ras laffan product flow diagram

1
[1] RG Lean and Rich LNG can be loaded on Berth2 and Berth3 [2] Lean LNG from Lot H can be loaded on Berth3 and Berth4 using transfer line [3] RG Lean LNG can be stored into LNG tanks in Lot H using interconecting/inlet distribution line [4] RG Trains-4/5 can produce Rich and Lean LNG [5] 2 Sulfur header line with electric jacket (SEEHT) Rev: 03: 4/May/08 [6] DFC can be loaded on B22 for back up in case SPM out of service Revision is still ongoing subject to new projects update available [7] PC can be loaded on B22 (and B21 using 21/22 cross connection with DEL) [8] PC can be loaded on SPM (if future provision is made in control systems) [9] With additional piping and controls future loading of LSC to SPM may be possible [10] With completion of CCS&L scope there will be not connection between LR and Berth 22 [11] LSC can be loaded on B22 (back up using 21/22 cross connection) [12] Pygas is waste product from RLOC will be loaded on Berth20. Main Product will be sent to QP Messaid via pipeline [13] RG SC will be reinjected to wells [14] RG Sulfur from Trains-4/5 are reinjected to wells [15] PC can be spiked into FC tanks and FC can be spiked into PC tanks Import Gas from QP to QG1 QG/RG Gas Export to QP QG1/AKG export to RLPC AKG Export to Messaied AKG Export to QPower Sulfur Cargo size 21,000 - 32,500 - 45,000 t Helium Container Cap. 4,000 kg Product Cargo size NFC: 500,000 US bbl DFC/LSC: 500,000 US bbl PC: 19,000 t C3: 11,000-33,000 t C4: 11,000-33,000 t OGO: 240,000 US bbl ONAP: 20,000-30,000 t SC: 1,800 sm3 RNAP 250,000 US bbl RKER 230,000 US bbl RGO 220,000 US bbl by:stampo/mwhitehead Notes 1 135.6 km3 2 135.6 km3 3 135.6 km3 RG Lean LNG (71-T05X) LNG Berth-3 LNG Berth-2 G R L N LNG Berth-1 G R L N Sulfur Berth CB101 Sulfur RasLaffan Products Flow Diagram as available Helium Truck He Tanks 56 T AKG1 Feed Gas from Offshore: 0.825 BCFD (current) 38" (share with RL2) QG1 RL1 DEL ORYX Feed Gas from RasGas: 0.2 BCFD (current) Sweet Gas Helium Gas Berth-22 QG2 QG3 QG4 RL2 RL3 AKG2 L.Refinery Feed = 146 kbbl/d (NFC). Helium LIquid CLPG Tanks Tot Net Cap (17-TXXX) 375 km3 101 C3 Tot Net Cap (17-TXXX) 330 km3 L.Refinery Products Tanks A B C A B C D 87-T7701X RNAP 87-T7704X RKER RGO Tot Net Cap: 1,259 kbbl 968 kbbl 575 kbbl L.R Feed Tanks 87- T7601 A 87- T7601 B 87-T7601 C 87- T7702 A Tot Net Cap: 2,516 kbbl CCSL Tanks (Phase-1) DFC A B C D Tot. Net Cap (73-T102X) 755 kbbl Tot. Net Cap (73-T101X) 