SLOPEIntegrated proceSsing and controL systems fOr sustainable forest Production in mountain arEas
Kick-off Meeting 8-9/jan/2014
WORK PACKAGE 6: SYSTEM INTEGRATION
FONDAZIONE GRAPHITECH
THEME:
Integrated processing and Control Systems for
Sustainable Production in Farms and Forests
Duration: 36 Months
Partners: 10
Coordinating institution: Fondazione Graphitech
Coordinator: Dr. Raffaele De Amicis
Kick-off Meeting 8-9/jan/2014
Agenda
• Work Package Goals
• Tasks Overview
• Timeline
• Deliverables
• Task Details
• Risks and Mitigation Actions
• Open Discussion
Kick-off Meeting 8-9/jan/2014
Work Package Goals
“Achieve a complete integration of the different components that are part of the SLOPE platform”
WP6 Integration (All Partners)
WP 2 ComponentsForest information
collection and analysisCOA,FLY,GT,ITE,TRE
WP 3 ComponentsIntegration of novel
intelligent harvesting systemsCNR, GRE,KES,ITE,MHG
WP 5 ComponentsForest information
system developmentCNR,TRE,BO
SLOPE PLATFORM
Kick-off Meeting 8-9/jan/2014
Work Package Goals
• Build a WORKING System • Ready for pilots and on the field testing• 3 integration steps
• 3 main tasks (T.6.2,T.6.3,T.6.4)
• Technical and Economical Analysis • Overall solution costs• Social impacts• Environmental impacts
T.6.2
T.6.3
T.6.4
Kick-off Meeting 8-9/jan/2014
Tasks and Roles
• T.6.1 Definition of integration Steps
• Task leader: GRAPHITECH; Participants: KESLA, MHG, FLY, ITENE
• T.6.2 First Integration - Forest inventory & harvesting systems
• Task leader: GRAPHITECH; Participants: KESLA, MHG, FLY, GRE, TRE, ITENE
• T.6.3 Second integration – Forest management
• Task leader: MHG; Participants: CNR, BOKU, GRE, TRE, ITENE
• T.6.4 – Third integration - System validation
• Task leader: GRAPHITECH; Participants: KESLA, MHG, BOKU, FLY, GRE, TRE, ITENE
• T.6.5 – Scientific Coordination
• Task leader: GRAPHITECH;
Kick-off Meeting 8-9/jan/2014
Timeline
2014 2015 2016
G F M A M J J A S O N D G F M A M J J A S O N D G F M A M J J A S O N D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration – Forest inventory & harvesting systems
T.6.3 Second integration – Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
Kick-off Meeting 8-9/jan/2014
Timeline & Deliverables
2014 2015 2016
G F M A M J J A S O N D G F M A M J J A S O N D G F M A M J J A S O N D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration – Forest inventory & harvesting systems
T.6.3 Second integration – Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
D.6.01 System Integration and Validation Plan
D.6.021 System Integration Report ID.6.041 SLOPE System Techno-Economic Evaluation Report I
D.6.022 System Integration Report IID.6.042 SLOPE System Techno-Economic Evaluation Report II
D.6.03 SLOPE System Field Trials Readiness Assessment Report
D.6.023 System Integration Report IIID.6.043 SLOPE System Techno-Economic Evaluation Report III
Kick-off Meeting 8-9/jan/2014
Timeline & Deliverable & Milestone
2014 2015 2016
G F M A M J J A S O N D G F M A M J J A S O N D G F M A M J J A S O N D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration – Forest inventory & harvesting systems
T.6.3 Second integration – Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
D.6.01 System Integration and Validation Plan
D.6.021 System Integration Report ID.6.041 SLOPE System Techno-Economic Evaluation Report I
D.6.022 System Integration Report IID.6.042 SLOPE System Techno-Economic Evaluation Report II
D.6.023 System Integration Report IIID.6.043 SLOPE System Techno-Economic Evaluation Report III
MS04 SLOPE System Integration Planning is completed
MS05 Forest Inventory and Intelligent Harvesting system integration
MS07 Forest Management system integrated
MS09 System testing ending
D.6.03 SLOPE System Field Trials Readiness Assessment Report
Kick-off Meeting 8-9/jan/2014
Timeline & Deliverable & Milestone & Project Meetings
2014 2015 2016
