Out of 7 Ports in Sri Lanka
only 4 major Ports can be
categorized as international
Ports (a) Colombo
(b) Trincomalee
(c) Galle
(d) Hambantota
Hambantota is the BRAND NEW
Green Field Port which
commenced her operations in
2012.
PPD KKS
Trincomalle
Oluvil
Hambantota
Colombo
Galle
Matara-Katharagama Road(Previous)
Matara-Katharagama
Road(Newly diverted)
Location of the Hambantota Port
Master Plan of the Hambantota Port
Industrial Zone
Phase 1
Phase II
Phase in the Future
Industrial Zone
Industrial Zone
Phase II Artificial Island-Phase II
Tank Farm
Phase I
• Total Project Cost
US$ 508 million China EXIM Bank US$ 450 million
SLPA US$ 55 million
• Project Duration –
42 months
( Jan 2008-Dec 2011)
Depth of Basin 17m
Depth & width and Length of Channel 16 m/210m/1km
General Purpose berth (two berths) 600 m
Oil Terminal (two berths) 610 m
Service Terminal 105 m
Break waters (two B/W) 1,300 m
Roads and Buildings
• Phase-I is completed
• Ro-Ro operations
commenced in June 2012.
Up to the end of Oct 2014
Ro Ro Ship arrivals 368
Transshipments – 160,457
Domestic – 59,863
Total – 220,320
0
5
10
15
20
25
302
01
2-J
un
eJu
lyA
ug
Sep
Oct
No
vD
ec
20
13
-Jan Fe
bM
rch
Ap
rM
ayJu
ne
July
Au
gSe
pO
ctN
ov
De
c2
01
4-J
an Feb
Mar
chA
pr
May
Jun
eJu
lyA
ug
Sep
Oct
No of Ships/Month RO-RO Operation(Ships Handled)
RO-RO Operation(Ships Handled)
0
5
10
15
20
25
302
01
2-J
un
e
Au
g
Oct
Dec
20
13
-Feb Ap
r
Jun
e
Au
g
Oct
Dec
20
14
-Feb Ap
r
Jun
e
Au
g
Oct
No of Ships/Month
0
50
100
150
200
250
300
350
400
20
12
-Ju
ne
Au
g
Oct
Dec
20
13
-Feb Ap
r
Jun
e
Au
g
Oct
Dec
20
14
-Feb Ap
r
Jun
e
Au
g
Oct
Cumulative ships handled
RO-RO Operations(Vehicles Handled)
0
5,000
10,000
15,000
20,000
25,0002
01
2-J
un
e
Au
g
Oct
Dec
20
13
-Feb Ap
r
Jun
Au
g
Oct
Dec
20
14
-Feb Ap
r
Jun
Au
g
Oct
No vehicles/months
0
50,000
100,000
150,000
200,000
250,000
20
12
-Ju
ne
Au
g
Oct
Dec
20
13
-Feb Ap
r
Jun
Au
g
Oct
Dec
20
14
-Feb Ap
r
Jun
Au
g
Oct
Cumulative Vehicles Handled
5.0ha
7.5 ha
Phase I Yard Phase I Yard Area 12.5 ha Storage No of Vehicle 10,000 Unit
7.5 ha
5.0ha Phase I car Yard Phase I car Yard
Phase II Yard-30.0ha
10ha
Phase II Yard 25.0 ha
Yard Area
Tank Farm-Layout
LNG TANKS(3)
AVIATION FUEL TANKS(3)
MARINE FUEL TANKS(8)
Tank Farm built on a reclaimed land of 14 ha
• This project includes 14 tanks with
80,000m3 capacity and installation
of loading arms.
Fuel Type No of Tanks Tank Capacity m3
Bunker Fuel 8 51,000
Aviation Fuel 3 23,000
LPG 3 6,000
Aviation Fuel Tanks Discussions are underway with CPC for the leasing arrangement of the Aviation fuel tanks. Capacity of three tanks are 23,00m3 and this will use for supply aviation fuel to Mattala Air Port
LPG Tanks The three LPG tanks has been Leased out to LITRO Gas Lanka by SLPA . LPG Operation already commenced by LITTRO and Bowser filling and distribution operations are currently ongoing.
Bunker Operations • The Magampura Port
Management Company Ltd (MPMC) has received the exclusive rights to operate the Tank Farm and Bunkering facility at the Hambanthota Port since 22nd June 2014 onwards and continuing successfully up to now.
• 39,777 MT of fuel has been supplied for 101 no of ships travelling in the international shipping route within this last 4 months
Bunker Operation
15
20
25
30
35
2014 July Aug Sep Oct
No of Ships/month
0
20
40
60
80
100
120
2014 July Augt Sept Oct
Cumulative ship arrivals
Bunker Operation (Fuel supplied)
7,000
8,000
9,000
10,000
11,000
12,000
13,000
14,000
20
14
-Ju
ly
Au
g
Sep
Oct
Fuel supplied/month(MT)
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
20
14
-Ju
ly
Au
g
Sep
Oct
Cumulative volume supplied(MT)
Total Ships Handling at Hambanthota Port
0
10
20
30
40
50
602012
-…
July
Au
g
Sep
Oct
No
v
De
c
20
13-J
an Feb
Mrc
h
Ap
r
May
Jun
e
July
Au
g
Sep
Oct
No
v
De
c
20
14-J
an Feb
Mar
ch
Ap
r
May
Jun
e
July
Au
g
Sep
Oct
(Ro-Ro + Bunkering) / Month
Key features of Phase II
Deepening of Channel From 16m to 17 m
Main Container Berth 838.5m
Feeder Container Terminal 460m
Multi purpose berth 838.5m
Transition Berth 208m
Dredging/Excavation 20Mn m3
Artificial Island 42.6 ha
Public Service Terminal 311m
Construction of Coffer Dam
Roads , Yards and Handling Facilities
Master Plan of the Hambantota Port
Industrial Zone
Phase 1
Phase II
Phase in the Future
Industrial Zone
Industrial Zone
Phase II Artificial Island-Phase II
Tank Farm
Industries RFP – Stage I
– Seven investors have been selected and got the cabinet approval to sign the agreement
Their Total Investment - USD 670Mn
– Three investors have signed the agreements.
Investor Industry Investment (USD )
Hambana Petrochemicals Ltd.
Sugar Refining Plant 220 million
Lanka Sugar Refinery Company (PVT) Ltd. (Shree Renuka Sugars)
Petro Chemical PET Manufacturing Plant
435 million
Thatta Cement Company (Pvt.) Ltd.
Cement Grinding and Bagging Plant
15million
Industries RFP – Stage II
• Ten (10) bidders have submitted the proposals
• Cabinet approval was granted for 05 investors
Their Total Investment - USD 1057Mn
Investor Industry Investment (USD )
Advance Surfactants India ltd Petroleum, Petrochemical & Chemicals 260 million
Laugfs Gas PLC LP Gas Terminal 20 million
Laugfs Holdings Ltd Lubricants Blending and Canning 1 million
Energy World International Ltd LNG & Power Plant 750 million
Rank Container Terminal Ltd Trans-shipment Tank Farm
(Petrochemicals - Para-Xylene) 26 million
Total Ships Handled at Hambanthota Port
0
10
20
30
40
50
602012
-…
July
Au
g
Sep
Oct
No
v
De
c
20
13-J
an Feb
Mrc
h
Ap
r
May
Jun
e
July
Au
g
Sep
Oct
No
v
De
c
20
14-J
an Feb
Mar
ch
Ap
r
May
Jun
e
July
Au
g
Sep
Oct