karen miller portfolio
DESCRIPTION
A selection of work from 2008-2012TRANSCRIPT
-
K M
study.
design.
live.
sketch.
create.
portfolio.
plan.
build.
preserve.karen miller
-
SELECTED SKILLS
EDUCATION
STUDY ABROAD
ACHIEVEMENTS
Autodesk AutoCAD Hand & Computer Rendering Autodesk Revit 3D and Physical Modeling Autodesk AutoCAD Architecture FormZ Adobe Photoshop MS Office Adobe InDesign Windows Movie Maker Adobe Illustrator Rhino (basic) Vasari (basic understanding) Google Sketch-Up (basic)
BALL STATE UNIVERSITY: MUNCIE, IN Current GPA 3.76 Master of Architecture Anticipated May 2012
MIAMI UNIVERSITY: OXFORD, OH GPA 3.63, Cum Laude Bachelor of Arts in Architecture Spring 2010
PENN STATE UNIVERSITY - PANTHEON INSTITUTE GPA 3.95 Study Abroad: Rome, Italy Summer 2011
KENT STATE UNIVERSITY - FLORENCE Cumulative GPA 3.95 Study Abroad: Florence, Italy Fall 2008
Graduate Assistantship and Scholarship 2012, 2010 Recipient, University Student Service Leadership Award 2010 Graduated with University Honors 2010 Deans List, all semesters, Miami University 2006-2010 Member, National Society of Collegiate Scholars 2006-2010 Miami University Honors College 2006-2010 Deans List, Kent State University Fall 2008
EXPERIENCEK M
-
The Estopinal Group: Architect Intern Jeffersonville, IN 01/2011-08/2011 I completed and coordinated changes among construction documents of life safety plans, dimension plans, reflected ceiling plans, floorplans, plan details, wall sections, elevations, and schedules. I worked with a senior architect to complete a set of record drawings with over 300 design changes, responded to ASKs, and designed details of a trench drain and a canopy. ecoREHAB: Home Reconstruction Muncie, IN 08/2010-12/2010 Volunteered 9 hours a week to rehab a historic, abandoned home into low-income housing. Assisted in demolition, paint stripping, rehabilitation of windows, construction, finishing, etc. Ball State University: Graduate Teaching Assistant Muncie, IN 08/2010-12/2010 Assisted with ARCH 373: Environmental Control Systems: monitored and responded to daily questions; distributed and taught students how to use equipment and run experiments; was responsible for running weekly lab sessions.
R. L. Beattie Jr., Architect: Preservation Pittsburgh Competition Assistant Pittsburgh, PA Summer 2010 Partnered in the schematic design process, was responsible for the CAD implementation, 3D model generation, and presentation regarding the reuse of the Civic Arena: three week project.
Camp Frederick: Director of Service Projects; Volunteer Coordinator (Promoted to director from a service-focused counselor in 2009) Rogers, OH Summers 2009; 2010 Acted as the companys liaison and sole communicator with volunteer groups; coordinated events and matched groups with appropriate community service opportunities; participant and leader of construction and renovation projects; led groups and staff while at camp. Habitat for Humanity; Architecture for Humanity: Volunteer Construction Jacksonville, FL and Biloxi, MS (Alternative Spring Breaks) 2007-2008 Gutted a community center ruined by Katrina; debris removal; sodded a yard; removed/hung siding; design charette for a farmers market; other projects.
KAREN MILLER 859.912.2612 [email protected] 108 beech dr. www.wix.com/mille211/mille211 edgewood, ky 41017
EXPERIENCE
-
hotel + med. center extended stay medical center; las americas virtual design studio
fort lauderdale, fl fall 2011; second year graduate studio
Revit, AutoCAD, Vasari, Photoshop
-
This extended stay medical facility desired to capitalize on the strict program requirements, city codes, aesthetic nature of the place, and sustainable features. A central, elevated street is exposed to the Floridian air to allow ample light and ventilation through the building. Angled room alignment and curved balconies allowed for shading and maximized views of the ocean and intercoastal waterway.
