site configuration manual-tp second phase

31

Upload: kashif-khattak

Post on 02-Feb-2016

241 views

Category:

Documents


0 download

DESCRIPTION

Kashif Khattak

TRANSCRIPT

Page 1: Site Configuration Manual-tp Second Phase
Page 2: Site Configuration Manual-tp Second Phase

USMS

Step 3: choose internet protocol (TCP/IP), double click it.

Step 4: set local laptop IP Address, and click “OK” IP Address: 10.72.88.100, subnet mask:255.255.0.0

2 第 2/2 页

Page 3: Site Configuration Manual-tp Second Phase

USMS

Step 5: click “ok”

Step 6: click “support”

3 第 3/3 页

Page 4: Site Configuration Manual-tp Second Phase

USMS

Step 7: check IP setting is successful or not, then click “close”

Part 2: Install EISU config software

Step 1: Find the file “ZXM10-EISUConfig software” in your laptop, Double click it.

4 第 4/4 页

Page 5: Site Configuration Manual-tp Second Phase

USMS

Step 2: Click “Next”

Step 3: click “Next”

5 第 5/5 页

Page 6: Site Configuration Manual-tp Second Phase

USMS

Step 4: Click “Install”

Step 5: Click “Finish”

6 第 6/6 页

Page 7: Site Configuration Manual-tp Second Phase

USMS

Part 3 : Download "v2para.tar.gz"

Step 1: Connect LAN cable between EISU MIP port and laptop LAN port.

Step 2: Open Eisuconfig software

Step 3: Click “scan server IP”

7 第 7/7 页

Page 8: Site Configuration Manual-tp Second Phase

USMS

Step 4: Wait a few seconds, Then IP will be obtained and show it in right interface

Step 5: Input password(11111111),and then click “login”

8 第 8/8 页

Page 9: Site Configuration Manual-tp Second Phase

Step 6: Please check the “”Channal Param config”menu . If the "1" position data, please skip "Part 3: Download" v2para.tar.gz " If the "1" position no data, perform "Step 7".

Step 7: Select”Device Mangement”.

Step8: Select”Device Mangement”.

Page 10: Site Configuration Manual-tp Second Phase

“2” position,please select "Download configuration”

. Download "v2para.tar.gz",Select FTP, FTP window will pop up. Please do not close.

Step8: Restart EISU.

Page 11: Site Configuration Manual-tp Second Phase

Part4 : Download "ATS Upgrade package"

Step 1: Login EISUconfig.

Step 2: Select”Device Mangement”.

Page 12: Site Configuration Manual-tp Second Phase

“2” position,please select "Updata package” . Please select the appropriate ATS.

Step 3: Click to “download”.

Step4: Restart EISU.

Step5: Check the ATS download situation, Select”VAS Configure”. If the "1" position data, the download was successful

Page 13: Site Configuration Manual-tp Second Phase

Part 5 : Check the fluid level,AC meter and DC meter. Check the fluid levelStep 1: Login EISUconfig.

Step 2: Select”Serial Port Management”, Select "COM1" Click “Read Serial Port Para”.

Page 14: Site Configuration Manual-tp Second Phase

1. "1" position Select "COM1"2. Click “Read Serial Port Para”.

Step 3: Check protocol.( The default protocol has been downloaded) If there is an protocol to skip "Step 4" If you did not. Click "Select DLL File", download protocol.

Step 4: Click "Select DLL File", download protocol. Click”Set Smart Port”

Step 5: Click “Read Serial Port Para”,”2” position Data needs and picture consistent, if not modify.( Configuration is

Page 15: Site Configuration Manual-tp Second Phase

complete, you need to restart EISU.)

Step 6: Click “Read”,Data is “1”. If it is not "1", click "Set" to modify.

Step 6: Click”Smart Channel Data”Click “Read Data”.

Page 16: Site Configuration Manual-tp Second Phase

If the "3" position display " DI-3000=1": Description sensor failure, check the wiring,Check” Step 5”.

