site installation manual-tp second phase

18
USMS Site Installation manual 1RMS cabinet installation1): This is the RMS cabinet 2): Following is the base of the cabinet 1 第 1/1 第

Upload: kashif-khattak

Post on 02-Feb-2016

229 views

Category:

Documents


0 download

DESCRIPTION

Kashif khattak

TRANSCRIPT

Page 1: Site Installation Manual-TP Second Phase

USMS

Site Installation manual1、RMS cabinet installation、1): This is the RMS cabinet2): Following is the base of the cabinet1第 1/1 页

Page 2: Site Installation Manual-TP Second Phase

USMS3): the cabinet should be installed on the wall2第 2/2 页

Page 3: Site Installation Manual-TP Second Phase

USMS2、Fuel sensor installation、1) find the fuel sensor as the following picture.2) Drill a hole on the top of the fuel tank. And insert the fuel sensor to the fuel tank.The fuel sensor must can be touch the buttom of the tank.3第 3/3 页

Page 4: Site Installation Manual-TP Second Phase

USMS3) find the RMS cable “fuel L”

4) Connect “Fuel L” cable to the fuel sensor as the following picture.

Fuel senor cable

RMS-Fuel L4

第 4/4 页Fuel senor cable RMS-Fuel L

Red(+12VDC) Red

Black(PS Common) Gray

Orange(Data+) Green(A)

Blue(Data-) Brown(B)

Bare Shielded wire

Page 5: Site Installation Manual-TP Second Phase

USMS3、Battery cabinet sensor installation and cable connection、1) Find the RMS cable “1# BAT-I” and “2# BAT-I”.2)Find CT And confirm And confirm CT input =”DC 0A~±100A” Different current sensors connect different devices5第 5/5 页

Page 6: Site Installation Manual-TP Second Phase

USMS3) Connect cable “1# BAT-I” to the current CT. Twist the cable as the following table.CTRMS-Battery I1234redNot connectiongreengrey4) CT should be measured of total battery current. Take care of the CT direction.6第 6/6 页

Page 7: Site Installation Manual-TP Second Phase

USMS5) Find the RMS cable “1# BAT-U” and the “2# BAT-U”. These should be measured oftotal battery voltage. If only has one battery group, we use cable “1# BAT-U” tomeasure total battery voltage. If two battery groups in the battery cabinet, we usecable “1# BAT-U” and the “2# BAT-U” to measure total battery voltage separately.6) Find the RMS cable “Temp”.7第 7/7 页

Page 8: Site Installation Manual-TP Second Phase

USMS7) Find the RMS “Temperature transducer” As the following picture.

8) Open the Temperature transducer. then connect the cable “Temp” to theTemperature transducer. As the following picture.

Temperature sensor RMS-Tem

T(Data+) Green

GND Grey

12V(VCC) Red

第 8/8 页

Page 9: Site Installation Manual-TP Second Phase

USMS4、ATS cabinet sensor installation and cable connection、1) Fine the following cables connect to the ATS cabinet.“AC-CTR”“DG UA”“DG CTR”“DG MANU”“DC PWR”“DTSD3366M-2-W1”“RJ 45-10”“RJ 45-11”2) Fine the cable “DG UA” connect to the DG phase A voltage at the genset loadoutput.

9第 9/9 页

3) Fine the cable “DC PWR” connect to the DG battery voltage at the ATS.

4) Fine the cable “DTSD3366M-2-W1” connect to the phase three voltage at the ATSload output. Voltage need connected to public part.

Page 10: Site Installation Manual-TP Second Phase

USMS5) Fine the cable “RJ45-10 interface” .6) Connect three current CT to the commercial power output location, as thefollowing picture. Take care of the direction. Phase 3 current (Ia/Ib/Ic) must beconsistency with ATS phase 3 voltage(phase A/phase B/phase C).10第 10 / 10 页

Page 11: Site Installation Manual-TP Second Phase

USMS7) Fine the cable “RJ45-11 interface”8) Connect three current CT to the DG power output location, as the followingpicture. Take care of the direction. Phase 3 current (Ia/Ib/Ic) must be consistencywith ATS phase 3 voltage(phase A/phase B/phase C).11第 11 / 11 页

Page 12: Site Installation Manual-TP Second Phase

USMS8) How to connect the following cables, please according to the different type ATS,then check the file “*** control DG and Commerical Power Operation Manual”.12第 12 / 12 页

Page 13: Site Installation Manual-TP Second Phase

USMS4、rectifier cabinet sensor installation and cable connection、1) Fine the following cables connect to the ATS cabinet.“REC-Com”“DCM-U”“DCM-I”“PRI-DWN”“USMU-PWR”2) Fine the cables “DCM-I”.3) Find the CT, and confirm CT input =”DC 0A~100A” Different current sensors connect different devices

13第 13 / 13 页

Page 14: Site Installation Manual-TP Second Phase

USMS3) Connect cable “DCM-I” to the current CT. Twist the cable as the following table.CTRMS “DCM- I”1234redNot connectiongreengrey4) CT should be measured of total load current. Take care of the CT direction.14第 14 / 14 页

Page 15: Site Installation Manual-TP Second Phase

USMS5) Fine the cables “DCM-U”.6) Connect “DCM-U” to the 48 voltage at the panel “BLVD”7) Find the cable “REC Com”.15第 15 / 15 页

Page 16: Site Installation Manual-TP Second Phase

USMS8) Connect “REC Com” to the rectifier RS232 interface.9) Find the cable “PRI-DWN”.10) Connect cable “PRI-DWN” to the 48 voltage at the panel “LLVD1”16第 16 / 16 页

Page 17: Site Installation Manual-TP Second Phase

USMS11) Find the cable “USMU-PWR”.12) Connect cable “PRI-DWN” to the 48 voltage at the panel “BLVD”

5、Ground cable connection、RMS ground cable must be connected to the ground from RMS cabinet.

6、SIM card installation、1) Open the ZNV cover.17第 17 / 17 页

Page 18: Site Installation Manual-TP Second Phase