  • 1. SLOPE Integrated proceSsing and controL systems fOr sustainable forest Production in mountain arEasWORK PACKAGE 6: SYSTEM INTEGRATION FONDAZIONE GRAPHITECHTHEME: Integrated processing and Control Systems for Sustainable Production in Farms and Forests Duration: 36 Months Partners: 10 Coordinating institution: Fondazione Graphitech Coordinator: Dr. Raffaele De Amicis Kick-off Meeting 8-9/jan/2014

2. Agenda Work Package Goals Tasks Overview Timeline Deliverables Task Details Risks and Mitigation Actions Open DiscussionKick-off Meeting 8-9/jan/2014 3. Work Package Goals Achieve a complete integration of the different components that are part of the SLOPE platform WP 2 ComponentsWP 3 ComponentsWP 5 ComponentsForest information collection and analysis COA,FLY,GT,ITE,TREIntegration of novel intelligent harvesting systems CNR, GRE,KES,ITE,MHGForest information system development CNR,TRE,BOWP6 Integration (All Partners)SLOPE PLATFORM Kick-off Meeting 8-9/jan/2014 4. Work Package Goals Build a WORKING System Ready for pilots and on the field testing 3 integration stepsT.6.2 3 main tasks (T.6.2,T.6.3,T.6.4) Technical and Economical Analysis Overall solution costs Social impacts Environmental impactsT.6.3T.6.4Kick-off Meeting 8-9/jan/2014 5. Tasks and Roles T.6.1 Definition of integration Steps Task leader: GRAPHITECH; Participants: KESLA, MHG, FLY, ITENE T.6.2 First Integration - Forest inventory & harvesting systems Task leader: GRAPHITECH; Participants: KESLA, MHG, FLY, GRE, TRE, ITENE T.6.3 Second integration Forest management Task leader: MHG; Participants: CNR, BOKU, GRE, TRE, ITENE T.6.4 Third integration - System validation Task leader: GRAPHITECH; Participants: KESLA, MHG, BOKU, FLY, GRE, TRE, ITENE T.6.5 Scientific Coordination Task leader: GRAPHITECH;Kick-off Meeting 8-9/jan/2014 6. Timeline 201420152016G F M A M J J A S O N D G F M A M J J A S O N D G F M A M J J A S O N D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 WP 6 System Integration T.6.1 Definition of the integration steps T.6.2 First Integration Forest inventory & harvesting systems T.6.3 Second integration Forest managementT.6.4 Third integration -System validation T.6.5 Scientific coordinationKick-off Meeting 8-9/jan/2014 7. Timeline & Deliverables 201420152016G F M A M J J A S O N D G F M A M J J A S O N D G F M A M J J A S O N D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 WP 6 System Integration T.6.1 Definition of the integration steps T.6.2 First Integration Forest inventory & harvesting systems T.6.3 Second integration Forest managementT.6.4 Third integration -System validation T.6.5 Scientific coordinationD.6.01 System Integration and Validation Plan D.6.021 System Integration Report I D.6.041 SLOPE System Techno-Economic Evaluation Report I D.6.022 System Integration Report II D.6.042 SLOPE System Techno-Economic Evaluation Report II D.6.023 System Integration Report III D.6.043 SLOPE System Techno-Economic Evaluation Report III D.6.03 SLOPE System Field Trials Readiness Assessment ReportKick-off Meeting 8-9/jan/2014 8. Timeline & Deliverable & Milestone 201420152016G F M A M J J A S O N D G F M A M J J A S O N D G F M A M J J A S O N D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 WP 6 System Integration T.6.1 Definition of the integration steps T.6.2 First Integration Forest inventory & harvesting systems T.6.3 Second integration Forest management T.6.4 Third integration -System validation T.6.5 Scientific coordinationD.6.01 System Integration and Validation Plan MS04 SLOPE System Integration Planning is completed D.6.021 System Integration Report I D.6.041 SLOPE System Techno-Economic Evaluation Report I MS05 Forest Inventory and Intelligent Harvesting system integration D.6.022 System Integration Report II D.6.042 SLOPE System Techno-Economic Evaluation Report II MS07 Forest Management system integrated D.6.023 System Integration Report III D.6.043 SLOPE System Techno-Economic Evaluation Report III D.6.03 SLOPE System Field Trials Readiness Assessment Report MS09 System testing ending Kick-off Meeting 8-9/jan/2014 9. Timeline & Deliverable & Milestone & Project