Overview Thirty three (33) years of  project management which includes : Contracting and engineering design Construction and installation, Pre-commissioning, commissioning Safety management Instrumenmtation & Electrical EPC management

28 years of which were in the oil, gas and shipping industry and EPC projects that include the following:  QHSSE management, conceptual, feasibility and risk and safety assessment studies, FEED and detailed safety and process control design engineering, procurement, planning, organizing, QA /QC, construction, offshore installation, modification, upgrades, pre-commissioning, start-up and commissioning, drilling operations coordination.

Experienced production operator and maintenance of international projects and gas plant operations for onshore & offshore oil and gas facilities. Said facilities cover FPSO, FLNG, gas plant, terminal, oil refinery, petrochemical and oil gathering station operations, and offshore topsides with accommodation platforms.

Thirty three (33) years of  project management which includes : Contracting and engineering design Construction and installation, Pre-commissioning, commissioning Safety management Instrumenmtation & Electrical EPC management

28 years of which were in the oil, gas and shipping industry and EPC projects that include the following:  QHSSE management, conceptual, feasibility and risk and safety assessment studies, FEED and detailed safety and process control design engineering, procurement, planning, organizing, QA /QC, construction, offshore installation, modification, upgrades, pre-commissioning, start-up and commissioning, drilling operations coordination.

Experienced production operator and maintenance of international projects and gas plant operations for onshore & offshore oil and gas facilities. Said facilities cover FPSO, FLNG, gas plant, terminal, oil refinery, petrochemical and oil gathering station operations, and offshore topsides with accommodation platforms.

Page 3: Psm Cv Presentation 3  2012

Overview Continued

Led and organized a team of people of various nationalities, including multi-discipline engineers (mech., piping, elec., civil, structural, instr. and process), who worked on different projects in FEED, detailed design, contract administration, construction and commissioning activities; assured the flow and completion of work schedule in these projects; monitored expenditures, organizational targets, delivery schedules; and ensured that such projects were implemented with strict compliance for safety, quality and environment  standards.

Lecturer/ Trainer /Resource Speaker/ facilitator for international and local events, conferences and workshops for oil and gas topics including EPCM project management, FPSO and Floating LNG risk assessment, HAZID/HAZOP studies, instrumentation and electrical control, I&E safety, project controls, safety systems, leadership and QC management.

Led and organized a team of people of various nationalities, including multi-discipline engineers (mech., piping, elec., civil, structural, instr. and process), who worked on different projects in FEED, detailed design, contract administration, construction and commissioning activities; assured the flow and completion of work schedule in these projects; monitored expenditures, organizational targets, delivery schedules; and ensured that such projects were implemented with strict compliance for safety, quality and environment  standards.

Lecturer/ Trainer /Resource Speaker/ facilitator for international and local events, conferences and workshops for oil and gas topics including EPCM project management, FPSO and Floating LNG risk assessment, HAZID/HAZOP studies, instrumentation and electrical control, I&E safety, project controls, safety systems, leadership and QC management.

Page 4: Psm Cv Presentation 3  2012

PositionSenior Project Engineer/ HSSE/ I&E

/Commissioning Engineer

Special Skills:

My personal attributes includes the following:

Excellent interpersonal skills, team-building and communication skills coupled with pragmatism/ flexibility to build good relationship with clients and people of different cultures and discipline; have a sense of urgency; goal and task oriented; posses leadership, initiative and strong motivation; very resourceful, high moral values and dedication to the work and to the project in particular .. Proactive and common sense approach to decision making and time management. Always organized, able to take the lead in tough situations, sensitive to the needs of others, and doing the best quality and safety to deliver multi-tasks on time within the budget.

Page 5: Psm Cv Presentation 3  2012

Contact InformationHome Address:

14 Kalantiao St., Novaliches, Caloocan City, Philippines

Home Tel./ Fax No. +632 753 8227

CP +63 921 485 0490

E mail: [email protected] or [email protected], website: http://ph.linkedin.com/in/patrickmuga

skypeID: psmuga9

Page 6: Psm Cv Presentation 3  2012

Projects Successfully Completed Saudi Arabia : Maintenance, construction and commissioning in Aramco and SCECO

modification projects. Libya; Zueitina Oil Company- Zella and Fidda facilities- Natural Gas Plant Projects. Malaysia; PETRONAS / Conoco-Phillips-West Natuna-Duyong gas tie-in Project,

Exxon Mobil Nigeria - YOHO Topsides Project and EPMI Larut A Topsides project(800 million Dollar project), Shell SSB & SSPC Technical Integrity IR Project (350 Million USD project)

Singapore; Shell Malampaya oil and gas production topsides Project (Upstream cost 2 billion USD)

