Page 1: Presented to: By: Date: Federal Aviation Administration Multifunction Phased Array Radar PAR Work Group Magda Batista-Carver June 21, 2007 Radar Operations

Presented to:

By:

Date:

Federal AviationAdministrationMultifunction Phased

Array Radar

PAR Work Group

Magda Batista-Carver

June 21, 2007

Radar Operations and Maintenance (O&M) Cost Data Collection and Analysis Update

Page 2: Presented to: By: Date: Federal Aviation Administration Multifunction Phased Array Radar PAR Work Group Magda Batista-Carver June 21, 2007 Radar Operations

2 2Federal AviationAdministration

MPAR Existing Radar O&M Cost UpdateJune 21, 2007

Radar O&M Cost Data Collection

• Being developed in response to MPAR Working Group Action Item # 2007-1.2, “Complete life cycle cost analysis for legacy radar systems”

Page 3: Presented to: By: Date: Federal Aviation Administration Multifunction Phased Array Radar PAR Work Group Magda Batista-Carver June 21, 2007 Radar Operations

3 3Federal AviationAdministration

MPAR Existing Radar O&M Cost UpdateJune 21, 2007

Purpose

• Form key input for overall cost benefit analysis for MPAR Business Case

• Systems to be included – 171 WSR-88Ds (NEXRAD)– 47 Terminal Doppler Weather Radars (TDWR)– 135 ASR-9s/Mode-S– 149 ASR-11s– 118 Long Range Radars (LRR)

• ARSR-1 through 4• FPS-20/60

Page 4: Presented to: By: Date: Federal Aviation Administration Multifunction Phased Array Radar PAR Work Group Magda Batista-Carver June 21, 2007 Radar Operations

4 4Federal AviationAdministration

MPAR Existing Radar O&M Cost UpdateJune 21, 2007

Methodology

• Adopt standardize Work Breakdown Structure (WBS) to ensure consistency between FAA radar and NEXRAD costs

• Collect and analyze historical data for baseline

• Projected costs include– standard inflation– failure rate estimates of major components

Page 5: Presented to: By: Date: Federal Aviation Administration Multifunction Phased Array Radar PAR Work Group Magda Batista-Carver June 21, 2007 Radar Operations

5 5Federal AviationAdministration

MPAR Existing Radar O&M Cost UpdateJune 21, 2007

Work Breakdown Structure TemplateWBS # WBS Element Methodology

5.0 In-service Management5.1 Preventative Maintenance/Certification Historical Data/Staff-loading5.2 Corrective Maintenance Included in WBS 5.15.3 Modifications N/A5.4 Maintenance Control N/A5.5 Technical Teaming N/A5.6 Watch Standing Coverage N/A5.7 Program Support Staff-loading/Historical Factor5.8 Logistics Historical Data5.9 In-Service Training Historical Data/Staff-loading

5.10 Second Level Support Historical Data/Staff-loading5.11 Infrastructure Support Historical Data/Staff-loading5.12 Flight Inspections and SIAP Development N/A5.13 System Performance Assessment N/A5.14 System Operations N/A5.15 Travel To and From Sites N/A

N/A: Requirements are not applicable

Page 6: Presented to: By: Date: Federal Aviation Administration Multifunction Phased Array Radar PAR Work Group Magda Batista-Carver June 21, 2007 Radar Operations

6 6Federal AviationAdministration

MPAR Existing Radar O&M Cost UpdateJune 21, 2007

WBS Element Examples

WBS # WBS Element Definition

5.1Preventative Maintenance

All activities associated with preventive maintenance of hardware and software, including activities specific for certification.

5.1.1Preventative Maintenance/Certification

All activities associated with scheduled FAA staff and prime contractor conducted non-recurring and recurring maintenance activities to retain a system in a specified condition. It includes all maintenance to accomplish periodic inspections, condition monitoring, critical item replacements, and calibration. It includes servicing requirements (e.g., lubrication, fueling, etc.), the loading of software updates, and certification activities.

5.1.1.1 ARSR-1/2

All activities associated with scheduled FAA staff and prime contractor conducted non-recurring and recurring maintenance activities performed on the ARSR type 1 and 2 LRRs.

Page 7: Presented to: By: Date: Federal Aviation Administration Multifunction Phased Array Radar PAR Work Group Magda Batista-Carver June 21, 2007 Radar Operations

7 7Federal AviationAdministration

MPAR Existing Radar O&M Cost UpdateJune 21, 2007

Challenges

• Inability to collect detailed cost information• Inability to breakout corrective and

preventative maintenance costs• Inconsistent terminology• Collecting and integrating NEXRAD tri-

agency cost information

Page 8: Presented to: By: Date: Federal Aviation Administration Multifunction Phased Array Radar PAR Work Group Magda Batista-Carver June 21, 2007 Radar Operations

8 8Federal AviationAdministration

MPAR Existing Radar O&M Cost UpdateJune 21, 2007

Status

Radar Status DescriptionLong Range Radar (ARSR-

1/2/3/4, FPS 20/60)April 1, 2005 O&M

ASR-9 December 19, 2003 SLEPASR-11 September 9, 2005 O&M TDWR January 23, 2006 SLEP

NEXRAD In Progress Mixed

Page 9: Presented to: By: Date: Federal Aviation Administration Multifunction Phased Array Radar PAR Work Group Magda Batista-Carver June 21, 2007 Radar Operations

9 9Federal AviationAdministration

MPAR Existing Radar O&M Cost UpdateJune 21, 2007

NEXRAD Team Composition

• National Oceanic & Atmospheric Administration– Tim Crum– Marty Williams– Russ Cook

• Department of Defense– Mike Spaulding

• Office of Federal Coordinator for Meteorology– Mark P. Weadon

• Federal Aviation Administration– Magda Batista-Carver

Page 10: Presented to: By: Date: Federal Aviation Administration Multifunction Phased Array Radar PAR Work Group Magda Batista-Carver June 21, 2007 Radar Operations

10 10Federal AviationAdministration

MPAR Existing Radar O&M Cost UpdateJune 21, 2007

NEXRAD Unique Cost Factors

• Archival costs• NEXRAD Radar Operations Center (ROC)• Product Improvement Categories

– Performance Enhancement (e.g., Dual Polarization, Radar Product Generator Refresh, etc.)

– Obsolescence– Reliability (e.g. Open Radar Data Acquisition

(ORDA), trigger amplifier, etc.)

Page 11: Presented to: By: Date: Federal Aviation Administration Multifunction Phased Array Radar PAR Work Group Magda Batista-Carver June 21, 2007 Radar Operations

11 11Federal AviationAdministration

MPAR Existing Radar O&M Cost UpdateJune 21, 2007

Next Steps

• O&M Cost Working Group– Continue to collect and analyze cost data– Complete final report by October 2007

• PAR Working Group– Use O&M Cost final report as a key input to a PAR

Business Case