0 July 25,1984 Ma. Mertlyn M. Wade Environmental £ncineer Wu te Manacement Di vision U.S. EnvlronmenW Protection Acency Keeton 1 .JPK federal Building Bolton, MA 02203 Ret Landfill c!c Retource Recovery, Inc. Specifications tor Bue Liner System (WE Project No. 023401 01) DeuMa. Wade l Encloeed pleue find techrrlcal specifications tor the bue llner system that will be lnltalled at the Lc!cRR taciUty in North Smithfield, Rhode laland. The tll*incatlons renect the installation of a 20 mil PVC Uner. 1'tdl information wu lnadvert•tty transmitted to our office rather than to EPA u 8ll'eed clwina the July 10, 1114 meetin& between EPA, L6:RR, and Wehran oiRdoll. Wehran £nclnMrinC, on behalf of LA:RR, wW submit appropriate detalll ..... ,. the EPA concerns prior to Aucust 3, 1114. The IUbmt.Jon wW detail the requirements for bue Unar slope, leachate aump installation, between bue liner and MUOM1 table, and a or the water balance that wu prepered for the Lc!cRR lite. lhould you have any quettiOI'II or comments prior to the albmt..lon or thne materials, pleue contact this office. Vary truly yours, WEHRAN ENGINEERING CORPORATION VIce President WJS.Jbp Enclosure CC I C.Wibon R. PellDO .J. Smaldone NewEnglandOtuce 32 Oepol Square Hampton, New Hampshire 03842 (603)92f-7A7

Upload: others

Post on 23-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LETTER REGARDING SPECIFICATIONS FOR BASE LINER SYSTEM · Tb~ a~ to be corered bu the c!ille:naiON of 800 fe.t. b7 llOO teet., p1u1 300· teet. lt 600 teet. includ.ina all.owanc•

0

July 251984

Ma Mertlyn M Wade Environmental poundncineer Wu te Manacement Division US EnvlronmenW Protection Acency Keeton 1 JPK federal Building Bolton MA 02203

Ret Landfill cc Retource Recovery Inc Specifications tor Bue Liner System (WE Project No 023401 01)

DeuMa Wadel

Encloeed pleue find techrrlcal specifications tor the bue llner system that will be lnltalled at the LccRR taciUty in North Smithfield Rhode laland The tllincatlons renect the installation of a 20 mil PVC Uner

1tdl information wu lnadvertbulltty transmitted to our office rather than to EPA u 8lleed clwina the July 10 1114 meetinamp between EPA L6RR and Wehran oiRdoll

Wehran poundnclnMrinC on behalf of LARR wW submit appropriate detalll the re~ EPA concerns prior to Aucust 3 1114 The IUbmtJon wW detail the requirements for bue Unar slope leachate aump installation eap~~ratlon between bue liner and MUOM1 ~middottar table and a ~ion or the water balance that wu prepered for the LccRR lite

lhould you have any quettiOIII or comments prior to the albmtlon or thne materials pleue contact this office

Vary truly yours

WEHRAN ENGINEERING CORPORATION

w~JIL VIce President

WJSJbp Enclosure CC I CWibon

R PellDO J Smaldone

NewEnglandOtuce 32 Oepol Square Hampton New Hampshire 03842 (603)92f-7A7

SPEClriCATIONS

Fa

UNIFIU UNER

FOR

UNIFIU bull RESOORCB RtOImt INC

IDlTH SKIniFUID RI 02876

10 General

20 Scope

JO Site Preptration

40 Uner Spec111cetiom

41 Gonenl

4middot2 PbJaical R~renta

4) Febricatioc

Sin

~o IrwtlllbullUbull

~1 CeMn1

~2 Fh1d Splicinc

~ Techn1cal Aaaiatance

60 Coot

Februa17 24 1984

SftlIfiCATIONS FOR LANDFILL lJNER

LANInLL l RESOORCE RroVRY 1 INC

NORTH SKITHflnD1 RI 02876

10 Genenl

LardfUl A ReiCilrU Recwe171 Inc viahee to soUeit cost proposala to

auppl7 a 20 Jdl1 unrdnfoned Pol7ritlfl chlorLde (PVC) Uner to eanr all

of their site located in North Sadthtleld1 middotRI

All work in preparinc the site ard iretallins tha liner will be

eorductecl b7 LardfUl A ReeCilrce Reccwe17 Penonnel The euppller vUl be

re~pcntible for the bullrufacture ard delin17 of the liner ard technical

auperrlaion or the iNtampllation

The bida an beina 1olicited b7 Lard11ll A ReaDlnt RecftJbull Inc

6S Oleele lAne Vanrick1 RI 02888 on behalf of the L A R L Site

locate ia llorth Sldththld B1dl vill be acceptS at the L A RR ot11ce

65 OKeefe Lane Vanrict RI 028881 no later than 12 Boon TuecIJ1

March 131 1984 The bid packace ahall inclllle tbe coe11 u dilcusaS

in Section 60 to corduct the vorlr dbullcribS heNln Also to be incbded

in the bid packace are the liner apecif1catiON u MUnS in Section 40

an bulltlaate b7 the 1uppller or the earlibullt date on vtdcb the PVC aner

can be dellvered at the dte1 and four (It) nferencbull of prwioaa a1111lar

work

Upon receipt or the bidl1 L A PR Inc v1ll eelect a supplier buS

on lCIIea~ total cost for all it- outlined in thb specit1cation 1n

awa~ or the contnet will be ca~plettd br TUesd March 21 1981

L A RR Inc reserves the riampht to reject aJV an all bicb tor azv

reason but thil is unlike]J No bid will be cOJWidered it total del1YeJ7

ca~ be actOIIlplltbed bJ the erd of Mq Total payment for the Uner IIUit

be m~de before the erd of June the cl01e of wr f1eeal 7ear

20 Scope

Tbe vork includes the upplJ ard delive17 or an impemuble bullmbrane

ror the isolation Or vaate bullterlab within a lall11ill Alao includad

v1ll be teehncal uailtance ard advice on installation ani bondinamp of

the liner The liner 1- to be irtallecl cwertop a previoualJ placed

ard aradecl aaU ccwer ard a alllll portion v1ll be installed on rlrampin

amprounl u a bottca liner AU vork on unloading placinamp field aplicina

ard uther_ irtallation related itCII will be cOBucted bTL bull RL

peracnael

30 Site Preparation

All site pnparation vork will be parfomat bT L bull Rll penomel

H011er the auppller ablll awit witb h1a quotat1on rtc~crdatiom

u tha tba llral ampndina or tha 11n1ahS lard11ll aurfaca L bull LBshypenomel han auccbullbullfllllTbull in 19791 pnrlcua]J iNtalled 2001000 sr

