11th January, 2017 1
IGG Agenda
Minutes from Previous IGG Meeting 13:30 – 13:35
Review of Action Items 13:35 – 14:00
CER Update 14:00 – 14:20
Gemserv Update 14:20 – 14:30
MRSO Update 14:30 – 14:40
ESB Networks Update 14:40 – 15:00
Retail Market Design Service Update 15:00 – 15:20
AOB 15:20 – 15:25
Next Steps 15:25 – 15:30
All participants are kindly requested to mute their phones when dialled into the forum conference call
11th January, 2017 2
Minutes
Minutes (v1.0) from IGG meeting
2nd November 2016
For Approval Today
11th January, 2017 3
IGG Action Items
Updated IGG Action List issued in advance of
meeting
9 Actions closed since last IGG meeting
8 IGG Actions carried forward
11th January, 2017 4
Update on Actions - Closed
AP No. Title
Org. Assigned
to Date Closed Date Raised
1017
Green Source Verification Process Clarifications and revised timelines - Suppliers
to submit questions/comments to CER (via RMDS) on the Green Source
Presentation outlined by CER. Suppliers 02/11/2016 31/08/2016
1018
Retail Market Code - CER is in the process of considering framework and
requirements for a Retail Market Code. Suppliers are requested to submit
comments/suggestions to CER (via RMDS) relating to proposed framework, content
and requirements. Suppliers 02/11/2016 31/08/2016
1020
CER Rebrand - CER to provide details of the CER Rebrand & Timelines to
Suppliers via RMDS. CER 02/11/2016 31/08/2016
1021
Suppliers are requested to submit comments on the Terms of Reference to the IGG
to CER via RMDS Suppliers 02/11/2016 28/09/2016
1022 RMDS to circulate if possible the NI Retail Market Code to Suppliers RMDS 02/11/2016 28/09/2016
1025
LTCA - LTCA Project Manager to circulate a Data Template to LTCA WG
participants in audit RMDS 07/12/2016 02/11/2016
1027
Non Schema 2017 - RMDS to issue prioritisation spreadsheet to Suppliers for
review. RMDS 07/12/2016 02/11/2016
1028 CER to revert with details about 2016 lock moratorium over Christmas Period CER 07/12/2016 02/11/2016
1029
Outages - RMDS to inform ESBN of Supplier's concerns with regard to the high no.
of TIBCO outages over the last number of weeks and a request to align all outages
to 3rd Sunday as had been agreed. ESBN to provide a response RMDS/ESBN 07/12/2016 02/11/2016
11th January, 2017 5
Update on Actions - Open
AP No. Title
Org.
Assigned to Date Due Date Raised948/1004 ESBN to analyse the process where Move out with no Move takes place and make
proposals based on existing Supplier processes for best business practise within this
area. Process must enable MPs to notify CMS when a move out without a move in
takes place. Proposal to be issued to market in the form of a DR. (The issue is an
amalgamation of 948 and 1004)
ESBN 11/01/2017 14/01/2015
986 Technical Details - DR covering the importance of appropriate Technical Details
(name and phone) to the 016 to be drafted. Detail to be added to MPD 01 & 02
ESBN 11/01/2017 02/09/2015
1023 Debt Flagging Figures - MRSO to provide Automated Debt Flagging figures in the
next MRSO Presentation
MRSO 11/01/2017 02/11/2016
1024 ESBN I-SEM Presentation - Suppliers to respond with preferences to the 2 questions
raised by the ESBN I-SEM Team:
1. A new Market Trials WP12 to accommodate Participant GU registration.
2. New Market Trials WP14 to accommodate Non Participant Generator
Arrangements
Suppliers 11/01/2017 02/11/2016
1026 DR1184 Cooling off for CoS - Suppliers to provide comments on this DR before IGG
Conference Call
Suppliers 11/01/2017 02/11/2016
11th January, 2017 6
Update on Actions – Open Cont.
AP No. Title
Org.