-
explore transformable facade
fall 2010; first year graduate comprehensive studioRevit, AutoCAD, Photoshop, Illustrator
-
explore:
1. verb. to traverse or range over for the purpose of discovery 2. verb. to look into closeley; scrutinize; examine 3. verb. to investigate into 4. verb. to engage in exploration
MULTIPLICITY: User-operable and -transformable facade. The double facade creates a path: the goal is not simply to enter the building, but to explore the intricacies and freely choose your own path. MOVING: The facades manueverability allows for exploration and a constantly changing envelope. -sliding -extending -hinging
KAREN MILLER ARCH 501
COGGESHALL TRANSFORMATIVE SURFACE
CLOSED- Moir effect stimulates intrigue and desire to scrutinize
OPEN- Users choice to create a unique, exploratory experience
The goal was to create a movable facade system to exemplify a word (explore). A double facade creates a path that users are free to interact with as they explore their own path around or into the building. Panels slide, hinge, extend, and retract to create a dynamic facade that has ever-changing shadows.
-
bracken library addition cafe + reading room addition
muncie, in fall 2010; first year graduate comprehensive studio
Revit, AutoCAD, Photoshop, Illustrator
-
Building off the explore facade, this addition to the Ball State University Library features a cafe, reading rooms, and individual reading nooks along a path. Users are encouraged to go explore the different levels of reading rooms via stairs or ramps and to find their preferred type of space. The perforated metal facade shades the harsh daylight yet allows in some natural light.
-
BRACKEN LIBRARY ADDITIONKAREN MILLER
+0 +10 +22 +32 south elevation floorplans 1/16 = 1 N
east elevation 1/16 = 1 section/axon section a 1/8 = 1 section b
-
vertical city cap+trade; mixed use tower
san francisco, ca fall 2010; first year graduate comprehensive studio
Revit, AutoCAD, Photoshop, Illustratorpartner project with Michelle Armand
-
An intensive program was combined into a vertical city to provide residents, hotel guests, office workers, and researchers with amenities within one structure. Sustainable tactics implemented tidal energy, solar power, a ventilated double facade, and fog harvesting. An offset U-shaped plan allows for privacy for the residents. The structure is stacked box trusses for each three stories, that are suspended from each other.
-
piazza celimontana covered market; piazza; underground parking garage; apartments
rome, italy summer 2011; independent study graduate comprehensive studio
Revit, AutoCAD, Photoshop
-
This project created a covered market, piazza, and apartments in a desolate plot of land. The market embraces the corner close to the Colosseum to invite visitors to interact with locals. The market is pushed down into the ground, with an accessible green roof from the piazza. Levels of privacy and more ownership of green space increase as residents go into their unit: some units have exterior circulation, while others are two stories to allow for balconies and interior porches.
-
bachelor hall court university courtyard infill
oxford, ohspring 2010; fourth year capstone studio
AutoCAD, FormZ, Photoshop, Hand Rendering
-
I revitalized a desolate university courtyard to make it usable space. Based on gallerias and Norman Fosters structural systems, my structure elegantly supports the fritted glass roof so the new enclosure does not bear on the existing building. Walkways allow for circulation in the academic building, breakout rooms can be classrooms or study space, and a raised stage allows for poetry readings for English majors.
-
-glass panels-purlins connecting glass panel to steel building structure-steel truss in compression-cables in tension connecting the columns-supporting I-beam-column capital-column (hollow for rain capture)-reinforced decking-supporting I-beam-column capital-column base (transfers into underground pylons)
-
wiikiaami roominterior cultural space
oxford, ohspring 2009; third year studio
AutoCAD, FormZ, Photoshop
-
The studio sought out to create a cultural space in the new studentcenter reminiscent of the traditional dwelling of the Miami Tribe. After all students proposed rooms, tribal members and University Architects chose to pursue my design and asked me to incorporate elements of my classmates designs. I adapted culturally significant elements, natural materials, and symbologies with modern technologies.
-
piazza brunelleschi addition to historical building & piazza renovation
florence, italyfall 2008; third year studio
AutoCAD, FormZ, Photoshop
-
My design revitalized the formerly dark entrance corridor to a university library. An inlaid, overriding glass box creates an indoor piazza. The glass box is interrupted by three main program spaces that open to the exterior, terraced piazza. Inside the box there are overlapping floating boxes suspended from trusses that act as reading rooms and breakout spaces.
