VIBRANT RAILWAYS STRENGTHENING BENGAL
Page -2
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page - 3
Shri Narendra ModiHon'ble Prime Minister
Indian Railways the growth engineof the nation's vikas yatra
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page -4
Shri Harindra RaoGeneral Manager, Eastern Railway
PREFACE
Indian Railways is the principal catalyst in bringing socio-economic development of the Nation. The Railway network at every nook & corner of India helps connect person to person, resources to regions and inputs to industries.
The Railway network in Eastern India was first set up from Howrah to Hooghly in Eastern Railway jurisdiction in 1854, which at that time was known as East Indian Railway. Since the beginning of the journey Eastern Railway has gone through stages of metamorphosis with the passage of time and developed as a principal transporter of passengers & freight in Eastern India.
Eastern Railway at present has a route kilometre of 2686 with four divisions viz. Howrah, Sealdah, Asansol & Malda. The Zonal headqarter as well as all the divisional headquarters of Eastern Railway are in West Bengal.
Eastern Railway is a pre-dominantly passenger carrying Railway. It has India's second largest suburban rail network. Eastern Railway also provides long-distance passenger traffic service by running large number of Mail/Express trains.
Coal is the main freight traffic of ER as it occupies 60% of the volume of freight commodities. Apart from coal, this Railway also transports iron and steel products from Durgapur & Burnpur, stones from Pakur & Jamalpur, cement from Durgapur and a lot of other merchandise including jute, tea, automobile, agricultural products etc. POL installation at Rajbandh & Budge Budge, cement plant at Durgapur and the industrial complexes at Asansol, Durgapur, Chittaranjan, Burnpur, industrial suburban area of Kolkata & Howrah are served by this Railway.
Goods train as well as passenger train services are also run between India & Bangladesh via Gede-Darshana and Petrapole-Benapole routes.
The Originating Revenue Loading of ER during 2017-18 was 62 MT. The Apportioned Goods Earning was ` 4,519 Crs. and Originating Passenger Earning of ER was ` 2,668 Crs. during FY 2017-18.
Railways is now marching ahead towards a new regime, a new area of reforms & modernization for achieving self sufficiency, in order to set a new growth path. Our officers and staff are vibrant, responsive and dedicated to adapt with the changing scenario & market demand and fulfil the expectation of the passengers, freight customers and other stakeholders.
Besides, three other Zonal Railways viz. South Eastern Railway, North-East Frontier Railway and Metro Railway, Kolkata also have their network in West Bengal and have valuable contribution towards transport of passengers & freight and socio-economic development of this State.
It may be noted that the Budgets allocated to various projects are not apportioned statewise but reflect the cost of the project.
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page - 5
RAIL BUDGET 2018-19
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page -6
Thrust on InfrastructureNew Lines Works Completed
� 2009-14 : 9 km average per year
� 2014-18 : 22 km average per year
Average construction of new line increased at 144% in last 4 years.
New Jubilee Bridge New Jubilee Bridge, an engineering marvel, has been constructed over the river Hooghly on Bandel-Naihati section of Eastern Railway.
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page - 6
New Jubilee Bridge
Ave
rage
km
per
yea
r
30
25
20
15
109 km
0
22 km
144%
2009-14 2014-18
5
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page - 7
Doubling
Work Completed
� 2009-14 : 50 km average per year
� 2014-18 : 86 km average per year
Gauge Conversion
Work Completed
� 2009-14 : 8 km average per year
� 2014-18 : 20 km average per year
Thrust on Infrastructure
Ave
rage
km
per
yea
r
Work of gauge conversion increased at 150%
Average doubling work increased at 72% leading to considerable increase in sectional capacity.
