    Our Main Focus

    Why do systems development?

    Understand the importance of linking the information

    system to business needs.

    Understand the need to create a system request. Understand how to assess technical, economic, and

    organizational feasibility.

    Understand Systems development Life Cycle and

    phases.

  • 7/29/2019 Systems Devt

    3/34

    Why the need for systems

    development?

    System Development has three primary business

    objectives:

    - Ensure the delivery of high quality systems; - Provide strong management controls;

    - Maximize productivity.

  • 7/29/2019 Systems Devt

    4/34

    Systems Development

    Definition:

    A conceptual model used in project

    management that describes the stages involved

    in an information system development project,

    from an initial feasibility study through

    maintenance of the completed application.

  • 7/29/2019 Systems Devt

    5/34

    Systems as Planned

    Organizational Change

    Building a new system is a kind of

    organizational change

    Includes changes in H/W, S/W, jobs,skill, management and organization

    When we design new system

    Need to redesign the organization

    5

  • 7/29/2019 Systems Devt

    6/34

    Systems Analyst specialization

    Most important skills:

    Technical, business, analytical, interpersonal,

    management, ethical, communication,

    problem-solving, decision-making Roles:

    Business analyst

    Systems analyst Infrastructure analyst

    Change management analyst

    Project manager etc

  • 7/29/2019 Systems Devt

    7/34

    7

    The activities that go into producing an

    information system solution to an

    organizational problem or opportunity are

    called systems development

  • 7/29/2019 Systems Devt

    8/34

    Preliminary Investigation object

    can be achieved in following steps:

    Request Clarification

    Feasibility study

    Estimating Costs and Benefits

    Request Approvals

  • 7/29/2019 Systems Devt

    9/34

    Feasibility Analysis involves 8 steps:

    Form a project team & appoint a project leader.

    Prepare system flowcharts.

    Enumerate potential candidate system.

    Describe & identify characteristics of candidatesystems.

    Determine & evaluate performance & cost

    effectiveness of each candidate system.

    Weigh system performance & cost.

    Select the best candidate system.

    Prepare & report final project directive to

    management.

  • 7/29/2019 Systems Devt

    10/34

    Feasibility Study Report

    The report contains the following

    sections:-

    Cover letter Table of

    Overview

    Detailed findings

    Economic justification

    Recommendations & conclusions

    Appendixes

  • 7/29/2019 Systems Devt

    11/34

    Types of feasibility study:

    There are six types of feasibility:

    Technical feasibility

    Economic feasibility

    Operational feasibility

    Legal and Political Feasibility

    Schedule Feasibility

  • 7/29/2019 Systems Devt

    12/34

    System Analysis or Requirement

    Analysis:

    Thisphaseof System Development is

    being completed in following step:

    Collection of data and facts

    Analysis of Present System

    Analysis of Proposed system

  • 7/29/2019 Systems Devt

    13/34

    13

    Collection of Data & Facts:

    1. Documents review:

    2. Questionnaires:

    3. Interviews:

    4. Observation.

  • 7/29/2019 Systems Devt

    14/34

    Analysis of Present

    System

    Review of Historical Aspects of organization

    Analyze Present inputs to the system

    Review of all data file maintained irrespective of

    online or offline

    Review methods, procedures & data

    communications

    Analyze Present outputs of system

    Review internal controls

    Model the existing physical system and logical

    system

    Undertake overall analysis of present system

  • 7/29/2019 Systems Devt

    15/34

    Analysis of Proposed

    System

    Output / Reports

    Maintenance of Database

    Data Inputting Process

    Methods and Procedures to show the

    relationship between Input and Output

    Work volume including peak periodwork volume

  • 7/29/2019 Systems Devt

    16/34

    System Design

    The overall plan or model for that system

    Consists of all the specifications that give

    the system its form and structure What makes one design superior to others

    is the ease and efficiency with which itfulfills user requirements within a specific

    set of technical, organizational, financial,and time constraints

  • 7/29/2019 Systems Devt

    17/34

    Programming (Software Coding)

    System specifications that were prepared

    during the design stage are translated into

    software program code

  • 7/29/2019 Systems Devt

    18/34

    System Testing

    Exhaustive and thorough testingmust be conducted to ascertainwhether the system produces the

    right resultse.g., Unit testing, system testing,

    UAT

    Systems development teamworks with users to devise asystematic test plan

    18

  • 7/29/2019 Systems Devt

    19/34

    Conversion

    Process of changing from the oldsystem to the new system

    e.g., parallel strategy, directcutover, pilot study and phasedapproach

    Detailed documentation showinghow the system works from both atechnical and end-user standpointis finalized during conversion stage

