  • Project SLOPE1

    WP 6 System integration

  • Technical Meeting 19-21 Jan 16

    Agenda

    Work Package Goals Tasks and Roles Overview Timeline Deliverables Task Details

    Task 6.02 Task 6.03

    Open Discussion

  • Technical Meeting 19-21 Jan 16

    Work Package Key aspects

    T.6.2

    T.6.3

    T.6.4

    Build a working system

    Ready for pilots and on-the-field testing

    3 Main tasks: First Integration - Forest Inventory & Harvesting

    System Second Integration - Forest Management Third Integration System Validation

    Technical and Economical Analysis Overall solution costs Social impacts Environmental impacts

  • Technical Meeting 19-21 Jan 16

    Tasks and Roles

    T.6.1 Definition of integration Steps Task leader: GRAPHITECH; Participants: MHG, FLY, ITENE

    T.6.2 First Integration - Forest inventory & harvesting systems Task leader: GRAPHITECH; Participants: MHG, FLY, GRE, TRE, ITENE, COM, CNR

    T.6.3 Second integration Forest management Task leader: MHG; Participants: CNR, BOKU, GRE, TRE, ITENE

    T.6.4 Third integration - System validation Task leader: GRAPHITECH; Participants: COM, MHG, BOKU, FLY, GRE, TRE, ITENE

    T.6.5 Scientific Coordination Task leader: GRAPHITECH;

  • 2014 2015 2016

    J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

    WP 6 System Integration

    T.6.1 Definition of the integration steps

    T.6.2 First Integration Forest inventory & harvesting systems

    T.6.3 Second integration Forest management

    T.6.4 Third integration -System validation

    T.6.5 Scientific coordination

    Technical Meeting 19-21 Jan 16

    Timeline, Deliverables, Milestone, Project Meetings

    D.6.01 System Integration and Validation Plan

    D.6.021 System Integration Report ID.6.041 SLOPE System Techno-Economic Evaluation Report I

    D.6.022 System Integration Report IID.6.042 SLOPE System Techno-Economic Evaluation Report II

    D.6.023 System Integration Report IIID.6.043 SLOPE System Techno-Economic Evaluation Report III

    MS04 SLOPE System Integration Planning is completed

    MS05 Forest Inventory and Intelligent Harvesting system integration

    MS07 Forest Management system integrated

    MS09 System testing endingD.6.03 SLOPE System Field Trials Readiness Assessment Report

    Technical MeetingsReview MeetingDeliverableMilestone

  • Technical Meeting 19-21 Jan 16

    Deliverables

    D. 6.01 System Integration and Validation Plan (M16) Integration and validation procedures and timeline to validate the SLOPE system Based on the use cases in WP1

    D.6.03 SLOPE System Field Trials Readiness Assessment Report (M36) Assessment of the initial user experience and recommendations for the field trials

    operations. Guidance and system operation manual for the Field Trials operators

  • Technical Meeting 19-21 Jan 16

    Deliverables

    D. 6.021 System Integration Report I (M27): Integration test and validation concept procedures results Assessment of the initial user experience Recommendations for field trials operations

    D 6.022 System Integration Report II (M31): Integration test and validation concept procedures results (rev. 2) Assessment of the initial user experience (rev. 2) Recommendations for field trials operations (rev. 2)

    D 6.023 System Integration Report III (M34): Integration test and validation concept procedures results (rev. 3) Assessment of the initial user experience (rev. 3) Recommendations for field trials operations (rev. 3)

  • Technical Meeting 19-21 Jan 16

    Deliverables

    D6.041 SLOPE System Techno-Economic Evaluation Report I (M27): Analysis of technical and economical aspects of SLOPE system Current practices and the potential known alternatives comparison Estimation phase

    D6.042 SLOPE System Techno-Economic Evaluation Report II (M31): Analysis of technical and economical aspects of SLOPE system Current practices and the potential known alternatives comparison Preliminary results phase

    D6.043 SLOPE System Techno-Economic Evaluation Report III (M34): Analysis of technical and economical aspects of SLOPE system Current practices and the potential known alternatives comparison Final results phase

  • Technical Meeting 19-21 Jan 16

    Deliverables Progress

    100

    20

    0 0 0

    20

    0 00

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    D.6.

    01 S

    yste

    min

    tegr

    atio

    n an

    dva

    lidat

    ion

    plan

    D.6.

    021

    Syst

    emin

    tegr

    atio

    n re

    port

    1

    D.6.

    022

    Syst

    emin

    tegr

    atio

    n re

    port

    2

    D.6.

    023

    Syst

    emin

    tegr

    atio

    n re

    port

    3

    D.6.

