Page 1: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation
Page 2: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page -2

Page 3: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page - 3

Shri Narendra ModiHon'ble Prime Minister

Indian Railways the growth engineof the nation's vikas yatra

Page 4: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page -4

Shri Harindra RaoGeneral Manager, Eastern Railway

PREFACE

Indian Railways is the principal catalyst in bringing socio-economic development of the Nation. The Railway network at every nook & corner of India helps connect person to person, resources to regions and inputs to industries.

The Railway network in Eastern India was first set up from Howrah to Hooghly in Eastern Railway jurisdiction in 1854, which at that time was known as East Indian Railway. Since the beginning of the journey Eastern Railway has gone through stages of metamorphosis with the passage of time and developed as a principal transporter of passengers & freight in Eastern India.

Eastern Railway at present has a route kilometre of 2686 with four divisions viz. Howrah, Sealdah, Asansol & Malda. The Zonal headqarter as well as all the divisional headquarters of Eastern Railway are in West Bengal.

Eastern Railway is a pre-dominantly passenger carrying Railway. It has India's second largest suburban rail network. Eastern Railway also provides long-distance passenger traffic service by running large number of Mail/Express trains.

Coal is the main freight traffic of ER as it occupies 60% of the volume of freight commodities. Apart from coal, this Railway also transports iron and steel products from Durgapur & Burnpur, stones from Pakur & Jamalpur, cement from Durgapur and a lot of other merchandise including jute, tea, automobile, agricultural products etc. POL installation at Rajbandh & Budge Budge, cement plant at Durgapur and the industrial complexes at Asansol, Durgapur, Chittaranjan, Burnpur, industrial suburban area of Kolkata & Howrah are served by this Railway.

Goods train as well as passenger train services are also run between India & Bangladesh via Gede-Darshana and Petrapole-Benapole routes.

The Originating Revenue Loading of ER during 2017-18 was 62 MT. The Apportioned Goods Earning was ` 4,519 Crs. and Originating Passenger Earning of ER was ` 2,668 Crs. during FY 2017-18.

Railways is now marching ahead towards a new regime, a new area of reforms & modernization for achieving self sufficiency, in order to set a new growth path. Our officers and staff are vibrant, responsive and dedicated to adapt with the changing scenario & market demand and fulfil the expectation of the passengers, freight customers and other stakeholders.

Besides, three other Zonal Railways viz. South Eastern Railway, North-East Frontier Railway and Metro Railway, Kolkata also have their network in West Bengal and have valuable contribution towards transport of passengers & freight and socio-economic development of this State.

It may be noted that the Budgets allocated to various projects are not apportioned statewise but reflect the cost of the project.

Page 5: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page - 5

RAIL BUDGET 2018-19

Page 6: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page -6

Thrust on InfrastructureNew Lines Works Completed

� 2009-14 : 9 km average per year

� 2014-18 : 22 km average per year

Average construction of new line increased at 144% in last 4 years.

New Jubilee Bridge New Jubilee Bridge, an engineering marvel, has been constructed over the river Hooghly on Bandel-Naihati section of Eastern Railway.

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page - 6

New Jubilee Bridge

Ave

rage

km

per

yea

r

30

25

20

15

109 km

0

22 km

144%

2009-14 2014-18

5

Page 7: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page - 7

Doubling

Work Completed

� 2009-14 : 50 km average per year

� 2014-18 : 86 km average per year

Gauge Conversion

Work Completed

� 2009-14 : 8 km average per year

� 2014-18 : 20 km average per year

Thrust on Infrastructure

Ave

rage

km

per

yea

r

Work of gauge conversion increased at 150%

Average doubling work increased at 72% leading to considerable increase in sectional capacity.