Assigned to Date Due Date Raised1030 De-energisations - Suppliers raised a concern relating to their experience of ESBN
not being able to complete de-energisation due to access. This item was raised
previously (Action 968) but MPs felt not suitably resolved. MPs to review previous
issue outcomes and send in comments/suggestions on their experience and issues
relating to de-energisations or lack thereof due to access restrictions.
Suppliers 11/01/2017 02/11/2016
1031 MPs to provide comments on the Lock Moratorium Disconnection Dates for 2017 MPs 11/01/2017 07/12/2016
1032 De-energisations: CER to revert to ESBN with regard to their schedule of charges
for de-energisations
CER 11/01/2017 02/11/2016
7
CER Update
11.01.2017
Retail Market Assurance
Services for the Irish Electricity
Market
Conall Bolger
Nirav Vyas
IGG
11 January 2017
Dublin
Assured Parties – December 2016
Gemserv 9
Number and type of live participants assured by Gemserv since 2005
NB this is not a reflection of the live market position.
11
7
28
8
5
Large
Small
Self Supplier
DSU
Export Supplier
Assurance Services: During December
2016
Gemserv 10
New Entrants
One Large Supplier
One Small Supplier
One Export Only Supplier
Complete
One SelfSupplier
Complete
Net ISU Upgrade
Assurance Strategy
Forward Work Plan
Gemserv 11
One Small
Supplier - IPT
Export Only
Supplier
Dec 2016 Mar 2017Jan 2017 Feb 2017
NET ISU
Assurance
Strategy
NET ISU Participant
Questionnaire
One Large
Supplier - IPT
Self
Supplier
MRSO Update Gerry Halligan
11th January 2017
14 esbnetworks.ie
Debt Flagging
Oct-16 Nov-16 Dec-16
Total Debt Notifications received (012) 308 359 193
Total Debt Notifications not forwarded for reason
implied or explicit CoLE, timeout, etc.72 96 44
Total Debt Notifications sent to gaining supplier
(112)236 263 149
Total not cancelled 155 186 75
Total cancelled 81 77 74
Total Debt Notifications sent to gaining supplier as
% of total COS0.9% 0.8% 0.6%
15 esbnetworks.ie
Debt Flagging
Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16
Total Debt Notifications received 400 379 420 463 428 374 412 368 312 308 359 193
Total Debt Notifications sent to gaining supplier 198 163 199 217 208 147 180 229 218 236 263 149
Total Cancelled 48 54 58 54 61 45 62 66 60 81 77 74
0
50
100
150
200
250
300
350
400
450
500
Total DebtNotificationsreceived
Total DebtNotifications sentto gaining supplier
Total Cancelled
16 esbnetworks.ie
Objections – Erroneous Transfers
52 5247
5348
69 68
59
67
79
92
68
89
74
65
8690
160
85
105
85
7269
64
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
0
20
40
60
80
100
120
140
160
180
No
. o
f C
oS
Co
mp
leti
on
s
No
. o
f O
bje
cti
on
s
No. of Objections
CoS Completions
17 esbnetworks.ie
Objections
Oct-16 Nov-16 Dec-16
No. of Objections 72 69 64
Cancellations from Objections 55 56 44
Objection emails to MRSO 4 2 3
Reasons:
Uncontactable by phone
Written communication
COS confirmed 4 2 3
Other
Escalation emails 10 1 1
ESBN Presentation to the IGG
John Bracken
11th January 2017
19 esbnetworks.ie
ESB Networks Items
NET ISU UpgradeThe installation of Service Packs ensures the system is fully supported. SAP regularly releases
Enhancement Packs to provide new functionality and Service Packs for routine maintenance to
ensure stability of all SAP systems. Installation of Service Packs is recommended by SAP as part
of a regular maintenance cycle. Cut Over June Bank Holiday 2017.
