building capacities of oda in moic
DESCRIPTION
Building Capacities of ODA functions for the Ministry of International CooperationTRANSCRIPT
Project funded by the European Union
Project Implemented with the Support of a Consortium Led by Linpico
Presentation of BC ODA Kick-Off Event
Sunday 18th May 2014
Ramses Hilton Hotel, Cairo, Egypt
Project implemented by the Ministry of International Cooperation (MoIC)
Building the Capacities of the Ministry of International Cooperation
in the Fields of Planning, Managing, Monitoring and Evaluating
Official Development Assistance to Egypt (BC ODA)
Project Contracting Authority
Contents
I. BC ODA Synopsis & Areas of Concentration
II. BC ODA Capacity Building and Stakeholders
III. Consideration for Multi-Level Integrated Planning
IV. BC ODA Implementation Strategy (Details in IX)
V. Human Resources Development
VI. BC ODA Implementation Status
VII. Potential for Cooperation with DPs
VIII. BC ODA Resources
IX. Details of BC ODA Implementation Strategy
- MoIC-BC ODA Internet Site and Contact
Building the Capacities of the MoIC in the Fields of
Planning, Managing, Monitoring and Evaluating ODA to Egypt
I. BC ODA SYNOPSIS (p.1)
Brief Descriptions* of BC ODA Target Groups and Purpose & Results
to be Achieved over 24 Months from 5th January 2014
Target
Groups
The technical staff of the Ministry of International Cooperation (MoIC) and its
affiliated programs/units. In addition, three International Cooperation Units from
selected Line Ministries may also be incorporated within the project at a later stage on a
pilot basis
Purpose
To add fully-fledged functionalities to the system for planning, managing, monitoring
and evaluating ODA, at Both Policy and Programme/Project Levels
Result
Area 1
Assessment and Review of MoIC Efforts in Policy Development, Strategic Planning,
Monitoring and Evaluation
Result
Area 2
Processes related to ODA Policy Development, Strategic Planning Monitoring and
Evaluation are Enhanced
Result
Area 3
Capacities of Staff are Developed and Upgraded in Policy Development, Strategic
Planning, Monitoring and Evaluation
Result
Area 4
Structures are Strengthened and/or Established and Operational for Policy
Development, Strategic Planning, Information/Database Management, Monitoring and Evaluation
Result
Area 5
Existing ODA Database System is Upgraded, Enhanced and Made Available for
Online interactivities of Additional Functionalities to Support Some MoIC’s Core
Functions
* Note: These descriptions are just for working purpose. Actual descriptions are as per Project Workplan and Logframe.
Building the Capacities of the MoIC in the Fields of
Planning, Managing, Monitoring and Evaluating ODA to Egypt
I. BC ODA SYNOPSIS (p.2) BC ODA will concentrate its Support to
Building Capacities of MoIC in:
ODA Policy Development
ODA Strategic Planning
ODA Information / Data Management
ODA Monitoring* &
ODA Evaluation*
Because of its Limited Timeframe and Resources, MoIC considers BCODA as a Catalyst for Capacity Building and an Umbrella Project to Streamline all MoIC’s Capacity Development Efforts
*Note: Monitoring & Evaluation of ODA related policies, plans, programmes and
projects. In particular, for MoIC, monitoring should address monitoring at all stages of
ODA cycle/processes. Similarly, evaluation should cover ex ante evaluation/
appraisal/selection, mid-term evaluation/on-going evaluation, end of programme/project evaluation, and ex post evaluation/impact evaluation.
