aiesec kolkata igcdp 2013

27
AIESEC IN KOLKATA IGCDP ANNUAL REPORT 2013 VICE PRESIDENTS: Apurva Vurity ([email protected] ) Samiksha Sanghi ([email protected] )

Upload: samiksha-sanghi

Post on 07-Nov-2014

254 views

Category:

Technology


1 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Aiesec kolkata igcdp 2013

AIESEC IN KOLKATAIGCDP ANNUAL REPORT

2013

VICE PRESIDENTS:

Apurva Vurity ([email protected])

Samiksha Sanghi ([email protected])

Page 2: Aiesec kolkata igcdp 2013

EXPERIENCE DELIVERY

Page 3: Aiesec kolkata igcdp 2013

Months Raise Match Realisation

January 11 05 09

February 31 04 12

March 43 02 04

April 80 02 00

May 32 27 01

June 15 20 06

July 21 09 29

August 05 01 12

September 12 02 00

October 21 06 05

November 31 20 00

December 04 10 09

Total 306 108 87

Page 4: Aiesec kolkata igcdp 2013

No of realisations per Issue

Entrepreneurship 4

Child Rights 51

Cultural Education 7

Environment 15

Health Care 7

Human Resource 2

Women Empowerment 1

Total 87

Matches given in transition- 34

Page 5: Aiesec kolkata igcdp 2013

Top Country Partners in 2013

LCs partnerships Delivered in 2013

Egypt AUCGUCZAGCairo University

Germany DresdenPassauBielefeld

Russia Rostov-on-DonSPUEFE&GMoscow

China SYSUGDUFS

Indonesia UIBandung

United Kingdom Sheffield

Tanzania Mzumbe

Ukraine KYIV

Greece MC

Vietnam FTU HCM

Page 6: Aiesec kolkata igcdp 2013

Growth Since 2012 Since 2011

Relative Growth

-25.64% +52.87%

Absolute Growth

-30 +46

Page 7: Aiesec kolkata igcdp 2013

IR Initiatives taken in 2013- • LC Matching Mania in the month of April and multiple

MM with different countries separately all throughout the year.

• Newsletters formed • Optimized tools of sending mails to bulk email ids • Increased use of social media • Started the use of Showcasing Impact as a strategy • Build IR relations through LC partnerships • Better Quality experiences.

Page 8: Aiesec kolkata igcdp 2013

NET PROMOTERS SCORE

Page 9: Aiesec kolkata igcdp 2013

 Quarters/NPS

Matched Realized Completed

Quarter 1 -50 -29 44

Quarter 2 24 14 15

Quarter 3 15 17 15

Quarter 4 20 0 0

Overall 14 -7 27

Top Promoters Issues:

Cross-Cultural Understanding & Awareness

Opportunity to create positive social impact

Personal Development

Page 10: Aiesec kolkata igcdp 2013

Top Detractor Issues:

Communication effectively during acceptance procedureInference: There should not be many touch points for the interns. It only leads to immense confusion. It is suggested that the person who matches an EP looks into the EP’s pre-arrival requirements and is also the co-ordinating with the intern for delivery. This person should be in charge of following up with the EP buddy as well. This will ensure that there are not many touch points for the EP and communication is effective.

Integration by the hosting entityInference: Prepare activities from before-hand for the 1st week cultural induction of the EP. These activities should include a 2-3 day home stay, showing the EP a few must visit places, showing the EP his/her workplace, explaining to him all the modes of transport that the EP can use and also changing his currency for him and telling him the rates.

Logistical SupportInference: The EP should be provided with the SIM card in the airport itself so that there is no issue of communication. The internet should also be provided within 48hrs of the EP’s arrival. Help must also be provided for the conversion of money.

Job description clarity and alignmentInference: The right week wise work is mentioned in the TN ID. This right expectation setting done will make sure that the EP is not taken aback by the experience that he/she is given. All relevant details related to the work needs to be provided to the EP in the TN ID.