Meetings201420152016G F M A M J J A S O N D G F M A M J J A S O N D G F M A M J J A S O N D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 WP 6 System Integration T.6.1 Definition of the integration steps T.6.2 First Integration Forest inventory & harvesting systems T.6.3 Second integration Forest management T.6.4 Third integration -System validation T.6.5 Scientific coordinationD.6.01 System Integration and Validation Plan MS04 SLOPE System Integration Planning is completed D.6.021 System Integration Report I D.6.041 SLOPE System Techno-Economic Evaluation Report I MS05 Forest Inventory and Intelligent Harvesting system integration D.6.022 System Integration Report II D.6.042 SLOPE System Techno-Economic Evaluation Report II MS07 Forest Management system integrated D.6.023 System Integration Report III D.6.043 SLOPE System Techno-Economic Evaluation Report III D.6.03 SLOPE System Field Trials Readiness Assessment Report MS09 System testing ending Kick-off Meeting 8-9/jan/2014 10. Deliverables D. 6.01 System Integration and Validation Plan Integration and validation procedures and timeline to validate the SLOPE system Based on the use cases in WP1 D.6.03 SLOPE System Field Trials Readiness Assessment Report Assessment of the initial user experience and recommendations for the field trials operations. Guidance and system operation manual for the Field Trials operatorsKick-off Meeting 8-9/jan/2014 11. Deliverables D. 6.021 System Integration Report I: Integration test and validation concept procedures results Assessment of the initial user experience Recommendations for field trials operations D 6.022 System Integration Report II: Integration test and validation concept procedures results (rev. 2) Assessment of the initial user experience (rev. 2) Recommendations for field trials operations (rev. 2) D 6.023 System Integration Report III: Integration test and validation concept procedures results (rev. 3) Assessment of the initial user experience (rev. 3) Recommendations for field trials operations (rev. 3)Kick-off Meeting 8-9/jan/2014 12. Deliverables D6.041 SLOPE System Techno-Economic Evaluation Report I: Analysis of technical and economical aspects of SLOPE system Current practices and the potential known alternatives comparison Estimation phase D6.042 SLOPE System Techno-Economic Evaluation Report II: Analysis of technical and economical aspects of SLOPE system Current practices and the potential known alternatives comparison Preliminary results phase D6.043 SLOPE System Techno-Economic Evaluation Report III: Analysis of technical and economical aspects of SLOPE system Current practices and the potential known alternatives comparison Final results phaseKick-off Meeting 8-9/jan/2014 13. Risks Data Formats DB Model Reduce Harmonization/adaptation Images Unreliable Services Hardware interfaces with software Rfid BT Unability to reproduce planned test field/conditions Component testing takes time! Kick-off Meeting 8-9/jan/2014 14. Mitigating Actions Exhaustive System Architecture Exhaustive requirement analysis Common data model (T.1.4) Communication Skype (Small Group, no desktop sharing) Webex (up to 25 persons with desktop sharing)Kick-off Meeting 8-9/jan/2014 15. Contacts Coordination Dr. Raffaele De Amicis Technical & Scientific Coordination Dr. Federico Prandi Technical Development Giulio Panizzoni, Federico Devigili, Daniele Magliocchetti Project Administration (financial reporting included) Camilla Saiani, Letizia SantatoKick-off Meeting 8-9/jan/2014 16. Open DiscussionKick-off Meeting 8-9/jan/2014 17. Thank you for your attention DANIELE MAGLIOCCHETTI daniele.magliocchetti@graphitech.it Fondazione Graphitech Via Alla Cascata 56C 38123 Trento (ITALY) Phone: +39 0461.283395 Fax: +39 0461.283398Kick-off Meeting 8-9/jan/2014 18. Task 6.5 Scientific Coordination Leader: GraphitechObjectives Technical supervision of technology functionalities as planned Management of issues related to Software licenses and/or required hardware Quality Assurance and assessment/evaluation of technology results Regular reporting of the technical development of the projectKick-off Meeting 8-9/jan/2014