wp6 presentation by graphitech

18
SLOPE Integrated proceSsing and controL systems fOr sustainable forest Production in mountain arEas Kick-off Meeting 8-9/jan/2014 WORK P ACKAGE 6: SYSTEM INTEGRATION FONDAZIONE GRAPHITECH THEME: Integrated processing and Control Systems for Sustainable Production in Farms and Forests Duration: 36 Months Partners: 10 Coordinating institution: Fondazione Graphitech Coordinator: Dr. Raffaele De Amicis

Upload: slope-project

Post on 04-Jul-2015

206 views

Category:

Technology


2 download

TRANSCRIPT

Page 1: Wp6 presentation by graphitech

SLOPEIntegrated proceSsing and controL systems fOr sustainable forest Production in mountain arEas

Kick-off Meeting 8-9/jan/2014

WORK PACKAGE 6: SYSTEM INTEGRATION

FONDAZIONE GRAPHITECH

THEME:

Integrated processing and Control Systems for

Sustainable Production in Farms and Forests

Duration: 36 Months

Partners: 10

Coordinating institution: Fondazione Graphitech

Coordinator: Dr. Raffaele De Amicis

Page 2: Wp6 presentation by graphitech

Kick-off Meeting 8-9/jan/2014

Agenda

• Work Package Goals

• Tasks Overview

• Timeline

• Deliverables

• Task Details

• Risks and Mitigation Actions

• Open Discussion

Page 3: Wp6 presentation by graphitech

Kick-off Meeting 8-9/jan/2014

Work Package Goals

“Achieve a complete integration of the different components that are part of the SLOPE platform”

WP6 Integration (All Partners)

WP 2 ComponentsForest information

collection and analysisCOA,FLY,GT,ITE,TRE

WP 3 ComponentsIntegration of novel

intelligent harvesting systemsCNR, GRE,KES,ITE,MHG

WP 5 ComponentsForest information

system developmentCNR,TRE,BO

SLOPE PLATFORM

Page 4: Wp6 presentation by graphitech

Kick-off Meeting 8-9/jan/2014

Work Package Goals

• Build a WORKING System • Ready for pilots and on the field testing• 3 integration steps

• 3 main tasks (T.6.2,T.6.3,T.6.4)

• Technical and Economical Analysis • Overall solution costs• Social impacts• Environmental impacts

T.6.2

T.6.3

T.6.4

Page 5: Wp6 presentation by graphitech

Kick-off Meeting 8-9/jan/2014

Tasks and Roles

• T.6.1 Definition of integration Steps

• Task leader: GRAPHITECH; Participants: KESLA, MHG, FLY, ITENE

• T.6.2 First Integration - Forest inventory & harvesting systems

• Task leader: GRAPHITECH; Participants: KESLA, MHG, FLY, GRE, TRE, ITENE

• T.6.3 Second integration – Forest management

• Task leader: MHG; Participants: CNR, BOKU, GRE, TRE, ITENE

• T.6.4 – Third integration - System validation

• Task leader: GRAPHITECH; Participants: KESLA, MHG, BOKU, FLY, GRE, TRE, ITENE

• T.6.5 – Scientific Coordination

• Task leader: GRAPHITECH;

Page 6: Wp6 presentation by graphitech

Kick-off Meeting 8-9/jan/2014

Timeline

2014 2015 2016

G F M A M J J A S O N D G F M A M J J A S O N D G F M A M J J A S O N D

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

WP 6 System Integration

T.6.1 Definition of the integration steps

T.6.2 First Integration – Forest inventory & harvesting systems

T.6.3 Second integration – Forest management

T.6.4 Third integration -System validation

T.6.5 Scientific coordination

Page 7: Wp6 presentation by graphitech

Kick-off Meeting 8-9/jan/2014

Timeline & Deliverables

2014 2015 2016

G F M A M J J A S O N D G F M A M J J A S O N D G F M A M J J A S O N D

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

WP 6 System Integration

T.6.1 Definition of the integration steps

T.6.2 First Integration – Forest inventory & harvesting systems

T.6.3 Second integration – Forest management

T.6.4 Third integration -System validation

T.6.5 Scientific coordination

D.6.01 System Integration and Validation Plan

D.6.021 System Integration Report ID.6.041 SLOPE System Techno-Economic Evaluation Report I

D.6.022 System Integration Report IID.6.042 SLOPE System Techno-Economic Evaluation Report II

D.6.03 SLOPE System Field Trials Readiness Assessment Report

D.6.023 System Integration Report IIID.6.043 SLOPE System Techno-Economic Evaluation Report III

Page 8: Wp6 presentation by graphitech

Kick-off Meeting 8-9/jan/2014

Timeline & Deliverable & Milestone

2014 2015 2016

G F M A M J J A S O N D G F M A M J J A S O N D G F M A M J J A S O N D

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

WP 6 System Integration

T.6.1 Definition of the integration steps

T.6.2 First Integration – Forest inventory & harvesting systems

T.6.3 Second integration – Forest management

T.6.4 Third integration -System validation

T.6.5 Scientific coordination

D.6.01 System Integration and Validation Plan

D.6.021 System Integration Report ID.6.041 SLOPE System Techno-Economic Evaluation Report I

