2 nd November, 2016 1 IGG Agenda Minutes from Previous IGG Meeting 10:15 10:20 Review of Action Items 10:20 10:40 CER Update 10:40 11:00 Gemserv Update 11:00 11:10 MRSO Update 11:10 11:20 ESB Networks Update 11:20 11:45 Retail Market Design Service Update 11:45 12:05 AOB 12:05 12:10 Next Steps 12:10 12:15 All participants are kindly requested to mute their phones when dialled into the forum conference call

Upload: others

Post on 19-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 1

IGG Agenda

Minutes from Previous IGG Meeting 10:15 – 10:20

Review of Action Items 10:20 – 10:40

CER Update 10:40 – 11:00

Gemserv Update 11:00 – 11:10

MRSO Update 11:10 – 11:20

ESB Networks Update 11:20 – 11:45

Retail Market Design Service Update 11:45 – 12:05

AOB 12:05 – 12:10

Next Steps 12:10 – 12:15

All participants are kindly requested to mute their phones when dialled into the forum conference call

Page 2: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 2

Minutes

Minutes (v1.0) from IGG meeting

31st August 2016

For Approval Today

Page 3: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 3

IGG Action Items

Updated IGG Action List issued in advance of

meeting

4 Actions closed since last IGG meeting

7 IGG Actions carried forward

Page 4: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 4

Update on Actions - Closed

AP No. Title

Org. Assigned

to Date Closed Date Raised

1013

MRSO Presentations - Suppliers to provide suggestions as to what they want to see in

the MRSO IGG Presentations in the future & suggest whether the current forum slide

deck is best placed on the RMDS website only rather than provided at all IGGs. Suppliers 31/08/2016 29/06/2016

1015

DR1180 New Registrations - Suppliers to provide comments on this DR ahead of the

next IGG. Suppliers 31/08/2016 29/06/2016

1012 CER to circulate the Terms of Reference of the IGG to all Participants via RMDS CER 28/09/2016 04/05/2016

1019

Revenue Protection - Suppliers to submit nominee details, if any, for the Revenue

Protection Group to ESBN via RMDS Suppliers 28/09/2016 31/08/2016

Page 5: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 5

Update on Actions - Open

AP No. Title

Org.

Assigned to Date Due Date Raised

948/1004

ESBN to analyse the process where Move out with no Move takes place and make

proposals based on existing Supplier processes for best business practise within this

area. Process must enable MPs to notify CMS when a move out without a move in takes

place. Proposal to be issued to market in the form of a DR. (The issue is an

amalgamation of 948 and 1004) ESBN 02/11/2016 14/01/2015

986

Technical Details - DR covering the importance of appropriate Technical Details (name

and phone) to the 016 to be drafted. Detail to be added to MPD 01 & 02 ESBN 02/11/2016 02/09/2015

1017

Green Source Verification Process Clarifications and revised timelines - Suppliers to

submit questions/comments to CER (via RMDS) on the Green Source Presentation

outlined by CER. Suppliers 02/11/2016 31/08/2016

1018

Retail Market Code - CER is in the process of considering framework and requirements

for a Retail Market Code. Suppliers are requested to submit comments/suggestions to

CER (via RMDS) relating to proposed framework, content and requirements. Suppliers 02/11/2016 31/08/2016

1020

CER Rebrand - CER to provide details of the CER Rebrand & Timelines to Suppliers via

RMDS. CER 02/11/2016 31/08/2016

1021

Suppliers are requested to submit comments on the Terms of Reference of the IGG to

CER via RMDS (linked to IGG Action 1012) Suppliers 02/11/2016 28/09/2016

1022

RMDS to circulate if possible the NI Retail Market Code to Suppliers (linked to IGG

Action 1018) Suppliers 02/11/2016 28/09/2016

Page 6: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

6

CER Update

02.11.2016

Page 7: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

Retail Market Assurance

Services for the Irish Electricity

Market

Lizzie Montgomerie

IGG

2 November 2016

Belfast

Page 8: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

Assured Parties – November 2016

Gemserv 8

Number and type of live participants assured by Gemserv since 2005

NB this is not a reflection of the live market position.

