esb networks presentation to the igg - rmds · 2018. 8. 28. · duos billing new connections energy...
TRANSCRIPT
ESB Networks
Presentation to the IGG
29th August 2018
2 esbnetworks.ie
Agenda
Long Term No Access
I-SEM
Smart Metering and Retail Program
LONG TERM NO ACCESS INITIATIVE
Peter Warner – Manager Meter Reading
Mairead Murphy – LTNA Team Leader
4 esbnetworks.ie
Work Completed
SLA 14A:
98% OF Meters should have 1 reading (DSO or Customer)per year
Invites Issued:
To 5 suppliers
No of suppliers met:
3
Format of sessions and location:
Met at Supplier headquarters to discuss agreed agenda items
5 esbnetworks.ie
Work done by ESBN on an Ongoing Basis
• No access cards left by meter readers. 4 per year possibly
• One system generated letter after 12 months and another after 24 months
• At least 6 texts to customers annually if we have a mobile number
• LTNA lists sent to meter readers every two months and to suppliers quarterly
• After hours phoning and visits by readers to take-aways, pubs
• Seasonal initiatives around summer homes and pump-houses
• Liaising with Meter Ops/suppliers re market messages for de-energised/terminated
properties.
• Special read request to local offices
• Direct contact with multi-site customers e.g Vodafone, Irish Rail, Irish Water, Co
Councils, 3 mobile, Garda Siochana
6 esbnetworks.ie
Common Supplier Concerns
• Accuracy (honesty) of customer readings
• “Bill Shock” after long series of estimates
• What are ESB Networks doing where no access achieved
7 esbnetworks.ie
Sample from Supplier Lists
• Total Accounts: 4885
• Emails sent: 3517
• Frequent payers: 2247
• Infrequent payers: 781
• Reads received: 1025
• No Reply: 2051
• Undelivered: 441
8 esbnetworks.ie
Key Lessons Learnt
• ESB Networks is meeting its LTNA Regulated obligations
• No evidence of customers giving lower incorrect readings
• 85% of estimated accounts were within 1000 units or less of the actual
reading obtained
• ESB Networks has email addresses for 72% of customers
• Active payers respond far better than infrequent payers
• Response to emails better than text for receiving readings (29% versus 25%)
ESB Networks I-SEM Programme
Presentation to the IGG
James Long
29th August 2018
10 esbnetworks.ie
ESBN I-SEM Programme – General Update
We are continuing to work with the RAs, the EirGrid I-SEM Project and the other
Meter Data Providers through the I-SEM Metering Working Group
We are represented at the Market Trials Co-Ordinator Working Group which
EirGrid’s I-SEM Project has established.
At this time there remains NO Change to our understanding which remains that:
• No Changes are indicated to the Harmonised Retail Market Schema or the COBL
• D+1, D+4, M+4, M+13 Settlements will continue to operate on a Working Day basis for ESBN, with
no change to Frequency
• Need to concurrently operate the SEM and I-SEM until Re-Settlement of the SEM completes
• No Meter Data will be Price Effecting in the I-SEM and so I-SEM will not use the Price-Effecting
category
• I-SEM Market Trials started on the 1st Dec 2017 and will run until 31st August 2018
• The Go-Live date for the I-SEM is the 1st Oct 2018
11 esbnetworks.ie
ESBN I-SEM Programme – Update
• Registration Data Freeze – 28th August to 16th Oct 2018
• No new Supply or Generator units can register in the Retail Market during this period
• ISEM Market Trials will finish on the 31st August for all Market Participants
• As a result the Retail Suppliers currently involved in these trials will not receive any
further market messages after the 3rd Sept
• ESBN and ATOS will commence the process of de-coupling the retail market test
Emmas from our test Hub and returning same to the IPT Hub from the 4th Sept.
• ESBN are engaging with the ISEM Project team around cutover plans and details
throughout the month of Sept to ensure a smooth transition at Go-Live
• Price Effecting Units will return to ESBN from Eirgrid after ISEM Go-Live, preparation
of a detailed work plan is in progress
12 esbnetworks.ie
ESBN I-SEM Programme –
Important Cutover DatesMRSO
No.