Building the Capacities of the MoIC in the Fields of
Planning, Managing, Monitoring and Evaluating ODA to Egypt
II. BC ODA CAPACITY BUILDING AND STAKEHOLDERS (p.1)
MoIC SUSTAINABLE CAPACITY
The 3 “Pillars” of Capacity Building
EXECUTIVE LEADERSHIP
COMMITMENT FROM ALL
BUDGETARY RESOURCES
DECREE MoIC MANDATE
PUBLIC SERVICE LAW
VARIOUS INCENTIVES
OTHER PARTNERS …
SUPPORT
FROM
BC ODA
& OTHERS
AFFECTS
SUSTAI-
NABILITY
OR
EXTERNAL
FUNCTIONS /
INTERACTIONS
INTERNAL
FUNCTIONS /
INTERACTIONS
Minister of
International
Cooperation
- PERMANENT
- CONTRACT
MIS
MANAGEMENT INFORMATION
SYSTEM
OFFICE
EQUIPMENT
TA
& OTHER EXTERNAL SUPPORT
OFFICE
SPACE
INTERNAL RULES & OPERATING
SYSTEMS
STAFF: PCS, CCS,
OUDA
IN
DIV
ID
UA
L
1
OR
GA
NI-
SA
TIO
NA
L
2
EN
AB
LIN
G
EN
VIR
ON
ME
NT
3 Capacities +
are in MoIC
« Black Box »
1 2
Enabling
Environment comes
mainly from outside
« Black Box »
3
Building the Capacities of the MoIC in the Fields of
Planning, Managing, Monitoring and Evaluating ODA to Egypt
II. BC ODA CAPACITY BUILDING AND STAKEHOLDERS (p.2)
System Approach
Focus on Departments / Programmes /
Units Under the Responsibility of the Minister of International
Cooperation
MoIC Internal Stakeholders MoIC Departments
Affiliated Programmes / Units
New Structures (to be established
by this Project)
MoIC External Stakeholders Government Bodies
Parliamentary Bodies
National Private Sector and Civil Society ODA Development Partners
Institutions/Bodies, Private Sector and
Civil Society of other countries
Legend: Solid Black = Structures Under the Responsibility of the Minister of Internal Cooperation (MoIC)
Red / Circled with Red = National Government Bodies
Blue = ODA Development Partners and Institutions/Bodies and Private Sector & Civil Society other Countries
Brown = National Parliamentary Bodies
Green = National Private Sector & Civil Society
OR
Minister
of International
Cooperation
EXTERNAL
STAKEHOLDERS
INTERNAL
STAKEHOLDERS
MoIC
(TECHNICAL OFFICE, SECTORS /
DEPARTMENTS)
Affiliated
Bodies
(PEMA, DECODE, OUDA, SAAP)
Other
ODA
Stakeholders
National Private Sector & Civil Society
Private Sector & Civil Society
of Other Countries Institutions
/ Bodies of Other
Countries
Legislative Bodies
Municipalities
Prime Minister ---
Cabinet of Ministers
Presidency
Planning Ministry
Line Ministries Including
3 Pilot ones
Implementing Agencies
Governorates
Ministry of Foreign Affairs
ODA
Development Partners
(Europ, Amer, Int Org, Reg & Arab Funds, Arab & Afr, Asia)
Ministry of Finance
Central Bank of Egypt
Building the Capacities of the MoIC in the Fields of
Planning, Managing, Monitoring and Evaluating ODA to Egypt
III. ODA MULTI-LEVEL INTEGRATED PLANNING SYSTEM
EGYPT’s ODA
POLICY & SRATEGIC PLAN
Setting Egypt’s
ODA Policy and Strategy
Responsibility of the Minister of
International Cooperation
MO
NIT
OR
IN
G &
E
VA
LU
AT
IO
N
Usin
g P
erform
an
ce
B
ase
d M
ana
ge
me
nt (K
RA
s + K
PIs) o
f:
Eg
yp
t’s O
DA
P
olic
y a
nd
S
tra
te
gic
P
la
n A
ND
Ind
ivid
ual
Acti
on
Pla
ns
, S
tru
ctu
re A
cti
on
Pla
ns, M
oIC
In
teg
rate
d C
orp
ora
te P
lan
IN
FO
RM
AT
IO
N / D
AT
AB
AS
E M
AN
AG
EM
EN
T f
or:
OD
A in
form
ati
on
& d
ata
(A
ids I
nfo
rmati
on
Man
ag
em
en
t S
yste
m “
AIM
S”)
AN
D
Man
ag
em
en
t In
form
ati
on
rela
ted
to
Mo
IC C
orp
ora
te w
ork
(M
oIC
’s “
MIS
”)
EGYPT’s MTEF &
MTFF
(MT Expenditure &
Fiscal Frameworks)
Responsibility of
Finance Ministry
MoIC INTEGRATED
CORPORATE PLAN
A Plan for MoIC (incl. its Structures + its
Affiliates) to Fulfil its Mandate
Responsibility of the Minister of
International Cooperation
STRUCTURE
ACTION PLAN
A Plan for each Structure to
Fulfil its Mandate
Responsibility of
Each Head of Structure
INDIVIDUAL STAFF
ACTION PLAN
A Plan for each Individual Staff to fulfil
his/her responsibilities (Job Description)
Responsibility of Each Individual Staff
INTERNATIONAL
DEVELOPMENT
PARTNERS’
POLICIES
Foreign Governments /
Reg. & International
Organisations
EGYPT’s
NATIONAL
DEVELOPMENT
PLAN
Responsibility of
Planning Ministry
EGYPT’s
FOREIGN
POLICY /
STRATEGY
Responsibility of
Foreign Ministry
Building the Capacities of the MoIC in the Fields of
Planning, Managing, Monitoring and Evaluating ODA to Egypt
III. ODA MULTI-LEVEL INTEGRATED PLANNING SYSTEM
More Details
EGYPT’s ODA POLICY & SRATEGIC PLAN
(Responsibility of Minister of International Cooperation)
Setting Egypt’s ODA Policy and Strategy in term of: Support to IMPLEMENTATION of:
specific national development objectives,
Foreign policy objectives,
Aid Effectiveness policy dialogue,
Mobilisation of ODA resources,
Best use of comparative advantages of ODA DPs,
Optimisation of the choice and use of various ODA transfer mechanisms, etc.