If a large number of data, device is working properly.

Check AC meter

Page 17: Site Configuration Manual-tp Second Phase

Step 1: Login EISUconfig.

Step 2: Select”Serial Port Management”, Select "COM3" Click “Read Serial Port Para”.

Check protocol.( The default protocol has been downloaded) If not, please download protocol.( Reference fluid level Download protocol.)

Step 3: Click “Read Serial Port Para”,”2” position Data needs and picture consistent, if not modify.( Configuration is complete, you need to restart EISU.)

Page 18: Site Configuration Manual-tp Second Phase

Step 4: Click “Read”,Data is “1”. If it is not "1", click "Set" to modify.

Step 5: Click”Smart Channel Data”Click “Read Data”.

Page 19: Site Configuration Manual-tp Second Phase

If the "3" position display " DI-3000=1": Description sensor failure, check the wiring,Check” Step 3”.

If a large number of data, device is working properly.

Check DC meter Step 1: Login EISUconfig. Step 2: Select”Serial Port Management”, Select "Access Control"

Click “Read Serial Port Para”.

Page 20: Site Configuration Manual-tp Second Phase

Check protocol.( The default protocol has been downloaded) If not, please download protocol.( Reference fluid level Download protocol.)

Step 3: Click “Read Serial Port Para”,”2” position Data needs and picture consistent, if not modify.( Configuration is complete, you need to restart EISU.)

Page 21: Site Configuration Manual-tp Second Phase

Step 4: Click “Read”, Please set DC meter last 4 bit number.

Step 5: Click”Smart Channel Data”Click “Read Data”.

If the "3" position display "DI-3000=1": Description sensor failure, check the wiring,Check” Step 3”.

If a large number of data, device is working properly.

Part 6: Set VAS and FuelStep 1: Login EISUconfig.

Step 2: Select”Serial Port Management”Menu.

Page 22: Site Configuration Manual-tp Second Phase

Step 3: Select”gassline_monitor”Menu. Click”Param Config”.

Step4: Tank configuration parameters. Need to configure four positions. Reference Picture Settings.

Page 23: Site Configuration Manual-tp Second Phase

1. Position 1 Set the tank parameters

2. Position2 Set “No use”

3. Position3 Reference Picture Settings.

4. Position4 Set” Fuel Sensor Para”.

Page 24: Site Configuration Manual-tp Second Phase

Select “DeviceName”

Select”Channal 1”

5. Position5 Set” Oil Engine para”. Reference Picture Settings.

Step5:Set Fuel stealing para.

Step 6: In the lower right corner,First click "Save", the second click "Download".Step7: Restart EISU.

Step8: Reboot is complete, you need to wait 5 minutes.Step9: Check the channel.( Channel correctly, do not perform” Step9”—“ Step13”)

Page 25: Site Configuration Manual-tp Second Phase

Step10: If the channel is incorrect, please reconfigure the VAS.

Step11: Delete "gassline_monitor".

Page 26: Site Configuration Manual-tp Second Phase

Step12:Add “gassline_monitor”.

Step13: Repeat “Step 3”--- “Step 8”.

Part 7: Set EISU IDStep 1: Login EISUconfig.Step 2: Select”Network Setting”, Reading Network Information.

Page 27: Site Configuration Manual-tp Second Phase

Step 3: Set EISU ID.

Step5: Restart EISU.

Page 28: Site Configuration Manual-tp Second Phase

Part 8: RMS server information and SIM card

Step 1: Login EISUconfig.Step 2: Select”Wirless Management”, set picture parameter.

Server IP:10.218.207.7 Server port:9999(10 model site configure 9999, Other sites

configured to 9998) APN:zterms

Step 3: Test SIM card. Display "OK" normal network.

Page 29: Site Configuration Manual-tp Second Phase

Complete all configuration,Please contact "SyedTufailMazhar", he will configure the site in NMS