SunGuideSunGuideSMSM Software: Software:Development StatusDevelopment Status

Robert W. Heller, Ph.D.Robert W. Heller, Ph.D.July 14, 2004July 14, 2004

July 14, 2004SunGuide Software: Status Update 2

Goals and ObjectivesGoals and Objectives

FDOT Goals– Improve transportation safety.– Reduce congestion and delays.– Acquire (own) the most technically comprehensive ITS

software.– Establish a software standard at TMCs throughout the

State of Florida.– Reduce multiple TMC software development,

maintenance, and update costs.

SunGuide software goals:– Flexible and expandable to match individual TMC needs.– Respond to traffic incidents in a rapid, accurate, and

effective manner.

July 14, 2004SunGuide Software: Status Update 3

Project Web SiteProject Web Site

http://sunguide.datasys.swri.edu

July 14, 2004SunGuide Software: Status Update 4

SunGuideSunGuideSMSM Software Architecture Software Architecture

Robust

Extensible

Flexible

Scalable

Configurable

Proven

July 14, 2004SunGuide Software: Status Update 5

Release-Oriented Release-Oriented Development ApproachDevelopment Approach

July 14, 2004SunGuide Software: Status Update 6

Scope of SunGuideScope of SunGuideSMSM Effort Effort

Release 1:– Core software framework:

• Database• Process viewer• Status logger• User interface• Map

– DMS subsystem, drivers for:• NTCIP Florida MIB• Mark IV version 2.5

– CCTV subsystem, drivers for:• NTCIP camera support• NTCIP Video Switch Support• IP-Video support• Barco Video Wall Support

– Traffic Detection, driver for:• BiTrans B238-I4• RTMS (EIS and Wavetronix)• Microloops (3M)

– Incident management subsystem

Release 2a:– Core software framework upgrade– Center-to-Center – FDOT Central office configuration– Ramp metering – DMS subsystem, drivers:

• Trailblazers– RWIS – Archive data – HAR– Web server – Emergency evacuation

Release 2b:– Inventory and maintenance

July 14, 2004SunGuide Software: Status Update 7

Traffic ConditionsTraffic Conditions

July 14, 2004SunGuide Software: Status Update 8

Camera Control GUICamera Control GUI

July 14, 2004SunGuide Software: Status Update 9

DMS Status GUIDMS Status GUI

July 14, 2004SunGuide Software: Status Update 10

DMS Control GUIDMS Control GUI

July 14, 2004SunGuide Software: Status Update 11

Event ManagerEvent Manager

July 14, 2004SunGuide Software: Status Update 12

Incident Management Data EntryIncident Management Data Entry

July 14, 2004SunGuide Software: Status Update 13

Response Plan GUIResponse Plan GUI

July 14, 2004SunGuide Software: Status Update 14

Center-To-CenterCenter-To-Center

Status:– Centers must explicitly subscribe for data– User must choose to view the data

Command/Control: sender must have credentials at the receiving center

July 14, 2004SunGuide Software: Status Update 15

Center-to-CenterCenter-to-Center

User wishes to view other center’s data:

– Systems administrator must configure SunGuide to subscribe to other center’s data

– User must configure User Interface to display other center’s data

User wishes to command a remote center’s devices:

– Select equipment to command

– Issue command (credentials established locally will be transmitted to the remote center)

– Conflict resolution occurs at remote center

July 14, 2004SunGuide Software: Status Update 16

High Level ScheduleHigh Level Schedule

Software Releases

– Release 1 – November 2004: District 4

– Release 2a – August 2005: District 6

– Release 2b – November 2005: Statewide

Short-term deployments:

– District 4 Broward County RTMC

– District 6 Miami RTMC:

• Early release of Ramp Meter with Release 1 target for May / June 2004

July 14, 2004SunGuide Software: Status Update 17

Schedule StatusSchedule Status

Current schedule is posted to project web site

Functional threads that can be demonstrated:– Support processes (executive, logging)– Data Bus– GUI / Map– Incident Management– Administrative Editor– DMS:

• Subsystem master process• Mark IV• NTCIP

– CCTV:• Subsystem master process• NTCIP CCTV Camera control

– TSS:• Subsystem master process• BiTrans simulators

July 14, 2004SunGuide Software: Status Update 18

Functional Threads: Functional Threads: Graphical ViewGraphical View

July 14, 2004SunGuide Software: Status Update 19

District 4 Milestone DemoDistrict 4 Milestone Demo

Milestone Demonstrations: demonstrate system functionality prior to formal release

Coordination meeting took place July 1, 2004:– D4 discussed current configuration and projects

underway

Field / Center tours– Current center interfaces to field equipment /

infrastructure– Field interface to sign equipment– New center interfaces

Milestone demo date is still TBD; weekend testing is likely

July 14, 2004SunGuide Software: Status Update 20

Release 1+ Ramp Metering in D6Release 1+ Ramp Metering in D6

Need: D6 needs Ramp Meeting before release 2a will be complete.

Release 1+– Incorporate ramp metering into Release 1– Not formal release

Schedule– Install 6/1/2005– Operational 6/30/2005

July 14, 2004SunGuide Software: Status Update 21

Liang Y. Hsia, P.E.

[email protected]

(850) 410-5615

Florida Dept. of Transportation

605 Suwannee St. MS 90

Tallahassee, Florida 32399-0450

Robert Heller

[email protected]

(210) 522-3824

Southwest Research Institute

P.O. Drawer 28510

San Antonio, Texas 78228

Questions?

Contact Information:

http://sunguide.datasys.swri.edu