Ave

rage

km

per

yea

r

05

20 km

150%

0

10

15

20

8 km

Ave

rage

km

per

yea

r

70

60

50

40

30

50 km

10

86 km

72%

2009-14 2014-18

20

0

80

Page 8: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page -8

Thrust on InfrastructureWorks in Progress :

� 24 newline projects of 492 km at a cost of `4,217 crores

� 37 doubling project of 803 km at a cost of `5,592 crores

� 2 gauge conversion project of 27 km at a cost of `108 crores

Kolkata Metro projects in full swing : � Joka-BBD Bag : Length 16 km, at a cost of `2,914 crores

� Noapara-Barasat : Length 18 km, at a cost of `3,344 crores

� Noapara-Barackpore : Length 16 km, at a cost of `2,297 crores

� Kavi Subhash-Airport : Length 32 km, at a cost of `4,259 crores

Construction Work of Joka - BBD Bag Metro Project in progress

Tunnelling Work at East West Metro Project

Page 9: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page - 9

Fast track Electrification

� 996 track KM electrified from 2014 to 2018.

� The pace of electrification increased from 142 track KM per year in 2004-14 to 332 track Km Per year in 2014-18

� Rate of increase 234%

Advantages

� Faster trains

� Environment friendly traction

� Lower energy cost

Dedicated Freight Corridor

� Work on 488 KMs of dedicated freight corridor in full swing

� Electrified tracks

� Major freight terminals at Dankuni and Andal

Thrust on Infrastructure

Work of Eastern Dedicated Freight Corridor in progress

Trac

k K

MS

ele

ctrif

ied

per

year

350

142

332

234%

2009-14 2014-18

300

250

200

150

100

50

Period

Page 10: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page -10

Thrust on InfrastructureRoad Over Bridge / Road Under Bridge

Elimination of Level Crossings

� No. of Manned Level crossings has been reduced from 1124 in 2014 to 1068 in 2018.

� All the 252 Unmanned Level crossings have been eliminated by March, 2018.