Faulty Meter Update
I-SEM Update
20 esbnetworks.ie
ESB Networks Items
ESBN Presentation to the IGG
John Bracken
11th January 2017
ESB Networks I-SEM Programme
Presentation to the IGG
James Long & Theresa O’Neill
11th January 2017
23 esbnetworks.ie
ESB Networks I-SEM Programme - General Update
From the Last IGG on 02.11.2016:
Update 11.01.2017
• A revision to the Go-Live date for the I-SEM to the 23rd May 2018
• I-SEM Market Trials will run from Dec 2017- May 2018
• A revised MCR1182 to incorporate the changes will issue once they have been fully approved in the wholesale market
24 esbnetworks.ie
ESB Networks I-SEM Programme – Price Effecting Units : Update
From the Last IGG on 02.11.2016:
FR
Update 11.01.2017 – 5 Supplier Units have now moved to become Price Effecting with a decision
on the remaining 2 to follow shortly by SEM-O
A new Market Trial Working Group will be established by the I-SEM Project in March to look at
the preparation phase of Market Trials and the development of detailed supporting
documentation. We will provide feedback on this through the IGG as it becomes available.
25 esbnetworks.ie
• As discussed at the last IGG we looked for your feedback around the 2 questions listed below
We are considering drafting a new Market Trials WP12 to accommodate Participant GU registration
changes being requested specifically for Market Trials
Q1 Would you see any need for this , and would you use it
We are considering drafting a new Market Trials WP14 purely as part of the Unscripted Market Trials
to accommodate Non Participant Generator Arrangements changes being requested specifically for
Market Trials
Q2 Would you see any need for this , and would you use it
Update 11.01.2017
ESBN received comments from Suppliers showing an interest in both. Therefore ESBN will
raise a new DR to update both WP12 & WP14 and bring them to the May IGG / ReMCoWG.
ESB Networks I-SEM Programme – IGG Action 1024
26 esbnetworks.ie
Action 1024 – Further Information
ESBN Response to a specific Supplier query -
A Supplier may wish to participate in the I-SEM Project’s Market Trial.
If that Supplier wants to have different De Minimis NPGEN arrangements reflected in the data that
MRSO aggregate for Market Trials as against that which is aggregated as business as normal , then
they will need a way to communicate that to the ESB Networks I-SEM programme team (WP14 is the
mechanism for Production)
The Supplier may want to have their Retail Market test EMMA hooked up to get the Retail Market
Messages that will flow from the Market Trials test environment (viz 59x and 34x series of messages)
If the Supplier needs a different WP12 arrangement for Participant Generators for the Market Trials
than that which is catered for as business as normal, then they will need a way to communicate that to
the ESB Networks I-SEM programme team (WP12 is the mechanism for Production)
Based on Supplier feedback so far to IGG Action 1024, we are planning on bringing a DR to the Retail
Market in Q2/2017 to allow for arrangements specifically for Market Trial, for each of WP12 & WP14
Therefore, when you are working through your Registration requirements for I-SEM project’s Market
Trials you can consider the information above, and if you find you need to set up something different
for Market Trials than what is in Live Production, you will be able to let us know and we will reflect
these changes.
27 esbnetworks.ie
Action 1024 – Further Information
ESBN Response to a specific Supplier query -
Q - Can ESBN provide clarity as to whether they will be able to accommodate a
situation whereby a Generation Unit is registered with one supplier in SEM but
with another supplier in ISEM? Will the systems be able to accommodate the
varying parties during the resettlement period until SEM is completely shut down?
A - It will be possible to accommodate a situation whereby a Non Participant
Generation Unit is registered with one supplier in SEM up until the final
resettlement of the SEM and with another supplier in ISEM.
28 esbnetworks.ie
ESB Networks I-SEM Programme – Other Information
ESBN Response to a specific Supplier query -
Q - SEM-O have proposed that there would be a freeze on market registration for 3
months before ISEM go-live.
Is it likely this freeze extend to the registration of export arrangements for Non
Participant generators?
A – This will not impact on the Non Participant generators as this is a retail market
function and at the moment ring-fenced from any I-SEM changes.
However if this was to change we would inform the retail market through the usual
supplier forum, the IGG.
Thank You
Footer
11th January, 2017 30
Retail Market Design Update
David Walshe
RMDS
11th January, 2017 31
Ref From To Description Item
1 8/12/16 8/12/16 Audit Presentation by Deloitte Audit
2 9/12/16 9/12/16 LTCA Recommendations Questionnaire issued
to MPs
LTCAWG Final Report
3 9/12/16 13/01/16 MP Report Review/Clarifications/Corrections
Exchange between MPs and Auditor in order to
produce a final agreed version.