Page 11: Aiesec kolkata igcdp 2013

CEM Initiatives:

Webinars and pre-arrival online induction Reception Booklet Local Promoter Score(local feedback

system) Engagement Activities like involvement in

all LC forums like GBMs, LCong, any kind of celebration, all events.

Cultural Induction by taking the interns around in the first week of their arrival and also home stay for every intern for the first 2-3 days to cushion culture shock

EP Buddies using associate members

Page 12: Aiesec kolkata igcdp 2013

REVENUE GENERATED

Page 13: Aiesec kolkata igcdp 2013

Quarter Budget Revenue

Actuals Surplus

Q1 30000 31000 1000

Q2 50000 0 -50000

Q3 165000 89100 -75900

Q4 90000 7000 -83000

TOTAL 335000 127100 -207900

 Heads Income

Admin Fee from Client1,27,100

Board Contributions for the Project

1,49,000

ER / Event Income40,000

Page 14: Aiesec kolkata igcdp 2013

Initiatives taken for financial sustainability & revenue generation

• Charge TN Fees from Trainees too • Have an easier financial module • Take financial help from the Local BoD• Raise from ER Events.

Page 15: Aiesec kolkata igcdp 2013

MEMBERSHIP

Page 16: Aiesec kolkata igcdp 2013

Membership as on 31 Dec 2013

Team Leaders 4

Members 29

Quarter Retention Rate

Q1 65%

Q2 78%

Q3 72%

Q4 87%

Page 17: Aiesec kolkata igcdp 2013

Name of EPs on TMp/TLP on X Link to .net profile

Jorge http://www.myaiesec.net/viewmyaiesec.do?friendid=41766702&operation=viewMyAiesec

Kimlee Ngo http://www.myaiesec.net/viewmyaiesec.do?friendid=1000410686&operation=viewMyAiesec

Juana Otálvaro http://www.myaiesec.net/viewmyaiesec.do?friendid=1000402552&operation=viewMyAiesec

Elaine Marçal http://www.myaiesec.net/viewmyaiesec.do?friendid=1000212562&operation=viewMyAiesec

Liu Ling http://www.myaiesec.net/viewmyaiesec.do?friendid=1000417959&operation=viewMyAiesec

Wenham Yang

http://www.myaiesec.net/viewmyaiesec.do?friendid=1000426432&operation=viewMyAiesec

Ziyao Yang

http://www.myaiesec.net/viewmyaiesec.do?friendid=1000416941&operation=viewMyAiesec

Huang Yung

http://www.myaiesec.net/viewmyaiesec.do?friendid=1000255757&operation=viewMyAiesec

Hsinte Lin

http://www.myaiesec.net/viewmyaiesec.do?friendid=1000443092&operation=viewMyAiesec

Anna Abramova http://www.myaiesec.net/viewmyaiesec.do?friendid=1000507512&operation=viewMyAiesec

Bella http://www.myaiesec.net/viewmyaiesec.do?friendid=1000503994&operation=viewMyAiesec

Page 18: Aiesec kolkata igcdp 2013

Ruixue ZHANG http://www.myaiesec.net/viewmyaiesec.do?friendid=1000485523&operation=viewMyAiesecWafaa Mohyeldin http://www.myaiesec.net/viewmyaiesec.do?friendid=1000502007&operation=viewMyAiesecOmar Bassiouni http://www.myaiesec.net/viewmyaiesec.do?friendid=1000500433&operation=viewMyAiesecAhmed Fahmy Mohamed Aly http://www.myaiesec.net/viewmyaiesec.do?friendid=1000500495&operation=viewMyAiesecGrace Zhang http://www.myaiesec.net/viewmyaiesec.do?friendid=1000418740&operation=viewMyAiesecElaine Marçal http://www.myaiesec.net/viewmyaiesec.do?friendid=1000212562&operation=viewMyAiesecBoitshepo Motsamai http://www.myaiesec.net/viewmyaiesec.do?friendid=1000492200&operation=viewMyAiesecMelissa Xiao http://www.myaiesec.net/viewmyaiesec.do?friendid=1000485590&operation=viewMyAiesecWendy Mou http://www.myaiesec.net/viewmyaiesec.do?friendid=1000485488&operation=viewMyAiesec

