  • Outotec - All rights reserved

    Outotec Ausmelt Technology

    Santiago, Chile

    December 1-4, 2013

    Outotec Ausmelt Technology for DNMC Design and Commissioning

    Mr Wan Jun, Mr Luo Yi and Mr Chen Baizhi (DNMC)Mr Gavin Swayn, Mr Jacob Wood and Ms Stefanie Creedy (OT)

  • Outotec - All rights reserved

    Introduction Thank you to co-authors

    Thank you to Daye for allowing this paper to be prepared

    2 Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Introduction Thank you to co-authors

    Outotec colleagues - for the input and efforts to help assess and prepare this paper.

    3 Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Introduction In 2008, Daye Nonferrous Metals

    Company Limited (DNMC) made the decision to expand and improve its operating capacity at its operations in Daye City, Hubei, China.

    The expansion aimed to Modernise the operations, Improve process flexibility, Expand capacity in smelting and refinery

    operations

    The project was cited as Energy Saving Environmentally Efficient Copper Smelter.

    Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Introduction to DNMC

    5 Copper 2013 Commissioning/Startup DNMC Presentation

    Daye, Hubei

    Ausmelt

  • Outotec - All rights reserved

    Introduction to DNMC

    6

    Daye Non-Ferrous Metals Company Top 500 enterprises in China Founded in 1953

    Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Introduction to DNMC

    7

    Daye Non-Ferrous Metals Company More than 50 years DNMC has grown to be

    one of Chinas main copper industries.

    Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Introduction to DNMC

    8

    Main products of DNMC are

    Copper cathode

    Gold and silver

    PGMs Sulphuric acid Other rare

    metal products

    Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Outotec Ausmelt Process History

    9

    1970sDr J. Floyd develops Top Submerged Lance Technology at the CSIRO.

    1980s1981 Ausmelt founded. First commercial scale Ausmelt plants installed 4 projects commissioned.

    1990-2000Growing acceptance 12 further projects commissioned.

    2000AusIron demonstration plant is commissioned for iron production at 2 t/h demonstration scale

    2000 - 2010A leading smelting technology 19 further projects commissioned

    2010 Ausmelt becomes part of

    15 further projects commissioned or commenced design

    Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Outotec Ausmelt Process around the world

    10Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Outotec Ausmelt Process History

    Continually developed - over 30 years experience.

    Over 65 commercial AusmeltFurnaces have been installed or in design/construction phase.

    Total Solutions available as part of the Outotec smelting team best practices utilized

    11

    1970sDr J. Floyd develops Top Submerged Lance Technology at the CSIRO.

    1980s1981 Ausmelt founded. First commercial scale Ausmelt plants installed 4 projects commissioned.

    1990-2000Growing acceptance 12 further projects commissioned.

    2000AusIron demonstration plant is commissioned for iron production at 2 t/h demonstration scale

    2000 - 2010A leading smelting technology 19 further projects commissioned

    2010 Ausmelt becomes part of

    14 further projects commissioned or commenced design

    Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Ausmelt TSL Process Overview

    3/12/201312

    Relative simple furnace constructionTop Submerged Lance (TSL) processInjection of process gases & fuel via lance

    High rates of heat and mass transferEnergy efficient process

    Good environmental performance Suitable for continuous and batch processes

  • Outotec - All rights reserved

    Outotec Ausmelt Copper Smelting - Daye

    Recycled Dusts

    Matte

    Discard Slag

    Matte / Slag

    AusmeltSmelter

    Settling (ESF)

    Copper Concentrates

    AirOxygen

    Fuel Coal

    LimestoneSilica

    Cu

  • Outotec - All rights reserved

    Outotec Ausmelt Application Features

  • Outotec - All rights reserved

    Daye ESEE Project

    15

    Replace Reverbatory and Noranda furnace operations Maintain existing PS Converters and anode furnace in converter aisle Ausmelt furnace and ENFI designed/supplied ESF

    Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Daye ESEE Project Start-up Milestones

    2008 Engineering Design for Ausmelt furnace and ESF

    Additionally the gas handling system for furnaces

    2009 18th July 2009 plant foundations were officially laid

    2010 November - following 555 days of plant construction

    and cold commissioning, the project moved into the hot commissioning phase

    December 31st - copper matte/slag flows from the Ausmelt furnace to the ESF via the weir