Audit
MPs Complete Questionnaire and include
other comments.
LTCAWG Final Report
4 18/01/17 18/01/17 LTCA WG Meeting (Incl. Auditor) to agree and
close out the Audit Report.
Audit
5 16/01/17 03/02/17 RMDS Compile LTCAWG Report LTCAWG Final Report
6 07/02/17 07/02/17 Draft report Issued to LTCAWG LTCAWG Final Report
7 08/02/17 14/02/17 MPs review report LTCAWG Final Report
8 15/02/17 20/02/17 Update report LTCAWG Final Report
9 21/02/17 21/02/17 LTCAWG ConCall/Meeting to agree Report LTCAWG Final Report
10 28/02/17 28/02/17 Issue Report to CER LTCAWG Final Report
LTCA
11th January, 2017 32
LTCA - Timelines
Ref From To Description Item
1 8/12/16 8/12/16 Audit Presentation by Deloitte Audit
2 9/12/16 9/12/16 LTCA Recommendations Questionnaire issued
to MPs
LTCAWG Final Report
3 9/12/16 13/01/16 MP Report Review/Clarifications/Corrections
Exchange between MPs and Auditor in order to
produce a final agreed version.
Audit
MPs Complete Questionnaire and include
other comments.
LTCAWG Final Report
06/01/2017 - Reminder issued.
To Date 3 completed questionnaires have been returned.
By the end of February 2017
the goal is that LTCA WG shall produce
a Report to CER
containing a recommended position on how to handle LTCA in the RoI Market
11th January, 2017 33
DR1184 – Cooling Off for CoS (Status Update)
Suppliers have raised a number of queries in relation to this DR.
The latest version of this DR details scenarios relating to CoS with CoLE.
Also included in this version of the DR are details of an alternative Objection
Reason Code which could be used instead of Objection Reason Code SE.
Objection Reason Code ME was used for Debt Flagging in the past.
However, this is no longer required and is infrequently used. As ME is now
available it may be a better option. Suppliers feedback on this is welcome.
Suppliers are asked to review and submit any queries to RMDS.
This DR shall be available for Approval at the next Forum.
11th January, 2017 34
MCR1185 –Small Supplier Categorisation(1/2)
Currently the structure of the Small Supplier category does not facilitate
the business model of a Supplier having a small number of sites but
energy usage greater than 10MW power at peak demand.
The proposal is to change the current categorisation and assurance
approach within the Small Supplier category
the threshold of < 200 sites registered will continue to be part of the
criteria in qualifying and operating as a Small Supplier in the Retail
Market at all times
the threshold of 10MW power supplied at peak demand will not
apply as criteria where a Supplier indicates that their model is one
which is a small number of customers but where there will be greater
than 10MW power at peak demand.
11th January, 2017 35
MCR1185 – Small Supplier Categorisation(2/2)
The assurance body will determine the assurance assessment required for
each Small Supplier entering the Retail Market based on the segment(s)
the Supplier is entering and their Business model.
The Scope of Change to Design Documentation relates to amendments to
the Market Assurance and Market Entry Documentation.
At Today’s Meeting: For Approval
11th January, 2017 36
Non Schema Release 2017
The prioritisation exercise has been completed for the Non Schema Release.
