Project SLOPE1
WP 6 System integration
Technical Meeting 19-21 Jan 16
Agenda
Work Package Goals Tasks and Roles Overview Timeline Deliverables Task Details
Task 6.02 Task 6.03
Open Discussion
Technical Meeting 19-21 Jan 16
Work Package Key aspects
T.6.2
T.6.3
T.6.4
Build a working system
Ready for pilots and on-the-field testing
3 Main tasks: First Integration - Forest Inventory & Harvesting
System Second Integration - Forest Management Third Integration System Validation
Technical and Economical Analysis Overall solution costs Social impacts Environmental impacts
Technical Meeting 19-21 Jan 16
Tasks and Roles
T.6.1 Definition of integration Steps Task leader: GRAPHITECH; Participants: MHG, FLY, ITENE
T.6.2 First Integration - Forest inventory & harvesting systems Task leader: GRAPHITECH; Participants: MHG, FLY, GRE, TRE, ITENE, COM, CNR
T.6.3 Second integration Forest management Task leader: MHG; Participants: CNR, BOKU, GRE, TRE, ITENE
T.6.4 Third integration - System validation Task leader: GRAPHITECH; Participants: COM, MHG, BOKU, FLY, GRE, TRE, ITENE
T.6.5 Scientific Coordination Task leader: GRAPHITECH;
2014 2015 2016
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP 6 System Integration
T.6.1 Definition of the integration steps
T.6.2 First Integration Forest inventory & harvesting systems
T.6.3 Second integration Forest management
T.6.4 Third integration -System validation
T.6.5 Scientific coordination
Technical Meeting 19-21 Jan 16
Timeline, Deliverables, Milestone, Project Meetings
D.6.01 System Integration and Validation Plan
D.6.021 System Integration Report ID.6.041 SLOPE System Techno-Economic Evaluation Report I
D.6.022 System Integration Report IID.6.042 SLOPE System Techno-Economic Evaluation Report II
D.6.023 System Integration Report IIID.6.043 SLOPE System Techno-Economic Evaluation Report III
MS04 SLOPE System Integration Planning is completed
MS05 Forest Inventory and Intelligent Harvesting system integration
MS07 Forest Management system integrated
MS09 System testing endingD.6.03 SLOPE System Field Trials Readiness Assessment Report
Technical MeetingsReview MeetingDeliverableMilestone
Technical Meeting 19-21 Jan 16
Deliverables
D. 6.01 System Integration and Validation Plan (M16) Integration and validation procedures and timeline to validate the SLOPE system Based on the use cases in WP1
D.6.03 SLOPE System Field Trials Readiness Assessment Report (M36) Assessment of the initial user experience and recommendations for the field trials
operations. Guidance and system operation manual for the Field Trials operators
Technical Meeting 19-21 Jan 16
Deliverables
D. 6.021 System Integration Report I (M27): Integration test and validation concept procedures results Assessment of the initial user experience Recommendations for field trials operations
D 6.022 System Integration Report II (M31): Integration test and validation concept procedures results (rev. 2) Assessment of the initial user experience (rev. 2) Recommendations for field trials operations (rev. 2)
D 6.023 System Integration Report III (M34): Integration test and validation concept procedures results (rev. 3) Assessment of the initial user experience (rev. 3) Recommendations for field trials operations (rev. 3)
Technical Meeting 19-21 Jan 16
Deliverables
D6.041 SLOPE System Techno-Economic Evaluation Report I (M27): Analysis of technical and economical aspects of SLOPE system Current practices and the potential known alternatives comparison Estimation phase
D6.042 SLOPE System Techno-Economic Evaluation Report II (M31): Analysis of technical and economical aspects of SLOPE system Current practices and the potential known alternatives comparison Preliminary results phase
D6.043 SLOPE System Techno-Economic Evaluation Report III (M34): Analysis of technical and economical aspects of SLOPE system Current practices and the potential known alternatives comparison Final results phase
Technical Meeting 19-21 Jan 16
Deliverables Progress
100
20
0 0 0
20
0 00
10
20
30
40
50
60
70
80
90
100
D.6.
01 S
yste
min
tegr
atio
n an
dva
lidat
ion
plan
D.6.
021
Syst
emin
tegr
atio
n re
port
1
D.6.
022
Syst
emin
tegr
atio
n re
port
2
D.6.