MO
NIT
OR
IN
G &
E
VA
LU
AT
IO
N U
sin
g P
erform
an
ce B
ase
d M
ana
gem
ent (K
RA
s + K
PIs) o
f:
Ind
ivid
ual
Acti
on
Pla
ns,
Str
uctu
re A
cti
on
Pla
ns,
Mo
IC In
teg
rate
d C
orp
ora
te P
lan
AN
D
Eg
yp
t’s O
DA
Po
licy a
nd
Str
ate
gic
Pla
n
EGYPT’s NATIONAL DEVELOPMENT PLAN
(Responsibility of Planning Ministry)
Setting Egypt’s Development Policy and objectives over medium
to long terms
EGYPT’s FOREIGN POLICY / STRATEGY
(Responsibility of Foreign Ministry)
Setting Egypt’s Foreign Policy towards other
countries and regional and international organisations
MoIC INTEGRATED
CORPORATE PLAN
(Responsibility of Minister of International Cooperation)
Setting MoIC Plan to fulfil its mandate towards the IMPLEMENTATION of Egypt’s ODA Policy and Strategic Plan, through appropriate organisation / mobilisation of resources within MoIC, PEMA, DECODE SAAP, OUDA…
STRUCTURE ACTION PLAN
(Responsibility of Each Head of Structure) Action Plan for each MoIC Structure to fulfil its
mandate towards the IMPLEMENTATION of MoIC Integrated Corporate Plan, through appropriate
organisation / mobilisation of resources available within the Structure (i.e., Sector / Central Department / General
Department)
INDIVIDUAL STAFF ACTION PLAN
(Responsibility of Individual Staff) Action Plan for each MoIC staff to fulfil his/her responsibilities (Job Description) towards the
IMPLEMENTATION of his/her Structure’s Action Plan, through appropriate organisation / mobilisation of
his/her skills and time.