2,264 kbbl PC A B C D A B C D A B Tot. Net Cap (73-T105X) 377 kbbl Phase-2 Tot. Net Cap (73-T103X) 2,264 kbbl LSC Tanks (143-0T0100X) A B C Tot. Net.Cap: 1,500 kbbls A B C Tot. Net.Cap: 1,500 kbbls LSC Phase-2 Oryx GTL (184-TK-00X) 184TK- 002 184TK- 001 431 kbbl 320 kt Tot Net Cap: OGO ONAP Tot Net Cap: 191-61 T-01 610 kbbl PNAP 19161T- 03 430 kbbl PGO 19161T- 02 430 kbbl PKER 101 111 S.Caustic Tanks Total Net Cap. (73-TXXX) 3.9 km3 SPM-1 Berth-20 Liquid Products Berth-21 Berth-23 Berth-24 Berth-25 QG/RG Lean LNG (27-T71OX) 1 140 km3 2 140 km3 4 140 km3 3 140 km3 5 140 km3 Lot N Lot H 87- T7702 B 87-T7705 87-T7706A 87-T7706B 87-T7703 SPM-2 LLNG 1 81.7 km3 2 81.7 km3 3 78.5 km3 4 78.5 km3 QG Rich LNG (T-710X) RLNG GTL GTL Liquid Products Liquid Products Liquid Products Liquid Products Liquid Products Liquid Products NGL/LPG Non Regulated Product Non Regulated Product Non Regulated Product Reinjection RNAP,RKER,RGO DFC LPG (C3&C4) PC LSC ONAP,OGO PNAP PKER PGO NFC SULF 11-T8601 A/ B Molten Storage Tanks Tot Net Inv: 11,5 kt Common Sulfur Storage (11- XK- 4102) Design Cap: 230 kt Tot.Net Inv: 192 kt Ship Loader (2 ea): 3700 t/h (each) Granulation Sulfur Truck BARZAN RasLaffan Olefin Company x PBO RLOC PC Deodorized FC Untreated FC AKG1 & LR [12 ] [3] [1] [2] [5] [13] SC [4] PLUB (16 tanks) T- 8671 - T8687 Tot Net Cap: 202 kt PDSO 19197T- 01 9.4 kt DSO BO PDSO PYGAS G N L L LNG Berth-4 G N L L LNG Berth-5 G N L L LNG Berth-6 G N L L Sour Gas (Export/Import) UNDER CONSTRUCTION UNDER CONSTRUCTION UNDER CONSTRUCTION [14] 6 transfer tanks [15] T8661 16 kt PPAR PPAR [BiDi] [BiDi] 1 135.7 km3 2 135.6 km3 3 135.6 km3 RG Rich LNG (71-T00X) Feed Gas from Offshore: 1.6 BCFD (current). Trains-1/2/3 Pipeline: 32" Feed Gas from Offshore: 3.0 BCFD (Planned) Trains-4/5 (Sep-8/Apr-9) 38"(Tr-4), 34"(Tr-5) Feed Gas from Offshore: 1.5 BCFD (Planned) Train-6 (1Q-09) 38" Feed Gas from Offshore: 1.5 BCFD (Planned) Train-7 (4Q-09) 38" Feed Gas from Offshore: 1.6 BCFD (current) Trains-1/2 32" Feed Gas from Offshore: 4.0 BCFD (current) Trains-3/4/5 38" (share with AKG1) Feed Gas from Offshore: 3.2 BCFD (Planned) Trains-6/7 (Aug-8/Aug-9) 38" Feed Gas from Offshore: 1.45 BCFD (planned) RFO: Feb-09 38" Feed Gas from Ofshore: 2.6 BCFD(current/planned) 2 x 36" PEARL Feed Gas from Offshore: 1.98 BCFD (planned) RFO: Oct-09 (TBC) 2 x 30" stand by for RLPC only LSC B 21 / 22 cross connect @ Jetty 1 001 021 102 C4 002 022 LPG LSC Acid Gas [8, 9] [7, 11] [10] [6]

