  • Ian Knowles Technical Officer, PBN

    Performance-based Navigation Products and Services

  • PBN Promotional Video

  • Outline • Why implement PBN? • Global status of PBN

    Implementation

    • Why PBN Products and Services? • Products and Services Overview • Summary

    3

  • PBN BENEFITS

    REDUCES

    ENVIRONMENTAL

    IMPACT

    IMPROVES

    SAFETY

    IMPROVES

    OPERATIONAL

    EFFICIENCY

    INCREASES

    AIRSPACE

    CAPACITY

    REDUCES

    INFRASTRUCTURE

    Air Navigation Priority

    4

  • Approach procedures with vertical guidance -

    APV (Baro-VNAV) including LNAV-only minima

    for all instrument runway ends by 2016

    Assembly Resolution A37-11

    5

    Time is running out to meet the

    Performance-based Navigation (PBN) objectives of A37-11

  • GANP Highlights • ICAO focus is on development and implementation of:

    – PBN – CCO and CDO – ATFM (including runway sequencing capabilities

    (AMAN/DMAN)

    • “PBN is air navigation’s highest priority. Implementation of PBN in terminal airspace is seen as key enabler for advanced terminal operations . . .”

    6

  • GASP Highlights • The GASP has identified Runway Safety

    and Controlled Flight into Terrain (CFIT) as priorities

    • “Many safety benefits can be gained from PBN implementation” – PBN instrument approaches with vertical

    guidance (APV) can help reduce probability of runway excursions and CFIT

    7

  • Global Traffic Forecast • Air traffic is predicted to double in the

    next 15 years

    • Our collective responsibility is to allow the aviation system to safely and

    efficiently, realize this growth

    • PBN enables this growth

    3 October 2016 8

  • Current Situation

    • PBN Implementation plans • PBN Approaches

  • Global Status of PBN Implementation Plans

    PBN PLAN

    YES

    NO

    109 States

    10

  • Implementation of PBN

    Approaches

    3 October 2016 11

    Total instrument runway ends: 3454

    PBN runway ends: 2138 61.9%

    As at July 2016

  • Why ICAO Products and Services?

    12

    To provide States the necessary

    assistance to implement PBN

  • PBN Tailored Products & Services • Flight Procedures Programme (FPP) • PBN Start • PBN Training • PBN Publications and Bundles • PBN Symposia/Workshops • PBN Implementation Assistance • PBN Business Planning • PBN Financial Aid • PBN Recognitions Provided through ICAO HQ, Regional Offices,

    FPPs, ICAO Authorized Training Centers, On-

    line ICAO Store

    13

  • Flight Procedures Programme (FPP) • Assists participating States with PBN flight

    procedures, ops approvals, airspace designs

    • Asia-Pacific FPP – Beijing, China – Phase III approved – Extended another 3 years to 2020

    • African FPP – Dakar, Senegal – FPP Office established 2014 (covers all African States)

    14

  • Flight Procedures Programme (FPP)

    15

    Mid FPP – To be established January

    2017

  • PBN Start • PBN assessment of State requirements • 2-week intensive collaboration with all

    Stakeholders

    • Analyzes and evaluates all aspects - needs, issues and concerns

    • Delivers an achievable strategic plan aligned with local/regional PBN goals

    3 October 2016 16

  • PBN Training • Computer Based Training Courses (CBTs)

    • PBN Classroom Courses

    PBN Overview

    PBN Ops Approval

    PBN Airspace Design

    PBN for Pilots

    PBN for ATCOs

    (Coming Soon)

    PBN Ops Approval

    PBN Airspace Design

    IFP Design Courses

    (PBN and Conventional)

    17

  • PBN Publications and Bundles • PBN Manual (Doc 9613) 4th Edition • PBN Ops Approval Manual (Doc 9997) • Manual on PBN Use in Airspace Design (Doc

    9992)

    • RNP AR Procedure Design Manual (Doc 9905)

    • PANS Ops Volume I & II • CDO Manual (Doc 9931) • CCO Manual (Doc 9993) • Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906)

    18

  • PBN Symposia and Workshops • Organization/provision of a ICAO HQ global event to

    help all States and Stakeholders with implementation

    • Assistance in organizing local and regional events that promote PBN Implementation and education

    • Provision of subject matter experts to address specific State/Regional issues

    3 October 2016 19

  • PBN Implementation Assistance

    • Needs vary from State to State • Tailored assistance to meet a

    State’s specific needs. • Provision of necessary tools to

    assist with implementation and understanding of PBN

    3 October 2016 20

  • PBN Related Tools to assist with implementation

    • PBN related Publications and Annexes – Bundled specifically for Stakeholders – Hard and soft copies

    • CBT Training (iLearn) Available through ICAO e-store: www.store1.icao.int

    21

  • PBN Funding Coordination

    • Assistance in obtaining funding to meet a State’s implementation needs

    • Coordination with International bodies such as the World Bank, Industry partners

    and other financial institutions

    3 October 2016 22

    http://www.google.ca/url?sa=i&rct=j&q=&esrc=s&source=images&cd=&cad=rja&uact=8&ved=0ahUKEwiDiMiljufOAhXC7R4KHTQMBLoQjRwIBw&url=http://anfinancialgroup.com/business-credit-building/step-02-get-approved-for-funding/&psig=AFQjCNHIjiEXuenglt9yuopXJZvOb0OnWA&ust=1472576814140969

  • • Recognition of Compliance of Instrument Procedure Design organizations

    • To assist States with PBN Implementation

    • 11 Organizations recognized by ICAO – From 8 different States across all ICAO regions

    PBN Recognition of Compliance – IFP Organizations

    23

  • SUMMARY • PBN implementation is the #1 Air Navigation Priority • GANP and GASP highlight the importance of PBN • PBN enables many of the ASBUs • Increasing air traffic will continue to make PBN implementation even

    more important – Capacity and Efficiency • Many States have not developed a PBN implementation plan nor

    met the objectives of A37-11

    • ICAO Products and Services were developed to specifically help all States with implementation

    3 October 2016 24

  • For more information

    Contact us at :

    PBN@icao.int

    3 October 2016 25

    Or visit us at:

    http://www.icao.int/pbn

    mailto:PBN@icao.int http://www.icao.int/pbn

  • For more information

    Download the App

    3 October 2016 26

    Follow us

    #icaoPBN

  • Questions?