Milestone Settlement Day Start Date End Date
1 Final Settlement Day of Meter Data (00:01-
24:00) to be entered into SEM Systems
Sun 30 09 18 Sun 30 09 18 Sun 30 09 18
2 First Settlement Day of Meter Data (00:01-24:00)
to be entered into I-SEM Systems
Mon 01 10 18 Mon 01 10 18 Mon 01 10 18
3 MRSO input D+1 Data into SEM Systems
(00:01-24:00) for Final Time
Sun 30 09 18 Mon 01 10 18 Mon 01 10 18
4 MRSO input D+1 Data into I-SEM Systems
(00:01-24:00) for First Time
Mon 01 10 18 Tue 02 10 18 Tue 02 10 18
5 MRSO input D+4 Data into SEM Systems
(00:01-24:00) for Final Time
Sun 30 09 18 Thu 04 10 18 Thu 04 10 18
6 MRSO input D+4 Data into I-SEM Systems
(00:01-24:00) for First Time
Mon 01 10 18 Fri 05 10 18 Fri 05 10 18
7 MRSO input M+4 Data into SEM Systems
(00:01-24:00) for Final Time
Sun 30 09 18 Mon 14 01 19 Mon 14 01 19
8 MRSO input M+4 Data into I-SEM Systems
(00:01-24:00) for First Time
Mon 01 10 18 Tue 15 01 19 Tue 15 01 19
9 MRSO input M+13 Data into SEM Systems
(00:01-24:00) for Final Time
Sun 30 09 18 Mon 07 10 19 Mon 07 10 19
10 MRSO input M+13 Data into I-SEM Systems
(00:01-24:00) for First Time
Mon 01 10 18 Tue 08 10 19 Tue 08 10 19
13 esbnetworks.ie
ESBN I-SEM Programme – Sundry Information
• MCR1182 Ver 4.0 is available at this path: https://rmdsie.files.wordpress.com/2017/04/mcr1182-impact-of-
i-sem-on-the-retail-market-in-roi.pdf
• Q&As from the ESB Networks I-SEM Programme can be accessed via this path: https://rmdservice.com/i-sem-faqs/
• The current List of Distribution Connected Price Effecting Generator MPRNs is available on the
RMDS website at this path: https://rmdsie.files.wordpress.com/2014/03/site-specific-distribution-loss-factors-
2017-20181.xlsx
• Mailbox for communications with ESB Networks I-SEM Programme is: [email protected]
• External Link: http://www.sem-o.com/isem/Pages/Home.aspx
Thank You
Footer
Smart Metering Project – Industry Governance Group (IGG) Update
Wednesday 29th August 2018
SMART Project
16 esbnetworks.ie
SMART
Agenda
• ESBN SMART Project
o Phased Approach
o Overview & Milestones
• Market Release Schema v12.00.00
o Status
o Milestone Plan
• ESBN SMART Update
o SAP IS-U Unicode Conversion
o Market Release Schema v12.00.00
o Market Release Schema v13.00.00
17 esbnetworks.ie
ESBN SMART - Phased Approach
2019 2020 2024
Phase 1 Phase 2 Phase 3
2022
Market Release 1
(April 19)
Market Release 2
(December)
Market Release 4
(December)
2018
• Procure, build & test new solution
• Two Market Schema releases to facilitate
Smart Metering (non -Smart MCRs also incl)
• Daily collection & processing of interval
data.