Ave
rage
km
per
yea
r
05
20 km
150%
0
10
15
20
8 km
Ave
rage
km
per
yea
r
70
60
50
40
30
50 km
10
86 km
72%
2009-14 2014-18
20
0
80
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page -8
Thrust on InfrastructureWorks in Progress :
� 24 newline projects of 492 km at a cost of `4,217 crores
� 37 doubling project of 803 km at a cost of `5,592 crores
� 2 gauge conversion project of 27 km at a cost of `108 crores
Kolkata Metro projects in full swing : � Joka-BBD Bag : Length 16 km, at a cost of `2,914 crores
� Noapara-Barasat : Length 18 km, at a cost of `3,344 crores
� Noapara-Barackpore : Length 16 km, at a cost of `2,297 crores
� Kavi Subhash-Airport : Length 32 km, at a cost of `4,259 crores
Construction Work of Joka - BBD Bag Metro Project in progress
Tunnelling Work at East West Metro Project
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page - 9
Fast track Electrification
� 996 track KM electrified from 2014 to 2018.
� The pace of electrification increased from 142 track KM per year in 2004-14 to 332 track Km Per year in 2014-18
� Rate of increase 234%
Advantages
� Faster trains
� Environment friendly traction
� Lower energy cost
Dedicated Freight Corridor
� Work on 488 KMs of dedicated freight corridor in full swing
� Electrified tracks
� Major freight terminals at Dankuni and Andal
Thrust on Infrastructure
Work of Eastern Dedicated Freight Corridor in progress
Trac
k K
MS
ele
ctrif
ied
per
year
350
142
332
234%
2009-14 2014-18
300
250
200
150
100
50
Period
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page -10
Thrust on InfrastructureRoad Over Bridge / Road Under Bridge
Elimination of Level Crossings
� No. of Manned Level crossings has been reduced from 1124 in 2014 to 1068 in 2018.
� All the 252 Unmanned Level crossings have been eliminated by March, 2018.
2013-14 2013-142017-18 2017-18
View of ROB/RUB on Khana-Nalhati section
Road Over Bridges120
97
0
118
22%
2013-14 2017-18
100
80
60
40
20
2013-14 2017-18
Road Under Bridges
70
0
126
80%
140
120
100
80
60
40
20
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page - 11
Connected West Bengal99 New Trains Services Introduced
Train No. From To
13137/13138 Barrackpore Kolkata
13063/13064 Howrah Balurghat
18629/18623 Ranchi New Jalpaiguri
37315 Tarakeswar Arambagh
33593/33594 Basirhat Hasnabad
31391/31392 Kalyani Ranaghat
52507/52501 Darjeeling Kurseong
73035/73036 Jangipur Nimtita
63131/63132 Cossimbazar Lalgola
37397/37398 Singur Tarakeswar
37387/37388 Haripal Tarakeswar
33591/33592 Basirhat Hasnabad
31393/31394 Kalyani Kalyani Simanta
30122 Majerhat Ballygunge
12377/12378 New Jalpaiguri Alipurduar
52572/52573 Kurseong Mahanadi Himalayan
63106 Berhampore Lalgola
52574/52575 Dajeeling Ghoom
75713/75714 Siliguri Changrabandha
75743/75744 Siliguri Katihar
Kolkata-Khulna Bandhan Express
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page -12
Train No. From To
25255/25256 Darjeeling Ghoom
30013 Biman Bandar Barasat
37371/37372 Arambagh Goghat
37365/37362 Arambagh Goghat
30051 BNBA/DDC Madhyamgram
30052 Madhyamgram DDC/BNBA
30011 BNBA/DDC Habra
30014 Habra DDC/BNBA
30053 BNBA/DDC Duttapukur
30016 Duttapukur DDC/BNBA
37051/37052 Sheoraphuli Goghat
37379/37380 Arambagh Goghat
37315 Arambagh Goghat
37378 Arambagh Goghat
34322 Mathurapur Lakshmikantapur
34331 Mathurapur Lakshmikantapur
53003/53004 Malda Katihar
63105 Berhampore Lalgola
35017/35018 Balgona Srikhanda
33661/33662 Habra Gobardanga
33683/33684 Gobardanga Bangaon
31051 Barrackpore Naihati
31028 Majerhat New Alipore
31021 Majerhat New Alipore
37015/37016 Shrirampur Seoraphuli
37059/37060 Seoraphuli Goghat
37325 Tarakeshwar Arambag
22857 Santragachi Anand Vihar(T)
22858 Anand Vihar(T) Santragachi
22813 Santragachi Paradeep
22863 Howrah Yesvantpur
22864 Yesvantpur Howrah
22887 Howrah Yesvantpur
22888 Yesvantpur Howrah
22877 Howrah Ernakulam