11

7

27

8

4

Large

Small

Self Supplier

DSU

Export Supplier

Page 9: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

Assurance Services: During October 2016

Gemserv 9

New Entrants

One Large Supplier

And One Complete

One Small Supplier

One Export Only Supplier

And One Complete

One SelfSupplier

Complete

Page 10: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

Thank You

Lizzie Montgomerie

Head of Assurance

T: +44 (0) 20 7090 7750

E: [email protected]

W: www.gemserv.com

Page 11: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

MRSO Update Gerry Halligan

2nd November 2016

Page 12: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

12 esbnetworks.ie

Debt Flagging

Jul-16 Aug-16 Sep-16

Total MPRNs received 412Automated

Debt Flag

Automated

Debt Flag

Total CoLEs returned to outgoing supplier 215

Returned for other reason to outgoing

supplier (invalid MPRN, switch completed)17

Valid Debt Flags issued to gaining supplier 180 229 228

Total not cancelled 118 150 158

Total cancelled 62 79 70

Valid Debt Flags as % of total COS 0.7% 0.9% 0.8%

Page 13: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

13 esbnetworks.ie

Debt Flagging

Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16

Total MPRNs received 763 509 356 400 379 420 463 428 374 412 0 0

Valid Debt Flags issued 529 229 164 198 163 199 217 208 147 180 277 228

Total Cancelled 51 79 71 48 54 58 54 61 45 62 79 70

0

100

200

300

400

500

600

700

800

900

Total MPRNs received

Valid Debt Flags issued

Total Cancelled

Page 14: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

14 esbnetworks.ie

Objections – Erroneous Transfers

91

74

64

52 5247

5348

69 68

59

67

79

92

68

89

74

65

8690

160

85

105

85

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

0

20

40

60

80

100

120

140

160

180

No

. o

f C

oS

Co

mp

leti

on

s

No

. o

f O

bje

cti

on

s

No. of Objections

CoS Completions

Page 15: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

15 esbnetworks.ie

Objections

Jul-16 Aug-16 Sep-16

No. of Objections 85 105 85

Cancellations from Objections 62 81 58

Objection emails to MRSO 11 15 12

Reasons:

Uncontactable by phone 1 2 1

Written communication 1

COS confirmed 10 12 11

Other

Escalation emails 3 2 3

Page 16: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

16 esbnetworks.ie

Comments on query raised at last IGG on sharp

increase in objections for June 2016

• Sharp increase in objections for erroneous transfer recorded in

June (May 90 – June 160 – July 85)

• Increase mainly due to two losing suppliers

• Objections were raised against spread of gaining suppliers

• Analysis of cancellations from objections showed cancellations

were spread across gaining suppliers

• On average 70% of objections for ET are cancelled, the

cancellation figure for June is 73%

• The gaining suppliers would presumably have completed their own

investigations and were satisfied to cancel

• No increase in objection emails or escalations received in MRSO

• From MRSO perspective, Market Process for erroneous transfer

appears to be followed in respect of the data for June

Footer

Page 17: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

ESBN Presentation to the IGG

Aileen Greaves

2nd November 2016

Page 18: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

18 esbnetworks.ie

ESB Networks Update

• Revenue Protection Workshop was held

• Next meeting scheduled 16th November @ 10.30 same venue

• Progressing with CER issues around the Retail Work Plan

• Commented on IGG Terms of Reference

Footer

Page 19: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

ESB Networks I-SEM Programme

Presentation to the IGG

Theresa O’Neill & James Long

2nd November 2016

Page 20: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

20 esbnetworks.ie

ESB Networks I-SEM Programme - General Update

We are continuing to work with the RA’s , the I-SEM Project and the other Meter Data Providers through the

I-SEM Metering Working Group.

