03 OUTLINE SPECIFICATION

05 EXTERNAL FINISHES

06 INTERNAL FINISHES

16 DOORS

17 SERVICES

18 UTILITIES

19 PROTECTIVE INSTALLATIONS

Contents

Page 3: Technical Specification June 2021

03

OutlineSpecification

EXISTING BUILDING The Ink Building is a refurbishment of a robust existing building, a number of moves have been made to enhance it, giving it a contemporary edge and offering maximum flexibility.

STRUCTURE The existing concrete frame is being retained throughout. The coffered concrete slabs are found in good condition and offer an opportunity to have significant visual interest when exposed within the office spaces.

All stairs and landings are precast concrete.

An area of slab is being removed on Level 1 to create a double height feature entrance lobby.

Page 4: Technical Specification June 2021

04

Page 5: Technical Specification June 2021

05

ExternalFinishes

The existing facing brick is painted chalky black using a mineral paint by Keim. This product reacts chemically with the substrate creating a permanent bond which maintains vapour permeability whilst also providing an effective barrier to moisture ingress. The product is also UV stable and as such the colour remains strong for decades. This, combined with the fact that the paint will not crack or flake, means it is a sustainable long-term choice, with minimal maintenance and repainting requirements. No solvents or plasticisers are used in this product, and it has very low VOC content.

The plinth wall and landscaping areas are masonry structures with a black ceramic granite tiled finish.

The existing curtain walling ‘bays’ are replaced with a modern aluminium frame, double glazed, unitised system by Shuco. The existing window system facing onto the courtyard is replaced with a modern, aluminium frame, double glazed system by Metal Technology. The curtain walling and windows achieve a minimum u-value of 1.6W/m2k, a significant improvement on the existing 1980s installation. All aluminium is PPC finished to a dark grey finish throughout.

Dark grey back painted glazed spandrels over floor zones.

The glazing to ground and first floor have been replaced with a modern aluminium frame, double glazed, unitised system offering full height glazing. All aluminium is PPC finished to a dark grey finish throughout.

Main entrance screen as part of curtain walling system with automatic bi-part sliding doors and glazed escape door offering direct access from the main stair.

The existing roofing was replaced in full to deliver a new robust finish with an improved thermal performance and has a 25-year warranty with the manufacturer. A BBA certified Euroroof Mono bitumen system with a new vapour control layer and 150mm insulation, by Alumasc, was installed. The installation is designed to achieve a u-value of 0.15W/m2K.

FLOOR TO CEILING HEIGHT Floor to ceiling (u/s of coffered concrete slab) – 2,885mm

Floor to floor – 3,435mm

Page 6: Technical Specification June 2021

06

InternalFinishes

Entrance Lobby

LOBBY ENTRANCE DOORS Glazed bi part sliding doors with access control entry system.

FLOORING High quality concrete effect porcelain tiles. Stainless steel trimmed entrance matting at external door.

WALLS Painted plasterboard.

CEILINGS Opening cut in first floor slab to create a double height entrance space, this will be lined in plasterboard and receive a paint finish. The u/s of level 2 slab will remain exposed.

LIGHTING Suspended feature lighting.

Page 7: Technical Specification June 2021

07

InternalFinishes

Main Reception

FLOORING High quality concrete effect porcelain tiles. Stainless steel trimmed entrance matting at external door.

WALLS Feature wall behind reception desk with signage and lighting. Painted plasterboard finish elsewhere.

CEILINGS Coffered concrete slab left exposed.

LIGHTING Suspended linear fittings for space lighting with feature lighting suspended over reception desk.

RECEPTION DESK High quality bespoke reception desk.

Page 8: Technical Specification June 2021

08

InternalFinishes

Lift Lobbies

FLOORING High quality concrete effect porcelain tiles. Stainless steel trimmed entrance matting at external door.

WALLS Painted plasterboard.

CEILING Painted plasterboard.

LIGHTING Recessed linear fittings.

