ucr redevelopment project a presentation to the asucrp baltimore, md april 24, 2012

21
UNCLASSIFIED UNCLASSIFIED UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012 03/22/2022 1 Brian D. Griffith UCR Redevelopment Program Manager Federal Bureau of Investigation CJIS Division 304-625-4535 [email protected]

Upload: ezra-perry

Post on 31-Dec-2015

26 views

Category:

Documents


1 download

DESCRIPTION

UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012. Brian D. Griffith UCR Redevelopment Program Manager Federal Bureau of Investigation CJIS Division 304-625-4535 [email protected]. Interesting things to know about New UCR. Data Submission Options - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED

UCR Redevelopment ProjectA presentation to the ASUCRP

Baltimore, MDApril 24, 2012

04/19/2023 1

Brian D. GriffithUCR Redevelopment Program Manager

Federal Bureau of InvestigationCJIS Division304-625-4535

[email protected]

Page 2: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED

Interesting things to know about New UCR

Data Submission OptionsAutomated Data Quality Check & Responses

Using the 9-Character NCIC ORINIBRS “Time Window”

Publication “Blackout” PeriodUCR External Data Query Tool

Overall Project Status

04/19/2023 2

Page 3: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED

Data Submission Options

• Electronic Interface Options– Flat File (position based record) for NIBRS, Summary, Hate Crime,

Cargo Theft, & LEOKA• Technical Specifications will be shared on FBI.gov with revision history and planned

changes

– UCR Crime Report Information Exchange Package Description (IEPD)• XML Interface Specification• Still in Draft form – some changes related to implementation

– Online Data Entry (not likely a State Program choice)– Microsoft Excel Forms Workbook and Tallybook

• Agency data collection tools that can be deployed by states• Breakout session at 10:30

– N-DEx NIBRS extract (next slides)

04/19/2023 3

Page 4: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED

Data Submission OptionsN-DEx to NIBRS Data Extract

• CJIS is developing functionality that will allow N-DEx participating State Programs and direct contributing agencies to have NIBRS data extracted and sent to UCR.– This capability is not yet operational– To date, difficulty mapping N-DEx Incident/Arrest IEPD to the NIBRS structure– Testing with Tennessee State Program will resume in 2012– Expected to be available in late 2012/Early 2013

• Migration to this submission method MUST be coordinated with N-DEx and UCR. – Participation with N-DEx does not assure NIBRS extract capability (next slide)– Specific implementation instructions for agencies/states wanting to participate

in this capability have not yet been developed– Contact you UCR POC if you are making plans to utilize the N-DEx to NIBRS

interface

04/19/2023 4

Page 5: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED

Data Submission OptionsN-DEx to NIBRS Data Extract

• Agencies / State Programs must be NIBRS certified.– Due to the difference between this interface and flat-file, an expedited

recertification using the N-DEx to NIBRS approach will be necessary• Submitters, not N-DEx must apply NIBRS edits to any data.

– N-DEx will only extract and deliver the submitted NIBRS data elements to UCR• N-DEx data must indicate with their submission that an incident is ready to

be extracted and passed to UCR• Once an agency has begun submitting NIBRS data via N-DEx, that will be

the only method through which NIBRS data will be accepted

04/19/2023 5

Page 6: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED

Data Submission Options(continued)

• Paper Submissions– Standard UCR Forms

• OCR scanning for 3 most recently approved OMB forms• Forms must be, or EXACTLY MATCH the OMB approved forms.

– UCR Non-Standard FormsState Crime Reporting Programs that currently submit all or part of their Summary data via non-standard forms or other means requiring FBI manual data entry are requested to develop a credible plan, by July 1, 2013, that will allow them to migrate to standard electronic interfaces. Per UCR Subcommittee, the FBI will define and share required parameters of a credible plan.