of 20 U Pv c liner ard an tudliar vitb aua

ltbullO Uner Spaci11cat1orw

The bullbullnne to be auppllat ahall be abntinc Mda ot Uftlftntorcecl

~nrlchloride (PVC) ard ahampll be 20 U 1D thickDeal PVC bulltariW

bullhall be Mlllfactured 1101 de~~bulltic vircln poJJryirvl chloride roin ard

apec111c~Jl1 cOIIIpCIUIded for uae in Vdraulic tacilltibull in a 1tandanl

aim- Vidth of S4 inchbull Reprocesaed bullterial aball not be Uied

lu2 hysical Reguirementa

The polTdrvl chloride bullembrane ahall bulleet the ~ical requirmente

llatlaquolt belews Please Wo pn an estiaampte or anticipated lite vben liner 11

in contact with clean tina eand and CCJIered with 2 or clean Une eard

to pTCVeot aunlight Please elva an estizrate or life vhile Uposecl to

direct sunlight

middot PHYSICAL REQUIREoENTS

Hfnfm1111 lest Tnt Value-d ~

Thickness bullfl 20 5~ ASlM 0-1593 Spoc1f1c GriY1 ty 123-130 ASlM 0-712-A Tensile Strength psi bullfn 2200 ASlM 0882-A Elongation l~nfn 300S ASlM 0882-A 10~ Modulus ps1 1000-1600 ASTM 0882-A Elmendorf Tur gbullslbullfl bull1n 160 ASlM 01912 Graves Tear 1bsfnbull1n 270bull ASTM 01004 Water Extractfon llllX 0 35 ASlM 01239 Vo1atf11ty I 1000 bullx 075 ASTM 01203

Impact Cold Crack F -20 ASlM 1790 Dfmensfona1 Stlbflfty (at 100 C 15 111fn l

s 1111x change 5 Bonded Sebull Strength of

Ttnsfl e bullfn 801 1 ASTM 0882shyPfnholeslo sq yds bullx none Resistance to Burfll Par 14c Ill por

Tensfl e Strength lou S bullx USSR procedure Elongation loss s bullx

Color Black or Gr

The supplfer shall sutft wfth his quotation the

nlues and test ~~ethods of hh p1opou1 -brant

middot

43 Fabrication

The aabnnp aball be 1hop fabricated into atardard lized larabull

aectilaquo~~ bullbull described in 44 aJd into odd-aized pieces u required to

1uit the racillt7 to llirdJdnthe ruzher of 11eld aplica

Attar fabrication the IIlaquoDbnne shall be packed for eu7 and 1~

hanUinamp in the field Shippina ccmtainerw capabl_e of prenntinamp duaae

to the contentbull during 1hipmeot and 11eld hanUinc bullhall be prcwided bJ the

supplier These containen shall be actequatel7 bullriced with panel rumbere

con-eepon11na to the panel laJCIUt drewinc provided in aeetion sl 44 Sfio

Tbe tOtal area to be corend bJ the C bull-brane Ylll be 110600oo

square feet ot ll71778 square 71~ plua 1001000 square tet tor a battca

llnar aaldnamp a total of 11 ll01000 square feet ot 1281889 aqaan Jlntllbull

Tb~ a~ to be corered bu the cillenaiON of 800 fet b7 llOO teet p1u1

300middot teet lt 600 teet includina allowancbull for alcpa The bottca l1nar a_

io 200 toot b7 S00 toot lach ponol oball bo OIIPliod ill app-~oJT

10 toat vidtba za teet lema Altenwte panel abbull alao be PJCIPCIIII

it tbq vUl IUe to ldrdldse the Uiber ot 111114 1pllcbull anS bardl1J11bull

In bullUaatiDC tha vidtb of tbe irdiYidual panela1 the IUJIPller ahall proride

for allOIIADCII tor 1plicbull btveen penela DetUla on apliciq are diacuaalll

1D 52 Wote abCNt 8001000 at of liner will be inatalled OD a alope that

baa a ) bull borbontal run b7 1 vertical heiampbt incrae ( ) oo 1)bull

50 Itelletion

51 General

The PiC Nlllbnne vUl be iNtallecl b7 L a RR personnel The aupplier

1hall 1ubdt1 with h1a quotation a Haralal of Hembnne

0

Installation PriCtfcebull including n 1 M1n111Uifl CCIIIplete drawings

andor sketches and literature tndfcltfng the dimensions of tach

standard-size section of IIMbrane type sfze and weight of shtpptng

contltner procdurt for splicing conntcttng and anchoring iembrane

to son around pipes and othtr appurtenances and rtcmunended

11ethods of handling ~~embrane by fteld Personnel durtng Altbullbrane

installation The supplter shall suppiy four (-4) addttfonal copies

of tht bullManual of Mea~brant Installation Practicebull 1f awuded the

contractbull

52 Fteld Spltctno

lap joints shall be used to seal 1djacent lengths of f1ttory fabrfclted

pieces of PVC together fn the ffeld Joints shall overlap 1 bulltnt shy

of sb inches

The supplfr shall provide sufficient solvent c~~~tnt or ldhestve

to bullte fast and efficient fteld splices at tt~~peratures ranging

fr 20 F to 90 F

53 Technical AssfstarKe

The supplier shall usfgn 1 representltfve to tnspect the supporting

surflce prior to fnstallltfon of the bulle~~brane The representlthe

shill reufn at the sfte to supervise the ebrane fnstallatfon for

approxfNtely one (1 J wortf ng day and sh1ll be responsible for

trafnfng L A RRptrsonnel for the IDtllbrane instal litton oper1tfon

The supplfer shall bear the expense of the representative for the

duration of the fnspectfon period (one (1) worttng dayf bull

middot 60 Cost

lht cost to ptrfon1 the Nort outlfntd in 10 through 40 shtll bt

provided by the supplier u part of the bid peckage The supplier shall

supply the total cost middot to do the ebove 11t0rt u well u 1 cost brukdown

sho1ng un1t cost of the PVC liner in dollbull~ per square foot (Sttt2)

as delivered to the site con fo- tdhe~he lllterhls ($gallon) and a

cost for tKhnfcal supervfston ($dey) Al 1 costs u quoted shtl 1 hold

for a period of not less than 60 dtys frt11 the date of quoUt1on A

proposed cost PIYbullnt schedule shtll also be Ttqutsted by tht supplier

  1. barcode 561591
  2. barcodetext SDMS Doc ID 561591
Page 2: LETTER REGARDING SPECIFICATIONS FOR BASE LINER SYSTEM · Tb~ a~ to be corered bu the c!ille:naiON of 800 fe.t. b7 llOO teet., p1u1 300· teet. lt 600 teet. includ.ina all.owanc•