RECEPTION DESK High quality bespoke reception desk.

STAIRS Existing linotol finish retained, fully cleaned and repaired where necessary. Grey inset carpet to flights from Ground floor to Level 1 only.

Page 9: Technical Specification June 2021

09

InternalFinishes

Toilets

2 Male and 2 Female WCs on each floor from Ground to Level 7.

WALLS Full height plasterboard partitions to cubicles. Full height ceramic tiling to external face of cubicle walls and side walls around vanity area. Painted plasterboard elsewhere.

Full height mirror to end wall and behind vanity area.

Black laminate finish IPS unit within bathroom cubicles.

FLOORING High quality concrete effect porcelain tiles.

CEILINGS Painted moisture resistant plasterboard.

LIGHTING Recessed spotlight fittings.

DOORS Black laminate finish with black painted wood frames.

VANITY AREA Solid surface vanity unit with surface mounted Ideal Standard basins fitted with WRAS approved Ideal Standard Sensorflow 21 compact mixer taps fitted with 3.7l/minute flow restrictors to minimise water usage.

WCs Ideal Standard Concept with Conceala 2 cistern 6/4 litre dual flush to reduce water use.

Page 10: Technical Specification June 2021

10

InternalFinishes

Toilets cont.

ACCESSIBLE WCs 1no accessible WC on Levels 1, 3, 5 & 6 and Basement.

Full Doc M fittings to accessible WCs. WCs fitted with Conceala water saving delay fill 4.5 litre sensorflow cistern. Basins fitted with WRAS approved sensor taps to minimise water use.

Page 11: Technical Specification June 2021

11

InternalFinishes

Office Areas

WALLS Painted plasterboard finish.

Surface mounted MDF skirtings with water-based vinyl matt emulsion paint finish.

FLOORS Fully accessible modular raised access floor with minimum 125mm void (depth as existing).

CEILINGS Existing coffered concrete slab is exposed.

Page 12: Technical Specification June 2021

12

InternalFinishes

Basement Lobby

FLOORING Robust decorative finish screed.

WALLS Feature wall with painted accent colour and signage. Painted plasterboard finish elsewhere.

CEILINGS White painted plasterboard finish.

LIGHTING Recessed spotlight fittings.

ENTRANCE DOOR A modern aluminium frame, double glazed screen with fully glazed door. All aluminium is PPC finished to a dark grey finish throughout. Door is access controlled.

Page 13: Technical Specification June 2021

13

InternalFinishes

Basement Changing & Shower Areas

Existing external basement walls upgraded with waterproofing render and a new insulated cavity construction to achieve a u-value of 0.24w/m2K.

The new external grade wall, constructed in the existing car park to contain the new lobby and changing area is an insulated timber frame construction with a blockwork outer face. The construction achieves a u-value of 0.24w/m2k.

1 MALE AND 1 FEMALE WC, 1 ACCESSIBLE WC Male and Female changing and shower areas each with 1 shower and 1 accessible shower.

FLOORING Robust decorative finish screed with aggregate included to enable safety floor finish.

WALLS Painted Moisture Resistant plasterboard.

Full height ceramic tiling to key walls and to shower enclosures.

Black laminate finish IPS unit within Male & Female WCs.

Mirrors to changing areas.

CEILING Painted moisture resistant plasterboard.

LIGHTING Recessed spotlight fittings

Page 14: Technical Specification June 2021

14

InternalFinishes

Basement Changing & Shower Areas cont.

SANITARYWARE Ideal Standard Strada basin, or equal, wall hung fitted with WRAS approved Ideal Standard Strada or equal, and Ideal Standard Sensorflow 21 compact mixer taps fitted with 3.7l/minute flow restrictors to minimise water usage.

Ideal Standard Concept range WCs with Conceala 2 cistern 6/4 litre dual flush to reduce water.

WRAS approved Alto Ecotherm thermostatic showers with eco button to allow 50% water savings.

