plans for 2007 arne biastoch ifm-geomar

5
Plans for 2007 Plans for 2007 Arne Biastoch Arne Biastoch IFM-GEOMAR IFM-GEOMAR

Upload: unity-munoz

Post on 02-Jan-2016

36 views

Category:

Documents


6 download

DESCRIPTION

Plans for 2007 Arne Biastoch IFM-GEOMAR. ORCA05. Phasing with ORCA025 Phasing with NEMO‗v2 (together with KCM) MOC/tropical/Agulhas sensitivity experiments with Regional forcing or modification of individual forcing components Replacement of the 3D-restoring - PowerPoint PPT Presentation

TRANSCRIPT

Plans for 2007Plans for 2007

Arne BiastochArne Biastoch

IFM-GEOMARIFM-GEOMAR

ORCA05ORCA05

• Phasing with ORCA025

• Phasing with NEMO‗v2 (together with KCM)

• MOC/tropical/Agulhas sensitivity experiments with

• Regional forcing or modification of individual forcing components

• Replacement of the 3D-restoring

• (Replacement of CORE forcing by DFS3)

ORCA025ORCA025

• To be determined in collaboration…e.g. DFS3 with minimal SSS restoring

• Short-term Agulhas sensitivity experiments (depending on ORCA05)

Agulhas AGRIFAgulhas AGRIF

• Get AGRIF running under MPI on NEC SX-8 (F. Svensson, NEC)

• Set up three nested versions:

• ORCA2 – AGULHAS05 testing and long-term runs

• ORCA05 – AGULHAS01 hindcasts and sensitivity experiments

• (ORCA025 – AGULHAS 1/12)

• Find a Postdoc!

Click here to apply!

Equatorial AGRIFEquatorial AGRIF

Basis: ORCA05 or ORCA025Nest: 1/10° or 1/12°

• Setup follows Agulhas nest closely

• Set up AGRIF nest including STC/TC and Angola and Guinea Domes