powerlogistics asia 2014 - navigating rough seas: challenges of logistics in oil and gas –...

27
NAVIGATING ROUGH SEAS

Upload: powerlift-events

Post on 13-Jul-2015

332 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

NAVIGATING ROUGH SEAS

Page 2: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

ABOUT THE SPEAKER

Vilasini Krishnan

Vilasini Krishnan is originally from Malaysia. She was awarded an

ASEAN Scholarship by the Singapore government and has lived,

studied and worked in Singapore for the last 15 years. Vila graduated

from the National University of Singapore in 2007 with an BSc (Hons)

in Biomedical Sciences. She started her career as a financial

journalist. For the last five years she has specialised in Oil and Gas

logistics and is currently Head of Business Development for the

Regional Projects Division at deugro Singapore. Vila is well versed in

navigating the rough seas of big ticket oil and gas projects and has

built strong client relationships with companies including

McDermott, Saipem, Subsea 7, SBM and the likes. Vila is married

with two cats, Smudgy and Tigger.

Vilasini Krishnan

Head of Business Development – Regional Project Division

deugro (Singapore) Pte Ltd

E: [email protected]

T: +65 6273 2700

M: +65 9234 0675

Page 5: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

What is supply

chain

optimization?

Page 6: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

“we wanted it

yesterday”

Roles &

Responsibilities

Expecting the

unexpected

TODAY’S AGENDA

Page 7: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

“We wanted it

yesterday”

Page 8: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

OIL AND GAS IS SPECIAL!

• Time critical – and non-conventional timelines

• Huge cost impact of failure

• Remote locations

Page 9: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

UNIQUE CHALLENGES

• Equipment breakdown

• Manufacturing delays

• Poor planning

Page 10: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

EQUIPMENT BREAKDOWN

damaged thruster

Rolls Royce Marine,

Norway

Page 11: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

MANUFACTURING DELAYS & POOR PLANNING

42” valves

Ex Petrolvalves, Italy

Cargo wrong colour –

needed repainting

Chartered vessel at port

– detention!

Page 12: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

Roles &

Responsibilities

Who, what, where, when, how…

Page 13: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

COMMUNICATION – YAY OR NAY? MINI CASE STUDY OF SHIPMENT 1

2 units of 9.2m reels

180MT & 260MT

Mobilised to Belanak Field

Page 14: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

MINI CASE STUDY OF SHIPMENT 1

Flushing of flexible pipes with fresh water

Orientation of end-fittings

Added weight

Removal of cradles

URB

Bumper Guides

Page 15: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

MISCOMMUNICATION IS THE NUMBER 1 PROBLEM

• Information not shared

• Incomplete Information

• Last minute changes

• ASSUMPTIONS!

Page 16: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

Assumptions

are termites of

relationships.

BOTTOM LINE…

Page 17: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

THE SOLUTION: SPELL OUT GREY AREAS

• Incoterms vs Shipping terms

• Client vs Supplier vs Forwarder

• Duty and Tax – Exempted?

• Original scope vs actual scope – size matters!

Page 18: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd
Page 19: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

MINI CASE STUDY OF SHIPMENT 2

1 unit of 78 MT

hammer

18m length x 3m

OD

Page 20: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

MINI CASE STUDY OF SHIPMENT 2

Lifting Drawing

Page 21: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

MINI CASE STUDY OF SHIPMENT 2

The curious case of missing stopper!

Page 22: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

Discussion with

supplier & client

Revise lifting plan

Alternative lifting

points – approved

by supplier & client

MINI CASE STUDY OF SHIPMENT 2

Page 23: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

SUCCEEDING IN OIL AND GAS LOGISTICS: FORWARDERS

• Expect the worst but hope for the best!

• Don’t bank on routines

• Be proactive: Always be updated – and always update

• Be reactive: Respond quickly

YOU SNOOZE YOU LOSE!

Page 24: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

SUCCEEDING IN OIL AND GAS LOGISTICS: CLIENTS

• Manage expectations

• Be pragmatic

• Be fair

Fast

Good Cheap

Bermuda

Triangle

Page 25: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

IF YOU FORGET EVERYTHING ELSE, DON’T FORGET…

“we wanted it

yesterday”

Roles &

Responsibilities

Expecting the

unexpected

Page 26: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

LET’S DISCUSS

QUESTION & ANSWER SESSION

Page 27: PowerLogistics Asia 2014 - Navigating rough Seas: Challenges of Logistics in Oil and Gas – Vilasini Krishnan, Deugro (Singapore) Pte Ltd

THANK YOU! deugro (Singapore) Pte Ltd

83 Clemenceau Avenue

UE Square #15-03/04

Singapore

Vilasini Krishnan

T + 65 6273 2700

F + 65 6273 7879

M + 65 9234 0675

E [email protected]