Connected West Bengal99 New Trains Services Introduced
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page - 13
Train No. From To
22878 Ernakulam Howrah
20889 Howrah Vijayawada
20890 Vijayawada Howrah
68001 Santragachi Jhargram
38101 Santragachi Uluberia
38715 Santragachi Kharagpur
38901 Santragachi Amta
38110 Uluberia Santragachi
38902 Amta Santragachi
68688 Digha Panskura
68687 Panskura Digha
38712 Kharagpur Santragachi
68008 Jhargram Santragachi
78058 Bankura Sonamukhi
78061 Masagram Bankura
78057 Sonamukhi Bankura
Connected West Bengal99 New Trains Services Introduced
Trail run of Kolkata-Khulna Bandhan Express
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page -14
80 Trains Services Extended
Train No. From To Extension Upto
13137/13138 Barrackpore Azamgarh Kolkata
13133/13134 Sealdah Varanasi Delhi
55722/55723 Kaliaganj Katihar Radhikapur
37315 Howrah TarakeswarArambagh & further extended to Goghat
33593/33594 Sealdah Basirhat Hasnabad
31391/31392 Sealdah Kalyani Ranaghat
12377/12378 Sealdah New Jalpaiguri New Alipurduar
63106 Sealdah Berhampore Lalgola
53321/53322 Asansol Dhanbad Barkakana
30013 Majerhat Biman Bandar Barasat
37371/37372 Howrah Arambagh Goghat
37365/37362 Howrah Arambagh Goghat
30051 Majerhat Biman Bandar Madhyamgram
30052 Biman Bandar Majerhat Madhyamgram
30011 Majerhat Biman Bandar Habra
30014 Biman Bandar Majerhat Habra
30053 Majerhat Biman Bandar Duttapukur
30016 Biman Bandar Majerhat Duttapukur-Majerhat
35017/35018 Barddhaman Sripat-Srikhanda Katwa
37051/37052 Howrah Seoraphuli Goghat
37379/37380 Tarakeswar Arambagh Goghat
37315 Howrah Arambagh Goghat
37378 Arambagh Tarakeswar Goghat
34322 Sonarpur Mathurapur Lakshmikantapur
34331 Mathurapur Baruipur Lakshmikantapur
53003/53004 Howrah Malda Katihar
63105 Sealdah Berhampore Lalgola
35017/35018 Barddhaman Balgona Sripat-Srikhanda
33661/33662 Sealdah Habra Gobardanga
33683/33684 Sealdah Gobardanga Bangaon
31051 Budge Budge Barrackpore Naihati
30128 Kalyani Simanta Majerhat New Alipore
01| Eastern Railway
Connected West Bengal
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page - 15
Train No. From To Extension Upto
30121 Majerhat Naihati New Alipore
37015/37016 Howrah Srirampore Seoraphuli
37059/37060 Howrah Seoraphuli Goghat
37325 Howrah Tarakeswar Arambagh
18007 Shalimar Baripada Bhanjpur
22861 Shalimar Bankura Adra
68007 Howrah Belda Jaleswar
38202 Bagnan Santragachi Howrah
38109 Howrah Uluberia Bagnan
38110 Uluberia Howrah Bagnan
38201 Santragachi Bagnan Mecheda
68002 Belda Howrah Jaleswar
68047 Kharagpur Hijli Belda
68048 Hijli Kharagpur Belda
38481 Howrah Panskura Kharagpur
38416 Panskura Howrah Kharagpur
38435 Howrah Panskura Kharagpur
38452 Panskura Howrah Kharagpur
68019 Jhargram Chandrapura Phularitand
68020 Chandrapura Jhargram Phularitand
22862 Bankura Shalimar Adra
68087 Bankura Dhanbad Bishnupur
78021 Masagram Mathnashipur Bankura
Connected West Bengal80 Trains Services Extended
Kolkata-Dhaka Maitree Express
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page -16
Train No. From To Extension Upto
78022 Mathnashipur Masagram Bankura
78024 Bankura Mathnashipur Masagram
78023 Mathnashipur Bankura Masagram
78026 Bankura Seharabazar Masagram
78027 Seharabazar Bankura Masagram
78028 Bankura Mathnashipur Masagram
78025 Mathnashipur Bankura Masagram
Increase In Frequency
� Frequency of 7 trains increased
Train No. From To Frequency Increased
12073 Howrah Bhubaneswar 6 to 7 days
12278 Puri Howrah 6 to 7 days
12277 Howrah Puri 6 to 7 days
38413 Howrah Panskura 6 to 7 days
38903 Howrah Amta 6 to 7 days
38446 Panskura Howrah 6 to 7 days
38908 Amta Howrah 6 to 7 days
Connected West Bengal
International rail passenger terminal at Kolkata Station
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page - 17
Passenger Security � CCTV cameras installed at Howrah, Sealdah and Kolkata Terminal.
