Pelekane Bay Watershed Restoration Project August 2009 - February 2011

Upload: rhonda-graham

Post on 30-Dec-2015

23 views

Category:

Documents


0 download

DESCRIPTION

Pelekane Bay Watershed Restoration Project. August 2009 - February 2011. Funding - $2.9 million. A competitive grant for coastal restoration projects nationwide. 800+ projects submitted; 50 projects funded, two in Hawaii. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Pelekane Bay Watershed Restoration Project

Pelekane Bay WatershedRestoration Project

Pelekane Bay WatershedRestoration Project

August 2009 - February 2011

Page 2: Pelekane Bay Watershed Restoration Project

Funding - $2.9 millionFunding - $2.9 million

A competitive grant for coastal restoration projects nationwide. 800+ projects submitted; 50 projects funded, two in Hawaii.

A competitive grant for coastal restoration projects nationwide. 800+ projects submitted; 50 projects funded, two in Hawaii.

American Recovery and Reinvestment Act = need to be “shovel ready” and have a focus on hiring people to get them to work doing conservation activities.

American Recovery and Reinvestment Act = need to be “shovel ready” and have a focus on hiring people to get them to work doing conservation activities.

Page 3: Pelekane Bay Watershed Restoration Project
Page 4: Pelekane Bay Watershed Restoration Project
Page 5: Pelekane Bay Watershed Restoration Project

Storm flow - November 2010

Page 6: Pelekane Bay Watershed Restoration Project

Sediments

Page 7: Pelekane Bay Watershed Restoration Project

How did this happen?How did this happen?

FireFire

GoatsGoats

Bare GroundBare Ground Exotic GrassesExotic Grasses

eat everything except

consume native vegetation

fire-grass cyclechanges soil texture = no infiltration

ErosionErosionSediments smother coralSediments smother coral

Page 8: Pelekane Bay Watershed Restoration Project

FireFire

GoatsGoats

Bare GroundBare Ground Exotic GrassesExotic Grasses

eat everything except

consume native vegetation

fire-grass cyclechanges soil texture = no infiltration

ErosionErosionSediments smother coralSediments smother coral

Page 9: Pelekane Bay Watershed Restoration Project

Completed 18 miles of goat-proof fencing, and controlled feral goats inside fence.

Page 10: Pelekane Bay Watershed Restoration Project
Page 11: Pelekane Bay Watershed Restoration Project
Page 12: Pelekane Bay Watershed Restoration Project
Page 13: Pelekane Bay Watershed Restoration Project

FireFire

GoatsGoats

Bare GroundBare Ground Exotic Grasses

eat everything except

consume native vegetation

fire-grass cyclechanges soil texture = no infiltration

ErosionErosionSediments smother coralSediments smother coral

Page 14: Pelekane Bay Watershed Restoration Project

Created a 400 acre protected stream corridor for native plant restoration.

Page 15: Pelekane Bay Watershed Restoration Project
Page 16: Pelekane Bay Watershed Restoration Project
Page 17: Pelekane Bay Watershed Restoration Project
Page 18: Pelekane Bay Watershed Restoration Project

FireFire

GoatsGoats

Bare GroundBare Ground Exotic GrassesExotic Grasses

eat everything except

consume native vegetation

fire-grass cyclechanges soil texture = no infiltration

ErosionErosionSediments smother coralSediments smother coral

Page 19: Pelekane Bay Watershed Restoration Project

Treated about 13 acres of bare ground with erosion control fabric embedded with native seed

Build 60 sediment check dams in barren areas.

Page 20: Pelekane Bay Watershed Restoration Project
Page 21: Pelekane Bay Watershed Restoration Project
Page 22: Pelekane Bay Watershed Restoration Project
Page 23: Pelekane Bay Watershed Restoration Project
Page 24: Pelekane Bay Watershed Restoration Project
Page 25: Pelekane Bay Watershed Restoration Project
Page 26: Pelekane Bay Watershed Restoration Project
Page 27: Pelekane Bay Watershed Restoration Project

Many hands make light(er) work.

Keep it local.

Page 28: Pelekane Bay Watershed Restoration Project
Page 29: Pelekane Bay Watershed Restoration Project
Page 30: Pelekane Bay Watershed Restoration Project
Page 31: Pelekane Bay Watershed Restoration Project
Page 32: Pelekane Bay Watershed Restoration Project
Page 33: Pelekane Bay Watershed Restoration Project
Page 34: Pelekane Bay Watershed Restoration Project
Page 35: Pelekane Bay Watershed Restoration Project

What did we accomplish?

Constructed 18 miles of fence to make 6600 acre goat-free

area

Created a 400 acre restoration area free of cattle, pigs and

goats

Protected 50,000 existing native plants from animal

damage

Planted more than 30,000 native trees, shrubs and ground

covers

Laid more than 10 miles of irrigation line

Built 60 sediment check dams; each can hold 10 tons of

sediment

Treated 13 acres of bare soil with fabric seeded with native

plants

Grew more than 30 species of native plants from seed we

collected

Employed and trained 35 local people over the course of

the project

Page 36: Pelekane Bay Watershed Restoration Project

Mahalo!Mahalo!