Upload: neruda

Post on 26-Sep-2015

15 views

Category:

Documents


3 download

DESCRIPTION

PFD

TRANSCRIPT

  • [1] RG Lean and Rich LNG can be loaded on Berth2 and Berth3

    [2] Lean LNG from Lot H can be loaded on Berth3 and Berth4 using transfer line

    [3] RG Lean LNG can be stored into LNG tanks in Lot H using interconecting/inlet distribution line

    [4] RG Trains-4/5 can produce Rich and Lean LNG

    [5] 2 Sulfur header line with electric jacket (SEEHT)Rev: 03: 4/May/08 [6] DFC can be loaded on B22 for back up in case SPM out of service

    Revision is still ongoing subject to new projects update available [7] PC can be loaded on B22 (and B21 using 21/22 cross connection with DEL)

    [8] PC can be loaded on SPM (if future provision is made in control systems)

    [9] With additional piping and controls future loading of LSC to SPM may be possible

    [10] With completion of CCS&L scope there will be not connection between LR and Berth 22

    [11] LSC can be loaded on B22 (back up using 21/22 cross connection)

    [12] Pygas is waste product from RLOC will be loaded on Berth20. Main Product will be sent to QP Messaid via pipeline

    [13] RG SC will be reinjected to wells

    [14] RG Sulfur from Trains-4/5 are reinjected to wells

    [15] PC can be spiked into FC tanks and FC can be spiked into PC tanks

    Import Gas from QP to QG1QG/RG Gas Export to QPQG1/AKG export to RLPCAKG Export to MessaiedAKG Export to QPower

    Sulfur Cargo size21,000 - 32,500 - 45,000 t

    Helium Container Cap.4,000 kg

    Product Cargo sizeNFC: 500,000 US bblDFC/LSC: 500,000 US bblPC: 19,000 tC3: 11,000-33,000 tC4: 11,000-33,000 tOGO: 240,000 US bblONAP: 20,000-30,000 tSC: 1,800 sm3RNAP 250,000 US bblRKER 230,000 US bblRGO 220,000 US bbl

    by:stampo/mwhitehead

    Notes

    1135.6 km3

    2135.6 km3

    3135.6 km3

    RG Lean LNG (71-T05X)

    LNG Berth-3LNG Berth-2

    GR L N

    LNG Berth-1

    GR L N

    Sulfur B

    erth CB

    101

    Sulfur

    RasLaffan Products Flow Diagram

    as available

    Helium

    Truck

    He Tanks56 T

    AKG1

    Feed Gas from Offshore: 0.825 BCFD (current)

    38" (share with RL2)

    QG1

    Feed Gas: 1.6 BCF

    RL1 DEL ORYX

    Feed Gas from RasGas: 0.2 BCFD (current)

    Sweet Gas

    Helium Gas

    Berth-22

    QG2

    Feed Gas: 1.6 BCF

    QG3

    Feed Gas: 1.6 BCF

    QG4

    Feed Gas: 1.6 BCF

    RL2 RL3 AKG2

    L.Refinery

    Feed Gas: 1.6 BCFFeed = 146 kbbl/d (NFC).

    Helium LIquid

    CLPG Tanks

    Tot Net Cap (17-TXXX) 375 km3

    101

    C3

    Tot Net Cap (17-TXXX) 330 km3

    L.Refinery Products Tanks

    A

    B

    C

    A B

    C D

    87-T7701XRNAP

    87-T7704XRKER

    RGO

    Tot Net Cap: 1,259 kbbl 968 kbbl 575 kbbl

    L.R Feed Tanks

    87-T7601 A

    87-T7601 B

    87-T7601 C

    87-T7702 A

    Tot Net Cap: 2,516 kbbl

    S.Caustic Tanks CCSL Tanks (Phase-1)

    DFC

    A B

    C D

    Tot. Net Cap (73-T102X)

    755 kbbl

    Tot. Net Cap (73-T101X) 2,264 kbbl

    PC

    A B

    C D

    A B

    C D

    A B

    Tot. Net Cap (73-T105X)

    377 kbbl

    Phase-2 Tot. Net Cap (73-T103X) 2,264 kbbl

    LSC Tanks (143-0T0100X)

    A B C

    Tot. Net.Cap: 1,500 kbbls

    A B C

    Tot. Net.Cap: 1,500 kbbls

    LSC

    Phase-2

    Oryx GTL (184-TK-00X)

    184TK-002

    184TK-001

    431 kbbl320 kt

    Tot Net Cap:

    OGOONAP

    Tot Net Cap:

    191-61T-01

    610 kbbl

    PNAP

    19161T-03

    430 kbbl

    PGO

    19161T-02

    430 kbbl

    PKER

    101

    111

    S.Caustic Tanks Total Net Cap.