    3.12.201316 Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Daye ESEE Project Technology Transfer Technology Transfer is Integral to All projects Engineering design and Know-how Transfer

    Equipment Supply Training

    Construction Visits Management/metallurgical/operator training

    Cold and Hot Commissioning Support Ausmelt/Outotec provides experienced resources to support site

    cold commissioning programs, training etc Ausmelt/Outotec provides experienced resources to support site

    hot commissioning leadership/advice and operational training etc

    Provide Advisor Tools as art of its control system supply Ongoing Support

    Through extensive resources and global company Outotecoffers on going support to all our clients

    3.12.201317 Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Equipment Design/Supply Ausmelt Furnace - 2010

    3.12.201318

    Dimensions Internal diameter 5 m Internal height 16.5 m

    Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Ausmelt Furnace Weir (2010)

    3.12.2013 Outotec19

    Ausmelt Weir Operation Critical to high throughput Transfers continuously

    matte and slag to an ESF

    Specifically designed in all Outotec Ausmeltcopper smelter applications

    AusmeltFurnace

    AusmeltFurnace

    WeirMatte + Slag Underflow

    Weir overflow spout

  • Outotec - All rights reserved

    Ausmelt Furnace Weir (2010)

    3.12.2013 Outotec20

  • Outotec - All rights reserved

    Ausmelt Ancillary Equipment Lances

    Coal fired with 60% oxygen enrichment

    Air Blower 38,000 Nm3/h at 170 kPa 15,000 Nm3/h at 130 kPa 7,800 Nm3/h at 120 kPa

    Oxygen Plant Existing 6,000 Nm3/h at 100 kPa New 28,000 Nm3/h at 100 kPa

    (April 2011)

    3.12.201321 Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Ausmelt Furnace Feed Preparation

    8 New feed bins were installed 4 bins were used for

    different concentrates 1 separate bin for

    each of silica, lump coal and limestone

    Blending of materials is completed in the Ausmelt PCS as set by the operator.

    3.12.201322 Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Ausmelt Ancillary Equipment

    Waste Heat Boiler 120,000 Nm3/h at inlet

    1100 110 t/h steam production

    ESP 120,000 Nm3/h at inlet

    350

    3.12.201323 Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Electric Settling Furnace

    3.12.201324

    Rectangular 20m x 8m Hearth 1600 m2

    Electrical power 2 x 6000kVA 6 x1000mm Electrodes

    Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Converting and Fire-Refining

    3.12.201325

    PS Converters 1 x 80t capacity (existing) 1 x 120 t capacity (existing)

    1 x 120 t capacity installed in 2012

    Anode furnaces (existing) 480 t and 240 t

    Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Casting

    3.12.201326

    Anode Casting 1 x 10 m Twin M16 100t/h Outotec Casting Wheel

    (existing) 1 x 10 m Twin M18 110t/h Outotec Casting Wheel

    (2012)

    Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Tankhouse (2012 -2013)

    3.12.201327 Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    The First 12 Months

    3.12.201328 Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Process Management

    Following completion of the modernisation the Daye Ausmelt Smelter has continued to operate at or above design capacity. Despite some variations in feed grade (%Cu) the

    plant has fed up to 230 t/h. Oxygen enrichments of 60 % have not been

    detrimental to lance life. Slag/matte temperatures are controlled via pyrometer

    measurements from the weir outlet and are typically reported in the range of 118510.

    Feed carry over typically less than 0.5%.

    3.12.201329 Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Process Management

    3.12.201330

    ESF Matte and Slag Grade Variation 2011

    Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Process Management - 2013

    3.12.2013 Outotec31

    0

    5

    10

    15

    20

    25

    30

    35

    40

    0

    0.5

    1

    1.5

    2

    2.5

    3

    3.5

    4

    4.5

    5

    Jan. Feb. Mar. Apr. May June July Aug. Sep.

    wt %

    Fe

    and

    SiO

    2in

    Sla

    g

    wt %

    Cu,

    CaO

    and

    Fe/

    SiO

    2 in

    Sla

    gAverage 2013 Ausmelt/ESF Slag

    % Cu [Avg 0.827]

    Fe/SiO2 [Avg 1.31]

