yokogawa electric corporation 2-9-32 nakacho, musashino-shi tokyo, 180-8750 japan yokogawa electric...
TRANSCRIPT
Yokogawa Electric Corporation
2-9-32 Nakacho, Musashino-shiTokyo, 180-8750JAPAN
<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
DCS with long life
Yokogawa’s Migration Path
April 20, 2023
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Important issues for long life DCS.
Using DCS for a long time, the following items become more and more important.– System Deterioration Due to Aging.– Out-of-date Functions.– Increasing System Maintenance Cost.
You cannot avoid to renew your DCS to make your total cost lower.
HOWEVER ......
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
In case of “Scrap & Build”,
Advantages:– The latest technologies can be used.– System life becomes longer.
Disadvantages:– Full installation cost is necessary at once.– You need to consider your application assets.– How to use is changed suddenly, so particularly
operators may feel uncomfortable, at first.
Yokogawa’s MIGRATION solution is to minimize disadvantages without missing advantages.
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Key points of Yokogawa's Migration
Step by step– Only the portion with shorter life parts can be renewed
with remaining other portion.– Divide renewing cost.
Reuse the existing assets.– Field cable wiring.– Field devices.– Application database.
Shorten stopping time for migration work.– Longer stopping time directly leads to larger loss of your
business chance.
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Yokogawa’s Migration Path.
CENTUM CS
Micro-XL
CENTUM V
CENTUM-XL
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Yokogawa’s Migration Path.
CENTUM V, CENTUM-XL– Migrate to the latest CS3000 R3 system with 3
steps.• Step 1 : HMI migration• Step 2 : Controller migration• Step 3 : I/O portion migration
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Solution with Migration step 1
Ethernet
Vnet
HISCOPSV, EOPS are no longer necessary.
It is not necessary to modify FCS and I/O.
HISs works instead of COPSV, EOPS
• All tag data of the existing FCSs can be operated from HIS. (Read/Write is OK.)
• Operators need not recognize whether the tag is the existing FCSs’ or CS3000 FCSs’.
• Operation keyboard and touch panel are available.
OPC server
All process data is handled as CS3000 data. • Operation improvement with AOA function. • Seamless connection with PIMS.• Audit trail • Remote operation
Bus converter
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
How to connect.
Ethernet
VnetHIS
FCSs do not be affected at all.
As HF bus is redundant, the communication does not stop when connecting Vnet -- HF bus.
Tags are registered in CS3000 builder.
Builder
Download tag information to each HIS.
Process operation is not stopped when connecting HISs.
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
What are benefit at Step 1 ?
Step 1: HMI Migration– Dramatically reduced the anxiety of parts supplement.
• HMI includes the shorter life parts, such as CRT, HDD.• As CS3000 HMI is based on generic PC, it is easy to supply
these parts. – You can utilize the latest Windows technologies.
• Because CS3000 R3 works on MS-Windows2000 and will be able to work on WindowsXP.
– Seamless connectivity with various kinds of the latest business domain systems.
• HIS (R3 HMI) has OPC interface.• Most of MES, PIMS, and CMMS have OPC interface.
– Operation improvement with AOA software in HIS.• AOA (Advanced Operation Assistance) can improve your
manual operation.
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Solution with Migration step 2
Ethernet
Vnet
HIS
It is not need to modify I/O nests, signal conditioners, and field wiring at all.
CS3000 FCU has the interface for the I/O bus of CENTUM-XL and V.
• You can connect the existing I/O nests to CS3000 FCU.
• Field wiring cables need not changed at all.• CS3000 control logics can be connected to XL, V I/O.
OPC server
FCU is used instead of SCN. • Control logics (Loop, sequence)works as CS3000 control function.
• Much more availablity with Pair&Spare technology.
• Connected on Vnet.
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Solution with migration Step2
Existing CENTUM-XL
(Front) (Rear)
(Field)
Internal bus
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Solution with migration Step2
(Field)
(Front) (Rear)CS3000
XL SCN
Internal bus
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Solution with migration Step2
Same Interface connector
SI31 SI301
(Field)
(Front) (Rear)CS3000
Internal bus
XL SCN
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Solution with migration Step2
(Field)
(Front) (Rear)CS3000
Internal bus
ESB bus
CS3000 FIO subsystem
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
How to connect.