2013-14 2013-142017-18 2017-18

View of ROB/RUB on Khana-Nalhati section

Road Over Bridges120

97

0

118

22%

2013-14 2017-18

100

80

60

40

20

2013-14 2017-18

Road Under Bridges

70

0

126

80%

140

120

100

80

60

40

20

Page 11: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page - 11

Connected West Bengal99 New Trains Services Introduced

Train No. From To

13137/13138 Barrackpore Kolkata

13063/13064 Howrah Balurghat

18629/18623 Ranchi New Jalpaiguri

37315 Tarakeswar Arambagh

33593/33594 Basirhat Hasnabad

31391/31392 Kalyani Ranaghat

52507/52501 Darjeeling Kurseong

73035/73036 Jangipur Nimtita

63131/63132 Cossimbazar Lalgola

37397/37398 Singur Tarakeswar

37387/37388 Haripal Tarakeswar

33591/33592 Basirhat Hasnabad

31393/31394 Kalyani Kalyani Simanta

30122 Majerhat Ballygunge

12377/12378 New Jalpaiguri Alipurduar

52572/52573 Kurseong Mahanadi Himalayan

63106 Berhampore Lalgola

52574/52575 Dajeeling Ghoom

75713/75714 Siliguri Changrabandha

75743/75744 Siliguri Katihar

Kolkata-Khulna Bandhan Express

Page 12: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page -12

Train No. From To

25255/25256 Darjeeling Ghoom

30013 Biman Bandar Barasat

37371/37372 Arambagh Goghat

37365/37362 Arambagh Goghat

30051 BNBA/DDC Madhyamgram

30052 Madhyamgram DDC/BNBA

30011 BNBA/DDC Habra

30014 Habra DDC/BNBA

30053 BNBA/DDC Duttapukur

30016 Duttapukur DDC/BNBA

37051/37052 Sheoraphuli Goghat

37379/37380 Arambagh Goghat

37315 Arambagh Goghat

37378 Arambagh Goghat

34322 Mathurapur Lakshmikantapur

34331 Mathurapur Lakshmikantapur

53003/53004 Malda Katihar

63105 Berhampore Lalgola

35017/35018 Balgona Srikhanda

33661/33662 Habra Gobardanga

33683/33684 Gobardanga Bangaon

31051 Barrackpore Naihati

31028 Majerhat New Alipore

31021 Majerhat New Alipore

37015/37016 Shrirampur Seoraphuli

37059/37060 Seoraphuli Goghat

37325 Tarakeshwar Arambag

22857 Santragachi Anand Vihar(T)

22858 Anand Vihar(T) Santragachi

22813 Santragachi Paradeep

22863 Howrah Yesvantpur

22864 Yesvantpur Howrah

22887 Howrah Yesvantpur

22888 Yesvantpur Howrah

22877 Howrah Ernakulam

Connected West Bengal99 New Trains Services Introduced

Page 13: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page - 13

Train No. From To

22878 Ernakulam Howrah

20889 Howrah Vijayawada

20890 Vijayawada Howrah

68001 Santragachi Jhargram

38101 Santragachi Uluberia

38715 Santragachi Kharagpur

38901 Santragachi Amta

38110 Uluberia Santragachi

38902 Amta Santragachi

68688 Digha Panskura

68687 Panskura Digha

38712 Kharagpur Santragachi

68008 Jhargram Santragachi

78058 Bankura Sonamukhi

78061 Masagram Bankura

78057 Sonamukhi Bankura

Connected West Bengal99 New Trains Services Introduced

Trail run of Kolkata-Khulna Bandhan Express

Page 14: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page -14

80 Trains Services Extended

Train No. From To Extension Upto

13137/13138 Barrackpore Azamgarh Kolkata

13133/13134 Sealdah Varanasi Delhi

55722/55723 Kaliaganj Katihar Radhikapur

37315 Howrah TarakeswarArambagh & further extended to Goghat

33593/33594 Sealdah Basirhat Hasnabad

31391/31392 Sealdah Kalyani Ranaghat

12377/12378 Sealdah New Jalpaiguri New Alipurduar

63106 Sealdah Berhampore Lalgola

53321/53322 Asansol Dhanbad Barkakana

30013 Majerhat Biman Bandar Barasat

37371/37372 Howrah Arambagh Goghat

37365/37362 Howrah Arambagh Goghat

30051 Majerhat Biman Bandar Madhyamgram

30052 Biman Bandar Majerhat Madhyamgram

30011 Majerhat Biman Bandar Habra

30014 Biman Bandar Majerhat Habra

30053 Majerhat Biman Bandar Duttapukur

30016 Biman Bandar Majerhat Duttapukur-Majerhat

35017/35018 Barddhaman Sripat-Srikhanda Katwa

37051/37052 Howrah Seoraphuli Goghat

37379/37380 Tarakeswar Arambagh Goghat

37315 Howrah Arambagh Goghat

37378 Arambagh Tarakeswar Goghat

34322 Sonarpur Mathurapur Lakshmikantapur

34331 Mathurapur Baruipur Lakshmikantapur

53003/53004 Howrah Malda Katihar

63105 Sealdah Berhampore Lalgola

35017/35018 Barddhaman Balgona Sripat-Srikhanda

33661/33662 Sealdah Habra Gobardanga

33683/33684 Sealdah Gobardanga Bangaon

31051 Budge Budge Barrackpore Naihati

30128 Kalyani Simanta Majerhat New Alipore

01| Eastern Railway

Connected West Bengal

Page 15: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page - 15

Train No. From To Extension Upto

30121 Majerhat Naihati New Alipore

37015/37016 Howrah Srirampore Seoraphuli

37059/37060 Howrah Seoraphuli Goghat

37325 Howrah Tarakeswar Arambagh

18007 Shalimar Baripada Bhanjpur

22861 Shalimar Bankura Adra

68007 Howrah Belda Jaleswar

38202 Bagnan Santragachi Howrah