Myanmar; Premier  Oil ,Yetagun Topsides -Oil and Gas Production Platform Project. Indonesia; Conoco- Phillips – Wellhead Platform and FPSO Belanak Project. Vietnam; JVPC (Japan Vietnam Petroleum Corp.) Topsides Oil and gas platform

Randong I Project. Azerbaijan; AIOC, BP (British Petroleum), Central and West Azeri Topsides and

drilling offshore platform Project. China;  Bayer Polymers Petrochemical Facilities INFRA II Project (polycarbonate &

polyurethane production). Angola: Chevron onshore Malongo terminal facilities Kerosene Tank  Project, Esso

FPSO (Kiz A and B) offshore multi-discipline brown field maintenance support projects, Sonangol SNLPP Block 3 offshore Fire and Gas system upgrade, and PAC F4 /F1 Infill project, Chevron Block 14 BBLT offshore flotation water  treatment project, and Sonangol Refinaria De Luanda onshore Refinery Boiler Upgrades Project.

Philippines: NIDO Petroleum Oil production facility (AQ Vantage Rig Tindalo 1 offshore facility)

Page 7: Psm Cv Presentation 3  2012

Career summary and Capabilities:

Project and Contract Management:

Fifteen (15) years managing, facilitating, coordinating and assisting project team and contract administration for brown field and capital projects. Monitor and evaluate subcontract administrators on the following :

Prepare and review technical bid specifications and proposals, CTR’s, vendor data, resources, and liaise with clients, designers, PMT, vendors and subcontractors.

Budget control, Close-out of Subcontractor commercial issues. Identify back charges and ensure notification to affected parties. Identification of insurance claims. Issue of Field or Site Instructions. Input to management of change, schedule change, and progress evaluations. Ensure full understanding, implementation and full compliance with prevailing

company and country pertinent rules and regulations. Provide weekly status on contractual issues to senior management, and

recommend innovation to improve operation and minimize cost without compromising safety, productivity and environmental standards.

Page 8: Psm Cv Presentation 3  2012

Career summary and Capabilities continued:

Project safety, pre-commissioning and Commissioning:

Management/Supervision of up to 300 multi-discipline / multi-cultural Engineers and Technicians with experience on construction, pre-commissioning and commissioning of instrumentation and control systems, including supervision of engineers; safety management, mechanical alignments, motor and transformer tests, hydro testing, leak testing, pigging, cleaning, flushing, blowing, flooding, re-instatement, preservation, vendor equipment, start-up and testing, etc., QA/QC, procedure development, operations supervision, maintenance coordination, punch listing for pipe specifications, equipment and vessel completion, drawings, operator training.

Commissioning Management experience includes the following:

Preparing monthly/weekly reports and continuous progress monitoring of projects; Interaction and coordination amongst various stakeholders, managers, clients, contractors, third

party consultants and government agencies; Conduct frequent site visits to monitor method of execution, safety and progress of project works

as well as decision-making and authority that includes contracting issues, safety, quality assurance, management of change, and schedule. Familiar with ExxonMobil, PETRONAS, Total and Shell project process roadmap for value assurance and governance.

Develop plans for safety talks, tool box talks and development of site HSE Procedure and guideline, and Communicate HSE policies, guidelines and standards to all staff through presentation.

Prepare and supervise pre-commissioning and commissioning procedures.

Page 9: Psm Cv Presentation 3  2012

Career summary and Capabilities continued:

Instrumentation Design and HSE Engineering Mentor

Manage, prepare and ensure specifications and design basis for instrument and control systems applicable codes and standards

Supervise Contractors to validate integrated control and safety system architecture and design, ensuring that it meets legislation, codes standards and client requirements.

Ensure instrumentation and data communications system specifications and technical requisitions correctly define client requirements to meet project design objectives for control performance and reliability and that test inspection and other requirements are appropriately defined.

Complete instrument and control design work and deliverables in accordance with schedule and budget. - Ensure design interfaces are correctly managed with other disciplines in the Project Management Team

Supervise /coach junior engineers including development of National staff . Participate in safety and risk studies including HAZID, and HAZOP.

Provided lecture and training pertaining to safety, risk assessment, instrumentation, project management to local engineers and technicians for 25 years.

Page 10: Psm Cv Presentation 3  2012

Achievements:

  Received certificate of Appreciation from Top link Event organizers(JB Malaysia) for the

successful presentation of “Measuring, monitoring and improving project performance” as a guest speaker for the Successful Project Management conference held at Corus Hotel KL Malaysia, Sept.27,2010

Received certificate of Appreciation from Red Carpet Events Pte Ltd.(Singapore) for the successful presentation as a guest speaker for the World round Shape FPSO Platform for Offshore Oil and Gas Conference 2010 (22 April 2010). Topics presented was Risk Assessment and Hazop on an FPSO, and Reducing Hazards and Operability problems.