At this time there is no change to our understanding viz

• No Changes are indicated to the Harmonised Retail Market Schema or the COBL

• D+1,D+4,M+4,M+13 Working day Settlements will operate for ESBN for the I-SEM i.e. No Change to frequency

• Need to concurrently operate the SEM and the I-SEM until the Re-Settlement of the SEM has completed

• No Meter Data will be price effecting in the I-SEM and so I-SEM will not use the Price-Effecting category

• I-SEM Market Trials will run from June-Sept 2017

• The Go-Live date for the I-SEM is 1st Oct 2017

Discussion Request DR1182 was presented and discussed at the last IGG , and for information , no

further comments or queries have been raised with us.

Page 21: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

21 esbnetworks.ie

ESB Networks I-SEM Programme – Price Effecting Units : Update

Price Effecting Units

SEM-O have identified 7 Supplier Units that are currently Non-Price Effecting , and they have started work with

MRSO to move them to become Price Effecting in the SEM. This means that Eirgrid will become the MDP for

them in the SEM. This is expected to be completed shortly.

Eirgrid and SEM-O have confirmed the Units that will move from Eirgrid being their MDP in the SEM to

MRSO becoming their MDP in the I-SEM. These are the current stats, at time of writing:

• 32 Distribution Connected GUs will become NPEG

• 12 SUs will become NPED

The current List of Distribution Connected Price Effecting Generator MPRNs is available on the RMDS website

Distribution Loss Factors | RMDS Please note : this list is subject to change over time

We are continuing to work closely with Eirgrid and SEM-O on the cutover implications and the timeline for their

moving in the I-SEM.

• This will include a detailed consideration of the timelines for the I-SEM Transitional Registration Lock-Down

period once it has been confirmed , and the Go-Live date for the I-SEM

Page 22: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

22 esbnetworks.ie

ESB Networks I-SEM Programme – Market Trials : Update (1 of 2)

Unscripted Phase of the Market Trials & the RoI Retail Market

For the I-SEM Market Trials Unscripted phase, our intention for RoI Suppliers and Eirgrid TSO is to make

available

• For Suppliers; the 341,59x series of messages and 342 message for the Supplier’s own generators.

• For Eirgrid TSO; the 341,59x series of messages and 342 messages including those GUs and SUs that are

moved during market Trials so that MRSO becomes their MDP for Market Trials

Naturally this means that if you want to get these messages from the Market Trials then you will need to have a test

EMMA that is available for the duration of the Unscripted Market Trials phase

We expect that the Registration Data that we will set up in the Retail Market environment for the Unscripted

phase of Market Trials will mirror the I-SEM Transitional Registration details for SUs and Participant GUs

• This will include a practice cut-over of at least 1 of the Units that is moving from Eirgrid as MDP over to MRSO as

MDP

Note : we need to do more work to better understand what QH read data will be available during Market Trials for these

Units given that the actual SEM MDP at that time will still be Eirgrid . We’ll let you know the outcome in due course.

Page 23: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

23 esbnetworks.ie

Looking for your Feedback

We are considering drafting a new Market Trials WP12 to accommodate Participant GU registration

changes being requested specifically for Market Trials

Q1 Would you see any need for this , and would you use it

We are considering drafting a new Market Trials WP14 purely as part of the Unscripted Market Trials

to accommodate Non Participant Generator Arrangements changes being requested specifically for

Market Trials

Q2 Would you see any need for this , and would you use it

Your feedback on Q1 and Q2 is welcome , and as normal, we can be contacted via the RMDS

mailbox.