SPEClriCATIONS

Fa

UNIFIU UNER

FOR

UNIFIU bull RESOORCB RtOImt INC

IDlTH SKIniFUID RI 02876

10 General

20 Scope

JO Site Preptration

40 Uner Spec111cetiom

41 Gonenl

4middot2 PbJaical R~renta

4) Febricatioc

Sin

~o IrwtlllbullUbull

~1 CeMn1

~2 Fh1d Splicinc

~ Techn1cal Aaaiatance

60 Coot

Februa17 24 1984

SftlIfiCATIONS FOR LANDFILL lJNER

LANInLL l RESOORCE RroVRY 1 INC

NORTH SKITHflnD1 RI 02876

10 Genenl

LardfUl A ReiCilrU Recwe171 Inc viahee to soUeit cost proposala to

auppl7 a 20 Jdl1 unrdnfoned Pol7ritlfl chlorLde (PVC) Uner to eanr all

of their site located in North Sadthtleld1 middotRI

All work in preparinc the site ard iretallins tha liner will be

eorductecl b7 LardfUl A ReeCilrce Reccwe17 Penonnel The euppller vUl be

re~pcntible for the bullrufacture ard delin17 of the liner ard technical

auperrlaion or the iNtampllation

The bida an beina 1olicited b7 Lard11ll A ReaDlnt RecftJbull Inc

6S Oleele lAne Vanrick1 RI 02888 on behalf of the L A R L Site

locate ia llorth Sldththld B1dl vill be acceptS at the L A RR ot11ce

65 OKeefe Lane Vanrict RI 028881 no later than 12 Boon TuecIJ1

March 131 1984 The bid packace ahall inclllle tbe coe11 u dilcusaS

in Section 60 to corduct the vorlr dbullcribS heNln Also to be incbded

in the bid packace are the liner apecif1catiON u MUnS in Section 40

an bulltlaate b7 the 1uppller or the earlibullt date on vtdcb the PVC aner

can be dellvered at the dte1 and four (It) nferencbull of prwioaa a1111lar

work

Upon receipt or the bidl1 L A PR Inc v1ll eelect a supplier buS

on lCIIea~ total cost for all it- outlined in thb specit1cation 1n

awa~ or the contnet will be ca~plettd br TUesd March 21 1981

L A RR Inc reserves the riampht to reject aJV an all bicb tor azv

reason but thil is unlike]J No bid will be cOJWidered it total del1YeJ7

ca~ be actOIIlplltbed bJ the erd of Mq Total payment for the Uner IIUit

be m~de before the erd of June the cl01e of wr f1eeal 7ear

20 Scope

Tbe vork includes the upplJ ard delive17 or an impemuble bullmbrane

ror the isolation Or vaate bullterlab within a lall11ill Alao includad

v1ll be teehncal uailtance ard advice on installation ani bondinamp of

the liner The liner 1- to be irtallecl cwertop a previoualJ placed

ard aradecl aaU ccwer ard a alllll portion v1ll be installed on rlrampin

amprounl u a bottca liner AU vork on unloading placinamp field aplicina

ard uther_ irtallation related itCII will be cOBucted bTL bull RL

peracnael

30 Site Preparation

All site pnparation vork will be parfomat bT L bull Rll penomel

H011er the auppller ablll awit witb h1a quotat1on rtc~crdatiom

u tha tba llral ampndina or tha 11n1ahS lard11ll aurfaca L bull LBshypenomel han auccbullbullfllllTbull in 19791 pnrlcua]J iNtalled 2001000 sr

of 20 U Pv c liner ard an tudliar vitb aua

ltbullO Uner Spaci11cat1orw

The bullbullnne to be auppllat ahall be abntinc Mda ot Uftlftntorcecl

~nrlchloride (PVC) ard ahampll be 20 U 1D thickDeal PVC bulltariW

bullhall be Mlllfactured 1101 de~~bulltic vircln poJJryirvl chloride roin ard

apec111c~Jl1 cOIIIpCIUIded for uae in Vdraulic tacilltibull in a 1tandanl

aim- Vidth of S4 inchbull Reprocesaed bullterial aball not be Uied

lu2 hysical Reguirementa

The polTdrvl chloride bullembrane ahall bulleet the ~ical requirmente

llatlaquolt belews Please Wo pn an estiaampte or anticipated lite vben liner 11

in contact with clean tina eand and CCJIered with 2 or clean Une eard

to pTCVeot aunlight Please elva an estizrate or life vhile Uposecl to

direct sunlight

middot PHYSICAL REQUIREoENTS

Hfnfm1111 lest Tnt Value-d ~

Thickness bullfl 20 5~ ASlM 0-1593 Spoc1f1c GriY1 ty 123-130 ASlM 0-712-A Tensile Strength psi bullfn 2200 ASlM 0882-A Elongation l~nfn 300S ASlM 0882-A 10~ Modulus ps1 1000-1600 ASTM 0882-A Elmendorf Tur gbullslbullfl bull1n 160 ASlM 01912 Graves Tear 1bsfnbull1n 270bull ASTM 01004 Water Extractfon llllX 0 35 ASlM 01239 Vo1atf11ty I 1000 bullx 075 ASTM 01203

Impact Cold Crack F -20 ASlM 1790 Dfmensfona1 Stlbflfty (at 100 C 15 111fn l

s 1111x change 5 Bonded Sebull Strength of

Ttnsfl e bullfn 801 1 ASTM 0882shyPfnholeslo sq yds bullx none Resistance to Burfll Par 14c Ill por