� Integrated Security System (ISS) introduced at major stations like Howrah, Sealdah, Kolkata Terminal, Asansol, Malda, Barddhaman, Durgapur etc.
� All night bound trains are escorted by RPF Jawans.
� 'Mahila Vahini' of RPF has been formed at major stations to ensure security to lady passengers.
Operation 'Nanhe Farishte' :-
� 'Child Help Desk' has been set up at major stations.
� Rescue & rehabilitation of 2431 children by RPF during 2014-18.
� Help provided to Passengers through Security Help line No. 182 & Social Media.
Escorting of ladies special train by 'Mahila Vahini' of RPF
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page -18
Passenger Amenities Provided During 2014-18 � FOB - 15 Nos.
� Toilets - 55 Nos.
� Platforms - 88 Nos.
� Waiting Room - 10 Nos.
� Circulating Area - 15 Nos. Stations
� CCTV - 10 Nos. Stations
Upgraded Retiring Room
Bio Toilet in ER's Train coach Waiting Room at Asansol Station.
Clean Station
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page - 19
Digital India - Digital RailFast & Free Wi-fi
� High speed network access provided at 13 stations.
� In Process at more stations.
Point of Sale Machines for Digital transactions
� Cashless transactions can be made through BHIM, RuPay, debit cards, e-wallets etc. at many ticket counters.
Wi-fi facility at Howrah Station
Cashless transactions at Howrah booking counter CoTVM at Sealdah Station
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page -20
Swachh Bharat - Swachh Rail
Inspired by Swachh Bharat, we have launched Swachh Rail
� On board housekeeping services in Trains
� Mechanised Cleaning of all Coaches of 124 Mail / Express trains and Stations.
� 100% Mechanised Washing of linen
� 1771 Coaches fitted with 6669 Bio-toilets
Mechanised cleaning of Stations and Trains
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page - 21
Green Initiatives
LED fittings for energy conservation
� Provided at all 582 stations
� 100% target achieved
Tree plantation
� 9.60 Lakh tree saplings planted in last 4 years
Harnessing solar energy
� Total 10.17 MWP solar modules provided
� Solar panels provided at 35 stations and 251 level crossing gates
Solar pannels at Howrah Station
LED luminaires at Stations
Tree plantation at Gholshapur
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page -22
METRO RAILWAY, KOLKATABudget Grant (BG)
� Budget Grant increased from `601 crore in 2013-14 to `769 crore in 2017-18.
Passenger Traffic
Ongoing New Line Projects
� Joka-BBD Bag
� Noapara-Barasat
� Kavi Subhash-Airport via Rajarhat
� Noapara-Baranagar-Dakshineswar
� Trains run � Passengers Carried
`601Crore
2013-14 2017-18
`769Crore
28%
93,999
83,874
2013-14 2017-18
12%
2013-14 2017-18
11%
19Crore
21Crore
VIBRANT RAILWAYS STRENGTHENING BENGAL
Page - 23