merck serono transportation plan (geneva, switzerland)

17
Merck Serono Transportation Plan (Geneva, Switzerland)

Upload: adin

Post on 09-Jan-2016

52 views

Category:

Documents


1 download

DESCRIPTION

Merck Serono Transportation Plan (Geneva, Switzerland). About Merck Serono. Merck Serono is the pharmaceutical division of Merck KGaA. 1’300 employees work at the Headquarters in Geneva. Context. Problem Areas Decision to regroup three work locations into one - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Merck Serono Transportation Plan (Geneva, Switzerland)

Merck Serono Transportation Plan (Geneva, Switzerland)

Page 2: Merck Serono Transportation Plan (Geneva, Switzerland)

14/05/2009 Merck Serono transportation plan - Ecomm 2009 2

About Merck Serono

• Merck Serono is the pharmaceutical division of Merck KGaA.

• 1’300 employees work at the Headquarters in Geneva

Page 3: Merck Serono Transportation Plan (Geneva, Switzerland)

14/05/2009 Merck Serono transportation plan - Ecomm 2009 3

Context

Problem Areas

• Decision to regroup three work locations into one

• Reduction of the ratio of parking space per employee from 0,74 to 0,16 (1 parking space for 6 employees)

Initial Objectives of the Transportation Plan

• Minimize the negative effects caused by the lack of parking spaces

• Persuade those concerned that the quality of transport can be maintained

Page 4: Merck Serono Transportation Plan (Geneva, Switzerland)

14/05/2009 Merck Serono transportation plan - Ecomm 2009 4

The Transportation Plan

Objectives of the Transportation Plan

• Encouraging alternatives to single-occupancy car-use

• Taking staff needs into account

• Promoting equity

• Optimising the use of the car park

• Enabling employees to come to work in good conditions

Page 5: Merck Serono Transportation Plan (Geneva, Switzerland)

14/05/2009 Merck Serono transportation plan - Ecomm 2009 5

Transportation Plan Event History

• December 2005 : information, geo-localisation, online survey for all employees and the creation of two working groups

• March 2006 : Results of the geo-localisation, the survey and cross-analysis

Page 6: Merck Serono Transportation Plan (Geneva, Switzerland)

14/05/2009 Merck Serono transportation plan - Ecomm 2009 6

Investigation Results

Page 7: Merck Serono Transportation Plan (Geneva, Switzerland)

14/05/2009 Merck Serono transportation plan - Ecomm 2009 7

Transportation Plan Event History

• December 2005 : information, geo-localisation, online survey for all employees and the creation of two working groups

• March 2006 : Results of the geo-localisation, the survey and cross analysis

• January 2007 : Implementation of the first measures

Page 8: Merck Serono Transportation Plan (Geneva, Switzerland)

14/05/2009 Merck Serono transportation plan - Ecomm 2009 8

The Measures

Code of Practice Based on Eligibility :

• Permanent reduced mobility

• Company car

• Parents with children in the company’s nursery

• Carpooling members

• Dissimilarity between the time span required by car and combined transport > 1,5 (staff who live 40 minutes away from work using shared transport)

Page 9: Merck Serono Transportation Plan (Geneva, Switzerland)

14/05/2009 Merck Serono transportation plan - Ecomm 2009 9

The Measures

Encouraged Measures

• Transport allowance depending on home location (up to 400 €/an)

• The option of purchasing local public transport directly on the website + discount prices

• Quota of 35 admissions to the company car park

• Inside parking spaces for bicycles + discount on electric bikes

• Online Information on how to get to Headquarters

• Networking options for the carpooling scheme

Page 10: Merck Serono Transportation Plan (Geneva, Switzerland)

14/05/2009 Merck Serono transportation plan - Ecomm 2009 10

Transportation Plan Management

Specific IT Application

• Information on how to access the worksite

Page 11: Merck Serono Transportation Plan (Geneva, Switzerland)

14/05/2009 Merck Serono transportation plan - Ecomm 2009 11

Transportation Plan Management

Specific IT Application

• Information on worksite access

• Networking between employees wishing to participate in the carpooling scheme

• Occasional parking bookings (on-line, confirmation by e-mail/text, or phone

• Management of the transport allowances

Page 12: Merck Serono Transportation Plan (Geneva, Switzerland)

14/05/2009 Merck Serono transportation plan - Ecomm 2009 12

Monitoring

• Reel-time management of the car park

Page 13: Merck Serono Transportation Plan (Geneva, Switzerland)

14/05/2009 Merck Serono transportation plan - Ecomm 2009 13

Transportation Plan Event History

• December 2005 : information, geo-localisation, online survey for all employees and the creation of two working groups

• March 2006 : Results of the geo-localisation, the survey and cross analysis

• January 2007 : Implementation of the first measures

• January 2008 : monitoring by means of an online survey

• June 2008 : Implementation of news mesures

• January 2009 : monitoring by means of IT application

Page 14: Merck Serono Transportation Plan (Geneva, Switzerland)

14/05/2009 Merck Serono transportation plan - Ecomm 2009 14

Evaluation

An Important Progress

• + 12% of carpooling

• + 7% Park and Ride

• + 34% Public transportation

• + 1% Bicycle / walking

Page 15: Merck Serono Transportation Plan (Geneva, Switzerland)

14/05/2009 Merck Serono transportation plan - Ecomm 2009 15

Evaluation

Page 16: Merck Serono Transportation Plan (Geneva, Switzerland)

14/05/2009 Merck Serono transportation plan - Ecomm 2009 16

Evaluation

- 53% CO² emissions in two years

Page 17: Merck Serono Transportation Plan (Geneva, Switzerland)

14/05/2009 Merck Serono transportation plan - Ecomm 2009 17

THANK YOU FOR YOUR TIME!