Tensfl e Strength lou S bullx USSR procedure Elongation loss s bullx

Color Black or Gr

The supplfer shall sutft wfth his quotation the

nlues and test ~~ethods of hh p1opou1 -brant

middot

43 Fabrication

The aabnnp aball be 1hop fabricated into atardard lized larabull

aectilaquo~~ bullbull described in 44 aJd into odd-aized pieces u required to

1uit the racillt7 to llirdJdnthe ruzher of 11eld aplica

Attar fabrication the IIlaquoDbnne shall be packed for eu7 and 1~

hanUinamp in the field Shippina ccmtainerw capabl_e of prenntinamp duaae

to the contentbull during 1hipmeot and 11eld hanUinc bullhall be prcwided bJ the

supplier These containen shall be actequatel7 bullriced with panel rumbere

con-eepon11na to the panel laJCIUt drewinc provided in aeetion sl 44 Sfio

Tbe tOtal area to be corend bJ the C bull-brane Ylll be 110600oo

square feet ot ll71778 square 71~ plua 1001000 square tet tor a battca

llnar aaldnamp a total of 11 ll01000 square feet ot 1281889 aqaan Jlntllbull

Tb~ a~ to be corered bu the cillenaiON of 800 fet b7 llOO teet p1u1

300middot teet lt 600 teet includina allowancbull for alcpa The bottca l1nar a_

io 200 toot b7 S00 toot lach ponol oball bo OIIPliod ill app-~oJT

10 toat vidtba za teet lema Altenwte panel abbull alao be PJCIPCIIII

it tbq vUl IUe to ldrdldse the Uiber ot 111114 1pllcbull anS bardl1J11bull

In bullUaatiDC tha vidtb of tbe irdiYidual panela1 the IUJIPller ahall proride

for allOIIADCII tor 1plicbull btveen penela DetUla on apliciq are diacuaalll

1D 52 Wote abCNt 8001000 at of liner will be inatalled OD a alope that

baa a ) bull borbontal run b7 1 vertical heiampbt incrae ( ) oo 1)bull

50 Itelletion

51 General

The PiC Nlllbnne vUl be iNtallecl b7 L a RR personnel The aupplier

1hall 1ubdt1 with h1a quotation a Haralal of Hembnne

0

Installation PriCtfcebull including n 1 M1n111Uifl CCIIIplete drawings

andor sketches and literature tndfcltfng the dimensions of tach

standard-size section of IIMbrane type sfze and weight of shtpptng

contltner procdurt for splicing conntcttng and anchoring iembrane

to son around pipes and othtr appurtenances and rtcmunended

11ethods of handling ~~embrane by fteld Personnel durtng Altbullbrane

installation The supplter shall suppiy four (-4) addttfonal copies

of tht bullManual of Mea~brant Installation Practicebull 1f awuded the

contractbull

52 Fteld Spltctno

lap joints shall be used to seal 1djacent lengths of f1ttory fabrfclted

pieces of PVC together fn the ffeld Joints shall overlap 1 bulltnt shy

of sb inches

The supplfr shall provide sufficient solvent c~~~tnt or ldhestve

to bullte fast and efficient fteld splices at tt~~peratures ranging

fr 20 F to 90 F

53 Technical AssfstarKe

The supplier shall usfgn 1 representltfve to tnspect the supporting

surflce prior to fnstallltfon of the bulle~~brane The representlthe

shill reufn at the sfte to supervise the ebrane fnstallatfon for

approxfNtely one (1 J wortf ng day and sh1ll be responsible for

trafnfng L A RRptrsonnel for the IDtllbrane instal litton oper1tfon

The supplfer shall bear the expense of the representative for the

duration of the fnspectfon period (one (1) worttng dayf bull

middot 60 Cost

lht cost to ptrfon1 the Nort outlfntd in 10 through 40 shtll bt

provided by the supplier u part of the bid peckage The supplier shall

supply the total cost middot to do the ebove 11t0rt u well u 1 cost brukdown

sho1ng un1t cost of the PVC liner in dollbull~ per square foot (Sttt2)

as delivered to the site con fo- tdhe~he lllterhls ($gallon) and a

cost for tKhnfcal supervfston ($dey) Al 1 costs u quoted shtl 1 hold

for a period of not less than 60 dtys frt11 the date of quoUt1on A

proposed cost PIYbullnt schedule shtll also be Ttqutsted by tht supplier

  1. barcode 561591
  2. barcodetext SDMS Doc ID 561591
Page 3: LETTER REGARDING SPECIFICATIONS FOR BASE LINER SYSTEM · Tb~ a~ to be corered bu the c!ille:naiON of 800 fe.t. b7 llOO teet., p1u1 300· teet. lt 600 teet. includ.ina all.owanc•

SftlIfiCATIONS FOR LANDFILL lJNER

LANInLL l RESOORCE RroVRY 1 INC

NORTH SKITHflnD1 RI 02876

10 Genenl

LardfUl A ReiCilrU Recwe171 Inc viahee to soUeit cost proposala to

auppl7 a 20 Jdl1 unrdnfoned Pol7ritlfl chlorLde (PVC) Uner to eanr all

of their site located in North Sadthtleld1 middotRI

All work in preparinc the site ard iretallins tha liner will be

eorductecl b7 LardfUl A ReeCilrce Reccwe17 Penonnel The euppller vUl be

re~pcntible for the bullrufacture ard delin17 of the liner ard technical

auperrlaion or the iNtampllation

The bida an beina 1olicited b7 Lard11ll A ReaDlnt RecftJbull Inc

6S Oleele lAne Vanrick1 RI 02888 on behalf of the L A R L Site

locate ia llorth Sldththld B1dl vill be acceptS at the L A RR ot11ce

65 OKeefe Lane Vanrict RI 028881 no later than 12 Boon TuecIJ1

March 131 1984 The bid packace ahall inclllle tbe coe11 u dilcusaS

in Section 60 to corduct the vorlr dbullcribS heNln Also to be incbded

in the bid packace are the liner apecif1catiON u MUnS in Section 40

an bulltlaate b7 the 1uppller or the earlibullt date on vtdcb the PVC aner

can be dellvered at the dte1 and four (It) nferencbull of prwioaa a1111lar

work

Upon receipt or the bidl1 L A PR Inc v1ll eelect a supplier buS

on lCIIea~ total cost for all it- outlined in thb specit1cation 1n

awa~ or the contnet will be ca~plettd br TUesd March 21 1981

L A RR Inc reserves the riampht to reject aJV an all bicb tor azv

reason but thil is unlike]J No bid will be cOJWidered it total del1YeJ7

ca~ be actOIIlplltbed bJ the erd of Mq Total payment for the Uner IIUit

be m~de before the erd of June the cl01e of wr f1eeal 7ear

20 Scope

Tbe vork includes the upplJ ard delive17 or an impemuble bullmbrane

ror the isolation Or vaate bullterlab within a lall11ill Alao includad

v1ll be teehncal uailtance ard advice on installation ani bondinamp of

the liner The liner 1- to be irtallecl cwertop a previoualJ placed

ard aradecl aaU ccwer ard a alllll portion v1ll be installed on rlrampin

amprounl u a bottca liner AU vork on unloading placinamp field aplicina

ard uther_ irtallation related itCII will be cOBucted bTL bull RL

peracnael

30 Site Preparation

All site pnparation vork will be parfomat bT L bull Rll penomel

H011er the auppller ablll awit witb h1a quotat1on rtc~crdatiom

u tha tba llral ampndina or tha 11n1ahS lard11ll aurfaca L bull LBshypenomel han auccbullbullfllllTbull in 19791 pnrlcua]J iNtalled 2001000 sr