-
work experience the estopinal group
jeffersonville, inspring-summer semesters 2011
E:\S
BLH
\SB
LH.0
18\C
D\S
BLH
018
- LS
1.dw
g, 4
/19/
2011
5:2
1:49
PM
, klm
iller
-
E:\S
BLH
\SB
LH.0
18\C
D\S
BLH
018
- LS
1.dw
g, 4
/19/
2011
5:2
1:49
PM
, klm
iller
Sarah Bush Lincoln Hospital; Matoon, ILRenovation, Expansion, Addition
(left page) Life Safety plan(right page) Phasing plan
-
E:\S
BLH
\SB
LH.0
18\C
D\S
BLH
018A
0501
.dw
g, 5
/9/2
011
6:14
:57
PM
, mep
hilli
ps
DECON
E:\S
BLH
\SB
LH.0
18\C
D\S
BLH
018A
0401
.dw
g, 5
/9/2
011
4:31
:47
PM
, web
enne
tt
E:\S
BLH
\SB
LH.0
18\C
D\S
BLH
018A
1110
.dw
g, 5
/9/2
011
5:15
:47
PM
, web
enne
tt
E:\S
BLH
\SB
LH.0
18\C
D\S
BLH
018A
1110
.dw
g, 5
/9/2
011
5:15
:47
PM
, web
enne
tt
-
E:\S
BLH
\SB
LH.0
18\C
D\S
BLH
018A
0501
.dw
g, 5
/9/2
011
6:14
:57
PM
, mep
hilli
ps
Sarah Bush Lincoln Hospital; Matoon, IL(top) Interior Elevations
(left page) Partial floorplan(right page) Partial reflected ceiling plan
E:\S
BLH
\SB
LH.0
18\C
D\S
BLH
018A
1110
.dw
g, 5
/9/2
011
5:15
:47
PM
, web
enne
tt
-
E:\S
BLH
\SB
LH.0
18\C
D\S
BLH
018A
1110
.dw
g, 5
/9/2
011
5:15
:47
PM
, web
enne
tt
E:\S
BLH
\SB
LH.0
18\C
D\S
BLH
018A
1110
.dw
g, 5
/9/2
011
5:15
:47
PM
, web
enne
tt
-
Sarah Bush Lincoln Hospital; Matoon, IL(top) Interior elevations
(left page) Partial equipment plan(right page) Partial room finish plan
E:\S
BLH
\SB
LH.0
18\C
D\S
BLH
018A
1701
.dw
g, 5
/9/2
011
10:2
4:56
PM
, mep
hilli
ps
E:\S
BLH
\SB
LH.0
18\C
D\S
BLH
018A
1110
.dw
g, 5
/9/2
011
5:15
:47
PM
, web
enne
tt
-
Our Lady of Lourdes Regional Medical Center; Lafayette, LANew construction
(top L-R) Interior elevations; Trash compactor renovations (bottom L-R) Canopy at physician parking; Trench drain sections
-
B C D E F G H JA K
NORTH ELEVATIONSCALE: 1/8"=1'-0"
04
HEALTHMEDICAL OFFICE BUILDING 1
1 2 3
4
EAST ELEVATIONSCALE: 1/8"=1'-0"
01
54.3
3.4
2.4
NORTH PENTHOUSE ELEVATIONSCALE: 1/8"=1'-0"
05
D E F G
Min
ot, N
orth
Dak
ota
587
02
Med
ical
Offi
ce B
uild
ing
Tri
nity
Hea
lth
Sys
tem
sO
ne B
urdi
ck E
xpre
ssw
ay W
.
THSY.017
Produced By:
07.26.201150% QC Review (TEG)DD Signoff
99% CHECK SETAUGUST 05, 2011
www.teg123.com812.282.3700Jeffersonville, Indiana 47130903 Spring Street
ArchitecturePlanningEngineeringInteriors
JeffersonvilleLouisvilleShreveportEvansville
Coordinated By:
Q.C. Checked By:
HE
AL
TH
The Estopinal Group LLC
95% QC Review (TEG)08.23.2011100% CD Release
VOL. ISHELL PACKAGE
A8.1
Exterior Elevations
TEG
TEG
TEG
EAST PENTHOUSE ELEVATIONSCALE: 1/8"=1'-0"
03
E:\T
HS
Y\T
HS
Y.0
17\C
D\A
RC
H\T
HS
Y01
7A08
01.d
wg,
8/5
/201
1 8:
16:4
1 A
M, k
lmill
er
Min
ot, N
orth
Dak
ota
587
02
Med
ical
Offi
ce B
uild
ing
Tri
nity
Hea
lth
Sys
tem
sO
ne B
urdi
ck E
xpre
ssw
ay W
.
