ERTMS Deployment in Spain: Current Situation and Future Challenges Jaime PEREIRA Signalling & ERTMS Manager October 16 th CCRCC ‘19 Valenciennes

Upload: others

Post on 12-Jul-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ERTMS Deployment in Spain: Current Situation and …...ERTMS Deployment in Spain 1. Facts & Figures. 2. Historical Background. 3. Current Status of ERTMS deployment in Spain. 4. Future

ERTMS Deployment in Spain: Current Situation and Future Challenges

Jaime PEREIRA Signalling & ERTMS Manager

October 16th CCRCC ‘19 Valenciennes

Page 2: ERTMS Deployment in Spain: Current Situation and …...ERTMS Deployment in Spain 1. Facts & Figures. 2. Historical Background. 3. Current Status of ERTMS deployment in Spain. 4. Future

ERTMS Deployment in Spain

1. Facts & Figures.

2. Historical Background.

3. Current Status of ERTMS deployment in Spain.

4. Future Challenges.

5. Lessons Learnt.

October 16th

CCRCC ‘19 Valenciennes

Page 3: ERTMS Deployment in Spain: Current Situation and …...ERTMS Deployment in Spain 1. Facts & Figures. 2. Historical Background. 3. Current Status of ERTMS deployment in Spain. 4. Future

October 16th

CCRCC ‘19 Valenciennes

> 2500 ERTMS Km in operation.

> 2500 ERTMS additional Km already deployed and in PS process.

> 1000 (and growing!) ERTMS Km in project phase.

Strenght in Numbers.

Strong commitment with ERTMS.

Facts & Figures

Page 4: ERTMS Deployment in Spain: Current Situation and …...ERTMS Deployment in Spain 1. Facts & Figures. 2. Historical Background. 3. Current Status of ERTMS deployment in Spain. 4. Future

Facts & Figures

October 16th

CCRCC ‘19 Valenciennes

Huge need of specific profiles: Design and Testing, Requirements, CMS Project Managers, Safety, Traffic Management, Maintenance…

Not easy to find!

Availability of qualified human resources in the deployment of ERTMS

Page 5: ERTMS Deployment in Spain: Current Situation and …...ERTMS Deployment in Spain 1. Facts & Figures. 2. Historical Background. 3. Current Status of ERTMS deployment in Spain. 4. Future

October 16th

CCRCC ‘19 Valenciennes

Historical Background

First ERTMS Contract (Project & Works): 2000.

First ERTMS Placing in Service: 2006 (L1).

Page 6: ERTMS Deployment in Spain: Current Situation and …...ERTMS Deployment in Spain 1. Facts & Figures. 2. Historical Background. 3. Current Status of ERTMS deployment in Spain. 4. Future

2 0 0 6 0 4 8 62 0 0 7 0 8 1 02 0 0 8 0 9 9 12 0 1 0 1 4 3 12 0 1 1 2 0 0 12 0 1 2 2 2 0 22 0 1 4 2 3 6 42 0 1 6 1 8 7 82 0 1 7 1 5 6 82 0 1 8 2 1 6 32 0 1 9 2 7 5 8

Toledo

Barcelona

Lleida

Málaga

Zaragoza

Valencia

Albacete

Madrid

Figueras

Alicante

Orense

Santiago de Compostela

Madrid – Lleida [486 km]

L1. 2006

Lleida – Barcelona [181 km]

L1. 2008

Madrid – Valladolid [169 km]

L1. 2007

Orense – Santiago [84 km]

L1. 2011

Albacete – Alicante [162 km]

L2. 2014

Barcelona – Figueras [131 km]

L1. 2012

Madrid – Valencia – Albacete [440 km]

L1 . 2010 L2 2018

Córdoba

Sevilla

Olmedo

Zamora

León

Valladolid

ERTMS Lines in Operation

GranadaAntequera

Antequera – Granada [112 km]

L2. 2019

Total L1 1879 km

Total L2 879 km

Valladolid – León [ 165 km]

L2. 2019

Current Status of ERTMS deployment in Spain

ERTMS Level 1

ERTMS Level 2

ASFA/LZB

October 16th

CCRCC ‘19 Valenciennes

Parla

Colmenar Viejo

Alcobendas / S.S. Reyes

Cercanías Madrid [70km]

L1. 2012Córdoba– Málaga [155 km]

L1. 2007 L2 2019

YEAR Km

Page 7: ERTMS Deployment in Spain: Current Situation and …...ERTMS Deployment in Spain 1. Facts & Figures. 2. Historical Background. 3. Current Status of ERTMS deployment in Spain. 4. Future

October 16th

CCRCC ‘19 Valenciennes

Diverse range of suppliers (both tracks and OBUs).

Toledo

Barcelona

Lleida

Málaga

Zaragoza

Valencia

Albacete

Madrid

Figueras

Alicante

Orense

Santiago de Compostela

Madrid – Lleida [486 km]

L1. 2006

Lleida – Barcelona [181 km]

L1. 2008

Madrid – Valladolid [169 km]

L1. 2007

Albacete – Alicante [162 km ]

L2. 2014

Barcelona – Figueras [131 km]

L1. 2012

Parla

Colmenar Viejo

Alcobendas / S.S. Reyes

Madrid – Valencia – Albacete [440 km]

L1 . 2010

Córdoba

Sevilla

Olmedo

Zamora

León

Valladolid

Thales

Ansaldo

Siemens

Alstom

ERTMS Level 1

ERTMS Level 2

ASFA/LZB

Cercanías Madrid [70km]

L1. 2012

Granada

Antequera

ERTMS Lines in Operation.