of 20 U Pv c liner ard an tudliar vitb aua

ltbullO Uner Spaci11cat1orw

The bullbullnne to be auppllat ahall be abntinc Mda ot Uftlftntorcecl

~nrlchloride (PVC) ard ahampll be 20 U 1D thickDeal PVC bulltariW

bullhall be Mlllfactured 1101 de~~bulltic vircln poJJryirvl chloride roin ard

apec111c~Jl1 cOIIIpCIUIded for uae in Vdraulic tacilltibull in a 1tandanl

aim- Vidth of S4 inchbull Reprocesaed bullterial aball not be Uied

lu2 hysical Reguirementa

The polTdrvl chloride bullembrane ahall bulleet the ~ical requirmente

llatlaquolt belews Please Wo pn an estiaampte or anticipated lite vben liner 11

in contact with clean tina eand and CCJIered with 2 or clean Une eard

to pTCVeot aunlight Please elva an estizrate or life vhile Uposecl to

direct sunlight

middot PHYSICAL REQUIREoENTS

Hfnfm1111 lest Tnt Value-d ~

Thickness bullfl 20 5~ ASlM 0-1593 Spoc1f1c GriY1 ty 123-130 ASlM 0-712-A Tensile Strength psi bullfn 2200 ASlM 0882-A Elongation l~nfn 300S ASlM 0882-A 10~ Modulus ps1 1000-1600 ASTM 0882-A Elmendorf Tur gbullslbullfl bull1n 160 ASlM 01912 Graves Tear 1bsfnbull1n 270bull ASTM 01004 Water Extractfon llllX 0 35 ASlM 01239 Vo1atf11ty I 1000 bullx 075 ASTM 01203

Impact Cold Crack F -20 ASlM 1790 Dfmensfona1 Stlbflfty (at 100 C 15 111fn l

s 1111x change 5 Bonded Sebull Strength of

Ttnsfl e bullfn 801 1 ASTM 0882shyPfnholeslo sq yds bullx none Resistance to Burfll Par 14c Ill por

Tensfl e Strength lou S bullx USSR procedure Elongation loss s bullx

Color Black or Gr

The supplfer shall sutft wfth his quotation the

nlues and test ~~ethods of hh p1opou1 -brant

middot

43 Fabrication

The aabnnp aball be 1hop fabricated into atardard lized larabull

aectilaquo~~ bullbull described in 44 aJd into odd-aized pieces u required to

1uit the racillt7 to llirdJdnthe ruzher of 11eld aplica

Attar fabrication the IIlaquoDbnne shall be packed for eu7 and 1~

hanUinamp in the field Shippina ccmtainerw capabl_e of prenntinamp duaae

to the contentbull during 1hipmeot and 11eld hanUinc bullhall be prcwided bJ the

supplier These containen shall be actequatel7 bullriced with panel rumbere

con-eepon11na to the panel laJCIUt drewinc provided in aeetion sl 44 Sfio

Tbe tOtal area to be corend bJ the C bull-brane Ylll be 110600oo

square feet ot ll71778 square 71~ plua 1001000 square tet tor a battca

llnar aaldnamp a total of 11 ll01000 square feet ot 1281889 aqaan Jlntllbull

Tb~ a~ to be corered bu the cillenaiON of 800 fet b7 llOO teet p1u1

300middot teet lt 600 teet includina allowancbull for alcpa The bottca l1nar a_

io 200 toot b7 S00 toot lach ponol oball bo OIIPliod ill app-~oJT

10 toat vidtba za teet lema Altenwte panel abbull alao be PJCIPCIIII

it tbq vUl IUe to ldrdldse the Uiber ot 111114 1pllcbull anS bardl1J11bull

In bullUaatiDC tha vidtb of tbe irdiYidual panela1 the IUJIPller ahall proride

for allOIIADCII tor 1plicbull btveen penela DetUla on apliciq are diacuaalll

1D 52 Wote abCNt 8001000 at of liner will be inatalled OD a alope that

baa a ) bull borbontal run b7 1 vertical heiampbt incrae ( ) oo 1)bull

50 Itelletion

51 General

The PiC Nlllbnne vUl be iNtallecl b7 L a RR personnel The aupplier

1hall 1ubdt1 with h1a quotation a Haralal of Hembnne

0

Installation PriCtfcebull including n 1 M1n111Uifl CCIIIplete drawings

andor sketches and literature tndfcltfng the dimensions of tach

standard-size section of IIMbrane type sfze and weight of shtpptng

contltner procdurt for splicing conntcttng and anchoring iembrane

to son around pipes and othtr appurtenances and rtcmunended

11ethods of handling ~~embrane by fteld Personnel durtng Altbullbrane

installation The supplter shall suppiy four (-4) addttfonal copies

of tht bullManual of Mea~brant Installation Practicebull 1f awuded the

contractbull

52 Fteld Spltctno

lap joints shall be used to seal 1djacent lengths of f1ttory fabrfclted

pieces of PVC together fn the ffeld Joints shall overlap 1 bulltnt shy

of sb inches

The supplfr shall provide sufficient solvent c~~~tnt or ldhestve

to bullte fast and efficient fteld splices at tt~~peratures ranging

fr 20 F to 90 F

53 Technical AssfstarKe

The supplier shall usfgn 1 representltfve to tnspect the supporting

surflce prior to fnstallltfon of the bulle~~brane The representlthe

shill reufn at the sfte to supervise the ebrane fnstallatfon for

approxfNtely one (1 J wortf ng day and sh1ll be responsible for

trafnfng L A RRptrsonnel for the IDtllbrane instal litton oper1tfon

The supplfer shall bear the expense of the representative for the

duration of the fnspectfon period (one (1) worttng dayf bull

middot 60 Cost

lht cost to ptrfon1 the Nort outlfntd in 10 through 40 shtll bt

provided by the supplier u part of the bid peckage The supplier shall

supply the total cost middot to do the ebove 11t0rt u well u 1 cost brukdown

sho1ng un1t cost of the PVC liner in dollbull~ per square foot (Sttt2)

as delivered to the site con fo- tdhe~he lllterhls ($gallon) and a

cost for tKhnfcal supervfston ($dey) Al 1 costs u quoted shtl 1 hold

for a period of not less than 60 dtys frt11 the date of quoUt1on A

proposed cost PIYbullnt schedule shtll also be Ttqutsted by tht supplier

  1. barcode 561591
  2. barcodetext SDMS Doc ID 561591
Page 4: LETTER REGARDING SPECIFICATIONS FOR BASE LINER SYSTEM · Tb~ a~ to be corered bu the c!ille:naiON of 800 fe.t. b7 llOO teet., p1u1 300· teet. lt 600 teet. includ.ina all.owanc•

