Software

  • The most comprehensive Oracle applications & technology content under one roof

    Structure Mapping

    Workplans may be integrated with specialised project management tools e.g. MS projects. (If you do not use workplans, some HTML page functionality may not be applicable e.g. Earned Value Management)

  • The most comprehensive Oracle applications & technology content under one roof

    Project Performance Reporting Uses the same basic cost data as the project

    status inquiry (PSI) window, however

    It includes:

    Periodic and QTD display

    An ability to report in multiple currencies or calendars useful for multi-nationals

    It also displays earned value analysis and progress against plan in effort terms

    Users can personalise their own views

    Requires additional update processes

  • The most comprehensive Oracle applications & technology content under one roof

    Analysis of Costs by Task

  • The most comprehensive Oracle applications & technology content under one roof

    Analysis of Cost by Resource

  • The most comprehensive Oracle applications & technology content under one roof

    Budgeting and Forecasting

  • The most comprehensive Oracle applications & technology content under one roof

    Standard Earned Value Reporting

  • The most comprehensive Oracle applications & technology content under one roof

    Earned Value Management (EVM) A key advantage of combining work tracking

    and cost tracking in one system is the ability to do EVM reporting

    EVM is a project management practice that integrates: Schedule Scope Cost

    EVM measures the value of work performedFrom an Open World Presentation:

    Oracle Project & Portfolio Management for DoD Earned Value Compliance

  • The most comprehensive Oracle applications & technology content under one roof

    Task One 80%

    Task Two 24%

    Task Three 50%

    Task One 80%

    Task Two 24%

    Task Three 50%

    Create Status Reports

    Different reports for different

    audiences

    Automatic reminders for due reports

    Existing project info automatically

    included

    Exec. summary with status indicator

    Enter additional textual details

    Publish Status Report

    Send to stakeholders

    Online or email access

    Track history

    Project

    Customer

    Management

    Team

    Project

    Task One 80%

    Task Two 24%

    Task Three 50%

    Project

    Oracle Status Reporting

    These slides from Carl Morleys OpenWorld 2010 presentation

  • The most comprehensive Oracle applications & technology content under one roof

    Attachments (Project Documentation Repository)

  • The most comprehensive Oracle applications & technology content under one roof

    Issue Lists and Change Control

  • The most comprehensive Oracle applications & technology content under one roof

    Team Member Home Page

    Slide is from a 2004 Oracle presentation

  • The most comprehensive Oracle applications & technology content under one roof

    Project List View

  • The most comprehensive Oracle applications & technology content under one roof

    Exceptions

    Exception Reporting - KPIs

    Financial

    Schedule

    Execute

    Single Project Status

    Overall Project Status

    Key Performance AreasException

    Cost Variance %

    Cost Variance %

    10 % and more

    0 to 10%

    -1% and less

  • The most comprehensive Oracle applications & technology content under one roof

    So Why Would You Not Use It? Does it fit with your organisations project management (PMO)

    practice and project development process?

    What are the preferred tools already in use by your PMO, e.g. substantial investment in the use of an Intranet?

    Whos running the implementation and can they sell an integrated business process to the PMO?

    How much of your project management work is outsourced and what impact will that have?

    How do contractors fit in your project process (Oracle Projects supports them but will your IT and HR department?)

    Have you factored in the system maintenance and training required for another software tool?

  • The most comprehensive Oracle applications & technology content under one roof

    So Some functionality is new and unique to the

    HTML pages and may offer value to existing users

    However, this powerful functionality involves complexity and there are some gotchas and annoyances

    Oracle Implementation and User Guides, dont make a clear distinction between features and functions available and usable in Forms vs. HTML

  • The most comprehensive Oracle applications & technology content under one roof

    The Same or Similar Some functionality may be used in either

    Forms or HTML, e.g. project definition

    Existing users of Project Costing are probably licensed to use this type of functionality (cfMOS # 815154.1 and similar notes)

    Some Billing and Capital project functionality only exists in Forms

    HTML Dates may default in non-intuitive ways to Forms users (refer MOS # 361507.1)

  • The most comprehensive Oracle applications & technology content under one roof

    Different Name, Same Feature Customers and Contacts in Forms is the same as

    Billing Accounts in HTML pages

    Key Members in Forms is the same as Team Members in HTML pages

    DFF defined at Project-level in Forms displays in the Other Information section of Additional Information in HTML pages

    DFF defined at Financial Task-level in Forms displays in the Other Task Information section of HTML pages

  • The most comprehensive Oracle applications & technology content under one roof

    User Defined Attributes (UDAs)

    UDAs like context sensitive descriptive flexfields (DFFs) that are only accessible from the HTML-based application pages

    DFFs may be visible in both interfaces

    Both may require custom reporting

    Data from both can be used for AutoAccounting, Account Generation and Subledger Accounting (R12)