G F M A M J J A S O N D G F M A M J J A S O N D G F M A M J J A S O N D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration – Forest inventory & harvesting systems
T.6.3 Second integration – Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
D.6.01 System Integration and Validation Plan
D.6.021 System Integration Report ID.6.041 SLOPE System Techno-Economic Evaluation Report I
D.6.022 System Integration Report IID.6.042 SLOPE System Techno-Economic Evaluation Report II
D.6.023 System Integration Report IIID.6.043 SLOPE System Techno-Economic Evaluation Report III
MS04 SLOPE System Integration Planning is completed
MS05 Forest Inventory and Intelligent Harvesting system integration
MS07 Forest Management system integrated
MS09 System testing ending
D.6.03 SLOPE System Field Trials Readiness Assessment Report
Kick-off Meeting 8-9/jan/2014
Deliverables
• D. 6.01 System Integration and Validation Plan• Integration and validation procedures and timeline to validate the SLOPE system• Based on the use cases in WP1
• D.6.03 SLOPE System Field Trials Readiness Assessment Report• Assessment of the initial user experience and recommendations for the field trials
operations. • Guidance and system operation manual for the Field Trials operators
Kick-off Meeting 8-9/jan/2014
Deliverables
• D. 6.021 System Integration Report I: • Integration test and validation concept procedures results • Assessment of the initial user experience• Recommendations for field trials operations
• D 6.022 System Integration Report II: • Integration test and validation concept procedures results (rev. 2)• Assessment of the initial user experience (rev. 2)• Recommendations for field trials operations (rev. 2)
• D 6.023 System Integration Report III: • Integration test and validation concept procedures results (rev. 3)• Assessment of the initial user experience (rev. 3)• Recommendations for field trials operations (rev. 3)
Kick-off Meeting 8-9/jan/2014
Deliverables
• D6.041 SLOPE System Techno-Economic Evaluation Report I: • Analysis of technical and economical aspects of SLOPE system • Current practices and the potential known alternatives comparison• Estimation phase
• D6.042 SLOPE System Techno-Economic Evaluation Report II: • Analysis of technical and economical aspects of SLOPE system • Current practices and the potential known alternatives comparison• Preliminary results phase
• D6.043 SLOPE System Techno-Economic Evaluation Report III: • Analysis of technical and economical aspects of SLOPE system • Current practices and the potential known alternatives comparison• Final results phase
Kick-off Meeting 8-9/jan/2014
Risks
• Data Formats• DB Model• Reduce Harmonization/adaptation• Images
• Unreliable Services• Hardware interfaces with software
• Rfid• BT
• Unability to reproduce plannedtest field/conditions
• Component testing takes time!
Kick-off Meeting 8-9/jan/2014
Mitigating Actions
• Exhaustive System Architecture• Exhaustive requirement analysis• Common data model (T.1.4)• Communication
• Skype (Small Group, no desktop sharing)• Webex (up to 25 persons with desktop sharing)
Kick-off Meeting 8-9/jan/2014
Contacts
CoordinationDr. Raffaele De Amicis
Technical & Scientific CoordinationDr. Federico Prandi
Technical DevelopmentGiulio Panizzoni, Federico Devigili, Daniele Magliocchetti
Project Administration (financial reporting included)Camilla Saiani, Letizia Santato
Kick-off Meeting 8-9/jan/2014
Open Discussion
Kick-off Meeting 8-9/jan/2014
Thank you for your attention
DANIELE MAGLIOCCHETTI
Fondazione GraphitechVia Alla Cascata 56C38123 Trento (ITALY)
Phone: +39 0461.283395Fax: +39 0461.283398
Kick-off Meeting 8-9/jan/2014
Task 6.5
Scientific Coordination• Leader: Graphitech
Objectives• Technical supervision of technology functionalities as planned• Management of issues related to Software licenses and/or required hardware• Quality Assurance and assessment/evaluation of technology results• Regular reporting of the technical development of the project