023
Syst
emin
tegr
atio
n re
port
3
D.6.
3 Sy
stem
fiel
dtr
ials
read
ines
sas
sess
men
t rep
ort
D.6.
041
Tech
no-
econ
omic
eval
uatio
n re
port
1
D.6.
042
Tech
no-
econ
omic
eval
uatio
n re
port
2
D.6.
043
Tech
no-
econ
omic
eval
uatio
n re
port
3
Deliverables Status
Technical Meeting 19-21 Jan 16
Tasks Overview
Technical Meeting 19-21 Jan 16
Task 6.1 Definition of the integration steps
Status: Completed (100%) Length: 7 Months (From M10 to M16) 5 Involved Partners
Leader: GraphiTech Participants: COMPOLAB, MHG, FLY, ITENE
Aim: Achieve a complete integration of the different components that are part of the SLOPE platform to be tested on pilot areas
Output: D.6.01 System integration and validation plan
Technical Meeting 19-21 Jan 16
Integration StrategyWaterfall + agile like approach 3 major loops of integration and lab validation 4 minor loops of iterative evolution Bug fixing and integration at high frequency Parallel support for real use case pilots
T.6.2
T.6.3
T.6.4
Technical Meeting 19-21 Jan 16
Integration Strategy - 2
For each main integration step: Involved components Timeline (integration steps, milestones, telcos, days for testing) One testing scenario Involved actors HW and SW requirements Functional requirements
defining a function Non-functional requirements
defining a criteria for an operation Testing approach
Technical Meeting 19-21 Jan 16
Task 6.2 First integration: forest inventory and harvesting systems
Status: In progress (50%) Length: 14 Months (From M14 to M27) 8 Involved Partners
Leader: GraphiTech Participants: COMPOLAB, MHG, FLY, GRE, TRE, ITENE, CNR
Aim: Integration of forest information system (FIS) with harvesting
measurement systems and software components
Output: D.6.21 System integration report I D.6.41 SLOPE System Techno-Economic Evaluation Report I
Technical Meeting 19-21 Jan 16
Task 6.2 - Effort GraphiTech
3D Harvesting planner improvements (alpha 1.2, 1.3 and 1.4) Banana Pro board Integration coordination (Telcos, reports, etc.)
MHG FIS improvements and adaptations
TREE Backend development for on field app Upload of trees on the FIS
ITENE Intelligent truck system finalization
Technical Meeting 19-21 Jan 16
Alpha 1.2 - Features
Cable crane placement, profiling and animation Multilanguage support (Italian, German, English) 3D moving objects along a path (for real-time
tracking) Project saving Added Lammertal data Legend associated with cadastral and public data Bug fixes
Technical Meeting 19-21 Jan 16
Alpha 1.3 - Features
Features: Login/Logout Automatic PDF Report generation Compass New WMS data for Austrian pilot Rope Launcher Easer simulation Added FlyBy Satellite imagery
Technical Meeting 19-21 Jan 16
Video
Technical Meeting 19-21 Jan 16
Alpha 1.4 Upcoming features
Improved profiling and drawing tools DSM + DTM data from Annaberg test site Multiresolution terrain support Database Trees visualization and spatial queries (TREE) Database Truck visualization (ITENE) Improved cable way visualization Long distance fog (+30% performance) Improved terrain loading times
Technical Meeting 19-21 Jan 16
Alpha 1.5 Planned features
New rope launcher easer (new requirements from Greifenberg) Point of interest (sawmills, storage areas, etc.) New interface for stand analysis (Virtual tree selection) Tree stand visualization and spatial queries
Technical Meeting 19-21 Jan 16
Task 6.02 Components
Technical Meeting 19-21/Jan/2016
Task 6.02 Timeline
4 agile-like integration sprints (bimonthly) 2 sprint overlapping with step 2
1 monitoring meeting every 2 weeks 1 Round of testing at the end of each sprint
Incremental built of D.6.02.1 Report Incremental build of D.6.04.1
Only 2 Completed
Done Only 2 Completed Draft Draft
Technical Meeting 19-21 Jan 16
Task 6.02 Integration Goals
1. Connection of the 3D modelling for harvesting planning (T.2.4) with the FIS [75%] Some features need to be finalized
2. Connection of handheld devices (Treemetrics and MHG) with the FIS [70%] Treemetrics field app backend communication to be completed [40%] MHG app development still in progress