Stave 250: Preparations at RAL. Peter & Martin. Stock at RAL. BCC V3 1 with correct R TERM fitted 3 with R TERM removed 19 scheduled to have R TERM removed 10 more to be shipped with the stave core EoS 1 cut (ready for stave) 1 uncut Modules Cambridge M5, M6 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Stave 250: Preparations at RAL

Stave 250: Preparations at RAL

Peter & Martin

Page 2: Stave 250: Preparations at RAL

Stock at RAL• BCC V3

– 1 with correct RTERM fitted– 3 with RTERM removed– 19 scheduled to have RTERM removed– 10 more to be shipped with the stave core

• EoS– 1 cut (ready for stave)– 1 uncut

• Modules– Cambridge M5, M6– “US module” – can anyone confirm its identity?

• 7 boxes in progress at Liverpool, more modules will ship soon

• Tandem DC-DC– 1 uncut, unmounted

• Did not work unloaded during CERN tests, best avoid?– 1 uncut, mounted– 12 cut, mounted

• Significant glue voids on most samples, only 2 good for use• Remainder will return to Oxford to be reworked

Page 3: Stave 250: Preparations at RAL

OK

Page 4: Stave 250: Preparations at RAL

OK

Page 5: Stave 250: Preparations at RAL

“BURCO2” cooling plant• Plumbing to gas shed partially done• Gas shed contains gas panel & 1 bottle• Pipes to connect to stave frame ready

CO2 Safety• Bund under plant collects lost CO2 • Will house “Cellar Safe” Detector (below)• Alarm will

• close CO2 Solenoid• Start extractor fan (flex pipe)• Be shown on repeaters at room doors

Page 6: Stave 250: Preparations at RAL

The stave will sit in its own bund. CO2 collected in this one “drains” to thelower Bund (with the CO2 sensor) through a fan assisted pipe (not shown).

The stave test coverhas a clear panel toverify there is no ice.An opaque lid will sit on top of this.

Page 7: Stave 250: Preparations at RAL

Cables & Readout• LV pigtail and cable made (shown on last slide)• HV cable Glenair to D37 Made

– D37 extension in progress• mates directly to HV MUX box

– Patch panel to 12 SCTHV channels in progress as backup• HSIO and 2 x CPX400DP PSU will sit on shelf on top of the bund

– Within reach of 5ft SAMTEC cables• 3 * SCTHV will sit in half height rack below the bench• Cambridge Interlock will monitor cooling and interlock Stave

power• New windows 7 PC to be installed next week