update on phase 2muon upgrade tp

8
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal” Recent developments: ME0 inserted into HGCAL as for other endcap calorimeters EE and basic HE driving the calor. design, not tail catcher >9.5l Excellent simulation progress See Cesare Calabria talk at today’s muon POG https://indico.cern.ch/event/305369 / , “now we have a 2023 scenario that works with all the muon upgrades!” TP contacts group has started assembling text for a 30- page draft This week: LHCC upgrade presentation concentrating on R&D activities Three slides sent as input for Didier, see backup Upgrades Week at Karlsruhe Mar. 31-Apr. 4 Have you registered? Update on Phase 2muon upgrade TP 1

Upload: quanda

Post on 09-Feb-2016

31 views

Category:

Documents


0 download

DESCRIPTION

Update on Phase 2muon upgrade TP. Recent developments: ME0 inserted into HGCAL as for other endcap calorimeters EE and basic HE driving the calor . design, not tail catcher >9.5 l Excellent simulation progress - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Update on Phase 2muon upgrade TP

G

ener

al M

uon

Mee

ting,

03-

Mar

ch-2

014

Jay

Hau

ser

“Upd

ate

on P

hase

2 m

uon

Tech

nica

l Pro

posa

l”

Recent developments: ME0 inserted into HGCAL as for other endcap calorimeters

EE and basic HE driving the calor. design, not tail catcher >9.5l Excellent simulation progress

See Cesare Calabria talk at today’s muon POG https://indico.cern.ch/event/305369/, “now we have a 2023 scenario that works with all the muon upgrades!”

TP contacts group has started assembling text for a 30-page draft

This week: LHCC upgrade presentation concentrating on R&D activities Three slides sent as input for Didier, see backup

Upgrades Week at Karlsruhe Mar. 31-Apr. 4 Have you registered? First draft of the TP to be prepared

Update on Phase 2muon upgrade TP

1

Page 2: Update on Phase 2muon upgrade TP

G

ener

al M

uon

Mee

ting,

03-

Mar

ch-2

014

Jay

Hau

ser

“Upd

ate

on P

hase

2 m

uon

Tech

nica

l Pro

posa

l”

From Cesare’s draft muon POG talk

2

Page 3: Update on Phase 2muon upgrade TP

G

ener

al M

uon

Mee

ting,

03-

Mar

ch-2

014

Jay

Hau

ser

“Upd

ate

on P

hase

2 m

uon

Tech

nica

l Pro

posa

l”

March 3-7 Have fragments of sections 1, 2, 3 Missing sections 4, 5, 6, 7, 8, 9 Very few figures

March 10-14 expect parts of all sections, draft figures Urgent!

March 17-21 TP contacts work on improving readability

March 24-28 Fabrizio-organized internal review 24th Release draft to muon IB (reading group?) 28th Have a muon IB reading

NB presentation to USG on longevity R&D plans, Mar. 17?

Proposed timeline for muon upgrade TP

3

Page 4: Update on Phase 2muon upgrade TP

G

ener

al M

uon

Mee

ting,

03-

Mar

ch-2

014

Jay

Hau

ser

“Upd

ate

on P

hase

2 m

uon

Tech

nica

l Pro

posa

l”

DT: is MTT part of the baseline plan? Currently not. Needs specific motivation from

simulation, and/or approximate cost estimate as “option”.

RPC: Is multi-gap for fine time resolution the baseline

(sim. results)? Or else, approximate additional cost estimate for R&D and production. (Back-end and front-end electronics)

CSC: Need backup plan in case trigger group decides 10

ms not enough latency GEM:

ME0 need to decide on baseline segmentation, “stack”

What else?

Decisions to be made by Upgrades Week

4

Page 5: Update on Phase 2muon upgrade TP

G

ener

al M

uon

Mee

ting,

03-

Mar

ch-2

014

Jay

Hau

ser

“Upd

ate

on P

hase

2 m

uon

Tech

nica

l Pro

posa

l”

Backup: three-slide summary for LHCC

5

Page 6: Update on Phase 2muon upgrade TP

G

ener

al M

uon

Mee

ting,

03-

Mar

ch-2

014

Jay

Hau

ser

“Upd

ate

on P

hase

2 m

uon

Tech

nica

l Pro

posa

l”

DT minicrate Common plans: typically late-2014 to

2017 Detector and electronics radiation tests at

GIF++ (all three subdetectors plan tests with source and beam)

Neutron and/or proton beams for electronics single event upsets

DT specific plans: Replacement of the minicrates and upstream

electronics, design 2015-20 CSC specific plans:

CFEB rate capabilities at various latencies – verify expectations with data

RPC specific plans: R&D on freon-less gas mixtures (LHC- and

CERN-wide project) includes tests at GIF++

Longevity R&D for existing muon detectors

RPC chambers for GIF test

6

Page 7: Update on Phase 2muon upgrade TP

G

ener

al M

uon

Mee

ting,

03-

Mar

ch-2

014

Jay

Hau

ser

“Upd

ate

on P

hase

2 m

uon

Tech

nica

l Pro

posa

l”

GEM detectors (proposed for GE1/1, GE2/1, and ME0 Chambers: well-advanced in context of GE1/1

5th generation prototypes, assembly techniques optimized

GE2/1 very similar to GE1/1 but 2x larger, ME0 similar but more layers to cope with high-h rates; further industrialization, QC, and other studies ongoing

Front-end electronics: VFAT3 needed for CMS and under design

Back-end, DAQ, and trigger electronics R&D: under development for 40o GE1/1 slice test installed in YETS 2016

Improved RPC detectors Glass: 6 chambers to be tested at GIF++

High rate capability and time resolution to be studied Bakelite:

Lower resistivity, new FE electronics for lower HV, gain being developed (CMS-ATLAS-ALICE) during 2014-16

Muon Fast Track Tag (MTT) for barrel Fast scintillator tiles read out with SiPMs and

combined with DT/RPC in L1 trigger Study ghost suppression, efficiency and timing in

HO 2014-16, develop prototypes 2014-20

New muon detector R&DGE1/1 slice testYETS 2016

VFAT3

New RPC electronics

7

Page 8: Update on Phase 2muon upgrade TP

G

ener

al M

uon

Mee

ting,

03-

Mar

ch-2

014

Jay

Hau

ser

“Upd

ate

on P

hase

2 m

uon

Tech

nica

l Pro

posa

l”

Geometry of new detectors mostly complete: Have all new detectors implemented ME0 geometry will need refinement

Reconstruction implementation: Rechits in all new detectors Local reconstruction in all detectors Global reconstruction in GE1/1 and GE2/1 Additional capabilities under development

Effect on trigger and muon ID: Studies well advanced for GE1/1 (e.g. lower

right plot) Preliminary studies for other stations, e.g. ME0

motivation for high-h muon tagging Background rate estimation:

Existing detectors: comparisons of measured versus originally foreseen rates: For 1/1, 2/1, 3/1, and 4/1 will allow straightforward

estimation (only variable is sensitivity of detectors) Ongoing studies: various complicating effects such

as neutron leaks (CSC station 2), TOTEM, CASTOR For ME0, optimization of shielding etc. needed

Depends on calorimeter detailed configuration

Muon Simulation R&D

ECFA 2013

GE1/1

GE2/1

ME0

GEM-CSC trigger combination

8