    % CaO [Avg 3.93]

    % SiO2 [Avg 27.5]

    % Fe [Avg 36.1]

  • Outotec - All rights reserved

    Process Management

    3.12.2013 Outotec32

    Concentrate Grade Variation - 2011

  • Outotec - All rights reserved

    Process Management - 2013

    3.12.2013 Outotec33

    0

    5

    10

    15

    20

    25

    30Ja

    n-13

    Feb-

    13

    Mar

    -13

    Apr-

    13

    May

    -13

    Jun-

    13

    Jul-1

    3

    Aug-

    13

    Sep-

    13

    wt %

    in C

    once

    ntra

    te (

    daily

    ave

    rage

    )

    DNMC Ausmelt Copper Smelter - Concentrate Grade 2013

    Cu

    S

    Fe

    SiO2

    CaO

  • Outotec - All rights reserved

    Process Management - 2013

    3.12.201334

    Jan. Feb. Mar. Apr. May June July Aug. Sep.Oxygen enrichment 59.47 60.54 59.76 58.95 58.65 59.27 59.42 58.23 59.24Matte grade 53.644 56.076 56.625 56.176 57.415 57.366 57.534 57.026 56.954

    50

    52

    54

    56

    58

    60

    62

    % C

    u in

    Mat

    te a

    nd%

    O2

    in L

    ance

    Gas

    esDNMC Operations 2013

    Avg Matte Grade (Cu) and Lance Oxygen Enrichment

    Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Conclusions - Ausmelt TSL Projects - Copper

    Client Location Feed Annual Throughput(t/y) Starting YearXinjiang Wuxin Copper Co. Ltd. Urumqui City, China Cu Concentrates 575,000 Oct 2013Yunnan Tin Co. Ltd. Geiju City, China Cu Concentrates 450,000 2012Yunnan Tin Co. Ltd. Geiju City, China Cu Matte 190,000 2012 &Huludao Copper Group Huludao City, China Cu Concentrates 500,000 On HoldDaye Non-Ferrous Metals Co. Huangshi City, China Cu Concentrates 1,500,000 2010Chifeng Jinjian Copper Group Chifeng City, China Cu Concentrates 480,000 2008Russian Copper Company Karabash, Russia Cu Concentrates 550,000 2006Birla Copper Dahej, India Cu Concentrates 350,000 2003 on holdBirla Copper Dahej, India Cu Matte 160,000 2003 on holdAnhui Tongdu Copper Tongling City, China Cu Concentrates 330,000 2003Zhong Tiao Shan Houma City, China Cu Concentrates 200,000 1999Zhong Tiao Shan Houma City, China Cu Matte 60,000 1999 &

    Nambia Custom Smelters* Tsumeb, NamibiaCu Concentrates

    (from 2008)140,000 1997/2008

    3/12/201335

    Client Location FeedAnnual Throughput

    (t/y) Starting YearGlobal Resources and Materials South Korea Cu Secondaries 110,000 2011Dowa Mining Co. Ltd. Akita, Japan Cu Secondaries 150,000 2007Korea Zinc Onsan, South Korea Cu Residues 70,000 2004

    Primary Copper

    Secondary Copper

  • Outotec - All rights reserved

    Conclusions - Ausmelt TSL Copper Plant

    3/12/2013 Outotec Ausmelt36

  • Outotec - All rights reserved

    Conclusions

    Outotec Ausmelt technology has been successfully applied by DNMC as part of the modernisation of their existing operations in China.

    The plant is currently operating with concentrate feedrates of greater than 200 t/h and more than 90% availability.

    Incorporation of the underflow weir has facilitated not only such high throughput but also improved process control.

    3.12.201337 Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Conclusions

    The DNMC project demonstrated the advantages of the technology for treatment of variable throughput and low grade concentrates.

    The replacement of the Noranda and reverbatory furnace operations has provided superior environmental performance in line with the Chinese National Emission Reduction policies.

    3.12.201338 Copper 2013 Commissioning/Startup DNMC Presentation

  • Outotec - All rights reserved

    Outotec Ausmelt Technology

    Sustainable useof Earthsnaturalresources

    3.12.201339

    THANK YOU!

    Copper 2013 Commissioning/Startup DNMC Presentation