july 23, 2019 - casper lrtp – connecting crossroads
TRANSCRIPT
July 23, 2019
Long Range Transportation Plan
• Federally Mandated Process• Guide To Long-Range Regional Transportation Spending• Leads To Metropolitan Transportation Improvement
Program
December 2018 March 2019
June/July 2019
Fall 2019
The Conventional Approach
The Conventional Approach
The Conventional Approach
East 2nd Street
Community Events
March Workshops
Press Coverage
Community Goals
• Safe and Efficient Transportation• Meet Demands Cost Effectively• Promote Alternative Travel Modes• Coordinate Land Use and Transportation• Invest To Promote Growth and Diversification
2014 LRTP
Final Project Goals• Increase Transportation Options for All Modes• Improve Safety and Health for All Residents• Enhance The Region’s Distinct Character• Support The Region’s Diversifying Economy• Promote Affordable and Easy Mobility Solutions
Community Survey Feedback Results
Streets For People
Transit: Key ChallengesFinancial
Sustainability
Organizational Structure
Transit Service Efficiency
Pedestrian Issues
Long and exposed crossings distances Indirect paths of travel Short pedestrian signal phases Obstructed visibility Lack of ADA provisions Narrow sidewalks with mountable curbs Lack of consistency
CY Ave/Poplar St
Bicycle IssuesLack of consistencyFew protected facilitiesLack of bicycle signalsDangerous crossings at intersections and trailsLack of connectivity to trail networkDriver Education
1st/Yellowstone
2nd/Yellowstone
Existing + Proposed Bike Network
Desired Low Stress Network
Desired Bike Network
Limited Funding
Limited Funding for Future Projects
Growth Scenarios
Potential Growth Scenarios
Sprawl Pattern Compact Pattern
• Two future land use scenarios: Compact and Sprawl• Evaluated 3 network types: No Build, Auto-Oriented,
Multimodal• Population assumed to increase 67%
• VMT: 65% in compact scenarios; almost doubles in sprawl scenarios
• VHT: 68-70% in compact scenarios and 102-105% in sprawl scenarios
• Average speeds: in all scenarios
Modeling Outcomes
Compact Growth ScenarioMultimodal Projects Auto-Oriented Projects
Sprawl Growth ScenarioMultimodal Projects Auto-Oriented Projects
Project Prioritization
Final Project Goals• Increase Transportation Options for All Modes• Improve Safety and Health for All Residents• Enhance The Region’s Distinct Character• Support The Region’s Diversifying Economy• Promote Affordable and Easy Mobility Solutions
Evaluation CriteriaModal OptionsCongestion ReductionNetwork ConnectivityADA AccessibilitySafetyModal DensityAccess to Community AssetsAccess to Healthy Food Sources
Facilitate Goods MovementParking ImpactsFunding FeasibilityProject CostMaintenance ResponsibilityContext and PlacemakingPrevious Plan ConsistencyComplete Streets
Project Scoring – High PriorityReconstruction Reconstruction of Midwest Avenue Elm St. to Walnut St.Reconstruction Safety Islands, Street Lights, Ped Tunnel, and Beautification Wyoming Blv - Mills (Highway 20 to 13th St)Bike/Ped Improvements Mixed-use path on SW Wyoming Blvd CY Ave to 12th Street (7 mi)Bike/Ped Improvements Crossing improvements CY/PoplarBike/Ped Improvements Underpass beautification and ped enhancements Center Street UnderpassBike/Ped Improvements Pedestrian Bridge Comprehensive North Casper Pedestrian Bridge (N. Lincoln St)Reconstruction Reconstruction of Midwest Avenue Walnut St. to Poplar St.Bike/Ped Improvements Bike lane on Midwest Ave Poplar to Casper Rail Trail
Bike/Ped Improvements Pathway & Bike Lane Improvements City of Casper
Safety Improvements Sidewalks Street Light, and Beautification Robertson Road Safety Improvements Sidewalks Street Light, and Beautification Yellowstone Highway Mills (N 6th Ave to SE Wyo)Bike/Ped Improvements Bike lanes on Casper Mtn Dr/Durbin St Campus Dr to 15th StBike/Ped Improvements Sidewalk Installation. Various locations Evansville
Modify Intersection Reconstruct Poplar St/ 1st St.. widen Platte River bridge add sidewalks. Collins to the RR Bridge on PoplarBike/Ped Improvements Extend Casper Rail Trail (existing RR ROW) Hat 6 Rd to Edness Kimball Wilkins Park entranceBike/Ped Improvements Crossing improvements 1st/YellowstoneBike/Ped Improvements Crossing improvements 2nd/Yellowstone Bike/Ped Improvements 1st and Poplar Enhancements Landscaping and bicycle lanesBike/Ped Improvements Sidewalk Improvements Western to 20/26 EvansvilleBike/Ped Improvements Sidewalk Improvements Midwest Ave to C StReconstruction Convert to 2-way Midwest Ave to C StRoad Construction Legion Lane extension Wyoming Blvd to 2nd St
Project Scoring – Medium PriorityBike/Ped Improvements Bike lane on Blackmore Rd 2nd St to Casper Rail Trail
Bike/Ped Improvements Bike lanes on Hat 6 Rd 2nd St to Casper Rail Trail
Bike/Ped Improvements Bike lane on E 2nd St Blackmore Rd to Hat 6 Rd
Road Construction Add 1 lane on CY Ave (EB only), remove signal at CY/Wyo Wolf Creek Rd to Denis Dr
Bridge Replacement Bridge Replacement CR402 Bates Creek Road CR402 Bates Creek Road
Safety Improvements Intersection improvements and upgrade of the signals Poplar St & Collins and at Wyoming Blvd & 13th St.