• The opportunity for Suppliers to offer new
Time-of-Use based tariffs
• Enable remote operation
of the service switch in
Smart Electricity Meters
• Smart Pre-Payment
services with secure
remote de-
energisation/energisation
• Advanced meter alerts &
events
• Gas Meter integration
• Commence installation of
gas smart meters
• In-Home Channel (HAN)
• In-Home Displays for real-
time customer information
250K Smart Meters safely installed by
December 2020 1 million Smart Meters
installed by 2022Remaining Smart
Meters installed by
end of 2024
20232021
Market Release 3
(December)
2017
18 esbnetworks.ie
ESBN SMART - Overview & Milestones
SMART
High Level Scope Planned Go-Live Comment
SAP IS-U Unicode Conversion August Bank Holiday
2018
• No Market Design
Changes
• Market Assurance
• Successfully implemented
Aug B/H 2018
Deployment & Logistics Q4 2018 • Updates provided at Smart ILG
Market Release v12.00.00
• MCRs
• SMART Enablement for Meter
Installation
• Technical Upgrades
Easter Weekend
April 2019
• Significant body of work
• Market Assurance
• IPT
AMI Procurement & Enablement Q4 2019 • Updates provided at Smart ILG
Deployment Contractor Q4 2020 • Updates provided at Smart ILG
Market Release v13.00.00 Dec 2020 • Market Assurance
• IPT
* CoBLCR changes will be raised as required
19 esbnetworks.ie
Market Release v12.00.00 – StatusMCR Description Status
MCR0175 New Reject Reasons for Address Change Rejection
MCR1173 Vulnerable Customer Implementation in ROI of SI 463
MCR1167 Facilitate energy efficiencies in Local Authority Public Lighting
MCR1140 Introduction of Eircodes into the Retail Market Design in Ireland
MCR1169 Addition of Postal Code to two Downloadable Meter Point Details Files
MCR1175 Provide Market Participant Business Reference (MPBusinessReference)
for Reading
MCR1180 New Registration Default Supplier
MCR1183 010 Customer Validation Agreement (NI) ReMCoWG/CDA
MCR1154 New Unmetered Tariff for NI ReMCoWG/CDA
Other Comment Status
Smart Enablement • SAP IS-U Enhancement Pack (8.0)
• SMART Enablement for Meter Installation
• SAP Hana
20 esbnetworks.ie
ESBN SMART – UpdateElement Planned
Go-Live Date
Update
SAP IS-U Unicode Conversion August
Bank Holiday 2018
o SAP IS-U Unicode was successfully delivered over the
August Bank Holiday weekend
o No issues reported by Market Participants
Market Release v12.00.00
o MCRs
o SMART Enablement for
Meter Installation
o Technical Upgrades
Easter Weekend
April 2019
o Progressing on track
o MCR1167 - ESBN will publish as per usual yearly
schedule Standard Profiles
Burn Hour Calendars
Effective Wattages
o Future IGG engagement schedule – see appendix
TIBCO Upgrade Project Q3 2019 TBC o Discussions with NIE Networks are progressing to
determine scope, approach and timelines
o Follow up meeting scheduled for 5th Sept
Market Release v13.00.00
o Mandatory MCRs
o Proposed MCRs
o IT Changes
Dec 2020 o Communication Pack issued - Friday 27th July.
o 2020 Release Package agreed – Thu 9th August
21 esbnetworks.ie
Market Release v.12.00.00 - Milestone Plan
2018 2019
Q1 Q2 Q3 Q4 Q1 Q2 Q3
Design/Build/Test
V.12.00.00 Schema
Published
Jan 28th
Go Live Easter 2019
IPT Prep
CRU Decision
v
Other
Unicode Conversion
SAP Hana
SAP IS-U Enhancement Pack (8.0)
Smart Enablement for Meter Installation
5th16th 7th 7th 4th 25th 29th 3rd 8th30th3rd
Go Live Easter 2019
Go Live Easter 2019
Go Live Easter 2019
IPT Exec
Market Assurance
27th
Market Engagement
Go live
Aug B/H
Aug 2018
22 esbnetworks.ie
Market Release v 13.00.00 - Agreed Scope
MCR Description MCR Type Complexity Schema
Or
Non-Schema
TIBCO
Impacting
MCR1157 Data Aggregation and Data Processing CRU Mandated
(SMART)
Very High Schema Yes
MCR1158 Customer Data Very High Schema Yes
MCR1159 Change of Supplier Very High Schema Yes
MCR1160 Meter Works Very High Schema Yes
DR1161 New Connection Very High TBC Potentially
MCR1135 Market Web ServiceProposed Very High Non-Schema No
MCR0176
Email Address Validation Medium Schema Yes
Assumption:
Cohesive integration between SMART ILG and IGG/ReMCoWG forums will support re-versioning of SMART MCRs and progression of
DR1161 to an MCR
23 esbnetworks.ie
Proposed Package - Impact
DUoS BillingNew
Connections
Energy Data
ManagementIDOCS
Device
Management
Customer
ServiceUnmetered
Change of
Supplier
Meter WorksSupplier
Disputes
FI - Contract
Accounts
Data
Aggregation
Data
ProcessingMeter Reading
FI - GL
Processes (e.g.
