TARGETSSETFORTHEWEEK:
1.Implementingacachingstrategyfortheinitialscreenshowntotheuser.
2.UsingGoogle'sPlacesAPItoshowrelevantinformationtotheuser.
3.Designingthenavigationdrawerusingmaterialdesignguidelines.
ACHIEVEMENTSFORTHEWEEK:
1.CachingdirectorywasusedtosaveresponsesofHttprequests(toleratingstaleresponsestill4weeks)
2.ResponseofPlacesAPIwasusedtopopulateamapviewshowingnearbyutilitieslikeATM,Hospitalsetc.
3.Navigationdrawerwasimplementedthatchangesdesignaccordingtocurrentstateoftheuser(Logged
In/Out).
FUTUREWORKPLANS:
1.Improvingtheoverallresponsivenessoftheapplication
2.Fixingbugsthatarefoundduringtheinternaltestingoftheapplicationbeforeinitiallaunch
3.ImprovingthecurrentJSONparsingstrategy