ESB Networks I-SEM Programme – Market Trials : Update (2 of 2)

Page 24: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

24 esbnetworks.ie

ESB Networks I-SEM Programme – Market Trials (Appendix 1)

Appendix 1

Links to related I-SEM Project publications

The I-SEM Project has published their Market Trial Strategy and Market Trial Plan documents.

http://www.sem-o.com/ISEM/General/Market%20Trial%20Strategy.pdf

http://www.sem-o.com/ISEM/General/Market%20Trial%20Plan.pdf

Note that the description of phases of Market Trials and the Timelines are detailed within these documents

The draft/proposed Transitional Registration Plan has also been published and was presented by the I-SEM

project team for discussion with the BLG on 19th October. (NB At time of writing the plan is to be finalised)

http://www.sem-o.com/ISEM/General/Transitional%20Registration%20Plan.pdf

http://www.sem-o.com/ISEM/General/BLG_Registration%20Presentation%2019%20Oct.pdf

Page 25: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

25 esbnetworks.ie

ESB Networks I-SEM Programme – Market Trials (Appendix 2)

Appendix 2

Links to existing Retail Market Working Practices

https://rmdservice.com/working-practices-2/

WP12 To nominate / denominate a Supplier as a recipient of Participant Generator messages

WP14 Distribution Connected Non Participant Generator Export Arrangements Working Practice

Page 26: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

Thank You

Footer

Page 27: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 27

Retail Market Design Update

Jessica Gregory

RMDS

Page 28: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 28

LTCA

LTCA Audit Update

• Audit commenced 05/10/2016

• ESBN data gathering meetings 5th-7th October

• Scenarios developed by External Auditor

• MP Workshop held 12/10/2016

• 2 week Supplier data gathering period comm. 17/10/2016

• EA initial data analysis commencing. 31/10/2016

• Weekly reports issued commencing 23/09/2016

LTCA Audit Look Ahead

• MP Visits start week comm. 31/10/2016

All information / updates / progress posted to RMDS Confidential Website

Page 29: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 29

2015 IGG Survey Action

Action 4 – Non-Attendance at Market Workshops

Noted a high percentage of respondents did not attend Forum Workshops. An exercise

shall be undertaken to understand why this is the case.

• Review of attendance at IGG Meetings 2015 and 2016

• Review of attendance at Market Workshops 2015 and 2014.

• 5 Suppliers have not attended any of the above reasons below.

A decision to add all DSU’s, Self Suppliers and Export Only Suppliers to the IGG

Distribution List was made.

Supplier 1 Supplier 2 Supplier 3 Supplier 4 Supplier 5

No Business Need

Would attend if a topic motivated them

Limited Resources

Read Minutes

Future plans for regular attendance

Worry about their infuence

Page 30: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 30

Next Market Release (Agreed it will not be 2016, but 2017/2018?)

Decision as to when the next Schema and Non Schema releases will take place are pending the

outcome to

ReMCoSG action 135 (CER/UR to provide a decision around the future Co-ordinated Market

Priorities and deliveries of such) and

WG action 145 (CER/UR to respond to ESBN/NIEs with a position on how to progress the

Schema Market Release, specifically whether ROI/NI is supported in progressing planning

activity for the 2018 Schema Release as detailed in the Co-ordinated Market Retail Delivery

Plan.)

Market Release Summary

Page 31: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 31

The core driver from CER for this DR is that for sites which do not elect a supplier

within 5 days of energisation, should not automatically be assigned to Electric Ireland..

The difference to the current process is that for sites < 30 kVA the customer will in

future have to contact a Supplier of choice who will submit a registration to ESBN with

the customer name, and receipt of the registration by MRSO becomes a requirement

before the site is energised.

This DR was brought to last Forum and Market Participants generally support the

principle of a mandatory selection of a Supplier before energisation. However a

number of questions have arisen with regards to how New Registrations are cancelled.

This DR is now therefore on Hold until the Cooling off DR has been finalised, as the

design of this will affect how New Registration cancellations are handled.

At Today’s Meeting: For Information as the DR completion is dependant on outcome

of DR 1184 (Cooling Off period)

DR1180 – New Registrations(Place Holder)

Page 32: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 32

CER’s Retail Market team asked ESB Networks in January 2015 to assess the impact of

the ISEM on the Retail Market in Ireland..

