ReMCoWG04.03.2020
Rmdservice.com2
ReMCoWG Agenda
All participants are kindly requested to mute their phones when dialled into the forum conference call
Agenda Item Presenter Time
Introduction Lindsay Sharpe, ReMCoDS 13:00 – 13:05
ReMCoSG Meeting Feedback Lindsay Sharpe, ReMCoDS 13:05 – 13:05
ReMCoWG Action Items Lindsay Sharpe, ReMCoDS 13:05 – 13:10
Market Design Update Lindsay Sharpe, ReMCoDS 13:10 – 13:25
De-harmonisation Update Lindsay Sharpe, ReMCoDS 13:25 – 13:30
Tibco Hub/EMMA Update Gemma McHale, NIE Networks 13:30 – 13:45
Smart Metering Update Lisa Fahy, CRU 13:45 – 13:50
ReMCoWG To-Do List Review Lindsay Sharpe, ReMCoDS 13:50 – 13:55
AOB & Closing Lindsay Sharpe, ReMCoDS 13:55 – 14:00
Rmdservice.com3
For Approval Today:
• Minutes (v1.0) from ReMCoWG 16.01.2020
Minutes from previous ReMCoWG
Rmdservice.com4
ReMCoSG Update
• There has been no ReMCoSG Meeting since the last ReMCoWG
• Meeting scheduled for 19.02.2020 postponed until 18.03.2020.
Rmdservice.com5
ReMCoWG Action Items
• There are 2 closed ReMCoWG Actions.
AP No. Title Org. Assigned to Date Closed
165
ESBN/NIE Networks to consider via the ReMCoSG if the Final
Recommendation Report on De-harmonisation could be made available to
MPs ESBN/NIE Networks 16/01/2020
167
NIE Networks to issue a note to Suppliers with regard to saving files on the
EMMA NIE Networks 16/01/2020
Rmdservice.com6
ReMCoWG Action Items
• There is 1 open ReMCoWG Action.
AP No. Title Org. Assigned to Date Due
168
Secure Meters Incident – ReMCoDS to issue the Secure Meters
Presentation to MPs. NIE Networks to schedule a workshop with MPs and
Secure by the end of February 2020
ReMCoDS/NIE
Networks 04/03/2020
Co-ordinated Retail Market Design UpdateLindsay Sharpe, ReMCoDS
Rmdservice.com8
Facilitate energy efficiencies in Local Authority Public Lighting
V13.00.00 – Link on RMDS Website
Rmdservice.com9
Facilitate energy efficiencies in Local Authority Public Lighting
• The following Market Changes will be implemented in a single release, schema and non-
schema
v13.00.00 Release – Scope
MCR Version Description
MCR1157 V4.0 Data Aggregation and Data Processing
MCR1158 V4.0 Customer Data
MCR1159 V4.0 Change of Supplier
MCR1160 V4.0 Meter Works
MCR1161 V2.0 New Connection
MCR1135 V6.0 MPRN Enquiry web service
MCR0176 V4.0 E-Mail Validation
<NI MCRs> <N/A> <No NI MCRs in agreed scope>
Other (ROI Only) Comment
Smart Enablement • Technical Upgrades
Rmdservice.com10
v13.00.00 Release – Plan
2019
Q1 Q2 Q3 Q4
IGG
Engagement
2020
Q1 Q2 Q3 Q4
Design/Build/Test
March
2020
Go Live
(TBC)
Smart Enablement
Market Engagement
Other (ROI Only)
29th
May
26th
Jun
Market
Assurance
ROI Assurance
Approach
Published
ROI Approach
Approved By
IGGROI Participant
Questionnaire
Phase 2 Issued
IPT
Prep
IPT
Exec
IPT Window
(NI & ROI)
Go Live
(TBC)
Key
IGG (Meetings & Calls)
Key Milestone (Confirmed & Draft)
Go live
13th
Sep
24th
Jul
02nd
Oct
06th
Nov
04th
Dec
ROI Participant
Questionnaire
Phase 1 Issued
Publish Draft
Schema Sharing
Approach
Schema
Draft 1
Schema
Draft 2Schema
Draft 3 (Not
issued, as no
change)
Schema
Draft 4
Schema
Draft 5
v.13.00.00
Schema
Final
Schema
Release
Web Service MCR1135 Excel File with
Field Names &
Reject Reason
Codes
Draft Metadata
XML Format &
Sample Json
Request
Final Metadata
XML Format &
Sample Json
Request
16th
Jan 5th
Feb4th
Mar1st
Apr
29th
Apr
27th
May24th
Jun
22nd
Jul
2nd
Sep
30th
Sep4th
Nov
2nd
Dec
Draft 1 Release
Sample Market
Msgs, Files &
Screenshots
Draft 2 Release
Sample Market
Msgs, Files &
Screenshots
Rmdservice.com11
MCR Re-Versioning
• As per ESBN Smart conference call on Monday 24th February:
• ESBN request Market Participants to advise whether they see value in receiving
MM345 Smart HH Cumulative Register Readings when an actual is received
post D+1 by Friday 6th March
• The re-versioned v13.00.00 documents will be issued as per the timeline below:
Re-versioned MCR’s
circulated to Market
Participants
Market Participant
Re-versioned MCR
Workshop
Re-issue Re-
versioned MCR’s
Post – Workshop
Re-Versioned MCR’s
Approval at IGG
16/03/20 30/03/20 13/04/20 29/04/20Week
Commencing
Rmdservice.com12
Market Message 331 - Clarification
• MPD10: Market Process for Re-energisation
Per ESBN Smart conference call on 24th February, an inconsistency has been identified
between the v13.00.00 MPD 10 Word Document and the accompanying Visio Diagram
flow. This will be clarified in the re-versioned documentation, to be issued to Market
Participants w/c 16th March.