IN
FO
RM
AT
IO
N / D
AT
AB
AS
E M
AN
AG
EM
EN
T fo
r:
OD
A R
ela
ted
in
form
ati
on
an
d d
ata
(A
ids In
form
ati
on
Man
ag
em
en
t S
yste
m “
AIM
S”) A
ND
Man
ag
em
en
t In
form
ati
on
rela
ted
to
th
e M
oIC
Co
rpo
rate
wo
rk (
Mo
IC’s
“M
IS
”)
EGYPT’s MTEF & MTFF (Responsibility of Finance Ministry)
Setting Egypt’s Medium Term Expenditure
Framework (MTEF) & Egypt’s Medium Term
Fiscal Framework (MTFF)
INTERNATIONAL DEVELOP. PARTNERS’
POLICIES
(Foreign Governments / Reg. & International
Organisations)
Setting DP’s Cooperation Policy and programming priorities towards Egypt
Building the Capacities of the MoIC in the Fields of
Planning, Managing, Monitoring and Evaluating ODA to Egypt
IV. BC ODA IMPLEMENTATION STRATEGY (p.1)
Implementation includes 4 main Phases
* Will build upon previous efforts, in particular UNDP-MoIC Scoping Study
2
DEVELOPMENT OF OPTIONS / PROPOSITION FOR
Integrating New Policy & Strategic Planning and
Monitoring & Evaluation Structures in MoIC
Training Strategy and Programme
Roadmap for a Fully-Fledge Aids Management
Information System (AIMS)
Will build upon previous efforts, in particular UNDP-MoIC Scoping Study
ASSESSMENTS OF
MoIC Efforts in Policy and Strategic Planning
Existing ODA Information / Data Mgt. System
Training Needs of MoIC Depts. and Affiliates
1
Building the Capacities of the MoIC in the Fields of
Planning, Managing, Monitoring and Evaluating ODA to Egypt
IV. BC ODA IMPLEMENTATION STRATEGY (p.2)
CLARIFICATION MANDATES OF STRUCTURES TO BE
STRENGTHENED / ESTABLISHED IN AREAS
ODA Policy Development & Strategic Planning*
ODA Monitoring & Evaluation*
ODA Information / Data Management
*New Central Structures, require the Recruitment / Appointment of Needed Staff, including:
- Head of a Structure for Policy & Strategic Planning (new Department/Office to be established within MoIC), and
- Head of a Structure for Monitoring & Evaluation (new Department/Office to be established within MoIC)
4
OPERATIONALISATION / FUNCTIONNING
OF CONCERNED STRUCTURES
Support Preparation of Action Plans
Providing Specialised Advice,
Training, on-the-job Training, Coaching
Support for Development of an ODA Management
Manual and Procedures
3
Building the Capacities of the MoIC in the Fields of
Planning, Managing, Monitoring and Evaluating ODA to Egypt
V. HUMAN RESOURCES DEVELOPMENT (p.1)
Developing the Capacity of People is one of the 3
“Pillars” of Capacity Building
Project will provide in Results 2 and 3:
• Training Workshops (5 Modules)
• Study Visit(s) + Internships
Mentoring and Guidance Manuals
Work jointly with MOIC on training and facilities
Modern Practical Methodology
(training sessions and in office)
Sustainable Increased Productivity and Quality
Building the Capacities of the MoIC in the Fields of
Planning, Managing, Monitoring and Evaluating ODA to Egypt
V. HUMAN RESOURCES DEVELOPMENT (p.2)
MOIC and ODA Project Plan
MoIC ODA Systems review Initial TNA Study
Prepare initial ODA
systems manual
Develop IT &
Training platform
Project Training
Plan
MoIC HRD
Strategy Plan
ODA System Training (general &
Resource group)
Assist MOIC to get
Training Support
Support HRD
Department
Project Public
Admin Training
Results of Project 2 and 3
Improved & Standard ODA systems
Strengthened Communications- IT dbase and training
HRD system effectiveness strengthened
Capacity Plan in place -Demand driven in use
Improved Staff Capacity and culture
Building the Capacities of the MoIC in the Fields of
Planning, Managing, Monitoring and Evaluating ODA to Egypt
VII. BC ODA STATUS
1. Project Inception Report was submitted early March and will
be reviewed by the Project Management Committee
on 20th May
2. Human Capacity Development Report (updated TNA +
Training Programme + HRD Roadmap) was submitted mid-April
and is being reviewed by MoIC
3. Proposal on the Establishment of New Central Structures
Related to the Performance of New ODA Functions Policy & Strategic Planning Structure and
Monitoring & Evaluation Structure
has been Submitted and is being Processed by MoIC
4. Capacity Assessment of Current Efforts Undertaken
by MoIC in the Fields of Policy Development, Strategic Planning,
Monitoring & Evaluation is in Progress
5. A Preliminary Assessment of the Existing ODA Database
System has been Completed during the Inception Phase
Building the Capacities of the MoIC in the Fields of
Planning, Managing, Monitoring and Evaluating ODA to Egypt
VII. POTENTIAL FOR COOPERATION WITH
DEVELOPMENT PARTNERS (DPs) (p.1)
MoIC considers it is important to coordinate Capacity Building
efforts with respect to:
On-going activities (GIZ-DLP, WB, UNDP, KOICA, etc.), within the
Ministry and its Affiliates Programmes/Units; and
Identification and programming of additional and
complementary capacity building needs that are beyond the
scope of BC ODA
Building the Capacities of the MoIC in the Fields of
Planning, Managing, Monitoring and Evaluating ODA to Egypt
VII. POTENTIAL FOR COOPERATION WITH
DEVELOPMENT PARTNERS (DPs) (p.2)
Potential areas for cooperation with DPs include:
1. Conducting an Institutional Health Assessment of MoIC
2. Implementing recommendations of this Assessment
3. Support the operationalisation of establishing the new P&SP
and M&E Central Structures
4. Support the implementation of a Roadmap for the
establishment and institutionalisation of a fully-fledged Aid Information Management System (AIMS), following-
up on recommendations of the 2014 UNDP-MoIC scoping study
Building the Capacities of the MoIC in the Fields of
Planning, Managing, Monitoring and Evaluating ODA to Egypt
VIII. BC ODA RESOURCES (p.1) BC ODA Resources
Active contributions from MoIC Staff and its Affiliated
Programmes / Projects
Some IT Equipment for ODA Information / Data Management
Technical Assistance Contract
Key Expert 1 – Team Leader Expert in Policy Planning, Monitoring and Evaluation of ODA (full time) Key Expert 2, Expert in Institutional Capacity Building (part time) Key Expert 3, Expert in ODA Database Management (part time) Key Expert 4, Expert in Policy Planning (part time)
Non-Key Experts
Budget for Incidental Expenditures
Building the Capacities of the MoIC in the Fields of
Planning, Managing, Monitoring and Evaluating ODA to Egypt
LINPICO sarl (FRANCE) – Consortium Leader
www.linpico.com
WYG Turkey & WYG International (UK) http://www.wyg.com.tr/ - http://www.wyg.com/
CPM (LATVIA) http://www.cpmconsulting.eu/
VIII. BC ODA RESOURCES (p.2) Consortium Partners
Management of the Technical Assistance Contract
Backstopping
Quality Assurance
Technical Support – Technical Resource Panel
Building the Capacities of the MoIC in the Fields of
Planning, Managing, Monitoring and Evaluating ODA to Egypt
IX. DETAILS OF BC ODA IMPLEMENTATION STRATEGY (p.1)
Implementation will include 4 main Phases:
1. Assessments:
Assessment of MoIC’s efforts in policy development, strategic planning,
monitoring and evaluation (under Result 1)
Technical Assessment of existing ODA Information / Database System(s)
(under Result 5)
Capacities assessment of Staff of MoIC’s Departments and Affiliates
(under Result 2) and TNA
2. Development of Propositions / Options and
Ministerial Approval:
Mandates of two new Structures and options for their integrating in MoIC
Organisation Chart (under Result 4)
Training Strategy and Programme (under Result 2)
Roadmap options* for the long-term development of a fully-fledged Aid
Information Management System – AIMS – (under Result 5)
* Options will include a concrete plan to support, within the Project duration, the short-term incremental
upgrading of the current MoIC information / database system(s) with selected additional
functionalities. Options will build upon previous efforts, in particular UNDP-MoIC Scoping Study.
Building the Capacities of the MoIC in the Fields of
Planning, Managing, Monitoring and Evaluating ODA to Egypt
IX. DETAILS OF BC ODA IMPLEMENTATION STRATEGY (p.2)
3. Clarification of Mandates of Structures to be
Strengthened / Established*:
Support clarifying Mandates of Concerned Structures in the areas of
concentration – i.e., Policy Development & Strategic Planning, Information /
Database Management and Monitoring & Evaluation – (under Result 4) and
related job descriptions
* Note: Requires the Recruitment / Appointment of Needed Staff, including:
- Head of a Structure for Policy & Strategic Planning (new Department/Unit
to be established within MoIC) and - Head of a Structure for Monitoring & Evaluation (new Department/Unit to
be established within MoIC)
4. Support to Operationalisation / Functioning of
Concerned Structures:
Support to the Preparation of Action Plans for the Concerned Structures
(under Result 4 and 5)
Providing Specialised Advice, Training, on-the-job Training,
Coaching, and Support for Development of a Manual,
Procedures, etc. (under Results 2,3,4 and 5)
Building the Capacities of the MoIC in the Fields of
Planning, Managing, Monitoring and Evaluating ODA to Egypt
PowerPoint Presentation available on
www.mic.gov.eg
For further enquiries/communication with MoIC-BC ODA
moic.bc [email protected]
Building the Capacities of the MoIC in the Fields of
Planning, Managing, Monitoring and Evaluating ODA to Egypt