Ethernet
VnetHIS
You can change FCUs one by one without affecting other FCSs at all.
Builder
Download control logics to each FCS.
Process operation by other FCUs is not stopped when replacing an FCU.
Control loops, Sequence, etc.
Control logics
Converted as CS3000 application.
Control Logics
Save
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
What are benefit at Step 2 ?
Step 2: Controller Migration– Much Larger application capacity.– Much quicker processing.
• Short turn around to improve control ability.• More control logics can be used.
– The batch system complied with ISA S88.– Much more reliability.
• Pair & Spare mechanism to detect not only the hardware abnormalities, but also software abnormalities, such as the error by transient noise.
– Much more number of I/O point.• FIO subsystems can be additionally connected.
– Much more visualized control logics.• Not only decision tables, but logic chart, SFC, are available.• The work status of these logics can be displayed on HIS.
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Solution with Migration step 3
Ethernet
Vnet
HIS
OPC server
Renew I/O portion to R3 FIO subsystem.
•Front connector of FIO modules is same as existing I/O cards.•Field wiring can be remain.
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Hardware continuity
(Front) (Rear)
Same connector is available.
Field wiring is NO CHANGE
Field wiring
•Compatible modules with the existing.
•Same size as the existing.
Controller hardware can be renewed to R3 without changing field wiring.
In case of CENTUM V, CENTUM-XL
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
What are benefit at Step 3 ?
Step 3: I/O portion Migration– Much more reliability.
• All modules can be redundant.– Much more number of I/O point.– You can extend the functionality with new technologies.
• FOUNDATION Fieldbus solution.• Remote I/O installation.• Connectivity with various types of 3’rd party subsystems.
Even at Step 3, you need not rewire the field cables.– Yokogawa will continue supplying the signal conditioners.
Migration story completes !
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Yokogawa’s Migration Path.
CENTUM CS– Migrate to the latest CS3000 R3 system with 2
steps.• Step 1 : HMI migration• Step 2 : Controller migration
– Integrate with the latest CS3000 R3 system
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Solution with Migration step 1
Ethernet
Vnet
HISICSs are no longer necessary.
It is not necessary to modify FCS and I/O.
HISs works instead of ICS
• All tag data of the existing FCSs can be operated from HIS. (Read/Write is OK.)
• Operators need not recognize whether the tag is the existing FCSs’ or CS3000 FCSs’.
• Operation keyboard and touch panel are available.
OPC server
All process data is handled as CS3000 data. • Operation improvement with AOA function. • Seamless connection with PIMS.• Audit trail • Remote operation
CS FCS
EWS
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
How to connect.
Ethernet
Vnet
HIS
OPC server
CS FCS
EWS
Builder
FCSs are not affected at all. Process operation is not stopped when connecting HISs.
As Vnet is redundant, the communication does not stop when connecting replacing ICS to HIS.
•The ICS graphics can be imported into CS3000 HIS
•Tags are equalized in CS3000 builder.
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
What are benefit at Step 1 ?
Step 1: HMI Migration– Dramatically reduced the anxiety of parts supplement.
• HMI includes the shorter life parts, such as CRT, HDD.• As CS3000 HMI is based on generic PC, it is easy to supply
these parts. – You can utilize the latest Windows technologies.
• Because CS3000 R3 works on MS-Windows2000 and will be able to work on WindowsXP.
– Seamless connectivity with various kinds of the latest business domain systems.
• HIS (R3 HMI) has OPC interface without any gateways.• Most of MES, PIMS, and CMMS have OPC interface.
– Operation improvement with AOA software in HIS.• AOA (Advanced Operation Assistance) can improve your
manual operation.
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Solution with Migration step 2
Ethernet
Vnet
HIS
As RIO can be used also in CS3000, it is not necessary to modify I/O portion, and field wiring at all.
CS3000 FCU has the interface for RIO.
• You can connect the existing I/O nests to CS3000 FCU.
• Field wiring cables need not changed at all.
OPC server
FCU is migrated to the latest one.• Control logics (Loop, sequence)works as CS3000 control function.
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
How to connect.