In the interim, ESB Networks would like to confirm the following:
• For current v12.00.00 Market design:
• Where a QH site is re-energised (existing or new meter), MM106E is
issued to the registered Supplier and to TSO.
• From Go-Live of v13.00.00:
• Where an existing QH meter is re-energised, MM106E will issue to the
registered Supplier and to TSO.
• Where a QH meter is installed at Re-Energisation, MM331 will be issued to
the registered Supplier and to TSO.
Rmdservice.com13
DR1204 Details
Date Raised 17/01/2020 Date Previously Approved
Requesting
Organisation
NIE Networks Jurisdictional
Implementation
NI
Schema Impacting N Jurisdictional Applicability NI
Latest Version 1.0
Change Summary This Discussion Request has been raised as an interim solution to enable Suppliers in the NI
Retail Electricity Market to request the Installation of a Bluetooth Freedom Unit.
NIE Networks owns the Freedom Unit as the common services provider. The Supplier will
develop and own the APP in accordance with the NIE Networks’ Protocols.
The scope of the DR relates to Residential customers and will be used only in conjunction with
030 Market Message for SOSA Keypad jobs, primarily for existing keypad sites.
Classification • At Today’s Meeting; For Classification as NI Specific.
DR1204 – Bluetooth Keypad Meter Freedom Unit
Facilitate energy efficiencies in Local Authority Public Lighting
Rmdservice.com14
DR1205 Details
Date Raised 20/2/2020 Date last Approved
Requesting
Organisation
ESBN Jurisdictional
Implementation
ROI
Schema Impacting N Jurisdictional Applicability ROI
Latest Version V1.0
Change Summary This DR sets out ESB Networks process for invoicing and collecting PSO money relating to
Commercial Storage units. ESB Networks proposed this manual solution to the CRU in response
to CRU/19/034 on the basis that the number of customers involved are relatively low and that it is
limited in scope i.e. to commercial storage sites only.
ESB Networks will update it owns Embedded Generator application process to include details on
how a commercial storage unit applies for and agrees a house load MIC with ESB Networks.
ESB Networks will contact commercial storage customers who have already made a connection
application and will discuss MIC requirements with those customers.
Classification • At Today’s Meeting; For Classification as RoI Specific.
DR1205 - Application of the PSO to Commercial
Storage
Rmdservice.com15
Upcoming Outages
http://rmdservice.com/outages-2020
There are no outages scheduled for March
Rmdservice.com16
De-harmonisation Update
Lindsay Sharpe
ReMCoDS
18 esbnetworks.ie
TIBCO Outages
0
5
10
15
20
25
Jan Feb March April May June July August Sept Oct Nov Dec Jan
Nu
mb
er
Month
Unplanned Outages 2019/20
19 esbnetworks.ie
TIBCO Outages
• Unplanned Outages –14 in January
• Planned Outages – 4 in January
• Suppliers using the planned outage notification option
• General Housekeeping Reminder
Supplier Unplanned Count
Supplier 1 2
Supplier 2 2
Supplier 3 2
Supplier 42
Supplier 5 2
Supplier 6 1
Supplier 7 1
Supplier 8 1
Supplier 91
20 esbnetworks.ie
Tibco
A Tibco Technical Workshop was held on Friday 28 February 2020
The workshop covered the following:
• Supplier Roles and Responsibilities
• Atos Contact
• EMMA Access Methods
• Supplier Outages
• Fixes
• Webforms Account Management Demo
21 esbnetworks.ie
Secure Meters Workshop
• Following the system outage in November 2019, a workshop was held on Friday
28 February 2020
• The workshop covered the following:
• Review of the root cause of the incident
• New processes implemented to prevent recurrence
• Update on Seamless Solution for DR activity
• Date of next DR test – 16/17 May 2020
CRU SMART Metering
Update
04.03.2020
Rmdservice.com23
ReMCoWG Meeting
AOB
Rmdservice.com24
Next Steps
Diary dates for next ReMCoWG meeting: