Summary Structural concrete works for civil infrastructure. Roads and rail, mines, commercial,
industrial and residential projects. Pavements for industrial and local government
roadways. Water treatment plants for town water and natural gas applications.
Electrical substations.
Skills Managing up to 60 personnel, including sub-contractors.
Scheduling and co-ordination of all work being conducted on site.
Scheduling of machinery, allocation of materials and quantities for various
works/trades.
Reviewing of prices and sub-contractor profiles for various works.
Manage and Completion of ITP's for clients, in keeping with the specifications.
Receiving and distribution of plan revisions and site instructions.
Regular meetings with stakeholders, reviewing progress, resolving design issues,
operational matters, safety, health and environment, updating our schedules.
Requests for information and logging of variations.
Compiling daily project machinery and labour data and submitting it to our office
and to the Project Management Company.
Understanding of, and conveying drawing details to employees and sub-
contractors where questions are raised or misunderstandings may occur.
Site Inductions, daily JRSA's. Tool box meetings. Setting up SWMS in consultation
with Safety Officers.
Verify that the subcontractors undertake consistent risk management.
Daily Site Diaries. Time sheets, Incident reports.
Delegation of tasks to leading hands, tradesman and labourers.
Training and upgrading skill levels of employees
Monitoring of safety aspects in accordance with our work method statements.
Monitoring of environmental aspects relevant to our contract.
Qualified First Aid officer.
Qualified Carpenter.
Associated Diploma of Applied Science Building. (Incomplete).
Diploma of Building and Construction. (Incomplete).
Approx. 35 years’ experience in the building and construction industry.
Experience 12/13 – Current
Jasons Towing
Truck Driver Driving LR and MR vehicles
Delivering parts to mining companies.
05/13 – 12/13
Self-employed Carpenter
07/11 – 03/13
Epoca Constructions Pty/Ltd. Mackay
Site Supervisor
Managing the site activities of these contracts in conjunction with a project
manager / contract administrator.
2011 – 2012:- Structural Concrete Works of steam turbine block (360m3 of
concrete) cooling tower, pump bases and column bases. Excavation for pipelines,
cable pits and electrical feeds at Racecourse Sugar Mill for its Co- Gen power
generation project? (Expected to supply Mackay with 30%? of its power needs
from sugar cane waste).
Manage concrete subcontractors, supervise the excavations, RL's and set outs for
formwork and concrete levels, material supply and deliveries, flow chart
adjustments, consultation with clients.
2012 – 2012:- Road widening, grubbing, clearing, batter cut to extend the
roadway further into the hillside. Traffic Control, replacement of road base and
grading to surveyed levels, compaction and asphalt, environmental management,
gabion wall, S/W. pits and drainage, kerb and channel plus kerb and guardrails
for bike way at Grasstree Beach. (Near Sarina). Weekly meetings with Mackay
Regional Council.
2012 – 2012:- Road Stabilisation works around Mackay.
2012 – 2012:- Complete road base and asphalt seal on by- pass road near
Dysart.
2012 – Current: - Reclaimer and Stockpiler Storm cradle foundations for
Dalrymple Bay Coal. Bulk excavation, Formwork, reofix, concrete to RL's and
FL's, bolt installation, plinths. Rehabilitation of the sites.
I finished with Epoca Constructions in April 2013 when they were unable to
secure new contracts which would have secured my continued employed with
them.
2006 – 2010
N.F. Corbett Pty/Ltd. Brisbane.
Site Supervisor
Managing the Site Activities of these contracts -
Construction of an Energex Substation at Boval.
Construction of Water treatment plant, pump station and associated works for
Origin Energy near Chinchilla.
Construction of an Ergon Substation at Glabella. (Architect designed)
Construction of an Ergon Substation at El-Arish (Architect designed).
Construction of a Energex Substation at Tanah Merah
Construction of a Energex Substation at Indooroopilly.( Architect designed).
Finalise the construction of an Energex Substation at Browns Plains.
Finalise the construction of substations at Toowoomba South and Oakey.
Works under my control, (scheduled for sub-contractors or delegated to our
employees) -
Set Out of Buildings, and Harmonic Yard.
Excavation works for cable trenches, conduits, building footings and services.
Construction of Transformer bay's and installation of below ground Electrical and
Communication Conduits. Construction of cable trenches from harmonic yard to
the Sub- building.
Excavation of trenches from transformer bay's for pipelines to oil separator pit.
Excavation and construction of oil separator pit.
Installation of pipelines.
Sheet Piling and bulk excavations
Excavation and installation of reinforcement, concrete and hold down bolts in the
Harmonic Yard for bus bar frames, including earthing of reinforcement.
Checking on levels and Grid lines for hold down bolts.
Construction of building basements with conduit feeds and ground slabs.
Construction of suspended slabs and stairs.
Earthing of all reinforcement
Block work and Brickwork.
Electrical feeds through building walls.
Roof beams, roofing, eaves and roof plumbing.
Amenities / facilities for staff rooms. Associated plumbing work, water storage
and reticulation.
Fire Doors.
Construction of road pavements for entry and exits.
Finishing trades, painters, renderer's, fencers. Etc.
Finalising form 16's and as cons.
John Holland
Railway Line Construction, North and Western Qld.
Coal Loader at Gladstone.
Airport Pavement Brisbane domestic.
Construction Services Civil
Conveyor belt footings from Boyne Island Aluminum smelter to the harbour
Concrete storage tanks for potline feeds.
Amenity buildings under the potlines
Armstrong Enterprises
Bridges for railway electrification and Main road overpasses.
Caloundra turnoff overpass (M.R.D.).
QCGC
Palmwoods Water treatment plant
Building Partnership
Doing homes and Townhouses around the Sunshine Coast
Leighton Constructions
Water reservoirs, treatment plant for Moranbah.
Gunpowder mine infrastructure to double its output.
Tunnel exits, retaining walls, building extensions, sag mill footings.
Roadworks and associated infrastructure at Townsville.
SCCW
Gunpowder mine infrastructure to double its output.
Supervisor for a Sunshine Coast company
Building commercial and industrial buildings.
Mostly slab on ground, tilt panel construction, some high-rise.
Lo-Go appointments
Carpentry maintenance and office fit outs of local council buildings
Education
Asia Pacific Training Institute / Acquire Learning
Diploma of Business
2016 – Present
Carpentry Trade Certificate.
House Building Attainment.
Construction Site Management.
Project Safety.
Concrete Technology.
Construction Measurement and Estimating.
Apply Site surveys and set out procedures to building and construction
projects.
Identify services layout and connection methods to medium rise
construction projects.
Select and Manage Building and Construction Contractors.
Manage Construction Work.
Supervise and apply quality standards to the selection of building and
construction materials.
Tully State High School