20 Scope

Tbe vork includes the upplJ ard delive17 or an impemuble bullmbrane

ror the isolation Or vaate bullterlab within a lall11ill Alao includad

v1ll be teehncal uailtance ard advice on installation ani bondinamp of

the liner The liner 1- to be irtallecl cwertop a previoualJ placed

ard aradecl aaU ccwer ard a alllll portion v1ll be installed on rlrampin

amprounl u a bottca liner AU vork on unloading placinamp field aplicina

ard uther_ irtallation related itCII will be cOBucted bTL bull RL

peracnael

30 Site Preparation

All site pnparation vork will be parfomat bT L bull Rll penomel

H011er the auppller ablll awit witb h1a quotat1on rtc~crdatiom

u tha tba llral ampndina or tha 11n1ahS lard11ll aurfaca L bull LBshypenomel han auccbullbullfllllTbull in 19791 pnrlcua]J iNtalled 2001000 sr

of 20 U Pv c liner ard an tudliar vitb aua

ltbullO Uner Spaci11cat1orw

The bullbullnne to be auppllat ahall be abntinc Mda ot Uftlftntorcecl

~nrlchloride (PVC) ard ahampll be 20 U 1D thickDeal PVC bulltariW

bullhall be Mlllfactured 1101 de~~bulltic vircln poJJryirvl chloride roin ard

apec111c~Jl1 cOIIIpCIUIded for uae in Vdraulic tacilltibull in a 1tandanl

aim- Vidth of S4 inchbull Reprocesaed bullterial aball not be Uied

lu2 hysical Reguirementa

The polTdrvl chloride bullembrane ahall bulleet the ~ical requirmente

llatlaquolt belews Please Wo pn an estiaampte or anticipated lite vben liner 11

in contact with clean tina eand and CCJIered with 2 or clean Une eard

to pTCVeot aunlight Please elva an estizrate or life vhile Uposecl to

direct sunlight

middot PHYSICAL REQUIREoENTS

Hfnfm1111 lest Tnt Value-d ~

Thickness bullfl 20 5~ ASlM 0-1593 Spoc1f1c GriY1 ty 123-130 ASlM 0-712-A Tensile Strength psi bullfn 2200 ASlM 0882-A Elongation l~nfn 300S ASlM 0882-A 10~ Modulus ps1 1000-1600 ASTM 0882-A Elmendorf Tur gbullslbullfl bull1n 160 ASlM 01912 Graves Tear 1bsfnbull1n 270bull ASTM 01004 Water Extractfon llllX 0 35 ASlM 01239 Vo1atf11ty I 1000 bullx 075 ASTM 01203

Impact Cold Crack F -20 ASlM 1790 Dfmensfona1 Stlbflfty (at 100 C 15 111fn l

s 1111x change 5 Bonded Sebull Strength of

Ttnsfl e bullfn 801 1 ASTM 0882shyPfnholeslo sq yds bullx none Resistance to Burfll Par 14c Ill por

Tensfl e Strength lou S bullx USSR procedure Elongation loss s bullx

Color Black or Gr

The supplfer shall sutft wfth his quotation the

nlues and test ~~ethods of hh p1opou1 -brant

middot

43 Fabrication

The aabnnp aball be 1hop fabricated into atardard lized larabull

aectilaquo~~ bullbull described in 44 aJd into odd-aized pieces u required to

1uit the racillt7 to llirdJdnthe ruzher of 11eld aplica

Attar fabrication the IIlaquoDbnne shall be packed for eu7 and 1~

hanUinamp in the field Shippina ccmtainerw capabl_e of prenntinamp duaae

to the contentbull during 1hipmeot and 11eld hanUinc bullhall be prcwided bJ the

supplier These containen shall be actequatel7 bullriced with panel rumbere

con-eepon11na to the panel laJCIUt drewinc provided in aeetion sl 44 Sfio

Tbe tOtal area to be corend bJ the C bull-brane Ylll be 110600oo

square feet ot ll71778 square 71~ plua 1001000 square tet tor a battca

llnar aaldnamp a total of 11 ll01000 square feet ot 1281889 aqaan Jlntllbull

Tb~ a~ to be corered bu the cillenaiON of 800 fet b7 llOO teet p1u1

300middot teet lt 600 teet includina allowancbull for alcpa The bottca l1nar a_

io 200 toot b7 S00 toot lach ponol oball bo OIIPliod ill app-~oJT

10 toat vidtba za teet lema Altenwte panel abbull alao be PJCIPCIIII

it tbq vUl IUe to ldrdldse the Uiber ot 111114 1pllcbull anS bardl1J11bull

In bullUaatiDC tha vidtb of tbe irdiYidual panela1 the IUJIPller ahall proride

for allOIIADCII tor 1plicbull btveen penela DetUla on apliciq are diacuaalll

1D 52 Wote abCNt 8001000 at of liner will be inatalled OD a alope that

baa a ) bull borbontal run b7 1 vertical heiampbt incrae ( ) oo 1)bull

50 Itelletion

51 General

The PiC Nlllbnne vUl be iNtallecl b7 L a RR personnel The aupplier

1hall 1ubdt1 with h1a quotation a Haralal of Hembnne

0

Installation PriCtfcebull including n 1 M1n111Uifl CCIIIplete drawings

andor sketches and literature tndfcltfng the dimensions of tach

standard-size section of IIMbrane type sfze and weight of shtpptng

contltner procdurt for splicing conntcttng and anchoring iembrane

to son around pipes and othtr appurtenances and rtcmunended

11ethods of handling ~~embrane by fteld Personnel durtng Altbullbrane

installation The supplter shall suppiy four (-4) addttfonal copies

of tht bullManual of Mea~brant Installation Practicebull 1f awuded the

contractbull

52 Fteld Spltctno

lap joints shall be used to seal 1djacent lengths of f1ttory fabrfclted

pieces of PVC together fn the ffeld Joints shall overlap 1 bulltnt shy

of sb inches

The supplfr shall provide sufficient solvent c~~~tnt or ldhestve

to bullte fast and efficient fteld splices at tt~~peratures ranging

fr 20 F to 90 F

53 Technical AssfstarKe

The supplier shall usfgn 1 representltfve to tnspect the supporting

surflce prior to fnstallltfon of the bulle~~brane The representlthe

shill reufn at the sfte to supervise the ebrane fnstallatfon for

approxfNtely one (1 J wortf ng day and sh1ll be responsible for

trafnfng L A RRptrsonnel for the IDtllbrane instal litton oper1tfon

The supplfer shall bear the expense of the representative for the

duration of the fnspectfon period (one (1) worttng dayf bull

middot 60 Cost

lht cost to ptrfon1 the Nort outlfntd in 10 through 40 shtll bt

provided by the supplier u part of the bid peckage The supplier shall

supply the total cost middot to do the ebove 11t0rt u well u 1 cost brukdown

sho1ng un1t cost of the PVC liner in dollbull~ per square foot (Sttt2)

as delivered to the site con fo- tdhe~he lllterhls ($gallon) and a

cost for tKhnfcal supervfston ($dey) Al 1 costs u quoted shtl 1 hold

for a period of not less than 60 dtys frt11 the date of quoUt1on A

proposed cost PIYbullnt schedule shtll also be Ttqutsted by tht supplier

  1. barcode 561591
  2. barcodetext SDMS Doc ID 561591
Page 5: LETTER REGARDING SPECIFICATIONS FOR BASE LINER SYSTEM · Tb~ a~ to be corered bu the c!ille:naiON of 800 fe.t. b7 llOO teet., p1u1 300· teet. lt 600 teet. includ.ina all.owanc•

middot PHYSICAL REQUIREoENTS

Hfnfm1111 lest Tnt Value-d ~

Thickness bullfl 20 5~ ASlM 0-1593 Spoc1f1c GriY1 ty 123-130 ASlM 0-712-A Tensile Strength psi bullfn 2200 ASlM 0882-A Elongation l~nfn 300S ASlM 0882-A 10~ Modulus ps1 1000-1600 ASTM 0882-A Elmendorf Tur gbullslbullfl bull1n 160 ASlM 01912 Graves Tear 1bsfnbull1n 270bull ASTM 01004 Water Extractfon llllX 0 35 ASlM 01239 Vo1atf11ty I 1000 bullx 075 ASTM 01203