Whilst the SEM is to undergo a radical transformation arising from changes to European

legislation designed to create a single wholesale electricity market across Europe, the

intention of the RA’s I-SEM team is that there would be minimum impact for the Retail

Market and for Meter Data Providers arising from the I-SEM.

ESB Networks is one of the four Meter Data Providers represented at the I-SEM Metering

Working Group and have been considering the impacts of the I-SEM.

The proposed changes are fully detailed in MCR1182 and include changes to the Data

Processing and the Data Aggregation Retail Market business process between ESB

Networks and Market Participants.

At Today’s Meeting: For Approval as MCR

MCR1182 –Impact of I-SEM on the Retail Market

Page 33: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 33

The customers’ right to the cooling off period is detailed in Directive 2011/83/EU

on consumer rights, which was transposed into Irish legislations through the

Statutory Instrument S.I. No. 484 of 2013

Under this directive , customers have a right to a cooling off period of 14 days.

This includes situations when switching their gas and / or electricity accounts.

The cooling off period allows the customer to cancel the switch within a certain

time without incurring penalty.

The CER have completed a review on whether or not the a cancellation process

should be incorporated into the market design to allow for change of mind.

Options were presented to industry for comment, this resulted in selection of an

option which the majority of Suppliers supported.

DR1184 – Cooling off for COS(1/2)

Page 34: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 34

DR1184 – Cooling off for COS(2/2)

The Competition & Consumer Protection Commission’s website states that

the cooling off period is 14 calendar days.

The scenarios outlined in the DR were created based on 14 calendar days.

Once the customer contacts the Supplier, they have up to 4 days to send the

010 and the customer has 14 cooling off calendar days to exercise their

cooling off rights.(18 days total).

At Today’s Meeting: For Discussion

Page 35: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 35

DR1185 – Small Supplier Categorisation(1/2)

Currently the structure of the Small Supplier category does not facilitate

the business model of a Supplier having a small number of sites but

energy usage greater than 10MW power at peak demand.

The proposal is to change the current categorisation and assurance

approach within the Small Supplier category

the threshold of < 200 sites registered will continue to be part of the

criteria in qualifying and operating as a Small Supplier in the Retail

Market at all times

the threshold of 10MW power supplied at peak demand will not

apply as criteria where a Supplier indicates that their model is one

which is a small number of customers but where there will be greater

than 10MW power at peak demand.

Page 36: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 36

DR1185 – Small Supplier Categorisation(2/2)

The assurance body will determine the assurance assessment required for

each Small Supplier entering the Retail Market based on the segment(s)

the Supplier is entering and their Business model.

The Scope of Change to Design Documentation relates to amendments to

the Market Assurance and Market Entry Documentation.

At Today’s Meeting: For Approval

Page 37: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 37

Non Schema 2017 – Prioritisation

MCR NumberDR / MCR Description Comment

Delivery Event

DR1185 DR Small Supplier Categorisation For Approval at Forum on 2/11/2016 MMR

DR1184 DR Cooling Off for COS For Discussion at Forum 2/11/2016 NS / MMR

MCR1182 MCR I-Sem Changes For Approval at IGG on 2/11/2016 - delivered as part of I-SEM I-SEM proj

DR1180 DR New RegistrationsWaiting on Cooling off DR to be finalised prior to completion (reliant on Cooling off) NS

MCR1179 MCR Cessation of Eligible Cust Files on Extranet approved. To be impact assessed by ESBN NS

MCR1176 MCR Extranet Message Ordering Approved May 2016 NS

MCR1175 MCR Provide MP Bus Ref for Reading Approved June 2016 NS

MCR1169 MCRAddition of Postal Codes to two downloadable Meter Point Details Files Approved November 2015 (linked to MCR 1140 & Schema MCR ) NS

MCR 1141 MCR Supplier ID Validation on 260MM

With ESBN Currently. ROI still to determine best approach for ROI. With ESBN scope and design. Implemented in NI in 2015 on the 1st May 2015 and this was advised to the CDA Board at the CDA Board meeting that took place on 13th May 2015 ?