Current Status of ERTMS deployment in Spain

Valladolid – León [ 165 km]

L2. 2019

Orense – Santiago [84 km]

L1. 2011

Córdoba– Málaga [155 km]

L1. 2007 L2 2019

Page 8: ERTMS Deployment in Spain: Current Situation and …...ERTMS Deployment in Spain 1. Facts & Figures. 2. Historical Background. 3. Current Status of ERTMS deployment in Spain. 4. Future

October 16th

CCRCC ‘19 Valenciennes

✓ Protection of investments.

✓ Backwards compatibility.

Current Status of ERTMS deployment in Spain

Parallel ERTMS Specifications changes

Page 9: ERTMS Deployment in Spain: Current Situation and …...ERTMS Deployment in Spain 1. Facts & Figures. 2. Historical Background. 3. Current Status of ERTMS deployment in Spain. 4. Future

Toledo

BarcelonaLleida

Zaragoza

Madrid

Madrid – Lleida [486 km]

Level 1&2

Lleida – Barcelona [181 km]

Level 1&2

Madrid – Valladolid [169 km]

Level 1&2

Valladolid

Málaga

Córdoba

Córdoba – Málaga [155 km]

Level 1&2

Total L1 155 km

Total L2 991 km

October 16th

CCRCC ‘19 Valenciennes

Current Status of ERTMS deployment in Spain

Case study: ERTMS Migration

Initial Target Completion Date: 2016

Technical Scope: just 4 CRs!

Page 10: ERTMS Deployment in Spain: Current Situation and …...ERTMS Deployment in Spain 1. Facts & Figures. 2. Historical Background. 3. Current Status of ERTMS deployment in Spain. 4. Future

Toledo

Málaga

Córdoba

October 16th

CCRCC ‘19 Valenciennes

Current situation.

Huge interferences withongoing deployments.

System downgrading.

Certification issues.

Complex train retrofitting(re-authorizationprocesses).

Why?

Current Status of ERTMS deployment in Spain

Case study: ERTMS Migration

Page 11: ERTMS Deployment in Spain: Current Situation and …...ERTMS Deployment in Spain 1. Facts & Figures. 2. Historical Background. 3. Current Status of ERTMS deployment in Spain. 4. Future

October 16th

CCRCC ‘19 Valenciennes

Monforte – MurciaL2 [70 km]

Olmedo – Orense L2 [340 km]

Valladolid – León – Burgos L2 [256 km]

Plasencia – BadajozL2 [193 km]

La Robla – Pola de Lena L2 [50km]

Barcelona Comm. Lines L2 [50 km]

Barcelona

Sevilla – Cádiz L1 [155 km]

Eje Atlántico L1 [156 km]

Valencia – VandellósL1 [220 km]

Tarragona – VandellósL1 [65 km] L2 [14 km]

Chamartin– Torre Velasco L1 [37 km]

Madrid Comm. Lines L2 [70 km]

Future Challenges

ERTMS Placing in Service

2.3.0.d additional km deployed

> 500 L1 km (Conventional)

> 1000 L2 km (HS & Commuter)

Page 12: ERTMS Deployment in Spain: Current Situation and …...ERTMS Deployment in Spain 1. Facts & Figures. 2. Historical Background. 3. Current Status of ERTMS deployment in Spain. 4. Future

October 16th

CCRCC ‘19 Valenciennes

Future Challenges

ERTMS Placing in Service

Valladolid

Ourense

Olmedo

Zamora

Burgos

Murcia

Badajoz

Plasencia

Monforte

Monforte – Murcia L2 [70 km]

Olmedo – Orense L2 [340 km]

Thales

Ansaldo

Siemens

Alstom

Bombardier

Valladolid – León –Burgos L2 [256 km]

Plasencia – BadajozL2 [193 km]

Pola de Lena

La Robla

La Robla – Pola de Lena L2 [50km]

Barcelona Comm. Lines L2 [50 km]

Barcelona

Sevilla

Sevilla – Cádiz L1 [155 km]

Cádiz

Als/Sie/CAF

Eje Atlántico L1 [156

km]

A Coruña

Vigo

Valencia

Vandellós

Valencia – VandellósL1 [220 km]

CAF

Tarragona – VandellósL1 [65 km] L2 [14 km]

Chamartin– Torre Velasco L1 [37 km]

Madrid Comm. Lines L2 [70 km]

Page 13: ERTMS Deployment in Spain: Current Situation and …...ERTMS Deployment in Spain 1. Facts & Figures. 2. Historical Background. 3. Current Status of ERTMS deployment in Spain. 4. Future

(Hard) Lessons Learnt

➢ ERTMS version migration jeopardises ERTMSDeployment & Business Case.

➢ Final infrastructure test: issues.

➢ L1 still a valid and added value option. (Brown Fieldscenarios with no ultra high capacity needed). L2 inbrown field implementation never easy.

October 16th

CCRCC ‘19 Valenciennes

Page 14: ERTMS Deployment in Spain: Current Situation and …...ERTMS Deployment in Spain 1. Facts & Figures. 2. Historical Background. 3. Current Status of ERTMS deployment in Spain. 4. Future

➢ V&V processes with real operational conditions.

➢ Protection of investments.

➢ Stable specs (CRs only for real errors or G. Changers

Enhancements) + Backwards compatibility.

➢ B2 (set of specs #1) kept in TSI or ERTMS operation &

deployments to be hampered!!

➢ Focusing on achievable goals for the next 5-year span:

✓ CCS data model standarization.

✓ Standardization of high added value interfaces (e.g. IXL-RBC,TMS-ERTMS safety commands)

October 16th

CCRCC ‘19 Valenciennes

How can we optimizeERTMS deployments?

Page 15: ERTMS Deployment in Spain: Current Situation and …...ERTMS Deployment in Spain 1. Facts & Figures. 2. Historical Background. 3. Current Status of ERTMS deployment in Spain. 4. Future

Thanks for your attention