Received commendation Petronas CARIGALI HUC, Operations and SARKU management for the successful first gas project completion held last August 8, 2002 (West Natuna- Duyong gas Tie- in Project) witnessed by both Indonesia and Malaysia Head of state . A fast tract project completed on time , with simultaneous production and construction activities.

Received certificate of Appreciation from Malaysian Shipyard Engineering (MSE) and Esso Production Malaysia Inc. (EPMI)- Larut-A CPP) Project Management, acknowledging the contribution for the participation, dedication and tireless efforts (as Lead commissioning engineer) in achieving high standards of quality and promoting the maintenance of safety throughout the project execution up to the successful scheduled load-out. Completed 81% onshore pre-commissioning and commissioning of the Topsides Platform. One of the most satisfying aspects of the Larut development is that it was the safest project in ExxonMobil’s history in Malaysia. Over 4.6 million work hours were completed over a four year period without a single employee or contractor Lost Time Injury.

Received commendation for preparing technical proposals which includes preparation and implementation of Almutawa Company Policy, maintenance standard manual, safety and Loss prevention Manual, QC manual, and securing several awarded contracts from Aramco and Sceco for oil & gas refinery maintenance; during the three years as senior E&I, safety & contracts engineer.

Philippine Asst. Electrical Engineering. Board exam. result released 1984 with 82.4 % board rating.

Page 11: Psm Cv Presentation 3  2012

Educational Attainment:

College Degree : BS Electrical Engineering. Cebu Institute of Technology, 1979 Graduate.

: BS Electronics and Comm. Eng'g, Cebu Institute of Technology, 1988 Graduate : Masters in Eng’g CIT, 1983 , (undergraduate)

Professional Licensure : Registered Electrical Engineer. Philippine Registration No. 0025580

Past Member IEEE ( Institute of Elect.& Electronic Engrs.) member no. 3963485

Professional Drivers license - Philippines, Malaysia, Indonesia and Libya Holder of Petronas Malaysia Offshore safety passport Member-Consultant, Society of Industry Leaders ISNetworld ID No. 01541922 Member LinkedIn: http://ph.linkedin.com/in/patrickmuga

Page 12: Psm Cv Presentation 3  2012

Training Safety Instrumented Systems (SIS) Fundamentals Presentation for Management (ETC), Dec 19, 2011 SASBU Offshore Water Injection Quality and Facilities Overview. CABGOC angola Nov.4, 2011 Managing Process Safety in OE & Mgt. of Change (MOC) Training for Managers CABGOC Nov.11,2011 Chevron Project Management Dev. and Execution Process Training, CABGOC Angola, 18 Oct.2011 Environmental Management, Mod 1: General Awareness, Geology & Exploration Process Oct.28, 2011 Electrical Safe Work Practice, Chevron (SOP 43) CABGOC Cabinda Angola, August 1-3, 2011 H2S training, Business Conduct Code Ethics Code, CABGOC Cabinda Angola, 19 July 2011 Essentials for Enterprise Excellence, WFT health and safety, Weatherford Philippines, Oct, 2010 BOSIET, HUET and H2S Training, CTSI Manila Philippines, (OPITO accredited) Oct 20 to Oct.22. 2010 Successful Project Management in Energy, Power & Utilities Industry, Malaysia, Sept-30 2010 Project Management on line Training, PRW Malaysia Jan. 2010 Fire and Gas systems mapping and survey SSB,Lutong Malaysia Oct, 2009 Contracts administration and Management, Ranhill Worley, Malaysia Sept.17, 2009. Offshore Onshore Oil and Gas HSE Training, ( HSEMS OHSAS 18001) Philippines Mar 30, 2009 Safety training : LNG safety, PTW, H2S, compliance , Risk assessment, Habitat & accident investigation H2S Training, Boat transfer compliance, Swing rope compliance, Chevron, Angola 14 Nov.2007 HUET and sea survival training, Sonangol training center, Luanda Angola, Jan 2007. INTOOLS Basic operations training, Bayer Integrated site, Shanghai China, Nov-27, 2005 Primavera P3 (Computer aided Construction Project management) Manila, 14 Feb,2005 Several Safety Induction Training , BOSET, HUET, Permit to work system 2003 Construction Project Management (Planning, organizing, Scheduling and control) 21 Feb.,01 Programmable Logic Controllers (PLC) Allen Bradley 5/15, Zueitina Oil Company, Libya 1996 Electrical Energy Efficiency, U.P. ( University of the Philippines) Diliman Q.C. July, 1994 Maintenance Management Course, People Management: Counseling U.P. Feb. 1989 Security Systems, SENELCO, Madrid Spain, April 1986