Page 19: Aiesec kolkata igcdp 2013

Associate MembershipEnD in AIESEC Kolkata is looked after by Director with a Manager who had approx. 10 to 12 AMs under them throughout the year for the IGCDP Department. From pick ups to chills to intern servicing, most of the quality aspect of delivery was looked after by Associate Membership of the Department. This has been one of the best innovations in the filed of Engagement and Delivery to the trainees of the LC. Details of the same has been given below:

Name Phone No

megha bhawsinghka 9433049211

Sunny Sharma 8961070013

Yash Sikaria 9874433966

abdur rahman 9163028837

Satyaki Deb 8902686385

Navpreet Singh 9163322110

syed irtiza hasan 8981364342

Rishika Didwani 9088221591

Gaurav Agarwal 9681155810

Page 20: Aiesec kolkata igcdp 2013

Dhiraj Alampuria 9832577748

Yash Bhalotia 8013282824

Abhishek Roy 8961017049

Prachi Saraf 8017305948

Sourodeep Sarkar 9748217100

Saptrishi Sengupta 9433700484

Amit Kumar Das 8017042493

ankit gupta 9830940550

Savita sharma 8697100903

shaeq ahmed 9874629271

Siddharth varma 9007405341

Chiraag Kumar 8017420735

rohit agarwalla 9832255211

jayati agarwal 9836042584

agadh kalra 9007505880

dhiraj jindal 9836047547

sanjana bengani 9681627304

keenjal maiti 9874447393

anil nag 9831285741

palak ruia 9831905824

Page 21: Aiesec kolkata igcdp 2013

Leadership Opportunity

No of members who took the opportunites

Team Leader 25

Organizing Committees 14

Executive Body 6

IXP 1

Page 22: Aiesec kolkata igcdp 2013

MAJOR LC BASED INNOVATIONS

Page 23: Aiesec kolkata igcdp 2013

• There ahs been 5 dept RnRs, 2 for MB and 3 for GB• There has been 2 task forces, one for EnD and one

for CSR• There ahs been 29 TMP/TLP on X from the dept

trainees. • Regular chills have been taken place with the

trainees • Different trainee activities were carried out • 2 campaigns for promotion of TNs were released. • CEEDs were used for IR building • Job role specific members were recruited• Trainee House was revamped which saved a lot of

expenses.

Page 24: Aiesec kolkata igcdp 2013

PROJECTS UPDATES – PLEASE VISIT- HTTP://WWW.MYAIESEC.NET/CONTENT/VIEWFILE.DO?CONTENTID=10289222

Page 25: Aiesec kolkata igcdp 2013

SUMMARY

Page 26: Aiesec kolkata igcdp 2013

Achievements: • Good EnD system • Base set for the process optimization• Followed the Project Delviry Module • Financially Stable • Improved NPS• Able to achive better member culture. • Good pipeline in terms of leadership and nos.

Non- Achievements: • Negative growth from last year • Non achievement of Targets • Poor leadership in the first quarter • Poor performance in the second quarter. • Decreased NPS in last quarter.

Page 27: Aiesec kolkata igcdp 2013

•Capitalise on the January realisations for improving IR •LC Run projects for driving off-peak•Diversify issue pool •Capitalise on IR Partnerships (both National and Local). •Raising cycle should be covered in the first quarter. •Innovations in the matching process through showcasing impact•Member engagement plan for throughout the year •Delivery and Engagement module to be implemented throughout the year

Suggestions for improvement Next Year