    3 Sy

    stem

    fiel

    dtr

    ials

    read

    ines

    sas

    sess

    men

    t rep

    ort

    D.6.

    041

    Tech

    no-

    econ

    omic

    eval

    uatio

    n re

    port

    1

    D.6.

    042

    Tech

    no-

    econ

    omic

    eval

    uatio

    n re

    port

    2

    D.6.

    043

    Tech

    no-

    econ

    omic

    eval

    uatio

    n re

    port

    3

    Deliverables Status

  • Technical Meeting 19-21 Jan 16

    Tasks Overview

  • Technical Meeting 19-21 Jan 16

    Task 6.1 Definition of the integration steps

    Status: Completed (100%) Length: 7 Months (From M10 to M16) 5 Involved Partners

    Leader: GraphiTech Participants: COMPOLAB, MHG, FLY, ITENE

    Aim: Achieve a complete integration of the different components that are part of the SLOPE platform to be tested on pilot areas

    Output: D.6.01 System integration and validation plan

  • Technical Meeting 19-21 Jan 16

    Integration StrategyWaterfall + agile like approach 3 major loops of integration and lab validation 4 minor loops of iterative evolution Bug fixing and integration at high frequency Parallel support for real use case pilots

    T.6.2

    T.6.3

    T.6.4

  • Technical Meeting 19-21 Jan 16

    Integration Strategy - 2

    For each main integration step: Involved components Timeline (integration steps, milestones, telcos, days for testing) One testing scenario Involved actors HW and SW requirements Functional requirements

    defining a function Non-functional requirements

    defining a criteria for an operation Testing approach

  • Technical Meeting 19-21 Jan 16

    Task 6.2 First integration: forest inventory and harvesting systems

    Status: In progress (50%) Length: 14 Months (From M14 to M27) 8 Involved Partners

    Leader: GraphiTech Participants: COMPOLAB, MHG, FLY, GRE, TRE, ITENE, CNR

    Aim: Integration of forest information system (FIS) with harvesting

    measurement systems and software components

    Output: D.6.21 System integration report I D.6.41 SLOPE System Techno-Economic Evaluation Report I

  • Technical Meeting 19-21 Jan 16

    Task 6.2 - Effort GraphiTech

    3D Harvesting planner improvements (alpha 1.2, 1.3 and 1.4) Banana Pro board Integration coordination (Telcos, reports, etc.)

    MHG FIS improvements and adaptations

    TREE Backend development for on field app Upload of trees on the FIS

    ITENE Intelligent truck system finalization

  • Technical Meeting 19-21 Jan 16

    Alpha 1.2 - Features

    Cable crane placement, profiling and animation Multilanguage support (Italian, German, English) 3D moving objects along a path (for real-time

    tracking) Project saving Added Lammertal data Legend associated with cadastral and public data Bug fixes

  • Technical Meeting 19-21 Jan 16

    Alpha 1.3 - Features

    Features: Login/Logout Automatic PDF Report generation Compass New WMS data for Austrian pilot Rope Launcher Easer simulation Added FlyBy Satellite imagery

  • Technical Meeting 19-21 Jan 16

    Video

  • Technical Meeting 19-21 Jan 16

    Alpha 1.4 Upcoming features

    Improved profiling and drawing tools DSM + DTM data from Annaberg test site Multiresolution terrain support Database Trees visualization and spatial queries (TREE) Database Truck visualization (ITENE) Improved cable way visualization Long distance fog (+30% performance) Improved terrain loading times

  • Technical Meeting 19-21 Jan 16

    Alpha 1.5 Planned features

    New rope launcher easer (new requirements from Greifenberg) Point of interest (sawmills, storage areas, etc.) New interface for stand analysis (Virtual tree selection) Tree stand visualization and spatial queries

  • Technical Meeting 19-21 Jan 16

    Task 6.02 Components

  • Technical Meeting 19-21/Jan/2016

    Task 6.02 Timeline

    4 agile-like integration sprints (bimonthly) 2 sprint overlapping with step 2

    1 monitoring meeting every 2 weeks 1 Round of testing at the end of each sprint

    Incremental built of D.6.02.1 Report Incremental build of D.6.04.1

    Only 2 Completed

    Done Only 2 Completed Draft Draft

  • Technical Meeting 19-21 Jan 16

    Task 6.02 Integration Goals

    1. Connection of the 3D modelling for harvesting planning (T.2.4) with the FIS [75%] Some features need to be finalized

    2. Connection of handheld devices (Treemetrics and MHG) with the FIS [70%] Treemetrics field app backend communication to be completed [40%] MHG app development still in progress