Impact Cold Crack F -20 ASlM 1790 Dfmensfona1 Stlbflfty (at 100 C 15 111fn l

s 1111x change 5 Bonded Sebull Strength of

Ttnsfl e bullfn 801 1 ASTM 0882shyPfnholeslo sq yds bullx none Resistance to Burfll Par 14c Ill por

Tensfl e Strength lou S bullx USSR procedure Elongation loss s bullx

Color Black or Gr

The supplfer shall sutft wfth his quotation the

nlues and test ~~ethods of hh p1opou1 -brant

middot

43 Fabrication

The aabnnp aball be 1hop fabricated into atardard lized larabull

aectilaquo~~ bullbull described in 44 aJd into odd-aized pieces u required to

1uit the racillt7 to llirdJdnthe ruzher of 11eld aplica

Attar fabrication the IIlaquoDbnne shall be packed for eu7 and 1~

hanUinamp in the field Shippina ccmtainerw capabl_e of prenntinamp duaae

to the contentbull during 1hipmeot and 11eld hanUinc bullhall be prcwided bJ the

supplier These containen shall be actequatel7 bullriced with panel rumbere

con-eepon11na to the panel laJCIUt drewinc provided in aeetion sl 44 Sfio

Tbe tOtal area to be corend bJ the C bull-brane Ylll be 110600oo

square feet ot ll71778 square 71~ plua 1001000 square tet tor a battca

llnar aaldnamp a total of 11 ll01000 square feet ot 1281889 aqaan Jlntllbull

Tb~ a~ to be corered bu the cillenaiON of 800 fet b7 llOO teet p1u1

300middot teet lt 600 teet includina allowancbull for alcpa The bottca l1nar a_

io 200 toot b7 S00 toot lach ponol oball bo OIIPliod ill app-~oJT

10 toat vidtba za teet lema Altenwte panel abbull alao be PJCIPCIIII

it tbq vUl IUe to ldrdldse the Uiber ot 111114 1pllcbull anS bardl1J11bull

In bullUaatiDC tha vidtb of tbe irdiYidual panela1 the IUJIPller ahall proride

for allOIIADCII tor 1plicbull btveen penela DetUla on apliciq are diacuaalll

1D 52 Wote abCNt 8001000 at of liner will be inatalled OD a alope that

baa a ) bull borbontal run b7 1 vertical heiampbt incrae ( ) oo 1)bull

50 Itelletion

51 General

The PiC Nlllbnne vUl be iNtallecl b7 L a RR personnel The aupplier

1hall 1ubdt1 with h1a quotation a Haralal of Hembnne

0

Installation PriCtfcebull including n 1 M1n111Uifl CCIIIplete drawings

andor sketches and literature tndfcltfng the dimensions of tach

standard-size section of IIMbrane type sfze and weight of shtpptng

contltner procdurt for splicing conntcttng and anchoring iembrane

to son around pipes and othtr appurtenances and rtcmunended

11ethods of handling ~~embrane by fteld Personnel durtng Altbullbrane

installation The supplter shall suppiy four (-4) addttfonal copies

of tht bullManual of Mea~brant Installation Practicebull 1f awuded the

contractbull

52 Fteld Spltctno

lap joints shall be used to seal 1djacent lengths of f1ttory fabrfclted

pieces of PVC together fn the ffeld Joints shall overlap 1 bulltnt shy

of sb inches

The supplfr shall provide sufficient solvent c~~~tnt or ldhestve

to bullte fast and efficient fteld splices at tt~~peratures ranging

fr 20 F to 90 F

53 Technical AssfstarKe

The supplier shall usfgn 1 representltfve to tnspect the supporting

surflce prior to fnstallltfon of the bulle~~brane The representlthe

shill reufn at the sfte to supervise the ebrane fnstallatfon for

approxfNtely one (1 J wortf ng day and sh1ll be responsible for

trafnfng L A RRptrsonnel for the IDtllbrane instal litton oper1tfon

The supplfer shall bear the expense of the representative for the

duration of the fnspectfon period (one (1) worttng dayf bull

middot 60 Cost

lht cost to ptrfon1 the Nort outlfntd in 10 through 40 shtll bt

provided by the supplier u part of the bid peckage The supplier shall

supply the total cost middot to do the ebove 11t0rt u well u 1 cost brukdown

sho1ng un1t cost of the PVC liner in dollbull~ per square foot (Sttt2)

as delivered to the site con fo- tdhe~he lllterhls ($gallon) and a

cost for tKhnfcal supervfston ($dey) Al 1 costs u quoted shtl 1 hold

for a period of not less than 60 dtys frt11 the date of quoUt1on A

proposed cost PIYbullnt schedule shtll also be Ttqutsted by tht supplier

  1. barcode 561591
  2. barcodetext SDMS Doc ID 561591
Page 6: LETTER REGARDING SPECIFICATIONS FOR BASE LINER SYSTEM · Tb~ a~ to be corered bu the c!ille:naiON of 800 fe.t. b7 llOO teet., p1u1 300· teet. lt 600 teet. includ.ina all.owanc•