• January 1, 2013– Continue acceptance of non-standard forms and continue working

with state programs to migrate to electronic means• July 1, 2013

– Continue working with state programs that have developed a credible plan for migration to electronic means

– State programs not working toward a credible plan will be required to perform data entry via online data entry tools

04/19/2023 6

Page 7: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED

Automated Data Quality Checks

• New UCR will automatically apply current data quality checks known as “Business Rules”– Checks for data formatting, presence, and consistency– Flexible “if-then” statements that can be created, modified, or deleted by FBI

data management staff.– Based on current automated and manual practices.– Rules will be made available for review by state programs.

• Business Rule violations may result in:– Errors: The submission must be repaired before it can be processed.– Warnings: An error may or may not be present. The submission must be

reviewed by FBI staff before it can be processed.– Notifications: The system performed some action on behalf of the user or is

calling attention to some circumstance.• Submitting agency will receive automated business rule results (next slide)

04/19/2023 7

Page 8: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED

Submitting Agency Responses

• New UCR will send responses to the Submitting Agency (State Program) via the e-mail address on file with the system.– Submission Receipt Acknowledgement (always)

• 1 per submitted file

– Consolidated Error Report (if necessary)• 1 per submitted file• Report of Errors and Warnings (format pending – ideas?)• NIBRS Error Data Set (if required – used?)

• New UCR will automatically generate and deliver a missing month’s report to the Submitting Agency (State Program) via the e-mail address on file with the system.

• All other communications and reporting will come from your FBI point of contact.

04/19/2023 8

Page 9: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED

Using the NCIC ORI

• New UCR will receive and process data based upon the 9-Character NCIC assigned ORI for all crime report submissions– 7-Character ORIs delivered electronically (via Summary) will be

translated into the appropriate NCIC ORI before processing– 7-character “collisions” will need to be resolved manually by FBI staff

• UCR will treat NCIC assigned “UCR Only” ORIs as NCIC ORIs• Master File data will be translated to NCIC ORI but retain the

submitted ORI as well• Data entry web forms will require the NCIC assigned ORI

04/19/2023 9

Page 10: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED

Eliminating the “NIBRS Time Window”

• NIBRS Time Window (NTW)is an artifact of the “offloading” process to Master Files– Offloading was done to save space– With all data now online, the NTW is irrelevant

• Agencies are not required to remove NTW at this time– UCR will interpret “W” submissions as “M” requests for activities such

as Add Arrest

• NTW will continue to have limited use shortly following NIBRS certification when original incident was reported under Summary– New NTW implementation reflected in NIBRS Technical Specification.

04/19/2023 10

Page 11: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED

Elimination of UCR “Blackout Period”

• Currently, UCR stops processing submissions during the publication preparation period after the first of each year.– Maintains a static data set (+)– Creates a backlog of new data submissions (-)

• New UCR will continue processing new submissions while keeping control over publication data– A “publication line” gets set at beginning of publication prep cycle– Data that contributes to the developing publication gets held and

flagged for review by FBI staff– Data that does not contribute to the developing publication is

processed normally

04/19/2023 11

Page 12: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED

UCR’s External Data Query Tool

• UCR’s External Data Query Tool (EDQT) is a publically available query engine that can be accessed through FBI.gov

• All crime report data, except personally identifiable information (PII), will be available on EDQT– Summary, NIBRS, Hate Crime, Cargo Theft, and LEOKA– UCR has very little PII

• Two main data sets on EDQT– Static publication tables linked to a UCR publication that will not be

updated except in the case of required corrections to a publication• Similar to the UCR Data Tool, but more functionality

– Living, pre-publication crime report data that has cleared UCR business rules (see next slide)

04/19/2023 12

Page 13: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED

UCR’s External Data Query Tool(continued)

• Data that has passed UCR business rules and approved for release, pushed EDQT one month after the close of a reporting month– Ex. At the earliest, data for the month of May will be pushed on or

about July 1st.

• State Programs can choose the frequency of release– Monthly (as described above)– Quarterly (one month from the close of each quarter)– Semi-Annual (one month from the close of 2Q and 4Q)– Annual (one month from the close of 4Q)

04/19/2023 13

Page 14: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED

UCR’s External Data Query Tool(continued)

• State Programs are encouraged to consider monthly posting of data to EDQT.– It is believed that the value of UCR data increases in relation to

timeliness. – Many states already post crime data to their own websites monthly.