MCR1140 MCRNew RoI Postcodes into the Market Design(Eircodes)

Re-Versioned to cater for changes to GNI. Approved at IGG on 29/6/2016 (linked to MCR 1140 and Schema MCR NS

MCR 1135 MCRMarket Webservice as opposed to a Market Website to provide On-Demand Customer Information.... Read more

The MCR has been approved but has been put on hold. This is on hold due to concerns by CER that its implementation may have impacts on the central market systems NS

DR 1001 DRIncrease number of days for a Customer Read for a COS to match the Supplier Cooling Off Period - 7 Working Days

Brought to IGG meeting on 04.12.13 requesting withdrawal. Approval was not granted and this is now on hold. Outcome of DR 1184 may negate need for this DR. DR has to be reassessed in light of DR1184 ?

MCR 0062 MCRNew rule for MPD1 NQH Change of Supplier.... Read more

This MCR is on Hold. This must be reassessed in light of DR 1184 and LTCA WG outcomes. ?

Exclude first 3 as either Delivered outside of NS release

Page 38: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 38

Activity Role Action DateRank each of the changes highlighted in orange 1-7 with 1 being your top priority and 7 your least important. Items excluded are due to low probability of approval prior to mid 2017 or being subsumed into new DR/MCRs. Current applicability still to be determined. MPs Return to RMDS by 30/11/2016

Consolidate and formulate Market prioritised list. RMDS Issue to Market by 16/12/2016

Determine any action required to get prioritised MCR's approved. RMDSFormulate, plan & communicate by 11/01/2017

Communicate outcome of prioritisation exercise to Market at IGG RMDSPresent at IGG and issue email by 11/01/2017

Include Market feedback following delivery of list RMDS 18/01/2017

Provide ESBN list of prioritised MCRs for impact assessment. RMDS Issue to ESBN 19/01/2017

ESBN suggest proposed package of changes based on MP prioritisation and dependencies between MCRs, other work programmes. Proposed delivery dates of changes provided ESBN Issue to RMDS by TBD

Proposed package with delivery dates issued to Market for review & comment RMDS RMDS TBD

MPs MP TBD

Market Approval of Non Schema Package and delivery Date at IGG Market Approve at IGG in Q1 2017 TBD

CER approve Non Schema Package and delivery CER Approve Q1 2017 TBD

Non Schema Prioritisation 2017

Page 39: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 39

Extranet Screenshot issue - RMDS has been alerted by ESBN that a Supplier sent a

screenshot of the Extranet to one of it’s prospective customers. This is a breach of Data

Protection. Under no circumstances should Suppliers send Extranet screenshots to

Customers.

Working Practice 19 – Hardship PAYG. Some suppliers may have incorrectly been

advised to follow COS practises not agreed and contained in WP19. Please can all MPs

continue to follow the processes outlined in WP19 for hardship PAYG.

CER Lock Moratorium period for Christmas Period 2016.

Information for Suppliers

Page 40: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 40

2017 IGG & IGG Conference Call Dates – Full details are available on the RMDS website

under Reference Section/Guidance Documents

IGG/IGG Conference Call dates & Times 2017

ReMCoWG/IGG/CDA(8 week cycle)

Location IGG Conference Call(4 weeks after IGG)

11th January Dublin

8th February

8th March Belfast

5th April

3rd May Dublin

31st May

28th June Belfast

26th July

30th August Dublin

4th October

1st November Belfast

6th December

2017 Forum timings – As per WG Action 146 - CDA Meetings now only 1 hour 30 Minutes

CDA/WG/IGG in Dublin IGG/WG/CDA in Belfast

CDA 10:30 - 12:00 IGG 10:30 - 12:30

WG 12:30 - 13:30 WG 13:00 - 14:00

IGG 13:30 - 15:30 CDA 14:00 - 15:30

Page 41: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 41

Annual Tasks

Documents / Links

Meter Reading Calendar

Load Profile Indexes (6 Individual Files) – will be available

shortly.