Reconstruction 2nd Street reconstruction Curtis to Williams - Evansville
Road Construction Roadway extension Metro Road to Cemetery Road - Evansville
Safety Improvements Installation of Variable Speed Limit signs I-25 Casper Marginal
Bridge Replacement Bridge Replacement CR106 Notches Road/Powder River CR106 Notches Road/Powder River
Reconstruction Reconstruction of Lathrop Road from Aspens MHP to Wyoming Blv - Evansville
Road Construction W 25th/College Dr (widen from 2 to 4 lanes) Hanway Ave to S Ash St (1.03 mi)
Bridge Replacement Replace I-25 Casper Marginal structures with new structures over Walsh Dr. Yellowstone (MP 185.35) to Wyo Blv (MP 186.24)
Safety Improvements Traffic signals Hat Six Road
Road Construction N Center St RR underpass expansion (widen from 2 to 4 lanes) E BC Street to W D Street (0.16 mi)
Project Scoring – Low PriorityRoad Construction 21st St Extension (extension of major arterial) 21st St to East Belt Loop (1 mi)
Road Construction 12th St Extension (extension of major arterial) 12th St to East Belt Loop (1.5 mi)Road Construction Texas Street extension Miracle Drive to 20/26 (behind Baymont Hotel)Road Construction 26th St (extension of collector) Sagewood Ave to Casper Country Club RdRoad Construction East-West Arterial (new major collector) Morgan St to I-25 Interchange (8 mi)Road Construction East Belt Loop Road Wyoming Blv to Hat Six Road (5.5 mi)Road Construction Westwinds (new minor arterial) US 20/26 near airport to Bryan Stock Trail Ext (8.5mi)Road Construction SE Wyo Blv (expand from 4 to 5 lanes (+1NB)) E 15th St to Blackmore Rd (0.5 mi)Road Construction New Construction Westwinds Road extension to Airport Where Westwinds Rd ends (north of Bar Nunn) west to CR 119Road Construction N Salt Creek Hwy (expand 2 to 3 lanes (+1NB)) W. Yellowstone Hwy to Hwy 20/26 off-ramp (1.33 mi)Road Construction SE WYO BLV widen from 2 lanes to 4 lanes Casper Mtn Road to E 15th St. (3.9 mi)
Road Construction CY Ave widen from 4 lanes to 6 lanes S Robertson Rd. to Divided CY Ave near Poplar (8.63 mi)Road Construction Polaris Drive Westwind Rd to Salt Creek Highway (4.13 mi) west edge of Bar NunnRoad Construction N Salt Creek Hwy (expand 2 to 4 lanes) Howard St to Antelope Dr (0.67mi)Road Construction 2nd Street/21st Street Connector (new minor arterial) East of Blackmore Rd to 2nd Street (1 mi)Road Construction S Beverly St (extend minor arterial) S McKinley St to 24th St (1.35 mi)Road Construction Roberston RD (widen from 2 to 4 lanes) CY Ave to West Belt Loop (2.89 mi)Road Construction Bryan Stock Trail Extension (new minor collector) Platte River to Proposed McMurry Dr (4 mi)Road Construction Bryan Stock Trail Extension (new minor collector) Beverly St to Cole Rd (5mi)Road Construction Landmark Dr (expand from 2 to 4 lanes) Blackmore Rd to Caseda Dr (0.20 mi)Road Construction E Collins/S Kimball/ E Yellowstone Hwy (from 2 to 4 lanes) Durbin St to E 2nd St (0.21 mi)Road Construction Curtis St (widen from 2 to 4 lanes) E Yellowstone Hwy to 3rd St (0.33 mi)Road Construction Casper Mtn Rd (widen from 2 to 4 lanes) Goodstein Dr to T-Bird Dr (2.14 mi)Road Construction CY Ave/Wyoming (new major collector) CY Avenue (near Paradise Dr) to Wyoming Blv (near Arroyo Dr) (2.5 mi)
Mills Wyoming Blvd. ImprovementsEnhances safetySupports all modesImproves ADA accessIdentified funding sourcesConsistent with community plansEnhances regional character and
placemakingSupports economic redevelopment
High Score
Metro Road ConnectorAdds network connectivityProvides alternative route for EvansvilleIdentified local fundsLow per mile cost
Does not support non-auto modes
Does not improve safety
Medium Score
CY Congestion and Accessibility Corridor
CY Ave/Wyoming Blvd
CY Ave/Wyoming BlvdMedium Score
Beverly Street ExtensionSpeculative on future
developmentPromotes sprawlDoes not address congestion
or access issueNo identified funding sources Inconsistent with community
plans and goals
Low Score
Next StepsReview Priorities• Does the list look right?
Set Policy Direction• Do we press for infill?• Infrastructure
preservation• Bridge repair and
replacement Finalize Budgeting• Financial forecasting
through 2048• Allocate projects to 6-
year funding spans
Develop Action Plan
DISCUSSION
Trail Crossings
Long Creek Path/12th St
Trail Crossings
Sage Creek Path/12th St
Gateway Treatment
Pedestrian Safety Improvements
Bike and Lane Conversions
2nd/Wyoming Blvd
2nd/Wyoming Blvd
Redevelopment Concepts
Concept plans for the new State Office Building in the Old Yellowstone District include rail trail connections through the sitePlans also call for street frontage improvements including new
sidewalks, curb cuts, and landscapingMills will activate the River Trail