ESBN will advise when they will revert with a date for proposed Non Schema
Release
Package contents
Delivery Schedule
Activity Role Action DateRank each of the changes highlighted in orange 1-7 with 1 being your top priority and 7 your least important. Items excluded are due to low probability of approval prior to mid 2017 or being subsumed into new DR/MCRs. Current applicability still to be determined. MPs Return to RMDS by 30/11/2016
Consolidate and formulate Market prioritised list. RMDS Issue to Market by 16/12/2016
Determine any action required to get prioritised MCR's approved. RMDSFormulate, plan & communicate by 16/12/2016
Communicate outcome of prioritisation exercise to Market by email RMDS Issue Email 21/12/2016
Provide ESBN list of prioritised MCRs for impact assessment. RMDS Issue to ESBN 21/12/2016
ESBN suggest proposed package of changes based on MP prioritisation and dependencies between MCRs, other work programmes. Proposed delivery dates of changes provided ESBN Issue to RMDS by TBD
Proposed package with delivery dates issued to Market for review & comment RMDS RMDS TBD
MPs MP TBD
Market Approval of Non Schema Package and delivery Date at IGG Market Approve at IGG in Q1 2017 TBD
CER approve Non Schema Package and delivery CER Approve Q1 2017 TBD
11th January, 2017 37
Annual RMDS Statistics
Statistics are being gathered annually for the following 4 functions
New Entrants
Actions
Outages
Market Change Requests
Statistics provided under two headings:
Previous Calendar Year statistics (i.e. 2016)
Trend Analysis for previous 3 Years.
All statistics shall be provided on the RMDS website.
Retail Market Design Service
New Market Participants 2016
• There were 13 applications for Market Entry across the different
categories, an increase of 28% on the existing number of Market
Participants at the end of 2015
• The breakdown of the 13 New Entrants were : 1 Large, 1 Small ,
7 Self Supplier & 4 Export Only Supplier.
• At the end of 2016 of the 13 applications received, 7 of the Market
Participants had become effective in the market and 6 were in
process
Market Participants in the Market
Pre 2016 - 45
Retail Market Design Service
New Entrants/Requalification’s 2014 – 2016 - 3 year trend
• The New Entrant is categorised as belonging to a particular year
based on the receipt of their Assurance Application letter. Their
actual entry to market may take place in subsequent years
• 2016 saw an increase of 116% on Entry applications compared
with 2015 this included a significant increase in Self Supplier &
Export Only Supplier categories
• Following the introduction in Q4 2015 of Supplier type “Export
Only” Supplier there were 4 entry applications in 2016 in this
category
• Requalification's are categorised as belonging to a particular year
based on the receipt of their Application for requalification letter. The
actual requalification may take place in the subsequent year
• 2016 was similar number of requalification's as in 2015 however we
saw the first requalification from Export Only Supplier to Small Supplier
initiated
0
1
2
3
Total Small toLarge
Material Export Onlyto Small
Type of Requalification
Requalifications - 2014 - 2016
2014
2015
2016
1
2 2
0
2
4
6
8
10
12
14
Total Self Small Large DSU ExportOnly
New Entrants by Type 2014- 2016
2014
2015
2016
6
13
10
Retail Market Design Service
Average Assurance Completion & Effective in the Market Time Frame
• The graph shows the average time taken by New Entrants during
2014 -2016 in each category to complete their assurance and
become effective in the market .
• There was an increase in time frame for both assurance and
becoming effective in the market for the Large Supplier category
during 2015/2016 as a result of the TIBCO Upgrade programme
taking place during this time
• The large difference in time from the assurance completion to the
effective date for Self Suppliers, and DSU is a result of the time
duration for the completion of the Wholesale aspect of the market
entry and the Network infrastructure build/connection.
0
50
100
150
200
250
300
350
Self Small Large DSU ExportOnly
19
171
252
14 20
134
231
311
273
55
Days
Assurance Completion and Effective in the Market 2014 - 2016
Assurance completion Effective
Retail Market Design Service
IGG Actions – Summary 2016
Open / Closed Actions 2016 Length of time for Action Closure
• 37 New Actions created in 2016
• 10 Actions brought forward from 2015 (8 were closed in
2016 – 2 are being brought into 2017)
• 31 actions closed during 2016
• 8 Actions open at year end 2016 (including 2 open since
2015
37 New Actions in
2016
8 Open at year end 2016
29 created in 2016 closed
10 brought from 2015
closed in 2016
• 38% of the Actions raised in 2016 were closed within 4 weeks
• 38% closed in 8 weeks
• 3% closed in 12 weeks
• 6% closed in 16 weeks
• 15% (8 Actions) still open at the end of 2016 – including 2 that have been open
since 2015, i.e.