Bank etc)
Revenue
Protection
SAP ISU
SAP Process Integration
TIBCO
SEMOSAP XI
Market Trials
Inter ParticipantTesting
• Affects EVERY area except Unmetered
• Caters for increased data volumes and Market Requirements
ESBN SAP IS-U Impacted Area
24 esbnetworks.ie
2020 Market Release - Agreed Package
SMART
MCRs
MCR1157
MCR1158
MCR1159
MCR1160
DR1161 MCR0176
Validation
MCR1135
Market Web
Service
IT ChangesProposed Package
SAP PO Implementation
SFTS Replacement
SMART MCRs
MCR0176
MCR1135
Mandatory
Proposed
IT Changes
SAP PI Service Packs
Build New SAP Environments
Hana Upgrade
Mandatory Proposed
Sundry IT Initiatives (Upgrades)
IT Changes
Procure /Upgrade Hardware
SMART Enablement
25 esbnetworks.ie
Retail Market Programme – Up to 2020
Business As Usual
I-SEM
NIE SAP IS-U SPs / ES Infrastructure
Meter Reading Replacement/
QH remote modems pilot
Smart Enablers
MCR
1187 –
Eircodes
interim
2020 Market Release To Include:
• E Mail Validation
• Web Service
• Smart MCRs
Non Schema MCR1179
- Eligible customer
files on extranet
I-SEM go live 01.10.2018
Eircodes – MCR1140, MCR0175, MCR1169
Vulnerable Customers – MCR1173
Interim Public Lighting – MCR1167
New Unmetered Tariff (NI) - MCR1154
010 Customer Validation (NI) - MCR1183
Provide MP Business Reference for reading (Non Schema) – MCR1175
Interim New Registration Default – MCR1180
Non Schema MCR1176
- Extranet Message
reordering
Aug
2018
Easter
2019
I-SEM
Prioritisation
Process
Possible impacts on plan:
• Tibco Upgrade
• NI Regulatory
Executive Decisions
• De-Harmonisation
decision
26 esbnetworks.ie
Appendix
27 esbnetworks.ie
Topic MCR# Description Topic IGG Meeting
Indicative
Dates
Implementation
Details
MCR1167 Public Lighting ESBN Publication:
• Standard Profiles
• Burn Hour Calendars
• Effective Wattages
Aug 2018
MCR1140 Eircodes Upload mechanism and schedule for circa
1.5 Million Eircodes
Nov 2018
MCR1180 New Registration
Default Supplier
‘Work In Progress’ items will be discussed Nov 2018
MCR1173 Vulnerable
Customers
Reconciliation with suppliers for new
codes & Rejection Reasons
Nov 2018
MCR1140
MCR1173
MCR1167
MCR1169
Downloadable Meter
Point Files
Samples files Jan 2019
MCR1140
MCR1173
MCR1167
RMP Extranet
screenshots
Samples screenshots Jan 2019
MCR1167 700 Series MMs Samples 700MMs Feb 2019
Cutover &
Contingency
Planning
All Cutover &
Contingency
Planning
Cutover & Contingency Approach Nov 2018
Market Release Schema v12.00.00 – Future IGGs
28 esbnetworks.ie
ROI Market Release 2019 – Schema MCRs
MCR Description Change Details Comments
MCR0175
Version 5.0
New Reject Reasons for
Address Change Rejection
Nine New code values
are being added (I.e.