38109 Howrah Uluberia Bagnan

38110 Uluberia Howrah Bagnan

38201 Santragachi Bagnan Mecheda

68002 Belda Howrah Jaleswar

68047 Kharagpur Hijli Belda

68048 Hijli Kharagpur Belda

38481 Howrah Panskura Kharagpur

38416 Panskura Howrah Kharagpur

38435 Howrah Panskura Kharagpur

38452 Panskura Howrah Kharagpur

68019 Jhargram Chandrapura Phularitand

68020 Chandrapura Jhargram Phularitand

22862 Bankura Shalimar Adra

68087 Bankura Dhanbad Bishnupur

78021 Masagram Mathnashipur Bankura

Connected West Bengal80 Trains Services Extended

Kolkata-Dhaka Maitree Express

Page 16: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page -16

Train No. From To Extension Upto

78022 Mathnashipur Masagram Bankura

78024 Bankura Mathnashipur Masagram

78023 Mathnashipur Bankura Masagram

78026 Bankura Seharabazar Masagram

78027 Seharabazar Bankura Masagram

78028 Bankura Mathnashipur Masagram

78025 Mathnashipur Bankura Masagram

Increase In Frequency

� Frequency of 7 trains increased

Train No. From To Frequency Increased

12073 Howrah Bhubaneswar 6 to 7 days

12278 Puri Howrah 6 to 7 days

12277 Howrah Puri 6 to 7 days

38413 Howrah Panskura 6 to 7 days

38903 Howrah Amta 6 to 7 days

38446 Panskura Howrah 6 to 7 days

38908 Amta Howrah 6 to 7 days

Connected West Bengal

International rail passenger terminal at Kolkata Station

Page 17: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page - 17

Passenger Security � CCTV cameras installed at Howrah, Sealdah and Kolkata Terminal.

� Integrated Security System (ISS) introduced at major stations like Howrah, Sealdah, Kolkata Terminal, Asansol, Malda, Barddhaman, Durgapur etc.

� All night bound trains are escorted by RPF Jawans.

� 'Mahila Vahini' of RPF has been formed at major stations to ensure security to lady passengers.

Operation 'Nanhe Farishte' :-

� 'Child Help Desk' has been set up at major stations.

� Rescue & rehabilitation of 2431 children by RPF during 2014-18.

� Help provided to Passengers through Security Help line No. 182 & Social Media.

Escorting of ladies special train by 'Mahila Vahini' of RPF

Page 18: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page -18

Passenger Amenities Provided During 2014-18 � FOB - 15 Nos.

� Toilets - 55 Nos.

� Platforms - 88 Nos.

� Waiting Room - 10 Nos.

� Circulating Area - 15 Nos. Stations

� CCTV - 10 Nos. Stations

Upgraded Retiring Room

Bio Toilet in ER's Train coach Waiting Room at Asansol Station.

Clean Station

Page 19: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page - 19

Digital India - Digital RailFast & Free Wi-fi

� High speed network access provided at 13 stations.

� In Process at more stations.

Point of Sale Machines for Digital transactions

� Cashless transactions can be made through BHIM, RuPay, debit cards, e-wallets etc. at many ticket counters.

Wi-fi facility at Howrah Station

Cashless transactions at Howrah booking counter CoTVM at Sealdah Station

Page 20: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page -20

Swachh Bharat - Swachh Rail

Inspired by Swachh Bharat, we have launched Swachh Rail

� On board housekeeping services in Trains

� Mechanised Cleaning of all Coaches of 124 Mail / Express trains and Stations.

� 100% Mechanised Washing of linen

� 1771 Coaches fitted with 6669 Bio-toilets

Mechanised cleaning of Stations and Trains

Page 21: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page - 21

Green Initiatives

LED fittings for energy conservation

� Provided at all 582 stations

� 100% target achieved

Tree plantation

� 9.60 Lakh tree saplings planted in last 4 years

Harnessing solar energy

� Total 10.17 MWP solar modules provided

� Solar panels provided at 35 stations and 251 level crossing gates

Solar pannels at Howrah Station

LED luminaires at Stations

Tree plantation at Gholshapur

Page 22: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page -22

METRO RAILWAY, KOLKATABudget Grant (BG)

� Budget Grant increased from `601 crore in 2013-14 to `769 crore in 2017-18.

Passenger Traffic

Ongoing New Line Projects

� Joka-BBD Bag

� Noapara-Barasat

� Kavi Subhash-Airport via Rajarhat

� Noapara-Baranagar-Dakshineswar

� Trains run � Passengers Carried

`601Crore

2013-14 2017-18

`769Crore

28%

93,999

83,874

2013-14 2017-18

12%

2013-14 2017-18

11%

19Crore

21Crore

Page 23: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation

VIBRANT RAILWAYS STRENGTHENING BENGAL

Page - 23

Page 24: WAWA Page -4 Shri Harindra Rao General Manager, Eastern Railway PREFACE Indian Railways is the principal catalyst in bringing socio-economic development of the Nation