  • The most comprehensive Oracle applications & technology content under one roof

    User Defined Attributes: Complete Solution

    User Defined Attributes appear for projects and tasks based on the

    context and the level

    Context Data Level Usage

    Project Type Project

    and/or Task

    Enable a set of attributes based on

    a specific project type

    Class

    Category

    Project

    and/or Task

    Enable a set of attributes based on

    a specific project class category

    Class Code Project

    and/or Task

    Enable a set of attributes based on

    a specific project class code

    Task Type Task Enable a set of attributes based on

    a specific task type

    UDA slides are from a presentation by Carl Morley at Oracle OpenWorld 2010

  • The most comprehensive Oracle applications & technology content under one roof

    Budgets Vs. Financial Plans New HTML Plan Types introduced in 2005

    Existing Budget Types convertible during upgrade

    Enhanced budgeting unique to HTML pages:

    Excel data input (via webADI) is standard functionality

    Budget amounts may be generated from work plans using planning rates

    Initial Forecast version created from original budget and then generated from actuals etc.. using ETC methods

    Different implementation path to use Budgetary Control and/or Budget Integration (Forms budgets)

    New HTML Plan types are not compatible with Budgetary Control and Budget Integration functionality

  • The most comprehensive Oracle applications & technology content under one roof

    Forms Budgets vs. HTML Financial Plans

    A key implementation decision

    Conceptually the same however quite different system functionality:

    Do you need Budgetary Control / Integration? (If so, use Forms Budgets)

    Will you integrate workplans and use EVA? (Use HTML)

    HTML Financial Plans have standard Excel integration (webADI), however, More4Apps provides the same functionality for Forms (if this is the only drawcard)

  • The most comprehensive Oracle applications & technology content under one roof

    Resource Lists

    Forms Budgets use Resource Lists for budgeting and reporting

    HTML Financial Plans use Planning Resource Lists for budgeting and Resource Breakdown Structures for reporting

    Also note: PSI implications (MOS # 405219.1)

    Interface Budgeting Reporting

    Forms Resource Lists Resource Lists

    HTML Planning Resource Lists Resource Breakdown Structure

  • The most comprehensive Oracle applications & technology content under one roof

    Resource Lists

    An upgrade process is available

    After running UPG: Upgrade Resource Lists to Planning Resource Lists process:

    Subsequent changes are propagated from the original Resource List to the upgraded Planning Resource List (but not the RBS)

  • The most comprehensive Oracle applications & technology content under one roof

    HTML Project Home Page

  • The most comprehensive Oracle applications & technology content under one roof

    Conclusions

  • The most comprehensive Oracle applications & technology content under one roofThe most comprehensive Oracle applications & technology content under one roof

    Oracle Project Managementfor Users of Project Costing / Billing

    Loretta Bayliss

    Managing Director, Prescience TechnologyVice-President, AUSOUG (Qld)

    www.prescience.com.au

  • The most comprehensive Oracle applications & technology content under one roof

    Agenda

    A Users Perspective

  • The most comprehensive Oracle applications & technology content under one roof

    Oracle PjM

    Lorettas tools of choice include:

    Oracle PjM

    Microsoft Project Server

    Primavera EPPM

    Order of the day is largely defined by client requirements and corporate PMO mandates.

    Is it my tool of choice?

  • The most comprehensive Oracle applications & technology content under one roof

    Oracle PjM

    Narrowing it down further:

    Oracle PjM

    Microsoft Project Server

    Primavera EPPM

    This combination does have the potential to provide a true enterprise platform.

    Is it my tool of choice?

  • The most comprehensive Oracle applications & technology content under one roof

    Words of (?) Wisdom

    Do not expect a miracle, or a golden goose Either from Oracle PjM or Primavera

    Understand the impacts on/from other Oracle modules Oracle PjM does not operate in isolation

    Plan for and build up to the change an enterprise model is not achieved overnight

    Use all of the tools/reports at your disposal until the enterprise model is sufficiently robust to support project, program & portfolio Costing, Billing, AP, PO, AR, OTL can all add value

    System and Process

  • The most comprehensive Oracle applications & technology content under one roof

    Questions & Comments

  • The most comprehensive Oracle applications & technology content under one roof

    From the coal face

    Prescience Technology is on our Oracle E-Business services supplier panel. They are a

    niche player who know the area in which they operate. They have a good knowledge of the product and the market; access to skilled resources; and a good understanding of the requirements, especially if a problem is a bit more

    difficult. They apply their expertise and do the analysis, without trying to run too fast.

    My experience with Prescience Technology over the past four years gives me the absolute confidence to recommend them for Oracle related projects and support.

    Prescience demonstrates professionalism and maturity and is committed to working closely with us to deliver clear value for money and outcomes that either meet or exceed Tourism Australias expectations, every time.

    Hein Bouman, Information Systems Manager, Tourism Australia