    19

  • 7/29/2019 Systems Devt

    20/34

    Operation & Maintenance

    After the new system is installed andconversion is complete, the system is saidto be in operation

    During this stage, the system will bereviewed by both users and technicalspecialists to determine how well it hasmet its original objectives and to decide

    whether any revisions or modifications arein order

    Could conduct post-implementation audit

    20

  • 7/29/2019 Systems Devt

    21/34

    21

    Systems Development Process

    Changes in hardware,software, documentation, orprocedures to a production

    system to correct errors,meet new requirements, orimprove processingefficiency are termedmaintenance

  • 7/29/2019 Systems Devt

    22/34

    22

    Alternative Systems Development

    Approaches

    System development life cycle (waterfall)method has defined, linear stages of systemsdevelopment and support

    Prototyping model is used for developingprototype systems for soliciting userrequirements or building system

  • 7/29/2019 Systems Devt

    23/34

    The Waterfall Model

    The waterfall model specifies a set of

    sequential phases for software

    development Each step cannot begin until the

    previous step has been completed

    anddocumented.

    It is document-driven.

  • 7/29/2019 Systems Devt

    24/34

    3- 24

  • 7/29/2019 Systems Devt

    25/34

    The Limits of Waterfall Model

    Inflexibility Cannot easily swim upstream

    Over-Reliance on Documentation

    Relies too much on documentation Detachment from Technology

    One size methodology cannot fit all technologies.

    Detachment from Marketplace Slow-paced methodology (Time consuming).

    Detachment from the Profession Programming is not the same as assembly of cars or

    baking breads, nor programmers work the same wayas manufacturing workers or bakers.

  • 7/29/2019 Systems Devt

    26/34

    Prototyping

    Building experimental system rapidly and

    inexpensively for end users to evaluate

    Prototype: Working but preliminary version of

    information system Approved prototype serves as template for final system

    Steps in prototyping

    1. Identify user requirements

    2. Develop initial prototype

    3. Use prototype

    4. Revise and enhance prototype

    26

  • 7/29/2019 Systems Devt

    27/34

    27

    Prototyping Contd

  • 7/29/2019 Systems Devt

    28/34

    Advantages of prototyping

    Useful if some uncertainty in requirements or

    design solutions

    Often used for end-user interface design

    More likely to fulfill end-user requirements

    Disadvantages

    May gloss over essential steps May not accommodate large quantities of data or

    large number of users

    May not undergo full testing or documentation28

    Prototyping Contd

  • 7/29/2019 Systems Devt

    29/34

    29

    End-User Development

    Some types of information systems can be developedby end users with little or no formal assistance fromtechnical specialists

    Software tools (e.g., Microsoft Access and CrystalReport) enable end users to create reports or develop

    software applications Adv:

    Allowing users to specify the own business needsimproves requirements gathering

    Contributing to higher level of user involvement and

    satisfaction Disadv:

    Higher organizational risks

    Poor IS management and control

  • 7/29/2019 Systems Devt

    30/34

    means using an external vendor to build or

    operate a firm's information systems.

    The system may be custom built or may use asoftware package.

    In either case, the work is done by the vendorrather than by the organization's internal

    information systems staff.

    30

    Outsourcing

  • 7/29/2019 Systems Devt

    31/34

    Outsourcing (cont.)

    Advantages

    Allows organization flexibility in IT needs

    Disadvantages

    Hidden costs, e.g.

    Identifying and selecting vendor

    Transitioning to vendor

    Opening up proprietary business processes to

    third party

    31

  • 7/29/2019 Systems Devt

    32/34

    Rapid application development (RAD)

    Process of creating workable systems in a very short periodof time

    Utilizes techniques such as:

    Visual programming and other tools for building graphicaluser interfaces

    Iterative prototyping of key system elements

    Automation of program code generation

    Close teamwork among end users and information

    systems specialists

    32

  • 7/29/2019 Systems Devt

    33/34

    Used to accelerate generation of information

    requirements and to develop initial systems design

    Brings end users and information systems

    specialists together in interactive session to discusssystems design

    Can significantly speed up design phase and involve

    users at intense level

    33

    Joint application design (JAD)

  • 7/29/2019 Systems Devt

    34/34

    Focuses on rapid delivery of working software by

    breaking large project into several small sub-

    projects

    Subprojects Treated as separate, complete projects

    Completed in short periods of time using iteration and

    continuous feedback

    Emphasizes face-to-face communication over

    written documents, allowing collaboration and

    faster decision making

    34

    Agile development