Ethernet
VnetHIS
You can change FCUs one by one without affecting other FCSs at all.
Builder
Download control logics to each FCS.
Process operation by other FCUs is not stopped when replacing an FCU.
Control loops, Sequence, etc.
Control logics
Converted as CS3000 application.
Control Logics
Save
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
What are benefit at Step 2 ?
Step 2: Controller Migration– Much Larger application capacity.– Much quicker processing.
• Short turn around to improve control ability.– Much more number of I/O point.– You can extend the functionality with new technologies.
• FOUNDATION Fieldbus solution.
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Yokogawa’s Migration Path.
MicroXL– Migrate to the latest CS3000 system with 2 steps.
• Step 1 : HMI migration• Step 2 : Controller migration
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Solution with Migration step 1
Ethernet
Vnet
HISMOPSs are no longer necessary.
It is not necessary to modify FCS and I/O.
HISs works instead of MOPS
• All tag data of the existing FCSs can be operated from HIS. (Read/Write is OK.)
• Operators need not recognize whether the tag is MicroXL’s or CS3000 FCSs’.
• Operation keyboard and touch panel are available.
OPC server
All process data is handled as CS3000 data. • Operation improvement with AOA function. • Seamless connection with PIMS.• Audit trail • Remote operation
Bus converter
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
How to connect.
Ethernet
VnetHIS
FCSs are not affected at all.
If RL bus is redundant, the communication does not stop when connecting Vnet -- RL bus.
Tags are registered in CS3000 builder.
Builder
Download tag information to each HIS.
Process operation is not stopped when connecting HISs.
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
What are benefit at Step 1 ?
Step 1: HMI Migration– Dramatically reduced the anxiety of parts supplement.
• HMI includes the shorter life parts, such as CRT, HDD.• As CS3000 HMI is based on generic PC, it is easy to supply
these parts. – You can utilize the latest Windows technologies.
• Because CS3000 R3 works on MS-Windows2000 and will be able to work on WindowsXP.
– Seamless connectivity with various kinds of the latest business domain systems.
• HIS (R3 HMI) has OPC interface.• Most of MES, PIMS, and CMMS have OPC interface.
– Operation improvement with AOA software in HIS.• AOA (Advanced Operation Assistance) can improve your
manual operation.
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Solution with Migration step 2
Ethernet
Vnet
HIS
It is not need to modify most of signal conditioners, and field wiring at all.
OPC server
Migrate MicroXL FCS to FFCS• Control logics (Loop, sequence)works as CS3000 control function.
• Connected on Vnet. • Field wiring cables can be remain.
FFCS
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
How to connect.
Ethernet
VnetHIS
You can change FCUs one by one without affecting other FCSs at all.
Builder
Download control logics to each FCS.
Process operation by other FCUs is not stopped when replacing an FCU.
Control loops, Sequence, etc.
Control logics
Converted as CS3000 application.
Control Logics
Save
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Hardware continuity
(Front) (Rear)
Same connector is available.
Field wiring is NO CHANGE
Field wiringController hardware can be renewed to R3 without changing field wiring.
•Compatible modules with the existing.
•Same size as the existing.
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
What are benefit at Step 2 ?
Step 2: Controller Migration– Much Larger application capacity.– Much quicker processing.
• Short turn around to improve control ability.• More control logics can be used.
– The batch system complied with ISA S88.– You can extend the functionality with new technologies.
• FOUNDATION Fieldbus solution.– Much more visualized control logics.
• Not only decision tables, but logic chart, SFC, are available.• The work status of these logics can be displayed on HIS.
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Operation Continuity
CS3000 can provide quite similar operation environment to the existing operation.– Same kinds of screens, such as overview, trend, tuning, and
graphic, are available.– Console, touch-screen are available.– Operation keyboard is available.– Operator needs not recognize that each tag belongs
to CS3000 or to the existing systems.
Operators can smoothly start their work HIS instead of the existing HMI.
Proprietary info goes here…<ISD-MASP-S03048> Yokogawa Electric CorporationCopyright © by Yokogawa Electric Corporation<April 20, 2023>
Conclusion
By Yokogawa’s Migration solution, your DCS will become a dramatically longer life system with much more capability.You can reduce your TCO (Total Cost Ownership).