THSY.017
Produced By:
07.26.201150% QC Review (TEG)DD Signoff
99% CHECK SETAUGUST 05, 2011
www.teg123.com812.282.3700Jeffersonville, Indiana 47130903 Spring Street
ArchitecturePlanningEngineeringInteriors
JeffersonvilleLouisvilleShreveportEvansville
Coordinated By:
Q.C. Checked By:
HEA
LT
H
The Estopinal Group LLC
95% QC Review (TEG)08.23.2011100% CD Release
VOL. ISHELL PACKAGE
A9.3
Wall Sections
TEG
TEG
TEG
CANOPY SECTIONSCALE: 1/2"=1'-0"
03
VESTIBULE SECTIONSCALE: 1/2"=1'-0"
04
CANOPY SECTIONSCALE: 1/2"=1'-0"
01
VESTIBULE SECTIONSCALE: 1/2"=1'-0"
02VESTIBULE SECTIONSCALE: 1/2"=1'-0"
02A
CANOPY SECTIONSCALE: 1/2"=1'-0"
01A
E:\T
HS
Y\T
HS
Y.0
17\C
D\A
RC
H\T
HS
Y01
7A09
01.d
wg,
8/5
/201
1 8:
12:2
9 A
M, k
lmill
er
41
41
Minot, North Dakota 58702
Medical Office BuildingTrinity Health Systems
One Burdick Expressway W.
THSY.017
Produced By:
07.26.201150%
QC Review
(TEG)DD Signoff
99% CHECK SET
AUGU
ST 05, 2011
ww
w.teg123.com
812.282.3700Jeffersonville, Indiana 47130903 Spring Street
ArchitecturePlanningEngineeringInteriors
JeffersonvilleLouisvilleShreveportEvansville
Coordinated By:
Q.C. Checked By:
HEALTH
The Estopinal Group LLC
95% Q
C Review (TEG)
08.23.2011100%
CD Release
VOL. I
SHELL PACKAGE
WALL SECTIONSCALE: 1/2"=1'-0"
01WALL SECTIONSCALE: 1/2"=1'-0"
02
A9.1
Wall Sections
TEG
TEG
TEG
CHASE 2 SECTIONSCALE: 1/2"=1'-0"
03
E:\THSY\THSY.017\CD\ARCH\THSY017A0901.dwg, 8/5/2011 8:09:15 AM, klmiller
2.43.4
3.42.4
2.8
Minot, North Dakota 58702
Medical Office BuildingTrinity Health Systems
One Burdick Expressway W.
THSY.017
Produced By:
07.26.201150%
QC Review
(TEG)DD Signoff
99% CHECK SET
AUGU
ST 05, 2011
ww
w.teg123.com
812.282.3700Jeffersonville, Indiana 47130903 Spring Street
ArchitecturePlanningEngineeringInteriors
JeffersonvilleLouisvilleShreveportEvansville
Coordinated By:
Q.C. Checked By:
HEALTH
The Estopinal Group LLC
95% Q
C Review (TEG)
08.23.2011100%
CD Release
VOL. I
SHELL PACKAGE
A9.5
Wall Sections
TEG
TEG
TEG
STAIR A AND B SECTIONSCALE: 1/2"=1'-0"
01
E:\THSY\THSY.017\CD\ARCH\THSY017A0901.dwg, 8/5/2011 8:13:28 AM, klmiller
Trinity Health Systems Medical Office Building; Minot, NDNew construction (shell package)
(top L-R) Exterior elevations; Stair section(bottom) Wall sections
-
ecorehab clockwise, top left-bottom left: -Brick repair and replacement; bay window installation, framing and trim, reclaimed wood flooring; bay window exterior painting; final exterior; construction of bench from reclaimed wood flooring and paneling; finished bay window and stained floor; wooden and storm window installation; exterior building work; door framing.
-
service Morgantown, IN- Cabin demolition; roof removal; porch removal and rehabilitationEast Liverpool, OH- Gutting; preservation/restoration preparing Rogers, OH- Rustic bridge buildingBiloxi, MS- Destruction; gutting; restoration and preservation work Jacksonville, FL- housewrap and window sealant; siding; framing
-
K M karen [email protected] beech dr. edgewood, ky 41017www.wix.com/mille211/mille211