43 Fabrication

The aabnnp aball be 1hop fabricated into atardard lized larabull

aectilaquo~~ bullbull described in 44 aJd into odd-aized pieces u required to

1uit the racillt7 to llirdJdnthe ruzher of 11eld aplica

Attar fabrication the IIlaquoDbnne shall be packed for eu7 and 1~

hanUinamp in the field Shippina ccmtainerw capabl_e of prenntinamp duaae

to the contentbull during 1hipmeot and 11eld hanUinc bullhall be prcwided bJ the

supplier These containen shall be actequatel7 bullriced with panel rumbere

con-eepon11na to the panel laJCIUt drewinc provided in aeetion sl 44 Sfio

Tbe tOtal area to be corend bJ the C bull-brane Ylll be 110600oo

square feet ot ll71778 square 71~ plua 1001000 square tet tor a battca

llnar aaldnamp a total of 11 ll01000 square feet ot 1281889 aqaan Jlntllbull

Tb~ a~ to be corered bu the cillenaiON of 800 fet b7 llOO teet p1u1

300middot teet lt 600 teet includina allowancbull for alcpa The bottca l1nar a_

io 200 toot b7 S00 toot lach ponol oball bo OIIPliod ill app-~oJT

10 toat vidtba za teet lema Altenwte panel abbull alao be PJCIPCIIII

it tbq vUl IUe to ldrdldse the Uiber ot 111114 1pllcbull anS bardl1J11bull

In bullUaatiDC tha vidtb of tbe irdiYidual panela1 the IUJIPller ahall proride

for allOIIADCII tor 1plicbull btveen penela DetUla on apliciq are diacuaalll

1D 52 Wote abCNt 8001000 at of liner will be inatalled OD a alope that

baa a ) bull borbontal run b7 1 vertical heiampbt incrae ( ) oo 1)bull

50 Itelletion

51 General

The PiC Nlllbnne vUl be iNtallecl b7 L a RR personnel The aupplier

1hall 1ubdt1 with h1a quotation a Haralal of Hembnne

0

Installation PriCtfcebull including n 1 M1n111Uifl CCIIIplete drawings

andor sketches and literature tndfcltfng the dimensions of tach

standard-size section of IIMbrane type sfze and weight of shtpptng

contltner procdurt for splicing conntcttng and anchoring iembrane

to son around pipes and othtr appurtenances and rtcmunended

11ethods of handling ~~embrane by fteld Personnel durtng Altbullbrane

installation The supplter shall suppiy four (-4) addttfonal copies

of tht bullManual of Mea~brant Installation Practicebull 1f awuded the

contractbull

52 Fteld Spltctno

lap joints shall be used to seal 1djacent lengths of f1ttory fabrfclted

pieces of PVC together fn the ffeld Joints shall overlap 1 bulltnt shy

of sb inches

The supplfr shall provide sufficient solvent c~~~tnt or ldhestve

to bullte fast and efficient fteld splices at tt~~peratures ranging

fr 20 F to 90 F

53 Technical AssfstarKe

The supplier shall usfgn 1 representltfve to tnspect the supporting

surflce prior to fnstallltfon of the bulle~~brane The representlthe

shill reufn at the sfte to supervise the ebrane fnstallatfon for

approxfNtely one (1 J wortf ng day and sh1ll be responsible for

trafnfng L A RRptrsonnel for the IDtllbrane instal litton oper1tfon

The supplfer shall bear the expense of the representative for the

duration of the fnspectfon period (one (1) worttng dayf bull

middot 60 Cost

lht cost to ptrfon1 the Nort outlfntd in 10 through 40 shtll bt

provided by the supplier u part of the bid peckage The supplier shall

supply the total cost middot to do the ebove 11t0rt u well u 1 cost brukdown

sho1ng un1t cost of the PVC liner in dollbull~ per square foot (Sttt2)

as delivered to the site con fo- tdhe~he lllterhls ($gallon) and a

cost for tKhnfcal supervfston ($dey) Al 1 costs u quoted shtl 1 hold

for a period of not less than 60 dtys frt11 the date of quoUt1on A

proposed cost PIYbullnt schedule shtll also be Ttqutsted by tht supplier

  1. barcode 561591
  2. barcodetext SDMS Doc ID 561591
Page 7: LETTER REGARDING SPECIFICATIONS FOR BASE LINER SYSTEM · Tb~ a~ to be corered bu the c!ille:naiON of 800 fe.t. b7 llOO teet., p1u1 300· teet. lt 600 teet. includ.ina all.owanc•

0

Installation PriCtfcebull including n 1 M1n111Uifl CCIIIplete drawings

andor sketches and literature tndfcltfng the dimensions of tach

standard-size section of IIMbrane type sfze and weight of shtpptng

contltner procdurt for splicing conntcttng and anchoring iembrane

to son around pipes and othtr appurtenances and rtcmunended

11ethods of handling ~~embrane by fteld Personnel durtng Altbullbrane

installation The supplter shall suppiy four (-4) addttfonal copies

of tht bullManual of Mea~brant Installation Practicebull 1f awuded the

contractbull

52 Fteld Spltctno

lap joints shall be used to seal 1djacent lengths of f1ttory fabrfclted

pieces of PVC together fn the ffeld Joints shall overlap 1 bulltnt shy

of sb inches

The supplfr shall provide sufficient solvent c~~~tnt or ldhestve

to bullte fast and efficient fteld splices at tt~~peratures ranging

fr 20 F to 90 F

53 Technical AssfstarKe

The supplier shall usfgn 1 representltfve to tnspect the supporting

surflce prior to fnstallltfon of the bulle~~brane The representlthe

shill reufn at the sfte to supervise the ebrane fnstallatfon for

approxfNtely one (1 J wortf ng day and sh1ll be responsible for

trafnfng L A RRptrsonnel for the IDtllbrane instal litton oper1tfon

The supplfer shall bear the expense of the representative for the

duration of the fnspectfon period (one (1) worttng dayf bull

middot 60 Cost

lht cost to ptrfon1 the Nort outlfntd in 10 through 40 shtll bt

provided by the supplier u part of the bid peckage The supplier shall

supply the total cost middot to do the ebove 11t0rt u well u 1 cost brukdown

sho1ng un1t cost of the PVC liner in dollbull~ per square foot (Sttt2)

as delivered to the site con fo- tdhe~he lllterhls ($gallon) and a

cost for tKhnfcal supervfston ($dey) Al 1 costs u quoted shtl 1 hold

for a period of not less than 60 dtys frt11 the date of quoUt1on A

proposed cost PIYbullnt schedule shtll also be Ttqutsted by tht supplier

  1. barcode 561591
  2. barcodetext SDMS Doc ID 561591
Page 8: LETTER REGARDING SPECIFICATIONS FOR BASE LINER SYSTEM · Tb~ a~ to be corered bu the c!ille:naiON of 800 fe.t. b7 llOO teet., p1u1 300· teet. lt 600 teet. includ.ina all.owanc•

middot 60 Cost

lht cost to ptrfon1 the Nort outlfntd in 10 through 40 shtll bt

provided by the supplier u part of the bid peckage The supplier shall

supply the total cost middot to do the ebove 11t0rt u well u 1 cost brukdown

sho1ng un1t cost of the PVC liner in dollbull~ per square foot (Sttt2)

as delivered to the site con fo- tdhe~he lllterhls ($gallon) and a

cost for tKhnfcal supervfston ($dey) Al 1 costs u quoted shtl 1 hold

for a period of not less than 60 dtys frt11 the date of quoUt1on A

proposed cost PIYbullnt schedule shtll also be Ttqutsted by tht supplier

  1. barcode 561591
  2. barcodetext SDMS Doc ID 561591