Load Profile Indexes 2017

Unmetered PL Burn Hour Calendar 2017

Unmetered PL Index Values 24H 2017

Unmetered PL Index Values Dusk to Dawn 2017

Unmetered PL Index Values Dusk to Midnight 2017

Night Storage Heating Derived Profiles 2017

Derived Load Profiles 2017

Distribution Loss Factors 1.10.2016 - 30.09.2017

Site Specific Loss Factors effective 1.10.2016

ESB Networks Ltd – Statement of Charges

Christmas New Year Working Arrangements

IGG/CDA/ReMCoWG/ReMCoSG/Meeting Dates

Page 42: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 42

End of Year Working Arrangements Document covers period Friday 16th December 2016 to Tuesday 3rd

January 2017

This document is available on the RMDS website under guidance

documents. The link is http://rmdservice.com/guidance-documents/

The document is also placed on the calendar post for today’s IGG 2nd

November 2016.

Page 43: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 43

End of Year Working Arrangements

RMDS Support

The RMDS phone lines and email inbox will not be manned for the

period 23rd December 2016 to 3rd January 2017.

For emergencies during this period please contact Jessica Gregory on

+353 879548871.

BEST WISHES OVER THE FESTIVE

SEASON AND SEE YOU IN JANUARY

2017

Page 44: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 44

Upcoming Outages for ROI

http://rmdservice.com/outages-2016/

PLANNED OUTAGE NOTIFICATION

Outage Type Planned Outage

Start Date of Outage Saturday 5th November 2016

Start Time of Outage 08:00 hrs

Date of Restoration of Outage Saturday 5th November 2016 Restoration Time of Outage 18:00 hrs

Duration of Outage 10 hrs (approx.)

Jurisdiction Affected NI & ROI Electricity Markets

Reason for Outage To facilitate an upgrade of the TIBCO HUB infrastructure.

Market Systems Impacted TIBCO Market Messaging System

Backlog Impact / Comments Market Messages inbound and outbound will queue and be processed on resumption

of normal service.

System undergoing Outage TIBCO

Page 45: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 45

Upcoming Outages for ROI

http://rmdservice.com/outages-2016/

PLANNED OUTAGE NOTIFICATION

Outage Type Planned

Start Date of Outage Saturday 19th November 2016

Start Time of Outage 08:00 hrs

Date of Restoration of Outage Monday 21st November 2016

Restoration Time of Outage 06:00 hrs

Duration of Outage 46 hrs (approximately)

Jurisdiction Affected NI & ROI Electricity Markets

Reason for Outage NIE Networks Disaster Recovery Test

Market Systems Impacted TIBCO Market Messaging System

Market Website (NI only)

Secure Fileserver (NI only)

Backlog Impact / Comments Market Messages inbound and outbound will

queue and be processed on resumption of normal service.

System undergoing Outage TIBCO Market Messaging System

Market Website (NI only)

Secure Fileserver (NI only)

Page 46: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 46

IGG Meeting

AOB

Page 47: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 47

Next Steps

Diary dates for next IGG meeting:

Wednesday 11th January 2017 - Dublin

Dates included on Calendar of Events on RMDS

website www.rmdservice.com

Page 48: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 48

Next Steps

Diary dates for next Conference Call:

Wednesday 7th December 2016

Dates included on Calendar of Events on RMDS

website www.rmdservice.com

Call details are as follows:

Ireland Local Call Dial-In Number: 01 2475479

Std International Dial-In Number: +44 (0) 203 4333578

Conference code: 1663328269

Page 49: IGG Agenda - RMDS...Minutes (v1.0) from IGG meeting 31st August 2016 For Approval Today 2nd November, 2016 3 IGG Action Items Updated IGG Action List issued in advance of meeting 4

2nd November, 2016 49

IGG Meeting

Thank You