• Action 948/1004 Move Out/Move which has been open for 104 weeks
• Action 986 Technical Details DR – which has been open for 62 weeks
0
2
4
6
8
10
12
14
16
4 w
eeks
8 w
eeks
12
wee
ks
16
wee
ks
Still
op
en
No
. of
Act
ion
s
No. of weeks
Retail Market Design Service
IGG Actions – 3 Year Trends
Actions Opened per Year Length of time for Action Closure
31% Decrease in New Actions since 2015
Over the last 3 years:
• 44% of all Actions were closed within 4 weeks
• 24% closed within 8 weeks
• 10% closed within 12 weeks
• 12% closed within 16 weeks
• 9% closed within 36 weeks
• 1% are still open with:
• 2 Actions having been open for 104 weeks & 62 weeks respectively
0
10
20
30
40
50
60
2014 2015 2016
53 54
37
No
. o
f A
cti
on
s
05
1015202530354045
4 w
eeks
8 w
eeks
12
wee
ks
16
wee
ks
36
wee
ks
Still
op
en
% o
f A
ctio
ns
No. of weeks
Retail Market Design Service
Outages – Summary 2016
Retail Market Design Service
Outages – Summary 2016
Retail Markets Co-Ordination Design ServiceReMCoDS
02468
21
7
4
2016 New Requests
14 New Requestswere brought to Forums in 2016
0
5
10
SchemaROI NonSchema Total
46
10
2016 Approvals
10 MCRs were Approved in 2016
2
3
5
0
1
2
3
4
5
6
Non Schema Release Schema Release Total
2016 MCRs Implemented
5 MCRs were Implemented in 2016
58
63
63
56
56
56
56
52 54 56 58 60 62 64
Average
MCR1183
MCR1182
MCR1179
MCR1176
MCR1175
MCR1173
Average Time to Approval for Standard MCRs
AverageTime for Approvals of Standard MCRs
Change Requests Summary
Change Requests - Summary
Change Requests Summary per Year
0
5
10
15
20
2014 2015 2016 Average
10
17
14 14
New & Re-versioned Change Requests
3
6
54.7
2014 2015 2016 AVERAGE
MCRs Implemented per Year
3
15
10
6
0
2
4
6
8
10
12
14
16
2014 2015 2016 Average
Approvals Per Year
80
101
81
58
0 20 40 60 80 100 120
Average
2014
2015
2016
Average Time To Approvals Per Year
46
11th January, 2017 47
2016 RMDS Customer Satisfaction Survey
The RMDS survey will be issued in Q1 with a return date of 4 weeks later.
All Market Participants are encouraged to respond as we action items arising
out of the survey to improve service delivery to the Market.
At the same time, following Market feedback, the ReMCoDS Survey will be
conducted during the same period.
11th January, 2017 48
Upcoming Outages for ROI
http://rmdservice.com/outages-2017/
PLANNED OUTAGE NOTIFICATION
Outage Type Planned
Start Date of Outage Sunday 15th January 2017
Start Time of Outage 9:00
Date of Restoration of Outage Sunday 15th January 2017
Restoration Time of Outage 15:00
Duration of Outage 6 Hours
Jurisdiction Affected NI & ROI Electricity Markets
Reason for Outage To facilitate an upgrade of the TIBCO HUB.
Market Systems Impacted TIBCO Market Messaging System
Backlog Impact / Comments Market Messages inbound and outbound will
queue and be processed on resumption of normal service.
System undergoing Outage TIBCO
11th January, 2017 49
IGG Meeting
AOB
11th January, 2017 50
Next Steps
Diary dates for next IGG meeting:
Wednesday 8th March 2017 - Belfast
Dates included on Calendar of Events on RMDS
website www.rmdservice.com
11th January, 2017 51
Next Steps
Diary dates for next Conference Call:
Wednesday 8th February 2017
Dates included on Calendar of Events on RMDS
website www.rmdservice.com
Call details are as follows:
Ireland Local Call Dial-In Number: 01 2475479
Std International Dial-In Number: +44 (0) 203 4333578
Conference code: 1663328269
11th January, 2017 52
IGG Meeting
Thank You