• UCR’s EDQT will clearly note that crime data is fluid and changes frequently throughout the year as incidents are investigated and clearances posted.

04/19/2023 14

Page 15: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED

Project Status

Data MigrationSystem DevelopmentPaperless Migration

Shared Management

04/19/2023 15

Page 16: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED

Data Migration Status

• Goal is to bring 52 years of UCR data together – online!• Agency changes through the years

– Changing jurisdictions (hence population)– Covered-by; Contracts; Names; Counties; and more

• Summary Return A complete – working on ASR, Supp, and others– Makes evident how Summary has changed through the years

• New codes, modified codes, new agencies, new forms, etc…

• NIBRS data migration complete – working irregularities– Reuse of incident numbers by same agency in multiple years– Reattachment of Time Window submissions to original incident (as possible)– Orphan segments – likely result of Summary to NIBRS conversion– Inconsistent use of Incident Number for Hate Crime reporting.

• Ex. 11-01496 vs. 110001496

04/19/2023 16

Page 17: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED

Planning and Requirements

PhaseDesign Phase Development

Phase Test Phase Implementation Phase

System Development Status

17

SCR10/14/2009

1PRR

06/16/2010

2

CDR12/16/2011

(10/17/2011)

OAR12/12/2012

5

!PDR

07/19/2011I-TRR

06/19/2012(05/08/2012)

S-TRR07/05/2012

System Concept Review (SCR)Planning & Requirements Review (PRR)Preliminary Design Review (PDR)Critical Design Review (CDR)Integration – Test Readiness Review (I-TRR)System – Test Readiness Review (S-TRR)Operational Acceptance Review (OAR)

LCM Gate Review

LCM Project Level Review

Successfully Completed Review

RCR08/06/2010

!

Page 18: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED

Paperless Migration Status

• 2,957 agencies currently submit paper crime report data.• 100+ agencies have switched to electronic methods since

10/1/2011.– Conversion to NIBRS– Excel Workbook/Tallybook (10:30 Breakout Session)

• UCR working close with Maryland and Massachusetts State Programs to define an electronic submission alternative.– Other state programs welcome!

04/19/2023 18

Page 19: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED

Shared Management Status

• Continuing work with SC Law Enforcement Division (S.L.E.D.)

• Evaluated 15 state IBR data sets.

– Implementing most common state attributes.

– Ability to also carry uncommon attributes

• Completed ROM cost estimate with contractor.

• Will be developed as follow-on phase of UCRRP.

– Enhancement in fall 2013?

04/19/2023 19

Shared Management Concept

4/9/2012 1

CJIS Services

Shared UCR

CJIS CSMU

State ProgramCoordinators

LEAs

1 2

3

4

1. Some LEAs send data to State Program.

2. Some LEAs submit data via the UCR State Portal.

3. The State Program submits and manages aggregate data via the UCR State Portal.

4. State Program decides when to approve data for submission.

5. CJIS CSMU reviews, analyzes, and publishes data.

State Users would have access to state data only. Solution would be

configurable for some state variability and state identity. 5

Page 20: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED

For more information ..

• If you would like to talk specifically about the impact of New UCR on your state’s crime reporting process, please see me to schedule a time.

– Breaks, breakfast, lunch, dinner, drinks, or after this conference.

• For more information on ways to move to electronic submission formats, please attend the Breakout Session at 10:30 a.m.

• For more information on the UCR Shared Management Approach, please attend tomorrow’s Plenary Session at 11:00 a.m.

04/19/2023 20

QUESTIONS?

Page 21: UCR Redevelopment Project A presentation to the ASUCRP Baltimore, MD April 24, 2012

UNCLASSIFIED

UNCLASSIFIED04/19/2023 21

Brian D. GriffithUCR Redevelopment Program Manager

Federal Bureau of InvestigationCJIS Division304-625-4535

[email protected]