USMS
Site Installation manual1、RMS cabinet installation、1): This is the RMS cabinet2): Following is the base of the cabinet1第 1/1 页
USMS3): the cabinet should be installed on the wall2第 2/2 页
USMS2、Fuel sensor installation、1) find the fuel sensor as the following picture.2) Drill a hole on the top of the fuel tank. And insert the fuel sensor to the fuel tank.The fuel sensor must can be touch the buttom of the tank.3第 3/3 页
USMS3) find the RMS cable “fuel L”
4) Connect “Fuel L” cable to the fuel sensor as the following picture.
Fuel senor cable
RMS-Fuel L4
第 4/4 页Fuel senor cable RMS-Fuel L
Red(+12VDC) Red
Black(PS Common) Gray
Orange(Data+) Green(A)
Blue(Data-) Brown(B)
Bare Shielded wire
USMS3、Battery cabinet sensor installation and cable connection、1) Find the RMS cable “1# BAT-I” and “2# BAT-I”.2)Find CT And confirm And confirm CT input =”DC 0A~±100A” Different current sensors connect different devices5第 5/5 页
USMS3) Connect cable “1# BAT-I” to the current CT. Twist the cable as the following table.CTRMS-Battery I1234redNot connectiongreengrey4) CT should be measured of total battery current. Take care of the CT direction.6第 6/6 页
USMS5) Find the RMS cable “1# BAT-U” and the “2# BAT-U”. These should be measured oftotal battery voltage. If only has one battery group, we use cable “1# BAT-U” tomeasure total battery voltage. If two battery groups in the battery cabinet, we usecable “1# BAT-U” and the “2# BAT-U” to measure total battery voltage separately.6) Find the RMS cable “Temp”.7第 7/7 页
USMS7) Find the RMS “Temperature transducer” As the following picture.
8) Open the Temperature transducer. then connect the cable “Temp” to theTemperature transducer. As the following picture.
Temperature sensor RMS-Tem
T(Data+) Green
GND Grey
12V(VCC) Red
第 8/8 页
USMS4、ATS cabinet sensor installation and cable connection、1) Fine the following cables connect to the ATS cabinet.“AC-CTR”“DG UA”“DG CTR”“DG MANU”“DC PWR”“DTSD3366M-2-W1”“RJ 45-10”“RJ 45-11”2) Fine the cable “DG UA” connect to the DG phase A voltage at the genset loadoutput.
9第 9/9 页
3) Fine the cable “DC PWR” connect to the DG battery voltage at the ATS.
4) Fine the cable “DTSD3366M-2-W1” connect to the phase three voltage at the ATSload output. Voltage need connected to public part.
USMS5) Fine the cable “RJ45-10 interface” .6) Connect three current CT to the commercial power output location, as thefollowing picture. Take care of the direction. Phase 3 current (Ia/Ib/Ic) must beconsistency with ATS phase 3 voltage(phase A/phase B/phase C).10第 10 / 10 页
USMS7) Fine the cable “RJ45-11 interface”8) Connect three current CT to the DG power output location, as the followingpicture. Take care of the direction. Phase 3 current (Ia/Ib/Ic) must be consistencywith ATS phase 3 voltage(phase A/phase B/phase C).11第 11 / 11 页
USMS8) How to connect the following cables, please according to the different type ATS,then check the file “*** control DG and Commerical Power Operation Manual”.12第 12 / 12 页
USMS4、rectifier cabinet sensor installation and cable connection、1) Fine the following cables connect to the ATS cabinet.“REC-Com”“DCM-U”“DCM-I”“PRI-DWN”“USMU-PWR”2) Fine the cables “DCM-I”.3) Find the CT, and confirm CT input =”DC 0A~100A” Different current sensors connect different devices
13第 13 / 13 页
USMS3) Connect cable “DCM-I” to the current CT. Twist the cable as the following table.CTRMS “DCM- I”1234redNot connectiongreengrey4) CT should be measured of total load current. Take care of the CT direction.14第 14 / 14 页
USMS5) Fine the cables “DCM-U”.6) Connect “DCM-U” to the 48 voltage at the panel “BLVD”7) Find the cable “REC Com”.15第 15 / 15 页
USMS8) Connect “REC Com” to the rectifier RS232 interface.9) Find the cable “PRI-DWN”.10) Connect cable “PRI-DWN” to the 48 voltage at the panel “LLVD1”16第 16 / 16 页
USMS11) Find the cable “USMU-PWR”.12) Connect cable “PRI-DWN” to the 48 voltage at the panel “BLVD”
5、Ground cable connection、RMS ground cable must be connected to the ground from RMS cabinet.
6、SIM card installation、1) Open the ZNV cover.17第 17 / 17 页
USMS2) Find the GPRS board3) Insert the SIM card.18第 18 / 18 页