plans for 2007 arne biastoch ifm-geomar
DESCRIPTION
Plans for 2007 Arne Biastoch IFM-GEOMAR. ORCA05. Phasing with ORCA025 Phasing with NEMO‗v2 (together with KCM) MOC/tropical/Agulhas sensitivity experiments with Regional forcing or modification of individual forcing components Replacement of the 3D-restoring - PowerPoint PPT PresentationTRANSCRIPT
ORCA05ORCA05
• Phasing with ORCA025
• Phasing with NEMO‗v2 (together with KCM)
• MOC/tropical/Agulhas sensitivity experiments with
• Regional forcing or modification of individual forcing components
• Replacement of the 3D-restoring
• (Replacement of CORE forcing by DFS3)
ORCA025ORCA025
• To be determined in collaboration…e.g. DFS3 with minimal SSS restoring
• Short-term Agulhas sensitivity experiments (depending on ORCA05)
Agulhas AGRIFAgulhas AGRIF
• Get AGRIF running under MPI on NEC SX-8 (F. Svensson, NEC)
• Set up three nested versions:
• ORCA2 – AGULHAS05 testing and long-term runs
• ORCA05 – AGULHAS01 hindcasts and sensitivity experiments
• (ORCA025 – AGULHAS 1/12)
• Find a Postdoc!
Click here to apply!