    (73-TXXX) 3.9 km3

    SPM-1Berth-20

    LiquidProducts

    Berth-21 Berth-23Berth-24 Berth-25

    QG/RG Lean LNG (27-T71OX)

    1140 km3

    2140 km3

    4140 km3

    3140 km3

    5140 km3 Lot NLot H

    87-T7702 B

    87-T7705

    87-T7706A

    87-T7706B

    87-T7703

    SPM-2

    LLNG

    181.7 km3

    281.7 km3

    378.5 km3

    478.5 km3

    QG Rich LNG (T-710X)

    RLNG

    GTL

    GTL

    LiquidProducts

    LiquidProducts

    LiquidProducts

    LiquidProducts

    LiquidProducts

    LiquidProducts

    NGL/LPG

    Non Regulated Product

    Non Regulated Product

    Non Regulated Product

    Reinjection

    RNAP,RKER,RGO

    DFC

    LPG (C3&C4)

    PC

    LSC ONAP,OGOPNAPPKERPGO

    NFC

    SULF

    11-T8601 A/ BMolten Storage

    TanksTot Net Inv:

    11,5 kt

    Common Sulfur Storage

    (11- XK- 4102)

    Design Cap: 230 ktTot.Net Inv: 192 kt

    Ship Loader (2 ea): 3700 t/h (each)

    Granulation

    Sulfur Truck

    BARZAN

    RasLaffan Olefin Company

    x

    PBO

    RLOC

    PC Deodorized FC

    Untreated FC

    AKG1 & LR

    [12 ]

    [3]

    [1][2]

    [5]

    [13]SC

    [4]

    PLUB (16 tanks)T- 8671 - T8687

    Tot Net Cap: 202 kt

    PDSO

    19197T-01

    9.4 kt

    DSO BO

    PDSO

    PYGAS

    GNLL

    LNG Berth-4

    GNLL

    LNG Berth-5

    GNLL

    LNG Berth-6

    GNLL

    Sour Gas (Export/Import)

    UNDER CONSTRUCTION

    UNDER CONSTRUCTION UNDER CONSTRUCTION

    [14]

    6 transfer tanks

    [15]

    T8661

    16 kt

    PPAR

    PPAR

    [BiDi][BiDi]

    1135.7 km3

    2135.6 km3

    3135.6 km3

    RG Rich LNG (71-T00X)

    Feed Gas from Offshore: 1.6 BCFD (current).Trains-1/2/3Pipeline: 32"

    Feed Gas from Offshore: 3.0 BCFD (Planned)Trains-4/5 (Sep-8/Apr-9) 38"(Tr-4), 34"(Tr-5)

    Feed Gas from Offshore: 1.5 BCFD (Planned)Train-6 (1Q-09)38"

    Feed Gas from Offshore: 1.5 BCFD (Planned)Train-7 (4Q-09)38"

    Feed Gas from Offshore: 1.6 BCFD (current)Trains-1/232"

    Feed Gas from Offshore: 4.0 BCFD (current)Trains-3/4/538" (share with AKG1)

    Feed Gas from Offshore: 3.2 BCFD (Planned)Trains-6/7 (Aug-8/Aug-9)38"

    Feed Gas from Offshore: 1.45 BCFD (planned)RFO: Feb-0938"

    Feed Gas from Ofshore: 2.6 BCFD(current/planned)

    2 x 36"

    PEARL

    Feed Gas from Offshore: 1.98 BCFD (planned)RFO: Oct-09 (TBC)2 x 30"

    stand by for RLPC only

    LSC

    B 21 / 22 cross connect @ Jetty 1

    001 021

    102

    C4

    002 022

    LPG LSC

    Acid Gas

    [8, 9]

    [7, 11] [10]

    [6]