D.6.022 System Integration Report IID.6.042 SLOPE System Techno-Economic Evaluation Report II

D.6.023 System Integration Report IIID.6.043 SLOPE System Techno-Economic Evaluation Report III

MS04 SLOPE System Integration Planning is completed

MS05 Forest Inventory and Intelligent Harvesting system integration

MS07 Forest Management system integrated

MS09 System testing ending

D.6.03 SLOPE System Field Trials Readiness Assessment Report

Page 9: Wp6 presentation by graphitech

Kick-off Meeting 8-9/jan/2014

Timeline & Deliverable & Milestone & Project Meetings

2014 2015 2016

G F M A M J J A S O N D G F M A M J J A S O N D G F M A M J J A S O N D

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

WP 6 System Integration

T.6.1 Definition of the integration steps

T.6.2 First Integration – Forest inventory & harvesting systems

T.6.3 Second integration – Forest management

T.6.4 Third integration -System validation

T.6.5 Scientific coordination

D.6.01 System Integration and Validation Plan

D.6.021 System Integration Report ID.6.041 SLOPE System Techno-Economic Evaluation Report I

D.6.022 System Integration Report IID.6.042 SLOPE System Techno-Economic Evaluation Report II

D.6.023 System Integration Report IIID.6.043 SLOPE System Techno-Economic Evaluation Report III

MS04 SLOPE System Integration Planning is completed

MS05 Forest Inventory and Intelligent Harvesting system integration

MS07 Forest Management system integrated

MS09 System testing ending

D.6.03 SLOPE System Field Trials Readiness Assessment Report

Page 10: Wp6 presentation by graphitech

Kick-off Meeting 8-9/jan/2014

Deliverables

• D. 6.01 System Integration and Validation Plan• Integration and validation procedures and timeline to validate the SLOPE system• Based on the use cases in WP1

• D.6.03 SLOPE System Field Trials Readiness Assessment Report• Assessment of the initial user experience and recommendations for the field trials

operations. • Guidance and system operation manual for the Field Trials operators

Page 11: Wp6 presentation by graphitech

Kick-off Meeting 8-9/jan/2014

Deliverables

• D. 6.021 System Integration Report I: • Integration test and validation concept procedures results • Assessment of the initial user experience• Recommendations for field trials operations

• D 6.022 System Integration Report II: • Integration test and validation concept procedures results (rev. 2)• Assessment of the initial user experience (rev. 2)• Recommendations for field trials operations (rev. 2)

• D 6.023 System Integration Report III: • Integration test and validation concept procedures results (rev. 3)• Assessment of the initial user experience (rev. 3)• Recommendations for field trials operations (rev. 3)

Page 12: Wp6 presentation by graphitech

Kick-off Meeting 8-9/jan/2014

Deliverables

• D6.041 SLOPE System Techno-Economic Evaluation Report I: • Analysis of technical and economical aspects of SLOPE system • Current practices and the potential known alternatives comparison• Estimation phase

• D6.042 SLOPE System Techno-Economic Evaluation Report II: • Analysis of technical and economical aspects of SLOPE system • Current practices and the potential known alternatives comparison• Preliminary results phase

• D6.043 SLOPE System Techno-Economic Evaluation Report III: • Analysis of technical and economical aspects of SLOPE system • Current practices and the potential known alternatives comparison• Final results phase

Page 13: Wp6 presentation by graphitech

Kick-off Meeting 8-9/jan/2014

Risks

• Data Formats• DB Model• Reduce Harmonization/adaptation• Images

• Unreliable Services• Hardware interfaces with software

• Rfid• BT

• Unability to reproduce plannedtest field/conditions

• Component testing takes time!

Page 14: Wp6 presentation by graphitech

Kick-off Meeting 8-9/jan/2014

Mitigating Actions

• Exhaustive System Architecture• Exhaustive requirement analysis• Common data model (T.1.4)• Communication

• Skype (Small Group, no desktop sharing)• Webex (up to 25 persons with desktop sharing)

Page 15: Wp6 presentation by graphitech

Kick-off Meeting 8-9/jan/2014

Contacts

CoordinationDr. Raffaele De Amicis

Technical & Scientific CoordinationDr. Federico Prandi

Technical DevelopmentGiulio Panizzoni, Federico Devigili, Daniele Magliocchetti

Project Administration (financial reporting included)Camilla Saiani, Letizia Santato

Page 16: Wp6 presentation by graphitech

Kick-off Meeting 8-9/jan/2014

Open Discussion

Page 17: Wp6 presentation by graphitech

Kick-off Meeting 8-9/jan/2014

Thank you for your attention

DANIELE MAGLIOCCHETTI

[email protected]

Fondazione GraphitechVia Alla Cascata 56C38123 Trento (ITALY)

Phone: +39 0461.283395Fax: +39 0461.283398

Page 18: Wp6 presentation by graphitech

Kick-off Meeting 8-9/jan/2014

Task 6.5

Scientific Coordination• Leader: Graphitech