AD1->AD9)
• Market Message (MM): 014R
• 9 New Data Codes – Appendix – MCR0175 refers
MCR1173
Version 2.0
Vulnerable Customer
Implementation in ROI of SI
463
Change existing Code
0008 to be valid in ROI
&
Two new code values
(I.e. 0009 & 0010)
• Market Messages (MM): 010, 013 , 016 & 017
• 3 New Data Codes for ROI CoBL, 2 of which will be added to schema – Appendix –
MCR1173 refers
• Data Code values will now be used on Extranet and Downloadable files – not the
Central Market System Codes as per current design – Appendix – MCR1173 refers
• Code 0010 should not be used at this time – it’s being introduced for future proofing and
will be rejected. Rejection reasons and associated rejection messages will be
communicated at a future IGG.
• The codes will appear in confirmation messages in line with current market rules
• Modified downloadable files will be available to Suppliers from May 2019 – Appendix
MCR1173 refers
• ROI Webforms :code 0010 will be selectable, not display only as originally
communicated – Appendix MCR1173 refers
MCR1167
Version 3.0
Facilitate energy efficiencies
in Local Authority Public
Lighting
Eleven New code values
are being added
(I.e.
U13->U23)
• Market Messages (MM): 591, 700, 700W, 701 & 701W
• 11 New Data Codes & 11 New Standard Profiles – Appendix MCR1167 refers
• 25 New Burn Hour Calendars – Appendix MCR1167 refers
• Effective wattage for every lamp type will be published by ESBN (when available)
• CoBLCR changes will be raised, as needed
• Downloadable file with new data values and structure will be available to Suppliers from
May 2019 – Appendix MCR1167 refers
MCR1183 010 Customer Validation
Agreement (NI)
NI Requirements NI Schema changes are covered in ReMCoWG/CDA
MCR1154 New Unmetered Tariff for NI
29 esbnetworks.ie
ROI Market Release 2019 – Non-Schema MCRs
MCR Description Comments
MCR1140
Version 3.0
Introduction of
Eircodes into the
Retail Market Design
in Ireland
• Eircodes can be submitted on MMs in the existing Postal Code field : 010, 012, 012W,013 & 021
• Eircodes where available will be returned in the existing Postal Code fields on MM: 014R, 101, 101P, 101R, 102, 102P,
102R, 105, 105L, 110, 112, 112R, 112W, 114, 301, 301N& 330
• ESBN will agree schedule for mass uploads of Eircodes into the Meter Point Address Postal Code field in the Central
Market System at a future IGG.
• ESBN intend to update these in batch – mechanism and schedule to be discussed at a future IGG
• Once the Postal Code field has been populated it will be visible on the Retail Market Participant Extranet – Appendix
MCR1140 refers
Note: Existing Market Defect originally intended to go-live with MCR1187 will now be implemented alongside this MCR.
MCR1169
Version 2.0
Addition of Postal
Code to two
Downloadable Meter
Point Details Files
• Modified downloadable files will be available to Suppliers from May 2019 – Appendix MCR1169 refers
• However, population of field will be determined by the Eircode upload schedule for MCR1140
• ESB Networks intend to discuss the upload schedule for these two files at future IGGs
MCR1175
Version 3.0
Provide Market
Participant Business
Reference
(MPBusinessReferen
ce) for Reading
• The Market Participant Business Reference (MPBusinessReference) on the 300MM will be populated with that from the
associated original 210MM (i.e. where it populated a periodic meter reading order)
• Read Reason 95/’Not for COS’ is the only case for which the above applies
o If the customer reading which populates the open Meter Reading Order is implausible and is estimated populate
the MPBusinessReference on the corresponding 305MM
o If the customer reading which populates the open Meter Reading Order is withdrawn populate
the MPBusinessReference on the corresponding 300WMM
MCR1180
Version 4.0
New Registration
Default Supplier
• For sites with MIC <30kVa, the Customer must now register with a Supplier
• The 010MM must be received by the Central Market system before a connection point can be energised