Full Doc M fittings to Shower Room fitted with a Freedom Dual shower, 12l/min eco flow regulator in rain shower fitting and 8l/min eco flow regulator in the handspray option.

Page 15: Technical Specification June 2021

15

InternalFinishes

Basement Car Park

6 nos. parking spaces including 1 no. accessible space.

Secure access system to control gate at car park entrance.

31 floor and wall mounted cycle racks.

Cycle maintenance station.

Page 16: Technical Specification June 2021

16

Doors

RECEPTION AREA AND LIFT LOBBY DOORS Wooden doorsets with black laminate finish and glazed vision panels. Black painted frames, with facings and skirtings.

WC DOORS Wooden doorsets with black laminate finish and FSC hardwood lippings. Black painted frames, facings and skirtings.

RISER DOORS Wooden doors with concealed metal frame for a flush finish, doors have a white laminate finish.

High quality ironmongery throughout; suited locks, concealed door closers and hinges together with long format pull handles and push plates to all lobby doors.

LIFTS 2 nos. person lifts – fully replaced as part of refurbishment works.

Travel speed of up to 3.5m/s.

Floor finish to match ground floor lobby tiling.

High quality stainless steel and mirrored internal finish with fluorescent lights.

The lifts are energy saving and include intelligent energy saving measures for lift systems such as ESM (Energy Saving Management) which can reduce the yearly energy consumption of lift systems up to 50%.

Page 17: Technical Specification June 2021

17

Services

HEATING & COOLING All fittings are new as part of refurbishment works.

An electric Variable Refrigerant Flow (VRF) Air Source Heat Pump system is installed to provide heating and cooling throughout the Office spaces, within the Ground Floor Retail/Café space and the main reception area via ceiling fitted fan coil units.

The lift lobbies, WCs and basement lobby and changing areas are fitted with wall mounted radiators.

VENTILATION All fittings are new as part of refurbishment works.

Two new Air Handling Units are fitted on the roof and one at high level within the basement car park to supply filtered, tempered fresh air throughout the building.

Page 18: Technical Specification June 2021

18

Utilities

GAS The building is served by a Low Pressure (LP) Gas Supply.

ELECTRICITY The building is served by an LV supply, the incoming supply is terminated in the existing basement switchroom.

Lighting and power distribution boards are provided at each floor of office accommodation to enable connection for tenants’ fit out.

Landlord’s lighting and power distribution boards are provided within the landlord’s riser to service the common core areas.

TELECOMMUNICATIONS Multiple communications services ducts are provided to the communications intake area.

Each suite is micro-metered to provide detailed monitoring.

Page 19: Technical Specification June 2021

19

ProtectiveInstallations

FIRE DETECTION AND ALARM SYSTEM The design and installation of the fire detection and alarm system will be in accordance with the requirements of BS 5839 part 1. A category L2 system will be provided.

The fire alarm control panel has been located in the ground floor lobby. A fully automatic, analogue addressable fire alarm system has been provided, zoned and configured in accordance with the Architect’s fire compartmentation strategy.

ACCESS CONTROL An access Control system has been provided to cover the principal access and egress routes to the facility and will provide control to designated common building areas. The access control system will be provided to support the shell and core base provision but must be sufficiently flexible and have spare capacity to enable the addition of controllers to support the potential tenant fit out works. The access control server, monitoring and control equipment has been located in the basement building manager’s room.

CLOSE CIRCUIT TELEVISION An IP CCTV system has been provided. The system provides surveillance monitoring of the building perimeter, main entrance/reception, and the car park area.

INTRUDER DETECTION An intruder detection system has been provided to cover the access and egress doors to the building. Magnetic door contacts, dual technology detectors (PIR/Microwave) and passive infra-red detectors have been employed to facilitate intruder detection. Alarm confirmation technology has been used to reduce the potential for false alarms.

Control and indication equipment has been provided at the reception area. A keypad will provide the user interface.